B193_Flooding_Cleanup_SOW.pdf

PDF 68 KB Posted

Attached to
Emergency Sewage Cleanup, B-193, NOLF Federal contract opportunity
Solicitation number
N6247319Q0805
Issued by
Department of the Navy Naval Facilities Engineering Command

View the file

Other files for this federal contract opportunity

Other files attached to Emergency Sewage Cleanup, B-193, NOLF, newest first.
File Type Posted
N62473-19-Q-0805,_Solicitation_for_Sewage_Cleanup,_IMPBEA-193,_NOLF.pdf PDF
Single_Source_Justification_Sewage_Spill_MCG_signed_14Dec18.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 7DEC2018

WO#: 1595305

Project Engineer: LCDR Amy Honek

STATEMENT OF WORK

PROJECT TITLE: NOLF IB B193 Sanitize and Clean B193 Ground Floor from Flood

LOCATION: Navy Outlying Landing Field Imperial Beach, Bldg 193

1. SCOPE OF WORK: The contractor shall provide all labor, material, equipment, and supervision to provide cleaning and sanitation of the ground floor surfaces in B193. The work is to begin immediately and continue until completion.

A. The period of performance for this project shall be 10 days.

B. All works shall be coordinated with the building POC, assigned performance assessment representative, and the building security officer.

C. The contractor shall be in compliance with and utilize the EM-385-1-1 Safety and Health Manual. All employees shall wear all the appropriate personal protective and safety equipment required for this project.

D. It is Contractor's responsibility to field verify all existing conditions and measurements for this project.

E. Description of work as follow as minimum:

1) Remove as much flood water as possible using industry approved equipment. A nearby lift station failure resulted in sewage overflow; therefore contractor should be prepared for the removal of sewage.

2) After sewage removal, sanitize the floors and baseboards. Dry out the affected areas with fans and dehumidifiers or any industry approve equipment to prevent mold and mildew from forming

3) Where carpet was affected, remove carpeting and clean and sanitize the flooring underneath. Consult with the government representative on areas where carpet appears to not have been affected; otherwise contractor should plan on removal of all carpet on the ground floor.

4) Estimate 6000 sf of concrete/epoxy floors, 1000 sf of bathroom floors, 1000 sf of carpeted office space.

F. The contractor shall be responsible for all mobilization and demolition associated with this project. The contractor shall be responsible for removal of all debris covered under this contract. The contractor shall be aware that housekeeping and debris control are contract requirements. Contractor shall maintain a clean, safe, orderly jobsite and dispose of all debris accordingly

2. SPECIAL REQUIREMENTS

A. GENERAL

a. The contractor shall be responsible for all square foot, lineal foot measurements for the accurate measuring of the project and the ordering of all materials and equipment for the completion of this project. All measurements shall be verified by the contractor prior to start of this project.

b. Contractor shall perform all work in accordance with the U. S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1) in effect at the time of award.

c. The contractor is responsible for all work in order to assure complete workable systems.

d. Contractor shall prepare and perform the work in accordance with all applicable federal, state, and local codes, standards, regulations and ordinances.

e. The work coordination with the FEAD Coronado office and Public Works Department will be required.

f. Utility outage, laydown area, traffic control or road closures are not anticipated;

however, if determined to be required, contractor shall notify the PAR.

g. Contractor shall be responsible to set-up work site. Provide adequate storage capability to secure materials and equipment for duration of work. Provide truck(s) adequate for all debris removal. Mobilize equipment necessary for the project. Place appropriate signage where foot traffic is anticipated.

B. HAZMAT DISPOSAL REQUIREMENTS

a. Dispose of debris off of government property in accordance with Federal, State, and Local laws, regulations, and rules. Contractor shall keep all demolished materials and maintain site clean at all times.

C. POINTS OF CONTACT (name, phone # and email address)

a. Estimator: LCDR Amy Honek 619-545-2144 amy.honek@navy.mil

b. Contract Specialist: Contract Specialist: Anthony Bolden, (619) 767-7061 anthony.a.bolden@navy.mil

d. Performance Assessment Representative: Bruce Glenn (619) 767-1563 bruce.e.glenn@navy.mil

e. Tenant Liaison: Ken Stowell (619) 437-9330, Kenneth.stowell@navy.mil