N6247319R1603_SF30_Amendment_0001.pdf

PDF 254 KB Posted

Attached to
IDIQ JOC for Various Construction Projects
Solicitation number
N6247319R1603
Issued by

About this file

N6247319R1603_SF30_Amendment_0001.pdf

View the file

Other files

File Type Posted
Exhibit_A_Offeror_Team_Composition_and_Management.docx DOCX document
N6247319R1603_SF30_Amendment_0002.pdf PDF
Exhibit_D_Safety_Data.docx DOCX document
Website Link —
Exhibit_C_PPQ.docx DOCX document
Exhibit_B_Experience_Offeror.docx DOCX document
N6247319R1603_Specialty_JOC_RFP.pdf PDF
Click to Goto Solicitation —
N6247319R1603_Synopsis.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5614789

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

TITLE: SPECIALTY TRADES JOB ORDER CONTRACT

PURPOSE OF AMENDMENT: The purpose of this amendment is to transmit Request for Information Responses (RFI), Revisions to Section C.2, Section M(2), Exhibit M and transmiting w ritable forms. No further RFI's w ill be accepted.

Request for Proposal Due Date: By reason of this amendment, the Request for Proposal due date is changed from April 8, 2019 to April 12, 2019 at 1:00pm, local time.

Acknow ledgement: Offerors are to acknow ledge the amendment as indicated in Box 11.

1. CONTRACT ID CODE PAGE OF PAGES

1 22

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Apr-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247319R1603

X 9B. DATED (SEE ITEM 11)

07-Mar-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Apr-2019

CODE

NAVFAC SOUTHWEST

YUMA ROICC/CODE ROPDY

MARINE CORPS AIR STATION YUMA

PO BOX 99129 BLDG 731

YUMA AZ 85369-9129

N62473 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247319R1603

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

SECTION C

DESCRIPTION/SPECIFICATION/WORK STATEMENT

C.1 GENERAL INTENTION

It is the intention of this solicitation to secure specialty trade work as defined under NAICS 238990 at various locations throughout MCAS Yuma AZ area of responsbility by means of awarding an indefinite-quantitycontract at pre-determined unit prices and bid price coefficient, effective for a base period of twelve (12) months. The contract also provides for additional option periods, for a total contract period of sixty (60) months to be exercised at the discretion of the Government. Delivery or performance periods shall be specified in individual delivery orders issued hereunder. Individual order performance time will be in accordance with Section F, ORDERING OF WORK.

C.2 STATEMENT OF WORK

1. PURPOSE

The purpose of this Job Order Contract (JOC) is to provide minimal design, construction, supervision, equipment, material, labor, and all means necessary for alterations, repair, and replacements construction projects under NAICS 238990 ALL OTHER SPECIALTY TRADES at various government facilities within the Marine Corps Air Station Yuma, AZ Area of Responsibility (AOR). This JOC is intended to provide rapid response for construction, maintenance, rehabilitation and repair of real property in a cost effective manner. Task orders for design only shall not be placed against the contract. However, minimal design services related to construction may be required. Firm-fixed-price task orders for construction will be placed against the contract. The successful offeror must be able perform multiple task orders in multiple locations simultaneously.

Work locations include:

Marine Corps Air Station Yuma, AZ;

MCAS 16th Street Housing;

Cannon Air Defense Complex;

Barry M. Goldwater Range;

Martinez Lake Recreation Complex; and Naval Operational Service Centers in Phoenix and Tucson Flagstaff Observatory

This JOC will be used as one of many tools for a contracting method available to the Government for the types of construction services as referenced above that may be required by the agency. All task orders issued under this contract will be reviewed and deemed appropriate for this acquisition method.

2. DESCRIPTION

The successful offeror shall provide, upon receipt of a task order, all labor, materials, supplies, parts (to include system components), plant, supervision, equipment, and related services, (except when specified as Government furnished), for projects including, but not limited to, alterations, repairs, and construction of water and sewer lines, mains, pumping stations, treatment plants, and storage tanks. Work will be performed in strict accordance with all terms, conditions, special contract requirements, specifications, drawings, attachments, and exhibits contained in the RFP for the task order or incorporated by reference.

Work and responsibility shall include all project planning, scoping meetings, programming, administration, and management necessary to provide support for task orders awarded.

Conduct the work in strict accordance with the contract and all applicable Federal, State, and local laws, regulations, codes, or directives. Provide related services such as preparing and submitting required reports, perform administrative work, and submit necessary information as specified under this contract and within each task order. Ensure that all work provided meets the scope of work for each task order and any special specifications included with the individual task order or included in any applicable documents.

The Government will provide a detailed scope of work, detailing the work to be accomplished. Depending on the complexity of the project, the detail provided may vary from a general idea of what is required, with no drawings, to complete design documents.

The Contractor shall use the information provided by the Government and submit a complete proposal. For task orders where the Government provides no drawings, the Contractor shall provide sketches to clearly show an understanding of what work is included in the proposal.

Complete all work and services under this contract in accordance with schedules established in each task order. Submittal dates will be included in the task order. These dates identify when submittals are due in the issuing office and other addresses identified in the task order. Types and numbers of submittals and dates and places for review meetings shall be established by each task order.

3. DEFINITIONS

The following terms apply to this contract (the list is not all inclusive):

Abbreviations, Plural Words – Abbreviations, where not defined in Contract Documents, will be interpreted to mean the normal construction industry terminology, determined by recognized grammatical rules, by the COR or Contracting Officer. Plural words will be interpreted as singular and singular words will be interpreted as plural where applicable for context of Contract Documents.

CO – Contracting Officer. The official given authority to bind the Government to contracts.

They have authority to enter into, administer, or terminate contracts and make related determinations and findings.

Contractor – A corporation, partnership, joint-venture, business association, firm, individual or association that has entered into a contract with United States for the purpose of providing supplies, materials, equipment, or services. The Contractor provides similar supplies and services contemporaneously to the general public under terms and conditions similar to those offered to the Government. Herein, the term contractor is used to describe the successful offeror, awarded the JOC described by this document.

Construction: The action taken to accomplish construction; i.e., repair, renovation, minor new construction.

COR – Contracting Officer’s Representative. For the purposes of this contract, the Contracting Officer’s Representative is an Architect or Engineer with authority delegated by the Contracting Officer to manage day-to-day contract operations and inspect Contractor work, and who represents the Government.

Task Order: an individual requisition for construction services ordered against this Job Order Contract (JOC), as described within the scope of work, specifications, drawings, sketches or other project documentation issued with the request for proposal for the task order. Each task order is solicited, proposed, negotiated, and awarded individually, under the JOC.

Directed, Requested, Approved, Accepted, etc. – These terms imply "by the Contracting Officer", unless otherwise indicated. Approved by COR or Contracting Officer in no way releases the Contractor from responsibility to fulfill requirements of the Contract Documents.

Furnish – Supply and deliver to project site, ready for unloading, unpacking, assembly, installation, and similar subsequent requirements.

Incidental (work, waste, etc.) – items that are minor in nature, necessary to perform the work as described, but not of such magnitude as to require a line item in a cost proposal.

Examples include: preparation necessary to perform the work as described but that is not typically accounted for by a line item cost, waste of 15% or less on installed materials, small amounts of fasteners and fittings that are not typically tracked individually, hand tools that are not exhausted in a single use, pick up or delivery of incidental items, etc.

Independent Review – The Government may, at its expense, obtain an independent review of the Contractor’s work. The independent reviewer shall be a person or business qualified to perform the work the Contractor is performing. The person designated to conduct the independent review should not have had previous personal involvement in the project. The Government may have the project reviewed by the local jurisdiction, an Engineering firm not involved in the contract, or by others.

Independent Testing Laboratory – An independent (from the Contractor) entity engaged for the project to provide inspections, tests, interpretations, reports and similar services.

Indicated – Shown on drawings by notes, graphics or schedules, or written into other portions of Contract Documents. Terms such as "shown", "noted", "scheduled", and “specified" have the same meaning as "indicated", and are used to assist the reader in locating particular information.

Install – Operations at project site, including unloading, unpacking, assembly, erection, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, and similar requirements.

Installer – Entity (firm or person) engaged to install work, by Contractor, Subcontractor or Sub-subcontractor. Installers are required to be skilled experts in work they are engaged to install.

Minimum Requirements – Indicated requirements are for a specific minimum acceptable level of quality/quantity, as recognized in the industry. Actual work must comply (within specified tolerances), or may exceed minimums within reasonable limits. Refer uncertainties to the COR or Contracting Officer before proceeding.

Overlapping/Conflicting Requirements – Where compliance with two or more standards that establish different or conflicting requirements for minimum quantities or quality levels is specified, the most stringent requirement written directly into the Contract Documents is intended and will be enforced (generally), unless specifically detailed language written into the Contract Documents clearly indicates that a less stringent requirement is acceptable.

Refer uncertainties to the COR or Contracting Officer for a decision before proceeding.

Project Site or Site – Space available to the Contractor at location of project, either exclusively or to be shared with separate contractors, for performance of the work.

Provide – Furnish and install, complete and ready for intended use.

Site Survey: An inspection of a facility required to accomplish a design/build construction action and normally part of the work plan.

Transportation – movement, typically by motor vehicle, of personnel, material or equipment to, from or within the job site, necessary to assemble the work, receive materials/equipment on the site, or provide labor for the work. Does not include pulling waste dumpsters, which is included in the task order line item for trash disposal. Does not include transportation associated with mobilization/demobilization, such as moving large equipment (e.g., for earthmoving), trailers, etc. Does not include cranes, concrete pump trucks, or other means of moving materials on site that are typically charged for separately, as dictated by industry standard.

Work Plan (Design): A detailed package consisting of single line diagrams, design, engineering calculations, criteria, manufacturers' data/cut sheets, specifications, estimates, etc., suitable to provide details to repair or construct a facility.

4. OVERALL RESPONSIBILITY

The Contractor shall be responsible for all site surveys, calculations, work plans, construction actions; equipment startups, and testing, repair, and/or training required for satisfactory completion of the work as required by each individual task order. This shall include, but not be limited to, providing labor, equipment, materials, applicable engineering documentation, and other necessary services and/or products for the construction, implementation, or testing that may be required by the individual task order.

5. SUPERINTENDENCE

Unless specified otherwise in the individual Task Orders, the Contractor shall provide supervision in accordance with FAR Clause 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984) as follows:

(1) When any combination of Task Orders exceeds $150,000, a minimum of one full-time superintendent is required at that installation/Ordering Office. The superintendent shall be at the installation/Ordering Office at all times when work is being performed.

(2) When any individual Task Order exceeds $150,000, a full-time superintendent is required to be at the job site of that Task Order at all times when work is being performed.

The superintendent shall be able to converse in and understand the English language. If any Task Order involves non-English speaking workers, the Contractor shall provide the ability to translate instructions to the entire work force.

The superintendent may perform the duties of the Site Safety and Health Officer (SSHO).

The Contractor shall provide to the Contracting Officer for approval the names and qualifications of the proposed responsible superintendent(s) authorized to act for the Contractor.

The superintendent(s) shall be authorized by the Contractor to maintain sufficient civilian personnel to accomplish all phases of the work in a satisfactory and acceptable manner and to discharge for cause unsatisfactory employees.

It shall be the responsibility of the Contractor to provide a responsible official of the company to represent him in all matters pertaining to work under this contract. He shall be available, in person, by telephone, to respond to any and all problems to the Contracting Officer at all times when work is being performed.

The cost of superintendence is included in the contractor's coefficient and will not be compensated separately.

6. PROJECT MANAGER

The Contractor shall provide a responsible project manager to represent it in all matters pertaining to work under this contract. The project manager shall have the responsibility of overall supervisor, estimator and be responsible for management of all the ongoing and proposed projects. He/she shall be available in person, by telephone, or radio to respond to any and all problems during normal working hours. The contractor shall provide a detailed resume of the proposed project manager for review and approval by the Contracting Officer.

If during the life of this contract, the contractor changes or replaces the project manager, approval by the Contracting Officer is required.

The cost of project management is included in the contractor's coefficient and will not be compensated separately.

7. SITE SAFETY AND HEALTH OFFICER (SSHO)

The Contractor shall provide a Site Safety and Health Officer (SSHO) at the work site at all times to perform safety and occupational health management, surveillance, inspections, and safety enforcement for the Contractor. The Contractor Quality Control (QC) person CANNOT perform the duties of the SSHO. The contractor shall provide a detailed resume of the proposed SSHO (if not the Superintendent) for review and approval by the Contracting Officer. If during the life of this contract, the contractor changes or replaces the SSHO (if not the Superintendent), approval by the Contracting Officer is required.

The cost of the SSHO is included in the contractor's coefficient and will not be compensated separately.

8. CODES AND STANDARDS

The current DOD Unified Facilities Guide Specifications (UFGS) consisting of Divisions 02 through 48 of specifications in the Construction Specifications Institute’s (CSI) Master format are incorporated by reference into this solicitation. The intent of these specifications is to furnish industrial and/or commercial standards for design, construction, alteration, maintenance and repair of government facilities. Special requirements or/and edited specifications that are indicated in Task Order requests shall supersede any similar requirements noted in the reference guide or other specifications. The current UFGS can be found at the following website:

http://www.wbdg.org/ccb/browse_org.php?o=70

All work will be inspected in accordance with the requirements of this contract, the Task Order and applicable approved submittals. All work performed shall conform to the Unified Facilities Guide Specifications, standard industry work practices, and the provisions of this contract. Unless otherwise directed by the Contracting Officer all work shall be performed in accordance with the current International Fire Protection Association (NFPA) codes and standards, International Building Code, International Plumbing Code and International Mechanical Code. These Codes take precedence over all other direction that may be provided herein or with individual Task Orders UNLESS more stringent requirements are indicated on the Request for Task Order Work.

The publications listed below are additional reference documents that may be cited as applicable in individual task order statements of work:

• UFC-1-200-01, General Building Requirements

• UFC-3-301-01, Architecture

• UFC-3-201-01, Civil Engineering

• UFC-3-301-01, Structural Engineering

• UFC-3-501-01, Electrical Engineering

• UFC-3-600-01, Fire Protection

• NFPA 101, Life Safety Code

• NFPA 70, National Electric Code (NEC)

9. SAFETY REQUIREMENTS AND REPORTS

The Contractor shall conduct all work in a safe manner and shall comply with the requirements described in specification section 01 35 26 Governmental Safety Requirements, FAR 52.236-13, ACCIDENT PREVENTION (NOV 1991), as referenced in Section I, and the requirements described in Section J attachments.

The Contractor is subject to the safety and health standards of Occupational Safety & Health Act (OSHA), the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM-385-1-1), and Specification Section 01 35 29 “Safety and Occupational Health Requirements”. Implementation of OSHA provisions rests in the statutory requirement while compliance with EM 385-1-1 and the specification is a contractual matter. The most stringent requirement shall be followed where the documents are not consistent.

Prior to commencing work on the contract and/or individual Task orders, the Contractor shall meet with the Contracting Officer or designated representative to discuss and develop mutual understandings concerning the Contractor’s administration of a Safety Program. The Government may inspect the construction site for OSHA and Navy violations. Abatement of violations shall be the responsibility of the Contractor. The Contractor shall assist inspectors from the Safety Office and federal or state OSHA offices if a complaint is filed. The Contractor shall pay promptly any fines levied by federal and/or state OSHA offices.

The Contractor shall identify all safety-related issues for each Task order. These items shall be monitored at all times while the project is underway and the results documented on the Supervisor’s Daily Job-site Inspection Checklist form. The proposed "checklist" shall be submitted for approval as part of the Contractor’s Safety Plan prior to the start of work on each Task order. Completed inspection forms shall be kept on file in the Contractor’s office and shall be made available to the Government upon request.

The Contractor shall be responsible for the compliance of its subcontractor(s).

10. QUALITY CONTROL PLAN

The Contractor shall establish and maintain a complete quality control program in accordance with Specification Section 01 45 00.10 20 “Quality Control for Minor Construction” and FAR 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996). This quality control plan shall be submitted to the Contracting Officer for approval within 30 days, or an agreed to shorter period, after contract award. This plan shall be capable of being adapted by means of a supplement to the main plan as required by individual task orders.

11. PERMITS

In accordance with the 52.236-7, PERMITS AND RESPONSIBILITIES (NOV 1991), the Contractor shall, without additional expense to the Government, obtain all appointments, licenses, and permits required to perform work under this contract. All Contractor employees operating vehicles on Government property shall possess a valid state motor vehicle operator's license. The Contractor shall comply with all applicable federal, state, and local laws. Evidence of such permits and licenses shall be provided to the Contracting Officer and/or his designated representative before work commences and at other times as requested by the Contracting Officer and/or his designated representative.

12. MULITPLE TASK ORDER PERFORMANCE

The Contractor shall have the ability to perform multiple task orders in multiple locations simultaneously in accordance with the terms and conditions of this contract.

13. DOCUMENTATION

The Contractor shall implement, maintain, and control a system for identification, preparation, reproduction, distribution, and maintenance of all documentation, dates and information necessary for its internal management as well as for Government management of the individual projects and the total program.

14. PRESENTATIONS AND MEETINGS

The contractor shall attend all necessary progress meetings, provide presentations as necessary, and attend/conduct other meetings as necessary to execute the work.

15. STATION REGULATIONS

The Contractor shall furnish a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

Identification badges, if required, will be furnished based on the individual installation security procedures. Contactor is responsible for all costs associated with obtaining proper credentials, including participation in the DBIDS program. The Contractor must immediately report instances of lost or stolen badges to the Contracting Officer.

Failure of contractor personnel to obtain entry approval will not affect the contract price or time of completion. All Contractor personnel shall become familiar with and obey all Government regulations including fire, traffic, and security regulations. Refer to individual Task Order or Station requirements provided at the preconstruction conference.

Contractor’s personnel will not be admitted to the work site without approval. Access requirements will be as identified in station policy for each location. Some facilities, or areas within some facilities, restrict access to U.S. Citizens only.

16. SECURITY REQUIREMENTS

In addition to other provisions of this contract, the following security requirements apply to all work performed under this contract:

The Contractor shall, after award of the contract, submit the following information for all employees (on letterhead signed by the Contractor): Contract number, completion date, type of work being performed, area(s) of access, names of employees working on contract including their social security number, date and place of birth, citizenship (alien registration number must be included for registered aliens), any vehicle (including license plate number) to be used. The Contractor shall also have the employees fill out any questionnaires and other forms required by Security. See below for additional site specific information.

Neither the contractor nor any of his employees shall disclose or cause to be disseminated any information concerning the operations of the activity which could result in or increase the likelihood of the possibility of a breach of the activity’s security or interrupt the continuity of its operations.

Disclosure of information to any person not entitled to receive it, or failure to safeguard any classified information that may come to the Contractor or any person under his control, may subject the Contractor, his agents or employees to criminal liability under 18 U.S.C.

Sections 793 and 798.

All inquiries, comments or complaints arising from any matter observed, experienced, or learned as a result of or in connection with the performance of this contract, the resolution of which may require the dissemination of official information will be directed to the activity Commander.

Deviations from or violations of any of the provisions of this paragraph will, in addition to all other criminal and civil remedies provided by law, subject the Contractor to immediate termination for default and/or the individuals involved to a withdrawal of the Government’s acceptance and approval of employment.

17. PASSES AND BADGES

Security badges will be issued, if required, to the Contractor and his employees in accordance with station regulations. Badges shall be issued as explained at the Preconstruction Meeting of the individual Task order. A copy of the Station Security Regulations will be made available at that time. All badges must be returned or otherwise accounted for upon badge expiration or contract completion or upon termination of the employee. Lost or stolen badges shall be reported to the Contracting Officer immediately.

All Contractor and subcontractor personnel shall be required to possess and wear identification badges at all times when working within the confines of the individual military bases or other job site location under this contract.

Only bona fide contractor employees with Government issued passes and/or badges that perform duties authorized by the Contractor specifically for this contract shall be allowed at the work site. The presence of unauthorized personnel including guests, minor children, and other family members of Contractor personnel is strictly prohibited.

18. ACCESS TO BUILDINGS

It shall be the Contractor's responsibility to obtain access to buildings and facilities, and arrange for them to be opened and closed. Initial arrangements will be coordinated through the Contractor Officer or his/her authorized representative. If the Contractor cannot gain access to a work site, the Contractor shall notify the Contracting Office and/or his designated representative to reschedule a time with the building occupant.

Keys, when necessary, will be issued to the Contractor; however, it shall be the Contractor's responsibility to arrange for adequate security of those buildings and facilities at all times during the performance of his duties.

The Contractor shall be responsible for the cost of any keys lost by his employees that were furnished by the Government. If the Contracting Officer determines a lock must be replaced because of the loss of a key by Contractor employees, the Contractor shall pay the cost of replacement. Similarly, the Contractor shall pay the cost of changing a combination or combination lock if the Contracting Officer determines that the combination may have been compromised.

19. ENERGY CONSERVATION

The Contractor shall participate actively in the activity’s energy conservation program. The Contractor shall comply with the base energy conservation program as defined in local base regulations. Use of high energy consuming tools or equipment shall be approved by the Contracting Officer and/or a designated representative prior to use.

20. WATER CONSERVATION

The Contractor shall participate actively in the activity's water conservation program. The contractor shall comply with the base water conservation program as defined in local base regulations. The Contractor may represent his interest at all meetings of the Activity's Energy Conservation and Resource Management Committee. Use of high water consuming tools and equipment shall be approved by the Contracting Officer prior to use.

21. FIRE PROTECTION

The Contractor shall ensure that his employees shall know how to activate a fire alarm or otherwise notify the local Fire Department in the event of an emergency. The Contractor shall observe all requirements for handling and storage of combustible supplies, materials, waste and trash. Contractor employees shall be trained to properly respond to a fire alarm or fire in accordance with activity instructions.

22. ENVIRONMENTAL PROTECTION

The Contractor is responsible for understanding and properly performing all requirements under federal, state, interstate, and local environmental laws, regulations and ordinances that are applicable to the work being performed under this contract. This responsibility extends to securing all permits required by such laws, regulations, and ordinances.

The Contractor is responsible for advising its agents, employees, subcontractors, and other personnel who will perform operations, activities, or services under this contract of these requirements.

The Contractor is responsible for the following:

Notifying the Government promptly upon receipt of regulatory notices, orders, or requests for information, and promptly supplying copies to the Government.

Complying with environmental regulatory notices or orders to the extent attributable to the Contractor’s conduct, regardless of whether or not the Contractor is the named recipient of the notice or order.

Correcting conditions of environmental noncompliance identified by the Government in the absence of regulatory non-compliance notices. This includes cleaning up any contamination released from Contractor operations, whether such contamination is on or off Government property.

The Contractor is responsible, upon Government request, for providing the Government and/or any regulatory agency with any information that may be required regarding the actual or potential environmental impacts of Contractor’s operations. The information shall be timely and complete and in a form acceptable to the Government and/or the regulatory agency.

Soil disturbance in known or suspected contaminated or otherwise environmentally regulated sites will only be permitted after approval of an Environmental Plan.

23. WILDLIFE PRESERVATION

When work is located in a designated "wildlife preservation area" and before commencing work which may disturb wildlife; the Contractor shall obtain all necessary state, local and federal permits.

24. TRAFFIC CONTROL

The Contractor shall be responsible for providing all necessary traffic control, such as street blockades (including flashing lights), traffic cones, flagmen, etc., as required for each specific task order. Proposed traffic control methods shall be submitted to the Contracting Officer for final approval. A traffic control plan shall be prepared and sealed by a California registered professional traffic engineer. The plan shall include detailed drawings, descriptions, all detours and other modifications of traffic patterns. Plans shall be prepared in accordance with the most restrictive CALTRANS SSS, CALTRANS TC, MFHWA, MUTCD, all applicable base policies and U. S. Army Corps of Engineers (ACOE) Manual EM-385-1. No streets shall be completely closed to traffic without the Contracting Officer’s approval.

At the beginning of each working day the Contractor shall notify the Project Manager/s of the location(s) of work to be performed that day and the specific task order(s) which are to be accomplished that day.

25. DISPOSITION OF WASTE MATERIAL

All debris, rubbish, hazardous waste, and non-usable material resulting from the work under this contract shall be disposed of by the contractor at his expense off Government property, as specified in UFGS specification 01 74 19, "Construction Demolition and Waste Management". The Contractor shall make every effort to recycle, refer to specification section 01 62 35, “Recycled / Recovered Materials”.

All non-usable surplus material and debris resulting from work under these specifications shall be removed from the site by the Contractor at their expense. The Government retains salvage rights to any material of archaeological or historical value as determined by the Contracting Officer.

The Contractor shall remove all material not claimed for salvage by the Government and disposed of off base bi-weekly or as specifically agreed to in a specific Task order. The contractor shall dispose of hazardous waste in accordance with the Resource Conservation and Recovery Act and associated state and local regulations.

Salvage: Except where indicated and/or specified otherwise in other sections, all material and equipment removed, but not reused, shall become the property of the Contractor and shall be removed from Government Property. Title to all material resulting from demolition, and all material and equipment to be removed, is vested to the Contractor upon approval by the Contracting Officer of the Contractor’s demolition and removal procedures, and authorization by the Contracting Officer to begin demolition. The Government will not be responsible for the condition or loss of, or damage to, such property after notice to proceed.

Materials and equipment shall not be viewed by prospective purchasers or sold on the site.

Reuse of Material and Equipment: Carefully remove and store materials and equipment specified to be reused or relocated to prevent damage, and reinstall as the work progresses.

Salvaged Materials and Equipment: Carefully remove materials and equipment that are specified to be removed by the Contractor and that are to remain the property of the Government, and deliver to a storage site, as directed.

All vehicles transporting waste and debris from the job site shall be suitable for the task, properly loaded, and covered to prevent spillage during transport.

26. UNDERGROUND UTILITIES

The Contractor shall be responsible to ensure all underground utilities have been surveyed and located prior to commencing any excavation activities. Utility drawings are available at each site/activity for review.

For Activities where the Government provides utility location services, the Contractor is responsible for all damages they impart to properly marked utilities. The Contractor shall promptly perform all necessary repairs at no additional cost to the Government.

For Activities where the Contractor is required to perform the utility locating and marking, the Contractor shall be responsible for all damages to existing utility lines where the utility line was reasonably locatable. Prompt repairs to those damaged lines shall be at no additional cost.

27. IDENTIFICATION OF CONTRACTOR VEHICLES

Each Contractor provided vehicle shall display the company name in a manner and size that is clearly visible at all times. All vehicles shall display a valid state license plate and safety inspection sticker, if applicable. Contractor vehicles operated on Government property shall be maintained in good repair.

28. PROPOSED MATERIAL SUBMITTALS, CATALOG DATA, AND SAMPLES

Proposed material submittals required of the Contractor shall be made allowing sufficient time for processing, reviews, approval, and procurement before the Contractor is ready to use the material. Allow a minimum of five (5) days for routine approvals. Additional time may be required for complex reviews and for fire protection submittals. Where possible, the Government will return submittals in less than the above time frames. No material requiring submittals shall be installed prior to written submittal approval. Submittals for long lead time manufacturer’s items shall be submitted with the Contractor's proposal at the Government's request. Submittals shall be prepared and assembled as follows:

Submit five (5) copies of each submittal, unless specified otherwise in individual task order(s).

Present all submittals for each MEANS section as a complete bound volume, titled with the contract number, Task order number and project title.

Clearly mark each item that is proposed with its line item number.

Assemble each volume in the same numerical sequence as the line item number in the Task order.

Each copy of the submittal shall have a "Submittal Transmittal Approval Form” attached to the cover.

The Contractor shall certify on all submittals that the material being proposed conforms to contract requirements and can be installed in the space provided.

When required, catalog data shall be on printed pages on permanent copies of the manufacturer's catalogs.

Samples in the quantity specified shall be marked to show the name of the material, the name of the supplier, the contract number, Task order number, the segment of work where the material represented by the sample is to be used, and the name of the Contractor submitting the sample.

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

$5,000.00 $10,000,000.00

DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE

The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

$2,000.00 $1,000,000.00

SECTION M - EVALUATION FACTORS FOR AWARD

The following have been modified:

SECTION M

SECTION M

BASIS FOR AWARD

EVALUATION FACTORS FOR AWARD

1. The solicitation requires the evaluation of price and the following non-price factors:

Factor 1 – Ability to Manage Multiple Simultaneous Projects Factor 2 – Experience Factor 3 – Past Performance Factor 4 – Safety

Factor 5 – Price - Based on Proposed Task Order 0001 (Exhibit M)

The distinction between corporate experience and past performance is corporate experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.

2. The relative order of importance of the non-price evaluation factors:

Factor 1 (Ability to Manage Multiple Simultaneous Projects) will be rated as either Acceptable or Unacceptable. If an Offeror is rated Unacceptable for Factor 1, they will not be eligible for award. Factors 2 through 4 and price will be considered. The technical factors (2 and 4) are of equal importance to each other, respectively, and, when combined, are of equal importance to the performance confidence assessment (Factor 3, Past Performance). The combined non-price factors are approximately equal to price.

The importance of price will increase if the Offerors’ non-price proposals are considered essentially equal in terms of overall quality, or if price is so high, or low, as to significantly diminish the value of a non-price proposal’s superiority to the Government. Award will be made to the responsible Offeror(s) whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered.

3. Definitions:

DEFICIENCY: A material failure of a proposal to meet a solicitation requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.

WEAKNESS: A flaw in the proposal that increases the risk of unsuccessful contract performance.

SIGNIFICANT WEAKNESS: A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance.

STRENGTH: An aspect of a proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

PAST PERFORMANCE: Relates to how well an Offeror and Offeror's Team has performed;

e.g., the quality of work accomplished, schedule compliance, customer satisfaction.

EXPERIENCE: Pertains to work performed by an Offeror and Offeror's Team, within the prescribed timeframe, which is the same or similar to the work that may be ordered under this contract in terms of size, scope, and complexity. Experience is distinct from past performance (how well an Offeror has performed).

PROJECT: A design-build or design-bid-build construction activity or task, with a single starting point and a single ending point.

COMBINED PROJECT(S): Projects with multiple starting and ending points, performed under separate task orders, delivery orders, or multiple contracts combined in a single description. No credit will be given for work performed under MACC/IDIQ contracts in the aggregate or for multiple projects completed under more than one task/delivery order.

RENOVATION, REPAIR, ALTERATION PROJECT TYPES: Refers to projects where the work modifies existing facilities.

NEW CONSTRUCTION: Refers to creating entirely new facilities (or new expansions/ additions to existing facilities where a new structure and foundation are provided as part of the expansion/addition).

100% COMPLETE: The facility is completely constructed and ready for the intended use.

OFFEROR: Refers to the Contractor submitting the proposal as Offeror, including joint ventures, whose name and address appears in Block 14 of Standard Form (SF) 1442 (Solicitation, Offer and Award). In the event of a conflict or inconsistency between the Offeror's name and address cited on the SF 1442 and any other part of the proposal, the SF 1442 is the conclusive document in determining the Offeror who is submitting the proposal.

JOINT VENTURE (JV): A legal business entity formed between two or more companies (parties) to undertake the performance activities of a contract together. This does not include other arrangements such as "teaming agreement" or "strategic alliance," which are not recognized as bona fide joint ventures for the purposes of this solicitation.

FIVE-YEAR PERIOD: The prescribed timeframe for this solicitation that refers to the period of time for which projects may be submitted for experience or past performance. The five-year period is calculated by counting back five years from the initial RFP issuance date.

DESIGN-BID-BUILD: Refers to the traditional delivery method where design and construction are sequential and contracted for separately, with two separate contracts and contractors; one for an A-E contract and one for a construction contract.

SELF-PERFORM: Refers to performing relevant, major construction trade work in-house as the prime contractor without subcontractors. This does not include project administration or management functions (such as quality control or safety program) and miscellaneous work

(such as housekeeping or cleanup). Relevant, major construction trade work is that which is the same or similar to the work that may be ordered under this contract.

PAGE: Refers to one printed side of a piece of paper. (For example, 5 pieces of paper printed on both sides would result in 10 pages of narrative.)

FACTOR 1: ABILITY TO MANAGE MULTIPLE SIMULTANEOUS PROJECTS

a. Proposal Submission Requirements:

The current composition and proposed staffing of the firm to manage multiple simultaneous projects will be evaluated in this factor.

The Offeror shall submit the following information under Tab “1”:

(1) Using Exhibit “A” (Current Composition and Proposed Staffing), provide a narrative describing the current Offeror composition and the proposed staffing if awarded the single contract. Provide the role, responsibilities, and contractual relationships between the various firms (see FAR Subpart 9.6). On a separate sheet, include a simple organizational chart that clearly identifies the lines of authority between the entities. If the experience of an entity is being claimed in Factor 2, that entity must be named in the above narrative and organizational chart.

(2) In addition to the narrative, and if applicable, the Offeror shall submit a signed copy of a joint venture agreement, partnership agreement, teaming agreement, or approved mentor-protégé agreement (MPA).

b. Basis of Evaluation:

The assessment of the Offeror’s current composition and proposed staffing will be used as a means to evaluate the Offeror’s likely ability to manage multiple simultaneous projects.

This factor will be rated on an Acceptable or Unacceptable basis.

FACTOR 2: EXPERIENCE (See definition)

a. Proposal Submission Requirements:

Submit Exhibit “B” (Construction Experience Project Data Sheet) under Tab “2.”

Construction Experience:

Submit a maximum of five (5) relevant construction projects for the Offeror that best demonstrate your experience on projects that are similar in size, scope, and complexity to projects that may be ordered under this contract. For purposes of this evaluation, relevant projects are further defined UNDER NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM

(NAICS) CODE 238990 OTHER SPECIALTY TRADE CONTRACTORS

(https://www.census.gov/eos/www/naics/index.html) within the construction cost range of $2,000 to $1,000,000

In addition, the Offeror shall meet the following minimum requirements:

• At least two (2) relevant construction projects shall have a construction cost of

$500,000 or more. This refers to the total contract cost if the work was performed by the Offeror as prime contractor, and the subcontract cost if the work was performed by the Offeror as a subcontractor.

• At least one project demonstrating self-performed construction experience (see definition of self-perform).

Using Exhibit B, it is the Offeror's responsibility to properly describe how its previous experience fits within NAICS Code 238990. Previous projects incorrectly awarded by a Government agency under NAICS Code 238990 does NOT automatically make the project relevant experience.

Projects submitted for the Offeror shall be 100% complete (see definition) within the past five (5) years of the date of issuance of this RFP.

A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.

The attached Construction Experience Project Data Sheet (Exhibit “B”) is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project…