N6247319R1603_Specialty_JOC_RFP.pdf
PDF 2 MB Posted
- Attached to
- IDIQ JOC for Various Construction Projects
- Solicitation number
- N6247319R1603
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit_A_Offeror_Team_Composition_and_Management.docx | DOCX document | |
| N6247319R1603_SF30_Amendment_0002.pdf | ||
| Exhibit_D_Safety_Data.docx | DOCX document | |
| N6247319R1603_SF30_Amendment_0001.pdf | ||
| Website Link | — | |
| Exhibit_C_PPQ.docx | DOCX document | |
| Exhibit_B_Experience_Offeror.docx | DOCX document | |
| Click to Goto Solicitation | — | |
| N6247319R1603_Synopsis.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5614789
INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) JOB ORDER CONTRACT (JOC) COMPETITIVE 8(A) SET-ASIDE FOR SPECIALTY TRADES ADDRESSED UNDER NAICS 238990, WHICH INCLUDE (BUT ARE NOT LIMITED TO): ELECTRICAL, MECHANICAL, PAINTING, ENGINEERING/DESIGN, PAVING (ASPHALTIC AND CONCRETE), FLOORING (TILE WORK/CARPETING), ROOFING, STRUCTURAL REPAIR, FENCING, HVAC, AND FIRE SUPPRESSION/PROTECTION SYSTEM INSTALLATION AT VARIOUS INSTALLATIONS LOCATED WITHIN MARINE
CORP AIR STATION, YUMA AZ AREA OF RESPONSIBILITY.
This is a competitive Best Value Trade-Off Process Source Selection procurement that is RESTRICTED to eligible 8(a) participants as defined in section 8(a) of the Small Business Act (15 U.S.C. 637(a)) and SBA's implementing of the 8(a) Program Regulations (13 C.F.R. 124).
NAICS: 238990
Size Standard: $15.0 Million Task order range: $2,000 to $1,000,000 Minimum Contract Guarantee: $5,000
Construction Contract - Net 14 days for payment (FAR 52.232-27).
JACQUELINE CARRERA 928-269-6448
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
07-Mar-2019
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, notice to proceed. This performance period is mandatory, negotiable. (See _________________________Task Order
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________5 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All of fers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NAVFAC SOUTHWEST
YUMA ROICC/CODE ROPDY
MARINE CORPS AIR STATION YUMA
PO BOX 99129 BLDG 731
YUMA AZ 85369-9129
N62473
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
928-269-3557FAX:TEL: TEL: FAX:
N6247319R1603 176
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specified below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
N6247319R1603
Section A - Solicitation/Contract Form
SECTION A
A.1 TABLE OF CONTENTS
TABLE OF CONTENTS
(X) SEC. DESCRIPTION PAGE
PART I – SCHEDULE
X A SOLICITATION/CONTRACT FORM
X B SUPPLIES OR SERVICES AND PRICE/COST
X C DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
X D PACKAGING AND MARKETING
X E INSPECTION AND ACCEPTANCE
X F DELIVERIES OR PERFORMANCE
X G CONTRACT ADMINISTRATION DATA
X H SPECIAL CONTRACT REQUIREMENTS
PART II – CONTRACT CLAUSES
X I CONTRACT CLAUSES
PART III – LIST OF DOCUMENTS, EXHIBITS AND OTHER
ATTACHMENTS
J ATTACHMENTS AND EXHIBITS
PART IV – REPRESENTATIONS AND INSTRUCTIONS
X K REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
X L INSTRUCTIONS, CONDITIONS, AND NOTICES TO
OFFERORS
X M EVALUATION FACTORS FOR AWARD
A.2 TYPE OF CONTRACT
This is a Indefinite Delivery/Indefinite Quantity (IDIQ) contract. Refer to FAR Clause 52.216-1, Type of Contract (APR 1984) in Section L. The performance period will be for a one year base period and four one-year option periods. One contract will be awarded. The anticipated base performance period will be from TBD 1, 2019 through TBD 31, 2020.
Anticipated option period will be:
TBD 1, 2020 through TBD 31, 2021 TBD 1, 2021 through TBD 31, 2022 TBD 1, 2202 through TBD 31, 2023
TBD 1, 2023 through TBD 31, 2024
A.3 SET-ASIDE DETERMINATION
In accordance with FAR, Subpart 19.8, Contracting with the Small Business Administration (the 8(a) Program, it has been determined that competition for this procurement will be limited to 8(a) participants, with the assigned NAICS code of 238990, All Other Specialty Trade Contractors, with a size standard of $15.0 million..
A.4 STANDARD EXECUTION PROCEDURES
The NAVFAC SW Facilities Engineering and Acquisition Division (FEAD) Yuma Team is the procuring office and is responsible for all contractual matters related to the basic contract.
Individual task orders will be issued and administered by Contracting Officers at FEAD Yuma.
A.5 SUMMARY OF SOURCE SELECTION PROCESS
The Government intends to evaluate offers and award a contract without discussions (except for clarifications, as described in FAR 15.306(a)). Therefore, your initial offer should contain your best terms from a price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition, among the most highly rated proposals. Information regarding the source selection process, content of proposals, evaluation of proposals, and best value source selection evaluation criteria to be used is located in Sections L and M.
A.6 PRE-PROPOSAL CONFERENCE/SITE VISIT
No Pre-Proposal meeting is scheduled at this time. If the Government decides to hold a pre-proposal meeting, an amendment will be issued to the RFP with meeting details.
A.7 DUE DATE FOR TECHNICAL AND PRICE PROPOSALS
It is requested that all questions be received by 12:00 PM (PDT) on MARCH 25, 2019, as time may not permit responses to questions received after this.
Proposals are due by 2:00 PM local time (PST) on APRIL 8, 2019. Refer to Section A.9, for proposal delivery address. The Offeror agrees to hold its offer firm for 120 days from the date specified for receipt of proposals. See Section L, Proposal Submission Requirements for more information.
A.8 DATABASE REGISTRATION
a. System for Award Management (SAM): In accordance with FAR Clause 52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018) apply to this acquisition. See full text of clause in Section L.
All contractors must be registered in the SAM database prior to the award of a contract, basic agreement, basic ordering agreement, or blanket purchase agreement, in order to be eligible to receive an award. SAM is the primary registrant database for the U.S. Federal Government. SAM combines federal procurement systems and the Catalog of Federal Domestic Assistance into one new system. SAM includes the functionality from the following systems:
* Central Contractor Registry (CCR)
* Federal Agency Registration (FedReg)
* Online Representations and Certifications Application (ORCA)
* Excluded Parties List System (EPLS) SAM collects, validates, stores, and disseminates data in support of agency acquisition missions, including Federal agency contract and assistance awards. On-line registration instructions can be accessed from the SAM home page at: www.sam.gov.
b. VETS-4212: legislatively mandated under 38 U.S. Code, Sections 4211 and 42121 and codified at 41 CFR Parts 61-250 and 61-300, and FAR Subpart 22.13, Equal Opportunity for Veterans, the Veterans’ Employment and Training Service (VETS) has issued regulations and reporting requirements under The Vietnam Era Veterans Readjustment Assistance Act (VEVRAA) which requires Federal contractors and subcontractors to annually submit the Federal Contractor Veterans’ Employment Report VETS-4212 (“VETS-4212 Report”). VETS has a legislative requirement to collect, and make available to OFCCP, reported data contained on the VETS-4212 and/or VETS-4212A reports for compliance enforcement. On-line registration instructions can be accessed from the VETS-100 home page at: http://www.dol.gov/vets/vets4212.htm.
c. Executive Compensation: In accordance with FAR Subpart 4.14, Reporting Executive Compensation and First-Tier Subcontract Awards, and the Federal Funding Accountability and Transparency Act of 2006 (Pub. L. No. 109-282), as amended by section 6202 of the Government Funding Transparency Act of 2008 (Pub. L. 110-252), all Offerors are required to report subcontract award data and the total compensation of the five most highly compensated executives of the contractor and subcontractor. Refer to FAR Clause 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2015) in Section I. On-line registration and instructions can be accessed from the Federal Funding Accountability and Transparency Act (FFATA) homepage at: https://www.fsrs.gov/.
A.9 TECHNICAL/CONTRACTUAL INQUIRIES
Technical/contractual inquiries shall be directed to the Contract Specialist, Jacqueline Carrera, at the address listed in SF 1442, block #7, or by telephone at (928) 269-6448, or by e-mail at jacqueline.carrera@navy.mil. Inquiries not received at least ten (10) days prior to closing date for receipt of proposals may not be considered timely and may not receive a response.
A.10 POINTS OF CONTACT
The NAVFAC FEAD Yuma Team is the procuring office for this basic contract and is responsible for all contractual matters related to the basic contract.
Mailing address (US Postal Service, FedEx, or UPS delivery):
Naval Facilities Engineering Command SW Primary POC: Taz O’Brien Belcher, Contracting Officer Facilities Engineering and Acquisition DIV Phone: 928-269-2048 2878 E O’Neill Street, Building 888 Email: taz.belcher@navy.mil Yuma, AZ 85369-9129
A.11 CONTINUING RESOLUTION
Offerors are advised that funding may not become available. If funds are not available, no award will be made as a result of this solicitation. Offerors will not be reimbursed for any effort or proposal costs resulting from this solicitation.
A.12 POST-AWARD LIMITATIONS ON SUBCONTRACTING CERTIFICATION
In accordance with the provisions of FAR 52.219-14 LIMITATIONS ON SUBCONTRACTING (JAN 2017), 13 CFR 124.510, and 13 CFR 125.6, all 8(a) Contractors must agree that:
(1) In the case of a contract for services (except construction), the concern will perform at least 50 percent of the cost of the contract incurred for personnel with its own employees;
(2) In the case of a contract for supplies or products (other than procurement from a non-manufacturer in such supplies or products), the concern will perform at least 50 percent of the cost of manufacturing the supplies or products (not including the costs of materials);
(3) In the case of a contract for general construction, the concern will perform at least 15 percent of the cost of the contract with its own employees (not including the costs of materials);
(4) In the case of a contract for construction by specialty trade contractors, the concern will perform at least 25 percent of the cost of the contract with its own employees (not including the costs of materials).
In the performance of this contract, the Contractor must certify at the end of each six month period with a written determination that the Contractor will ultimately comply with the requirements listed above. The Contractor shall utilize Exhibit J Post Award Limitations on Subcontracting Report form unless otherwise instructed by the Contracting Officer.
End of Section A
Section B - Supplies or Services and Prices
SECTION B
B.1 OFFERS
1. The offeror must submit one coefficient factor for each line item below, supported by a fully completed Exhibit K Coefficient Breakdown Form with Profit Language. Refer to Paragraphs B.2, B.3, and Section L for instructions on submitting cost proposals.
CLIN DESCRIPTION
01 MARINE CORPS AIR STATION
YUMA, AZ COUNTY $10,000,000.00
(includes base period and option years)
9000 Exhibit Line Item Numbers (ELINS) FFP – Applicable for the Base year (See Exhibit A below)
ELIN FFP - Coefficient applicable to current R.S. Means (MEANS) Cost Data
COEFFICIENT
LINE ITEM DESCRIPTION COEFFICIENT
000101 Pre-priced Coefficient 000102 Non-pre-priced Coefficient
0002 PTO #0001 – Seed Project $__________
2. As detailed in Section L, for each coefficient factor provided above, the offeror shall provide a completed Exhibit K Coefficient Breakdown Form with Profit Language with the cost proposal. The breakdown shall indicate the amount of each item listed in section B.2 below contributing to the whole coefficient factor. The sum of those item contributions must add to the actual coefficient factor submitted, for each line item.
B.2 OFFEROR’S COEFFICIENT AND PRE-PRICED WORK
1. The offeror’s coefficient is a multiplier that represents costs (generally indirect costs) to be applied to the work item unit price information from the R. S. MEANS Cost Data software. The offeror’s coefficient shall account for a wide variety of risks of doing business, including but not limited to:
• Prime Contractor’s overhead and profit.
• Sub Contractor’s overhead and profit.
• Salaries of personnel required to operate and manage the contract, information technology and computer equipment required to manage the contract, off base storage facilities, offices, administrative supplies, office equipment, incidental engineering, job site supervision, vehicle operations and maintenance expenses and telephone charges.
• Bond Premiums
• Insurances
• Base labor rate mark-ups (To include lodging, per diem, escalation, etc.)
• Mobilization and demobilization (Phase-in and Phase-out Costs)
• Berthing
• Submittals and job planning
• Incidental engineering
• Company officers, site superintendents and support staff
• Quality control and inspections, to include costs associated with preparation and submittals, etc.
• Supervision and Management for Safety Requirements
• Transportation (Costs for purchase of equipment and vehicles, maintenance, operations, fuel, inspection, etc.)
• Costs associated with utility scopes, facility protection, safety
(personal protection equipment) and fire protection.
• Costs associated with compliance to security requirements
• Compliance with environmental laws (overhead (indirect)) costs associated with performing work in compliance with EPA/OSHA, and individual Station regulations, including obtaining any necessary licenses and permits, Dig Permits, outages, reporting requirements, training, etc.)
• Employer’s portion of taxes such as FICA, unemployment compensation, and fringe benefits
• Differences in Federal and State Unemployment costs, Builders Risk Insurance and Public Liability costs
• Work described in the contract that states the contractor shall perform at no additional cost to the Government: All costs associated with computer hardware/software applications.
• All costs associated with computer hardware/software to enable electronic correspondence with the Government. Production of AutoCAD requirements.
Subscription purchase in the CCB.
• Damaged Material, Waste and Excess Quantities associated with Completed-in- Place Construction Quantities. (All prices in R.S. MEANS Cost Data software are for completed-in-place construction unless explicitly described otherwise. Waste or excess material quantities are incidental costs that are included within the contract coefficient unless explicitly stated otherwise. Quantities used on individual task order proposals shall be taken from field measurement, as appropriate, without allowance for waste.)
• Customary small tools or equipment provided by the company or worker. (See Table below)
In addition to the aforementioned items, the following R. S. Means line items are not allowed in the Contractor’s estimate as pre-priced line items. Such line items should be factored into the Offeror’s coefficient:
011131.20 Construction management fees
012116.50 Contingency allowances
012155.50 Job conditions allowance
012163.10 Taxes
013113.20 Field personnel
013113.30 Insurance
013110.40 Main office expense
013113.50 General Contractor’s mark-up
013113.70 Overhead
013113.90 Performance bond
013213.50 Scheduling
015113.80 Temporary utilities
015213.20 Field office sheds and storage
015213.40 Field office expense
015409.50 Personnel protection equipment
015409.60 Safety nets
Tools and Equipment. This is a representative listing of tools and equipment that apply to the various trades. These items are indicative of, but not limited to, those that the Contractor is expected to provide as part of normal overhead cost.
Airlines (drop line) All hand tools Awl Axes Brushes Barricades, Safety Bolt cutters Barrier tape Broom Cable cutters Cable pullers/Hoist (hand held) Can Opener Calking Gun Caulking/Yarning Irons Chain Saw Chisels Clamps Cleaning Equipment (hand held) Compressor (sized as required to run tools) Conduit bender Crow Bars Dividers Drift Pins Drill, pneumatic Drill, pneumatic bits (up to 1 ¼ dia.)
Drill, Motors (hand held) Drill, Bits Drill, Hole Saw Drill, Rotary hammer (up to 1 ¼ dia.)
Extension Cords Files (hand held) Fish tapes Gloves Flash Lights Floats (hand held) Groover, Pipe (hand held) Hacksaws Hot Tap (hand held)
Hammers, hand Hammers, chipping Hammer, Jack Industrial Vacuum and Hepa Vac Jack, Hydraulic (12 tons or less) Knives Ladders (step to 12’ and extension to 24’) Lead Pot and Ladle Levels Levels, Builders Level, laser Lighting. Temporary (up to 6 each) Nailer, Pneumatic Nail Sets Picks Planes, (hand held) Planes, Electric, (hand held) Pliers Powder Actuated Fastening Tools Plumb Bob Pot Hook Personal Protective Equipment Punches Rake Rasps (files) Reinforcing steel, Shear and Bender Rivet Sets (Light, hand held) Rollers- Flooring Rules Safety Equipment (PPE) Safety fencing (orange plastic) Sanders (hand held) Saws, Hand Saws, Electric Hand, Circular Saws, Electric Hand, Reciprocating Saws, Backsaws and MiterBox
Saws, Power Miter Box Saw Horses Scaffolding, Portable. (8’ table height) Scrapers (hand held) Screw Drivers Screw Drivers, Electric Scribers Shears (hand held) Shovels Sledgehammers Squares Staplers, Air/Hand Steel Framing Tools, Lightweight Steel Framing Tampers (hand held, non- powered) Tapelines Tarpaulins (12’ X 24” maximum of 5 each) Temporary Lighting (400 square feet) Tin Slips Torch, hand Torch Igniters Trash Receptacles (35/gallon, 4 each) Trowels (non-powered, hand held) Tool Boxes (personal) Traffic cones Tubing Cutters (hand held, non-powered) Vacuum, wet/dry (5 gal) Vehicles (up to 1.5 ton) Vice Volt Meter, volt/ohm meter Wheel Barrow (non-powered) Wire Strippers Wrenches
2. The coefficient shall include all other administrative costs not specific to the task order and any other factor(s) the offeror deems necessary to cover all contingencies in connection therewith, since no allowance will be made later for additional costs.
3. The coefficient will be used in establishing the price for task orders and modifications. The coefficient is multiplied by the sum of bare costs (no O&P) for line items identified within the current edition of the MEANS Cost Data books or software that correspond to task order work items, to arrive at the total proposed cost of any given task order. The coefficient also includes any overhead and profit for subcontractors hired by the JOC Contractor. No additional compensation for using subcontractors will be paid by the Government.
4. The current edition of the MEANS Cost Data software shall be used in each year of the contract, including the most current quarterly updates for all costs. The volumes/titles within the MEANS Cost Data software to be consulted and used to identify pre-priced work items (as listed by preference below) are as follows:
Facilities Construction Cost Data Repair and Remodeling Cost Data Mechanical Cost Data Electrical Cost Data Plumbing Cost Data Building Construction Cost Data Heavy Construction Cost Data Site Work and Landscape Cost Data Interior Cost Data
As each new MEANS Cost Data software is released, it will be used for all pricing within that year, including quarterly updates. For example, if the base year occurs in 2019, the 2019 edition shall be used with the most up to date quarterly update;
upon release of the 2020 edition, all subsequent work shall be priced using the 2020 edition (and current quarterly update), until the next edition is released. For purposes of task order negotiations, the MEANS Cost Data software and current quarterly update in effect at the time the task order Request for Proposal (RFP) is due will be used for negotiating purposes. Similarly, any modifications made to a contract task order will incorporate the MEANS edition and quarterly update in effect at the time the modification RFP is due. The offeror is responsible for purchasing and maintaining its own current edition of the MEANS Cost Data software products for this purpose, and installing quarterly updates as they become available.
The City Cost Index is a multiplier used to adjust construction costs to a particular geographic location. Bare costs in the UPB represent the U.S national average. To adjust costs to a particular geographic location, the Weighted Average CCI is applied to the bare cost. The CCI for (TBD – SEE MEANS REFERENCE GUIDE) shall apply to all work under this contract. CCI rates are found in the Reference Section of the R.S. Means Cost Data Book.
5. Bare costs of line items/descriptions within the MEANS Cost Data software, by which the coefficient is multiplied to arrive at the task order proposal pricing, are “pre-priced”. Items not available with the MEANS Cost Data software, or identified below as such, are “non-pre-priced”. Line items within the Cost Data book or software which are listed under different titles with similar descriptions, but with different unit prices, or work items that could be interpreted within the software to be included by more than one line item shall be negotiated to arrive at one of the pre-priced line items within the software.
6. Coefficients will not be adjusted for any other changes or circumstances encountered during the life of the contract – the coefficients will remain unchanged throughout any given contract or option year.
7. Report proposed coefficients within the offeror’s proposal as follows: An offer of "net" would be represented by "1.0" (no cost above MEANS bare costs as described above). An example of a decrease from the bare prices listed in MEANS would be "0.90". An example of an increase above the bare prices in MEANS would be "1.10".
B.3 NON-PRE-PRICED WORK
1. Only non-pre-priced work that is incidental to pre-priced work shall be considered to be within the scope of this contract. If the value of non-pre-priced work exceeds 20% of the total task order cost it will NOT be considered incidental, and the project will not be executed under this contract.
A. Incidental non-pre-priced work may include minor facilities engineering work items that are not specifically included in the MEANS Cost Data software but that are within the basic intent and general scope of the contract and are incidental to a pre-priced work item.
B. Incidental non-pre-priced work will be negotiated on a work item-by-work item basis. MEANS or its factor used for calculating the pre-priced items will not be used to compute the cost proposal of the non-pre-priced items.
C. For non-pre-priced items, the contractor shall provide the following for each component or task required:
• Item Description
• Direct Labor Hours
• Labor Rate
• Crew size and description of personnel
• Hourly fringe benefit rate for trade performing task
• Description of proposed material
• Number of units of proposed material
• Cost per unit of material (direct bare costs only)
• Description of proposed equipment
• Time for which equipment will be required
• Rental rate for equipment (direct bare costs only) as provided in the latest version of the Army Corps of Engineers Manual EP 1110-1-8 Construction Equipment Ownership and Operating Expense applying to the location of the work (i.e. Region VII – California), unless renting new equipment, whereby vendor quotes are required.
D. Information submitted in support of non-pre-priced tasks shall include, but not be limited to, the following:
• Complete specifications and technical data, including task content, support drawings, task cost data, quality control and inspection requirements.
• Work schedule.
• Costing data shall include a cost analysis report, establishing the basis for selecting the approach proposed for accomplishment of the requirements.
Unless otherwise directed by the Contracting Officer, costing data will be submitted demonstrating that the Contractor sought and received three quotes. The Contractor shall provide an installed unit price (or demolition price if appropriate) that shall include all costs required to accomplish the non-pre-priced task.
• The total extended price for the non-pre-priced task will be determined by multiplying the unit price by the quantity required. The price offered in the proposal will be determined by multiplying the total extended price by Contractor’s non pre-priced coefficient adjustment factor.
• After a non-pre-priced item is used on three separate Task Orders, the unit price for such item will be established, following approval by the Contracting Officer, and fixed as a permanent pre-priced task that will no longer require price justification.
• The Contracting Officer’s determination as to whether an item is a pre-priced task or a non-pre-priced task shall be final, binding and conclusive as to the Contractor.
2. The pre-priced coefficient is not applied to non-pre-priced items. After the bare costs of these items have been negotiated, the non-pre-priced coefficient will be applied to the agreed to bare costs of non-pre-priced items.
B.4 CONTRACT TYPE
This is a Firm Fixed Price (FFP) Indefinite Delivery-Indefinite Quantity (IDIQ) Job Order Contract (JOC) for SPECIALTY TRADES work as defined under NAICS 238990 at various locations in the Marine Corps Air Station, Yuma, AZ area of responsibility.
B.5 MINIMUM AND MAXIMUM CONTRACT AMOUNTS
During the period specified in the ORDERING clause (DFARS 252.216-7006 [MAY 2011]), the Government shall place orders totaling a minimum of $5,000.00 for the life of the contract. The total value of this contract, including option years, shall not exceed $10,000,000. Individual task orders may not exceed $1,000,000 for the award amount.
B.6 DEPARTMENT OF LABOR WAGE DETERMINATION:
The work performed under this contract is subject to labor standards prescribed by the U. S.
Department of Labor (DOL) Construction Wage Rates (aka Davis-Bacon) Determination identified in Section J. In accordance with FAR 52.222-6, CONSTRUCTION WAGE RATE REQUIREMENTS (AUG 2018) and FAR 52.222-30 CONSTRUCTION WAGE RATE
REQUIREMENTS – PRICE ADJUSTMENT (NONE OR SEPARATELY SPECIFIED METHOD) (AUG
2018), any changes in the applicable minimum hourly rates of wages during the entire term of the contract including any option years shall not affect the unit price to be paid by the Government for work performed under this contract. A current Davis Bacon Wage Determination will be incorporated into the contract upon exercise of any option year without adjustment. More information on the DOL and SCA wage determinations can be found at the DOL's Wage Determinations On Line website: http://www.wdol.gov/Index.aspx.
B.7 BID GUARANTEE, PERFORMANCE AND PAYMENT BONDS, ADDITIONAL
BONDING REQUIREMENTS
Bonds are required for this contract. Refer to Section H, PERFORMANCE AND PAYMENT BONDS, ADDITIONAL BONDING REQUIREMENTS and Section I, FAR Clauses 52.228-1 BID
GUARANTEE (SEP 1996), 52.228-15 PERFORMANCE AND PAYMENT BONDS-CONSTRUCTION
(OCT 2010), and 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997).
End of Section B
Section C - Descriptions and Specifications
SECTION C
DESCRIPTION/SPECIFICATION/WORK STATEMENT
C.1 GENERAL INTENTION
It is the intention of this solicitation to secure specialty trade work as defined under NAICS 238990 at various locations throughout MCAS Yuma AZ area of responsbility by means of awarding an indefinite-quantity contract at pre-determined unit prices and bid price coefficient, effective for a base period of twelve (12) months.
The contract also provides for additional option periods, for a total contract period of sixty
(60) months to be exercised at the discretion of the Government. Delivery or performance periods shall be specified in individual delivery orders issued hereunder. Individual order performance time will be in accordance with Section F, ORDERING OF WORK.
C.2 STATEMENT OF WORK
1. PURPOSE
The purpose of this Job Order Contract (JOC) is to provide water and sewer line alteration, repairs, and construction services with minimal design requirements for new minor construction, facility repair, rehabilitation, and alterations for a broad range of renovation and construction work. This JOC is intended to provide rapid response for construction, maintenance, rehabilitation and repair of real property in a cost effective manner. Task orders for design only shall not be placed against the contract. However, minimal design services related to construction may be required. Firm-fixed-price task orders for construction will be placed against the contract. The successful offeror must be able perform multiple task orders in multiple locations simultaneously.
Work locations include:
This JOC will be used as one of many tools for a contracting method available to the Government for the types of construction services as referenced above that may be required by the agency. All task orders issued under this contract will be reviewed and deemed appropriate for this acquisition method.
2. DESCRIPTION
The successful offeror shall provide, upon receipt of a task order, all labor, materials, supplies, parts (to include system components), plant, supervision, equipment, and related services, (except when specified as Government furnished), for projects including, but not limited to, alterations, repairs, and construction of water and sewer lines, mains, pumping stations, treatment plants, and storage tanks. Work will be performed in strict accordance with all terms, conditions, special contract requirements, specifications, drawings, attachments, and exhibits contained in the RFP for the task order or incorporated by reference.
Work and responsibility shall include all project planning, scoping meetings, programming, administration, and management necessary to provide support for task orders awarded.
Conduct the work in strict accordance with the contract and all applicable Federal, State, and local laws, regulations, codes, or directives. Provide related services such as preparing and submitting required reports, perform administrative work, and submit necessary information as specified under this contract and within each task order. Ensure that all work provided meets the scope of work for each task order and any special specifications included with the individual task order or included in any applicable documents.
The Government will provide a detailed scope of work, detailing the work to be accomplished. Depending on the complexity of the project, the detail provided may vary from a general idea of what is required, with no drawings, to complete design documents.
The Contractor shall use the information provided by the Government and submit a complete proposal. For task orders where the Government provides no drawings, the Contractor shall provide sketches to clearly show an understanding of what work is included in the proposal.
Complete all work and services under this contract in accordance with schedules established in each task order. Submittal dates will be included in the task order. These dates identify when submittals are due in the issuing office and other addresses identified in the task order. Types and numbers of submittals and dates and places for review meetings shall be established by each task order.
3. DEFINITIONS
The following terms apply to this contract (the list is not all inclusive):
Abbreviations, Plural Words – Abbreviations, where not defined in Contract Documents, will be interpreted to mean the normal construction industry terminology, determined by recognized grammatical rules, by the COR or Contracting Officer. Plural words will be interpreted as singular and singular words will be interpreted as plural where applicable for context of Contract Documents.
CO – Contracting Officer. The official given authority to bind the Government to contracts.
They have authority to enter into, administer, or terminate contracts and make related determinations and findings.
Contractor – A corporation, partnership, joint-venture, business association, firm, individual or association that has entered into a contract with United States for the purpose of providing supplies, materials, equipment, or services. The Contractor provides similar supplies and services contemporaneously to the general public under terms and conditions similar to those offered to the Government. Herein, the term contractor is used to describe the successful offeror, awarded the JOC described by this document.
Construction: The action taken to accomplish construction; i.e., repair, renovation, minor new construction.
COR – Contracting Officer’s Representative. For the purposes of this contract, the Contracting Officer’s Representative is an Architect or Engineer with authority delegated by the Contracting Officer to manage day-to-day contract operations and inspect Contractor work, and who represents the Government.
Task Order: an individual requisition for construction services ordered against this Job Order Contract (JOC), as described within the scope of work, specifications, drawings, sketches or other project documentation issued with the request for proposal for the task order. Each task order is solicited, proposed, negotiated, and awarded individually, under the JOC.
Directed, Requested, Approved, Accepted, etc. – These terms imply "by the Contracting Officer", unless otherwise indicated. Approved by COR or Contracting Officer in no way releases the Contractor from responsibility to fulfill requirements of the Contract Documents.
Furnish – Supply and deliver to project site, ready for unloading, unpacking, assembly, installation, and similar subsequent requirements.
Incidental (work, waste, etc.) – items that are minor in nature, necessary to perform the work as described, but not of such magnitude as to require a line item in a cost proposal.
Examples include: preparation necessary to perform the work as described but that is not typically accounted for by a line item cost, waste of 15% or less on installed materials, small amounts of fasteners and fittings that are not typically tracked individually, hand tools that are not exhausted in a single use, pick up or delivery of incidental items, etc.
Independent Review – The Government may, at its expense, obtain an independent review of the Contractor’s work. The independent reviewer shall be a person or business qualified to perform the work the Contractor is performing. The person designated to conduct the independent review should not have had previous personal involvement in the project. The Government may have the project reviewed by the local jurisdiction, an Engineering firm not involved in the contract, or by others.
Independent Testing Laboratory – An independent (from the Contractor) entity engaged for the project to provide inspections, tests, interpretations, reports and similar services.
Indicated – Shown on drawings by notes, graphics or schedules, or written into other portions of Contract Documents. Terms such as "shown", "noted", "scheduled", and “specified" have the same meaning as "indicated", and are used to assist the reader in locating particular information.
Install – Operations at project site, including unloading, unpacking, assembly, erection, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, and similar requirements.
Installer – Entity (firm or person) engaged to install work, by Contractor, Subcontractor or Sub-subcontractor. Installers are required to be skilled experts in work they are engaged to install.
Minimum Requirements – Indicated requirements are for a specific minimum acceptable level of quality/quantity, as recognized in the industry. Actual work must comply (within specified tolerances), or may exceed minimums within reasonable limits. Refer uncertainties to the COR or Contracting Officer before proceeding.
Overlapping/Conflicting Requirements – Where compliance with two or more standards that establish different or conflicting requirements for minimum quantities or quality levels is specified, the most stringent requirement written directly into the Contract Documents is intended and will be enforced (generally), unless specifically detailed language written into the Contract Documents clearly indicates that a less stringent requirement is acceptable.
Refer uncertainties to the COR or Contracting Officer for a decision before proceeding.
Project Site or Site – Space available to the Contractor at location of project, either exclusively or to be shared with separate contractors, for performance of the work.
Provide – Furnish and install, complete and ready for intended use.
Site Survey: An inspection of a facility required to accomplish a design/build construction action and normally part of the work plan.
Transportation – movement, typically by motor vehicle, of personnel, material or equipment to, from or within the job site, necessary to assemble the work, receive materials/equipment on the site, or provide labor for the work. Does not include pulling waste dumpsters, which is included in the task order line item for trash disposal. Does not include transportation associated with mobilization/demobilization, such as moving large equipment (e.g., for earthmoving), trailers, etc. Does not include cranes, concrete pump trucks, or other means of moving materials on site that are typically charged for separately, as dictated by industry standard.
Work Plan (Design): A detailed package consisting of single line diagrams, design, engineering calculations, criteria, manufacturers' data/cut sheets, specifications, estimates, etc., suitable to provide details to repair or construct a facility.
4. OVERALL RESPONSIBILITY
The Contractor shall be responsible for all site surveys, calculations, work plans, construction actions; equipment startups, and testing, repair, and/or training required for satisfactory completion of the work as required by each individual task order. This shall include, but not be limited to, providing labor, equipment, materials, applicable engineering documentation, and other necessary services and/or products for the construction, implementation, or testing that may be required by the individual task order.
5. SUPERINTENDENCE
Unless specified otherwise in the individual Task Orders, the Contractor shall provide supervision in accordance with FAR Clause 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984) as follows:
(1) When any combination of Task Orders exceeds $150,000, a minimum of one full-time superintendent is required at that installation/Ordering Office. The superintendent shall be at the installation/Ordering Office at all times when work is being performed.
(2) When any individual Task Order exceeds $150,000, a full-time superintendent is required to be at the job site of that Task Order at all times when work is being performed.
The superintendent shall be able to converse in and understand the English language. If any Task Order involves non-English speaking workers, the Contractor shall provide the ability to translate instructions to the entire work force.
The superintendent may perform the duties of the Site Safety and Health Officer (SSHO).
The Contractor shall provide to the Contracting Officer for approval the names and qualifications of the proposed responsible superintendent(s) authorized to act for the Contractor.
The superintendent(s) shall be authorized by the Contractor to maintain sufficient civilian personnel to accomplish all phases of the work in a satisfactory and acceptable manner and to discharge for cause unsatisfactory employees.
It shall be the responsibility of the Contractor to provide a responsible official of the company to represent him in all matters pertaining to work under this contract. He shall be available, in person, by telephone, to respond to any and all problems to the Contracting Officer at all times when work is being performed.
The cost of superintendence is included in the contractor's coefficient and will not be compensated separately.
6. PROJECT MANAGER
The Contractor shall provide a responsible project manager to represent it in all matters pertaining to work under this contract. The project manager shall have the responsibility of overall supervisor, estimator and be responsible for management of all the ongoing and proposed projects. He/she shall be available in person, by telephone, or radio to respond to any and all problems during normal working hours. The contractor shall provide a detailed resume of the proposed project manager for review and approval by the Contracting Officer.
If during the life of this contract, the contractor changes or replaces the project manager, approval by the Contracting Officer is required.
The cost of project management is included in the contractor's coefficient and will not be compensated separately.
7. SITE SAFETY AND HEALTH OFFICER (SSHO)
The Contractor shall provide a Site Safety and Health Officer (SSHO) at the work site at all times to perform safety and occupational health management, surveillance, inspections, and safety enforcement for the Contractor. The Contractor Quality Control (QC) person CANNOT perform the duties of the SSHO. The contractor shall provide a detailed resume of the proposed SSHO (if not the Superintendent) for review and approval by the Contracting Officer. If during the life of this contract, the contractor changes or replaces the SSHO (if not the Superintendent), approval by the Contracting Officer is required.
The cost of the SSHO is included in the contractor's coefficient and will not be compensated separately.
8. CODES AND STANDARDS
The current DOD Unified Facilities Guide Specifications (UFGS) consisting of Divisions 02 through 48 of specifications in the Construction Specifications Institute’s (CSI) Master format are incorporated by reference into this solicitation. The intent of these specifications is to furnish industrial and/or commercial standards for design, construction, alteration, maintenance and repair of government facilities. Special requirements or/and edited specifications that are indicated in Task Order requests shall supersede any similar requirements noted in the reference guide or other specifications. The current UFGS can be found at the following website:
http://www.wbdg.org/ccb/browse_org.php?o=70
All work will be inspected in accordance with the requirements of this contract, the Task Order and applicable approved submittals. All work performed shall conform to the Unified Facilities Guide Specifications, standard industry work practices, and the provisions of this contract. Unless otherwise directed by the Contracting Officer all work shall be performed in accordance with the current International Fire Protection Association (NFPA) codes and standards, International Building Code, International Plumbing Code and International Mechanical Code. These Codes take precedence over all other direction that may be provided herein or with individual Task Orders UNLESS more stringent requirements are indicated on the Request for Task Order Work.
The publications listed below are additional reference documents that may be cited as applicable in individual task order statements of work:
• UFC-1-200-01, General Building Requirements
• UFC-3-301-01, Architecture
• UFC-3-201-01, Civil Engineering
• UFC-3-301-01, Structural Engineering
• UFC-3-501-01, Electrical Engineering
• UFC-3-600-01, Fire Protection
• NFPA 101, Life Safety Code
• NFPA 70, National Electric Code (NEC)
9. SAFETY REQUIREMENTS AND REPORTS
The Contractor shall conduct all work in a safe manner and shall comply with the requirements described in specification section 01 35 26 Governmental Safety Requirements, FAR 52.236-13, ACCIDENT PREVENTION (NOV 1991), as referenced in Section I, and the requirements described in Section J attachments.
The Contractor is subject to the safety and health standards of Occupational Safety & Health Act (OSHA), the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM-385-1-1), and Specification Section 01 35 29 “Safety and Occupational Health Requirements”. Implementation of OSHA provisions rests in the statutory requirement while compliance with EM 385-1-1 and the specification is a contractual matter. The most stringent requirement shall be followed where the documents are not consistent.
Prior to commencing work on the contract and/or individual Task orders, the Contractor shall meet with the Contracting Officer or designated representative to discuss and develop mutual understandings concerning the Contractor’s administration of a Safety Program. The Government may inspect the construction site for OSHA and Navy violations. Abatement of violations shall be the responsibility of the Contractor. The Contractor shall assist inspectors from the Safety Office and federal or state OSHA offices if a complaint is filed. The Contractor shall pay promptly any fines levied by federal and/or state OSHA offices.
The Contractor shall identify all safety-related issues for each Task order. These items shall be monitored at all times while the project is underway and the results documented on the Supervisor’s Daily Job-site Inspection Checklist form. The proposed "checklist" shall be submitted for approval as part of the Contractor’s Safety Plan prior to the start of work on each Task order. Completed inspection forms shall be kept on file in the Contractor’s office and shall be made available to the Government upon request.
The Contractor shall be responsible for the compliance of its subcontractor(s).
10. QUALITY CONTROL PLAN
The Contractor shall establish and maintain a complete quality control program in accordance with Specification Section 01 45 00.10 20 “Quality Control for Minor Construction” and FAR 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996). This quality control plan shall be submitted to the Contracting Officer for approval within 30 days, or an agreed to shorter period, after contract award. This plan shall be capable of being adapted by means of a supplement to the main plan as required by individual task orders.
11. PERMITS
In accordance with the 52.236-7, PERMITS AND RESPONSIBILITIES (NOV 1991), the…