N6247319R5000_Attachment_1_-_Annex_1503010_Custodial.pdf
PDF 334 KB Posted
- Solicitation number
- N6247319R5000
About this file
This document outlines requirements for custodial services at various Naval and Marine Corps facilities located in Arizona, California, Colorado, New Mexico, Nevada and Utah. The Navy seeks an Indefinite Delivery Indefinite Quantity (IDIQ) firm fixed price Multiple Award Schedule contract to provide recurring and non-recurring custodial work. Recurring services include space, floor, restroom and perimeter cleaning according to specified Common Output Level Standards. Non-recurring work will be ordered using FedMall task orders for requirements exceeding $500 in direct costs. The contract term is for one base year with four one-year options and has an estimated value of $30 million.
N6247319R5000_Attachment_1_-_Annex_1503010_Custodial.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6247319R5000_Sources_Sought_Notice_-_Custodial_MASC.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1503010 – Custodial
Spec Item Title
1 General Information
1.1 Concept of Operations
2 Management & Administration
2.1 Definitions and Acronyms
2.2 Personnel
2.2.1 Certification, Training, and Licensing
2.3 Special Requirements
2.3.1 Pathogen Exposure
2.4 References and Technical Documents
3 Recurring Work
3.1 Scheduled Services
3.1.1 Space Cleaning
3.1.1.1 Emptying Waste Containers
3.1.1.2 Emptying Recycling Containers
3.1.1.3 Low Area Cleaning
3.1.1.4 Lunch/Break Room Cleaning
3.1.1.5 High Area Cleaning
3.1.1.6 Interior Window Cleaning
3.1.1.7 Exterior Window Cleaning
3.1.1.8 Window Blinds Cleaning
3.1.1.9 Entrance Cleaning
3.1.1.10 Interior Glass Surfaces Cleaning
3.1.1.11 Drinking Fountains Cleaning
3.1.2 Floor Care
3.1.2.1 Sweeping and Dust Mopping
3.1.2.2 Vacuuming Carpets and Rugs
3.1.2.3 Cleaning Walk-off Mats
3.1.2.4 Spray Cleaning and Buffing
3.1.2.5 Damp Mopping
3.1.2.6 Stripping, Coating, and Buffing
3.1.2.7 Carpet and Rug Deep Cleaning
3.1.3 Restroom Services
3.1.3.1 Restroom Cleaning
3.1.3.2 Restroom Supplies
3.1.4 Group Shower/Locker Room Cleaning
3.1.5 Building Perimeter Services
3.1.5.1 Debris Removal
3.1.5.2 Emptying Perimeter Waste Containers
3.2 Custodial Services Orders
4 Non-Recurring Work
1503010 - Custodial
Spec
Item
Title Description
1 General
Information
The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to perform custodial services at various locations as required by Task
Order.
1.1 Concept of
Operations
The Concept of Operations should provide the Contractor with the general intent, scope, or services boundaries between sub-annexes if included in a multi-function or BOS contract. The
Concept of Operations should also give the Contractor insights into any interoperability requirements or any requirements included in the PWS that is not normally associated with the sub-annex, e.g., The intent of 1503010 Custodial is to specify the requirements related to the cleaning of facilities. Custodial requirements consist mainly of services that ensure the cleanliness of working environments.
The following services are not included in this Template:
Custodial services do not include any repair work of facilities or fixtures. This is included in 1502000, Facilities Investment.
Custodial services include waste removal for buildings and service locations to collection points, but disposal of waste from collection sites is addressed in 1503030
Integrated Solid Waste Management.
Removal and disposal of biohazardous waste (from areas such as medical centers) is addressed in 1800000
Environmental.
Item
Title Description
2 Management &
Administration
2.1 Definitions and
Acronyms
Definitions and Acronyms are listed in each Task Order.
2.2 Personnel The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required for efficient operations within the custodial function.
2.2.1 Certification, Training, and
Licensing
The Project Manager, Site Safety and Health Officer and other
Contractor personnel performing work where they may be exposed to blood or other potentially infectious materials shall receive pathogen training prior to beginning service. The
Contractor shall submit Pathogen Training Certificates per Task
Order.
2.3 Special
Requirement
2.3.1 Pathogen
Exposure
The Contractor shall comply with 29 CFR-1910.1030 at all times if personnel are performing work where they may be exposed to blood or other potentially infectious materials.
The Contractor shall have an established Exposure Control Plan accessible to employees. This plan shall be reviewed annually and comply with 29 CFR-1910.1030.
Employees in areas subject to higher exposure risk (such as hospitals) shall submit to all required testing and receive vaccinations as required by the installation.
2.4 References and
Technical
Documents
References and Technical Documents are listed in each Task
Order.
Item
Title Performance
Objective
Related Information Performance
Standard
3 Recurring Work The Contractor shall provide custodial services to ensure facilities are clean and sightly.
The Contractor's cleaning techniques and products shall protect the integrity of surfaces, finishes and floor coverings.
Common Output Level
Standards (COLS) are defined by Commander, Navy Installations
Command (CNIC) for
Navy Shore Commands.
Services and associated frequencies are specified for COL1, COL 2, COL 3, and COL 4, in Task Order.
The Contractor shall perform custodial services at the associated frequencies shown in Task
Customers not funded by
CNIC receive services at the associated frequencies shown by Service Class in
Task Order.
perform service at frequencies given in Task
Order, per Mandated
Service Classes for
Hospitals and Clinics and
Task Order, per Mandated
Service Classes for Child
Youth Program Facilities.
Maps and Locations for
Custodial Services are shown in Task Order and
Facilities are clean and sightly, consistent with the specified
COLS and/or service class.
Item
Title Performance
Objective
Related Information Performance
Standard
Floor Plans are included in
A Custodial Inventory is provided in Task Order, detailing floor types and surface area, fixtures, and other relevant information.
3.1 Scheduled
Services
The Contractor shall provide scheduled custodial services to ensure facilities are clean and sightly.
The Contractor shall develop and submit an
Annual Work Schedule and Monthly Work Plan for custodial services per
Task Order. The schedule shall clearly indicate the day of performance of each service for each building.
Facilities are clean and sightly, consistent with the specified
Work is completed in accordance with the Contractor’s schedule.
3.1.1 Space Cleaning The Contractor
shall clean spaces to ensure they are clean and sightly.
The Contractor shall return furniture and other items moved during performance to their original positions.
Areas designated as “Clean
Rooms” require special uniforms to be donned prior to entering and during the cleaning operation. Clean Room uniforms will be provided by the Government for use by Contractor personnel.
Areas to designated as
“Clean Rooms” are identified on the Custodial
Inventory provided in each
Task Order.
Spaces are clean and sightly consistent with the specified
Furniture and other items moved returned to original position.
Clean Rooms are maintained free of dust in accordance with clean room protocols.
Item
Title Performance
Objective
Related Information Performance
Standard
3.1.1.1 Emptying
Waste
Containers
The Contractor shall empty waste containers and ensure they are clean.
The Contractor shall collect and dispose of items placed adjacent to waste containers and marked "TRASH." Waste collection excludes individual items that exceed 20 pounds in weight.
All waste that is dropped during the waste removal process shall be picked up and properly disposed. All spills that occur during the waste removal process shall be and properly treated and cleaned.
collect all waste from desk-side waste containers and/or interior collection points unless otherwise specified based on COL as listed in Task Order.
All waste shall be moved to designated refuse containers.
Waste containers are empty and clean.
Waterproof liners are provided and replaced when soiled or unserviceable.
Services are performed at the specified frequencies.
3.1.1.2 Emptying
Recycling
Containers shall empty recycling containers and ensure they are clean.
The Contractor shall collect and dispose of items placed adjacent to recycling containers and marked "RECYCLE."
Waste collection excludes individual items that exceed 20 pounds in weight.
All recyclable material that is dropped during the removal process shall be
Recycling containers are the specified frequencies.
Item
Title Performance
Objective
Related Information Performance
Standard picked up and properly disposed.
Provide liners for plastic and glass containers.
collect all recyclable material from desk-side recycling containers and/or interior collection points unless otherwise specified based on COL as listed in
All recyclable material shall be moved to building collection site. Interior collection points and building collection sites are identified on Floor Plans included in Task Oder.
Informational Note: The
Government has found on previous contracts that collection of recyclable material two times per month has maintained services at an acceptable level.
3.1.1.3 Low Area
Cleaning
The Contractor shall provide low area cleaning services to ensure surface areas are clean.
Low area cleaning includes dusting and wiping clean all furniture and fixtures
(e.g., partitions, radiators, hand rails, grills, ledges, sills, walls, moldings, ledges, baseboards, doors, and light fixtures) to a maximum height of 7'-0" above floor level.
Surfaces are
Cleaning is
Item
Title Performance
Objective
Related Information Performance
Standard
Insert cleaning restrictions, e.g., Low area cleaning does not include desktops of occupied cubicles or offices.
Areas to receive low area cleaning are identified on the Custodial Inventory provided in task Order.
3.1.1.4 Lunch/Break
Room Cleaning
The Contractor shall provide cleaning services in lunch/break room areas to ensure areas are clean and sanitary.
Employee lunch/break room areas shall include sinks, countertops, trash containers, cooking equipment, coffee makers, and dining areas. Where present, soap and paper towel dispensers shall be refilled.
collect all waste from lunch/break room areas.
All waste shall be moved to designated refuse containers.
process shall be picked up and properly disposed.
Lunch/break room is clean and sanitary.
Lunch/break room waste containers are empty, clean, and waterproof liners have been replaced.
Dispensers are refilled and supplies are stocked.
the specified frequencies.
3.1.1.6 High Area
Cleaning
The Contractor shall provide high area cleaning services to ensure surfaces are clean.
.High area cleaning includes dusting and wiping clean all surfaces above 7'-0" from floor level (e.g., overhead piping, light fixtures, ceiling fans, vents, and ceiling areas).
The Contractor shall clean the exterior and interior
Surfaces are
Item
Title Performance
Objective
Related Information Performance
Standard surfaces of the light fixture.
ensure that overhead fixtures are protected from damage.
High area cleaning includes removal of all debris created, including debris falling into low areas.
3.1.1.7 Interior
Window
Cleaning
The Contractor shall clean window surfaces and adjacent areas to ensure that surfaces are clean and sightly.
Interior window cleaning shall be scheduled concurrently with exterior window cleaning.
All interior windows are sightly.
the specified frequencies.
3.1.1.8 Exterior
Window
Cleaning
The Contractor shall clean window surfaces and adjacent areas to ensure that surfaces are clean and sightly.
Where storm windows exist, the Contractor shall clean both sides of the storm window and the outside of the inner glass.
When screens are present, the Contractor shall remove and clean the screen such that it is free of debris and dust before reinstalling over cleaned windows. Work will not be considered complete until screens are reinstalled.
Insert applicable scheduling constraints, e.g., Exterior window cleaning shall be scheduled
All exterior windows are sightly.
Item
Title Performance
Objective
Related Information Performance
Standard concurrently with interior window cleaning.
3.1.1.9 Window Blinds
Cleaning
The Contractor shall clean window blinds to ensure they are clean and available for use in a timely manner.
Contractor shall clean both sides of blinds.
Blinds may be removed for cleaning.
Blinds are clean and in the same operational condition as prior to cleaning.
If removed for cleaning, blinds are returned to their original location within two working days.
the specified frequencies.
3.1.1.10 Entrance
Cleaning
The Contractor shall clean doors and all associated glass of the entrance to ensure doors and glass surfaces are clean and sightly.
Entrances surfaces include but are not limited to doors, associated transoms, and sidelights.
When the entry is an atrium entrance the
Contractor shall clean both sets of doors and all associated glass.
Surfaces shall be free of all dirt and provide a clear, streak-, smudge- and mark-free appearance regardless of height.
Glass surfaces are clean and sightly on both sides and for the full height of the glass.
Doors are clean and free of all dirt and marks.
the specified frequencies.
3.1.1.11 Interior Glass
Surfaces
Cleaning
The Contractor shall clean all interior glass to ensure glass surfaces are
Glass surfaces include but are not limited to interior doors, partitions, and walls.
Glass surfaces are clean and sightly on both sides and for the full height of the glass.
Item
Title Performance
Objective
Related Information Performance
Standard clean and sightly.
Surfaces shall be free of all dirt and provide a clear, streak-, smudge- and mark-free appearance regardless of height.
the specified frequencies.
3.1.1.12 Drinking
Fountains
Cleaning
The Contractor shall clean drinking fountains to ensure they are clean, sanitary, and sightly.
Drinking fountain surfaces shall be properly disinfected.
Drinking fountains are clean, sanitary, and sightly.
the specified frequencies.
3.1.2 Floor Care The Contractor
shall provide floor care services to ensure they are clean and sightly.
The Contractor shall move furniture, non-permanent rugs and other floor coverings prior to floor care services. The
Contractor shall return furniture, rugs, floor coverings, and other items moved during services to its original position.
When caring for raised deck floors, the Contractor shall ensure that all items below the floor are protected from damage.
Floor care services shall be performed in a manner that minimizes interference with daily operations.
The Contractor shall post warning signs and barricades in areas of floor care operations, as appropriate, to ensure personnel safety.
Floors are clean and sightly consistent with the specified
Item
Title Performance
Objective
Related Information Performance
Standard
Floors in Dust Free spaces shall be serviced using equipment which emit airborne particles no larger than 0.3 micrometers, and are 99.9% efficient. Dust
Free service areas are identified on the Custodial
Inventory provided in Task
Order. Equipment to be used in these spaces requires prior approval of the KO. The Contractor shall maintain equipment used in these spaces at optimum serviceability.
Equipment that cannot achieve the specified requirements shall be replaced immediately by the Contractor.
3.1.2.1 Sweeping and
Dust Mopping
The Contractor shall sweep or dust mop uncarpeted floors to ensure floors are free of debris and dust.
The Contractor shall sweep or dust mop uncarpeted floors, including stairwells and elevators.
Floors are free of debris and dust.
Services are performed at the specified frequencies.
3.1.2.2 Vacuuming
Carpets and
Rugs
The Contractor shall vacuum carpets and rugs to ensure they are free of debris and dust.
Contractor shall provide spot cleaning as needed.
Carpets and rugs are free of debris and dust.
the specified frequencies.
3.1.2.3 Cleaning Walk-
off Mats
The Contractor shall clean the walk-off mats and surfaces below the mats to ensure mats
The Contractor shall return mats to their original locations after cleaning.
The Contractor shall notify the KO when walk-off
Walk-off mats and surfaces below the mats are clean.
Item
Title Performance
Objective
Related Information Performance
Standard and surfaces are mats are defective, missing, or not serviceable.
Services are performed at the specified frequencies.
3.1.2.4 Spray Cleaning
and Buffing
The Contractor shall spray clean and buff floors to ensure floors are clean and present a sightly appearance.
The Contractor shall ensure there is no buildup or residue on baseboards, mop boards, cove base, and kick plates.
Floor products used shall result in a non-slip finish.
Floors are clean and have a uniform glossy finish.
Non-slip floors are clean and have a uniform matte finish.
the specified frequencies.
3.1.2.5 Damp Mopping The Contractor
shall damp mop floors to ensure that floors are clean.
The Contractor shall damp mop uncarpeted floors, including stairwells and elevators. Scuff marks, spots, and dried stains shall be removed.
Hospital, clinic and galley floors to be sanitized are identified on the Custodial
Inventory provided in Task
Order.
Floors are
Hospital, clinic, and galley floors are clean and sanitary.
the specified frequencies.
3.1.2.6 Stripping, Coating, and
Buffing
The Contractor shall strip, coat and buff floors to ensure that floors are clean and sightly.
shall coat floors to ensure continuous protection.
The Contractor shall strip, coat, and buff uncarpeted floors, including stairwells and elevators.
ensure there is no buildup or residue on baseboards, mop boards, cove base, and kick plates.
The Contractor shall apply sufficient coats of product
Floors are clean, free of previously applied coat, and have a uniform glossy finish.
Floors are properly coated and protected.
Item
Title Performance
Objective
Related Information Performance
Standard to protect floors from traffic and use.
Floor products used shall result in a non-slip finish.
Non-slip floors are clean and have a uniform matte finish.
the specified frequencies.
3.1.2.7 Carpet and Rug
Deep Cleaning
The Contractor shall deep clean carpets and rugs to ensure that floors are clean, sightly and available for use in a timely manner.
Acceptable methods for deep cleaning include shampooing, chemical extraction, steam cleaning, and other similar deep cleaning processes.
Carpets and rugs are clean.
Carpets and rugs are dry and passable in 12 hours.
the specified frequencies.
3.1.3 Restroom
Services
The Contractor shall service restrooms to ensure they are clean, sanitary, sightly, and stocked with sufficient supplies.
The Contractor shall inform the KO when dispensers, fixtures, and drinking fountains are damaged or missing.
The Contractor shall clean locker rooms and showers as part of restroom services.
Restrooms are clean, sanitary, and sightly consistent with the specified service class and COLS.
Restrooms are adequately stocked with restroom supplies.
the specified frequencies.
3.1.3.1 Restroom
Cleaning
The Contractor shall clean and disinfect restrooms to
All cleaning materials and equipment used in restrooms shall not be used
All restrooms are clean, sanitary, and
Item
Title Performance
Objective
Related Information Performance
Standard ensure they are clean, sanitary, and free of offensive odors.
in any other areas outside the restrooms.
Cleaning materials, including sponges, cloths, brushes, and similar items, used to clean toilets, urinals, floors, and walls shall not be used to clean showers, lavatories and sinks.
All restroom floors, walls, partitions, fixtures, mirrors, and shower areas shall be disinfected.
All graffiti from restroom surfaces shall be removed.
All waterless urinals shall be maintained in accordance with manufacturers’ recommendations, and at the frequency required by use. Waterless urinals are listed on the Custodial
Inventory provided in Task
Order.
free of offensive odors.
No graffiti present on restroom surfaces.
the specified frequencies.
3.1.3.2 Restroom
Servicing
The Contractor shall service restrooms to ensure they are stocked with sufficient supplies and waste containers are emptied.
Restroom supplies include toilet paper, toilet seat protectors, soap, and paper towels. Utilize dispenser where available.
collect all waste from all restrooms. All waste shall be moved to designated refuse containers.
Restroom supplies are filled to capacity and are available.
Restroom waste containers are empty, clean, and waterproof
Item
Title Performance
Objective
Related Information Performance
Standard process shall be picked up and properly disposed.
Services are performed at the specified frequencies.
3.1.4 Group
Shower/Locker
Room Cleaning shall provide cleaning services in group shower/locker rooms to ensure areas are clean and sanitary.
All cleaning materials and equipment used in shower/locker rooms shall not be used in any other areas outside the shower/locker rooms.
Cleaning materials, including sponges, cloths, brushes, and similar items, used to clean toilets, urinals, floors, and walls shall not be used to clean showers, lavatories and sinks.
collect all waste from all shower/locker rooms. All waste shall be moved to designated refuse containers.
process shall be picked up and properly disposed.
Shower/locker room supplies include toilet paper, toilet seat protectors, soap, and paper towels. Utilize dispenser where available.
All shower/locker rooms are clean, sanitary, and free of offensive odors.
Shower/locker room waste containers are empty, clean, and waterproof
Shower/locker room supplies are filled to capacity and are available.
the specified frequencies.
3.1.5 Building
Perimeter
Services
The Contractor shall provide building perimeter services to
The building perimeter is defined as the area within five feet from the building outside wall and shall be extended to include
Building perimeters are sightly consistent with
Item
Title Performance
Objective
Related Information Performance
Standard ensure that they are sightly.
associated porches, patios, sidewalks, and designated smoking areas as indicated on Maps and Locations shown in Task Order.
3.1.5.1 Debris Removal The Contractor
shall remove debris from the building perimeter to ensure a sightly appearance.
The Contractor shall deposit all debris in the designated waste container.
Building perimeters are clear of debris.
the specified frequencies.
3.1.5.2 Emptying
Perimeter
Waste
Containers
The Contractor shall empty perimeter waste containers and ensure they are clean.
The Contractor shall empty waste containers, excluding dumpsters, located in the perimeter area. The Contactor shall pick up all waste around the containers.
collect and dispose of items placed adjacent to waste containers.
The Contractor shall empty ash urns and refill or replace sand as necessary.
process shall be picked up and properly disposed.
Provide waterproof liners and replace when needed.
Waste containers are
Waterproof liners are provided and replaced when soiled or unserviceable.
the specified frequencies.
3.2 Custodial
Service Orders
The Contractor shall perform custodial service order work in a timely manner
The Contractor shall receive custodial service orders in accordance with the work reception requirements in Annex 2.
Custodial service order work is completed within the period of
Item
Title Performance
Objective
Related Information Performance
Standard to accomplish any custodial work identified within the entire boundary of the installation to ensure requirements are responded to and completed in accordance with specified standards.
The Contractor shall schedule and perform custodial service orders in a way that minimize disruptions to customers and Government operations.
The Government may issue custodial service orders for work requirements at any location within the defined boundaries of this contract for any reason at the discretion of the KO.
Custodial service orders will include a wide variety of work. Sample of historical custodial service order data is provided in
The Contractor has full responsibility for any work up to the custodial service order limit of liability of
$500 in direct labor and direct material cost per custodial service order.
The Government will only pay for the portion of direct labor and direct material that exceeds the custodial service order limits of liability.
The Contractor shall notify the KO upon identification that the custodial service order will exceed the specified limits of liability in accordance with reporting requirements in performance specified on the custodial service order.
Custodial service orders are signed by the original requestor or
PAR prior to being closed.
Item
Title Performance
Objective
Related Information Performance
Standard
Annex 2. If a non-recurring work is issued for the portion exceeding the specified custodial service order limits of liability, the Government will only pay for the portion of direct labor and direct material that exceeds the custodial service order limits.
Example: If a custodial service order requires $600 in direct labor and direct material cost, the
Government may issue a task order in accordance with the Non-Recurring
Work provisions of the contract for the $100 in direct labor and direct material cost that exceeds the custodial service order limit of liability.
The Contractor may invoice for completed custodial service orders.
The Contractor shall not invoice for incomplete custodial service orders and custodial service orders not issued. A modification will be process at the end of each period of performance to deduct for custodial service orders not issued and incomplete custodial service orders. Deduction will be based on the unit
Item
Title Performance
Objective
Related Information Performance
Standard prices specified in
Attachment Task Order.
submit a monthly summary of completed custodial service orders per Task
1503010 - Custodial Services
Item
Title Performance
Objective
Related Information Performance
Standard
4 Non-Recurring
Work
Non-Recurring work may be ordered utilizing DoD
FedMall in accordance with
Section H or on a task order in accordance with the
PROCEDURES
FOR ISSUING
ORDERS
clause in
Section G. The order will specify the exact locations and types of work to be accomplished.
The period of performance will be specified in each order.
Refer to Non-Recurring
Work ELINs for task listings, descriptions, and related requirements. All periods of performance are measured from issue date of order to acceptance of the work. Performance standards for Non-
Recurring work will be the same as those in Spec Item
3 where applicable.
File details come from the government source that posted it. Updated .