View the file

Other files

File Type Posted
0016Amendment0002.pdf PDF
0016Amendment0001.pdf PDF
General Decision NumberKernMonoCounty.pdf PDF
20R0016 RFI Response.pdf PDF
General Decision NumberSanBernadinoCounty.pdf PDF
Exhibit F Surety Form.docx DOCX document
Exhibit G Revised RFI Form.docx DOCX document
Exhibit E Financial Questionnaire.docx DOCX document
FINAL REVISED ROOFING ELINS FOR RFP.xlsx XLSX spreadsheet
REVISED Exhibit H GENERIC UFGS Guides for projects.docx DOCX document
Exhibit A - Offeror Team Composition and Management.docx DOCX document
General Decision NumberSanBernCounty.pdf PDF
UPDATED Exhibit D Safety Data 031319.docx DOCX document
N6247320R0016RFP.pdf PDF
Exhibit C - PPQ.docx DOCX document
UPDATED Exhibit B - Experience - Offeror.docx DOCX document
Exhibit J JOC IDIQ SAMPLE SUBMITTAL REGISTER.docx DOCX document
General Decision NumberKern&MonoCounty.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO: N62473-20-R-0016

INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) CONTRACT HUBZONE

SET-ASIDE UNDER NAICS 238160 FOR NEW ROOFING WORK, ADDITIONS,

ALTERATIONS, MAINTENANCE, AND REPAIRS AT VARIOUS GOVERNMENT

INSTALLATIONS LOCATED WITHIN THE MWTC BRIDGEPORT, MCAGCC

29 PALMS, AND MCLB BARSTOW, CALIFORNIA AREA UNDER THE

NAVAL FACILITIES ENGINEERING COMMAND SOUTHWEST (NAVFAC

SW) AREA OF RESPONSIBILITY (AOR)

February 20, 2020

This amendment is issued to include the updated Exhibit D Safety Data form.

Please see updated document beginning on page 2.

EXHIBIT “D”

SAFETY DATA SHEET

This form is to be completed by the Offeror. Use this form to provide safety information for the Safety factor. EMR, DART and TRC rates shall not be submitted for subcontractors.

Joint Venture (JV) or Partnership: Complete Blocks 1 through 8 for each contractor who is part of the JV or partnership.

Only one safety narrative (Block 9) is required.

1. Offeror Name:

Name of JV partner providing the information below (if applicable):

Offeror’s Three Previous Complete Calendar Years of Reported Safety Data:

Only complete year safety data will be considered. Indicate data rates as decimal figures, not whole numbers.

2. Experience Modification Rate (EMR):

2017 2018 2019

3a. For EMRs greater than 1.0, explain any extenuating circumstances and corrective actions taken:

3b. Explain any negative EMR trends:

3c. If you do not have an EMR for a given year, state so here and explain why:

NOTE: “N/A” or “Not Applicable” is not an acceptable response. If you state your rate is Zero OR your firm does not qualify for an EMR rate, provide supporting documentation from insurance carrier.

4. Insurance Carrier Information:

Insurance Carrier Name:

Agent’s name: Phone No.: Email:

5. U.S. Dept. of Labor, OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate

2017 2018 2019

Instructions for calculating the DART rate can be found at http://www.bls.gov/iif/osheval.htm.

6a. For DART Rates of 3.0 or greater, explain any extenuating circumstances and corrective actions taken:

6b. Explain any negative DART Rate trends:

6c. If you do not have a DART Rate for a given year, state so here and explain why:

NOTE: “N/A” or “Not Applicable” is not an acceptable response. If you state your rate is Zero, provide supporting labor hours and mishap log.

Note: Form may be expanded.

http://www.bls.gov/iif/osheval.htm

EXHIBIT “D” (continuation)

SAFETY NARRATIVE

7. U.S. Dept. of Labor, OSHA Total Recordable Case (TRC) Rate 2017 2018 2019

Instructions for calculating the TRC rate can be found at http://www.bls.gov/iif/osheval.htm.

8a. For TRC Rates of 4.5 or greater, explain any extenuating circumstances and corrective actions taken:

8b. Explain any negative TRC Rate trends:

8c. If you do not have a TRC Rate for a given year, state so here and explain why:

NOTE: “N/A” or “Not Applicable” is not an acceptable response. If your state your rate is Zero, provide supporting labor hours and mishap log.

http://www.bls.gov/iif/osheval.htm

9. Technical Approach for Safety: Provide the Safety Narrative using this form. Do not exceed page limitation specified in the RFP. Any additional pages will not be considered.

Describe the plan that the Offeror will implement to evaluate safety performance of potential subcontractors, as a part of the selection process for all levels of subcontractors:

Describe the safety management system that the Offeror will use to oversee the safety compliance and performance of self-performed and subcontractor performed work:

Note: Form may be expanded up to the page limit specified in the RFP.

9. Technical Approach for Safety (continuation): Provide the Safety Narrative using this form. Do not exceed page limitation specified in the RFP. Any additional pages will not be considered.

Describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at self-performed/and or all subcontractor levels:

Describe the methodology that the Offeror will use in order to execute an effective program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps, including a description of your “Good Catch” program:

File details come from the government source that posted it. Updated .