Exhibit J JOC IDIQ SAMPLE SUBMITTAL REGISTER.docx
DOCX document 15 KB Posted
- Solicitation number
- N62473-20-R-0019
About this file
This document contains a sample submittal register for an indefinite delivery indefinite quantity job order contract for construction projects at various government facilities within Naval Base Coronado, Naval Base Point Loma, Naval Base San Diego, and MCAS Miramar. The register lists 22 submittals or benchmarks required from the contractor prior to or during construction, including a quality control plan, safety plans, design documents, permits, insurance certificates, and operation and maintenance manuals. Offerors must provide prices for construction tasks within 21 days of award. The solicitation seeks an indefinite delivery indefinite quantity job order contract for other heavy and civil engineering construction projects at various facilities within the Naval Base Coronado, Naval Base Point Loma, Naval Base San Diego, and MCAS Miramar areas. The work will be ordered on an as-needed basis under task orders issued during the contract period of performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit I Wage Determination San Diego 013120.pdf | ||
| Amendment #2 N62473-20-R-0019.pdf | ||
| Amendment #1 N62473-20-R-0019.pdf | ||
| Exhibit B - Experience - Offeror.docx | DOCX document | |
| Exhibit A - Offeror Team Composition and Management.docx | DOCX document | |
| N62473-20-R-0019.pdf | ||
| Exhibit F Surety Form.docx | DOCX document | |
| Exhibit E Financial Questionnaire.docx | DOCX document | |
| Exhibit M CIVIL JOC NAICS 237990 PTO 0001.xlsx | XLSX spreadsheet | |
| Exhibit I Wage Determination San Diego 120619.pdf | ||
| Exhibit C - PPQ.docx | DOCX document | |
| EXHIBIT K COEFFICIENT WORKSHEET with profit language 072418.docx | DOCX document | |
| Exhibit H GENERIC UFGS Guides for projects.docx | DOCX document | |
| Exhibit G Revised RFI Form.docx | DOCX document | |
| Exhibit D Safety Data.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAMPLE SUBMITTAL REGISTER
| SUBMITTAL/BENCHMARK |
| DURATION |
| BENCHMARK |
| REQUIRED |
| STATUS |
| 1 |
| Quality Control Plan |
| Prior to |
| Start of Construction |
| 2 |
| Material Safety Data Sheets |
| Prior to |
| Start of Construction |
| 3 |
| Planning/Construction Schedule |
| Within 15 days |
| After Award |
| 4 |
| Waste Management Plan |
| Prior to |
| Start of Construction |
| 5 |
| Safety and Health Plan or Accident Prevention Plan |
| Prior to |
| Start of Construction |
| 6 |
| Utility Outage Plan |
| Prior to |
| Start of Construction |
| 7 |
| Schedule of Prices |
| Within 21 days |
| After Award |
| 8 |
| Operation and Maintenance Information |
| Prior to |
| Final Payment |
| 9 |
| Licenses and Permits |
| Prior to |
| Start of Construction |
| 10 |
| Badge Requests, DBIDS requests |
| Prior to |
| Any work on Government Property |
| 11 |
| Statement of Acknowledgement SF 1413 |
| Prior to |
| Any work on Government Property |
| 12 |
| Demolition and Work Plan |
| Prior to |
| Start of Construction |
| 13 |
| Design Development Docs (HVAC preliminary drawings of equipment and air distribution layout, structural cals and drawings, preliminary electrical single line drawings) |
| Prior to |
| Start of Construction |
| 14 |
| Final Design Docs (HVAC shop drawings of equipment and air distribution layout, structural shop drawings, electrical single line shop drawings) |
| Prior to |
| Start of Construction |
| 15 |
| Submittal Register |
| Prior to |
| Start of Construction |
| 16 |
| Performance/Payment Bonds |
| Within 15 days |
| After Award |
| 17 |
| Environmental Protection Plan |
| Prior to |
| Start of Construction |
| 18 |
| Certificates of Insurance |
| Prior to |
| Start of Construction |
| 19 |
| Door Details / Drawings |
| Prior to |
| Start of Construction |
| 20 |
| Manufacturer Material Cut Sheets and Specifications |
| Prior to |
| Start of Construction |
| 21 |
| eOMSI |
| Prior to |
| BOD |
| 22 |
| Operating and Maintenance Support Hazard Analysis |
| Prior to |
| Start of Construction |