This is a solicitation for Multiple Award Remedial Action Contracts for environmental remediation services at various Department of Defense installations. The Naval Facilities Engineering Command, Southwest intends to award three to four cost plus award fee contracts with a minimum $5,000 guarantee over a 60 month term. Services include performing remedial actions at contaminated Superfund, RCRA, UST, and MMRP sites involving contaminants such as solvents, fuels, metals, and ordnance residues in various media. Sites may include landfills, treatment facilities, tanks, and active or closed bases. The aggregate value of task orders shall not exceed $240 million. Offerors must submit proposals by 45 calendar days from solicitation date addressing experience, past performance, and safety factors. The solicitation will be available from the Navy Electronic Commerce Online website on May 31, 2019. This is a 100% small business set-aside for firms with 500 employees or less in NAICS code 562910.

_SOLICITATION_AMEND_0001.pdf

View the file

Other files

File Type Posted
N6247318R2418 Amendment 0003.pdf PDF
_RFI_Response_SET_2_AMEND_0002.zip ZIP file
_SOLICITATION_AMEND_0002.pdf PDF
_RFI_Response_SET_1_AMEND_0001.zip ZIP file
_JL_ATTACHMENTS.zip ZIP file
_SOLICITATION.pdf PDF
N6247318R2418_18R2418_PRESOLICITATION_NOTICE_Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0001 is issued to update sections as needed in response to Requests for Information - Set 1.

1. CONTRACT ID CODE PAGE OF PAGES

R 1 27

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Jun-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247318R2418

X 9B. DATED (SEE ITEM 11)

10-Jun-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Jun-2019

CODE

NAVFAC SOUTHWEST

ENVIRONMENTAL CONTRACTS CORE

CODE: EREST

937 NORTH HARBOR DRIVE

SAN DIEGO CA 92132-5190

N62473 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247318R2418

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The standard size code has changed from $20,500,000 to 750 Employees.

SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

The following have been modified:

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2018)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 562910.

(2) The small business size standard is 750 Employees.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

( ) Paragraph (d) applies.

( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.209-2; Prohibition on Contracting with Inverted Domestic Corporations--Representation.

(vii) 52.209-5; Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(viii) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(ix) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(x) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xi) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(xii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xiii) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xiv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xv) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xvi) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xvii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.

(xviii) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals--Representation. This provision applies to solicitations that include the clause at 52.204-7.)

(xix) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xx) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225- 3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $80,317, the provision with its Alternate II applies.

(D) If the acquisition value is $80,317 or more but is less than $100,000, the provision with its Alternate III applies.

(xxi) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225- 5.

(xxii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.

(xxiii) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.

(xxiv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(2) The following representations or certifications are applicable as indicated by the Contracting Officer:

[Contracting Officer check as appropriate.]

X (i) 52.204-17, Ownership or Control of Offeror.

X (ii) 52.204-20, Predecessor of Offeror.

(iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

X (iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.

X (v) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.

X (vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA-Designated Products (Alternate I only).

(vii) 52.227-6, Royalty Information.

(A) Basic.

(B) Alternate I.

X (viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The Offeror has completed the annual representations and certifications electronically in SAM accessed through https://www.sam.gov. After reviewing the SAM information, the Offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [ offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR Clause Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.

(End of provision)

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

INSTRUCTIONS TO OFFERORS

L1 PRE-PROPOSAL MEETING/SITE VISIT

A pre-proposal meeting/site visit is not required.

L2 INQUIRIES OR QUESTIONS

Inquiries and questions on this Request for Proposal shall be submitted in writing, electronically, to the Contract Specialist as follows:

Contract Specialist: Jennifer De Vera Email: jennifer.devera@navy.mil

All inquiries or questions must state the solicitation number, and clearly state the question and reference. All inquiries concerning the attached RFP must be received electronically at least thirty (30) days in advance of the solicitation closing date, or by 30 June 2019 at 2P.M., in order to permit adequate time to reply to the inquiry.

L3 PROPOSAL SUBMISSION REQUIREMENTS:

1) General: Proposals submitted in response to the solicitation shall be formatted as follows and furnished in the number of copies stated herein. Any proposal submitted that does not conform to the proposal submission requirements will not be considered. Firms shall submit proposals via electronic format on CD- ROM. The acceptable electronic formats for proposals include Adobe PDF 6.0 or later version, and Microsoft Office 2010 version for Factor 4 – Cost and all related cost modeling reference documents (Attachments JL.1 through JL.7). All formulas and links to detail worksheets for Attachment JL.7 should be intact. Do not submit Attachment JL.7 and JL.7A in a PDF format, it must be submitted as an Excel Spreadsheet.

2) Electronic mail proposals are not acceptable. Firms shall ensure that proposal disks are virus free, and free of password protection. If access to proposal data is prohibited due to viruses, passwords, or wrong format, the proposal will be rejected.

3) Proposal Submission Requirements:

a. All proposals (Paper and electronic) shall be labeled with the Volume Number and Title, Solicitation Number, Name, address, phone number, and facsimile number for the offeror.

b. The electronic/paper proposals shall be submitted in separate Disks/Binders. The following information shall be included in each Volume (Disk and Binder) and shall be tabbed and labeled accordingly:

VOLUME I: (NON-COST) TECHNICAL PROPOSAL:

General Information: A cover letter shall accompany the proposal as required by FAR 52.215- 1(c)(2), INSTRUCTIONS TO OFFERORS - COMPETITIVE ACQUISITION. The first page shall include the solicitation number, name, address, telephone number and facsimile number of the offeror. This page will not be included in the page count of the proposal.

File naming of proposal information: The file naming convention of Volume I – Technical Proposal - shall be as follows:

Factor 1 – Specialized Experience

Tab 1A: Attachments JL.11 and Attachment JL11.A, Submission Data Sheets, numbered sequentially and shall correspond to the PPQs or CPARS submitted under Factor 3 (For projects completed or substantially completed within five (5) years from solicitation issuance date). JL.11_Cost IDIQ Contract and JL.11A_Projects. The example submissions shall be numbered sequentially and correspond to the CPARS and/or PPQ submitted under Factor 3

Tab 1B: Attachment JL.12, Specialized Technical Experience on Example Submissions, numbered sequentially and The example submissions shall correspond to the submissions listed in Attachments JL.11 and JL.11A.

Factor 2 – Safety Tab 2A: Experience Modification Rate (EMR)

Tab 2B: OSHA /DART OSHA_DART_TRC

Tab 2C: Technical Approach to Safety

Factor 3 – Past Performance

Tab 3A: Attachment C, PPQ or CPARS Evaluation from referenced evaluators for each project submitted for Factor 1 Specialized Experience provided in Attachments JL.11 and Attachment JL.11A, Submission Data Sheets. CPARS_or_JL.14 PPQ. PPQs or Each CPARS evaluations and/or PPQ shall be numbered sequentially to correspond with projects example submissions under Factor 1.

VOLUME II – COST PROPOSAL:

General Information: A cover letter shall accompany the proposal as required by FAR 52.215- 01(c)(2), INSTRUCTIONS TO OFFERORS - COMPETITIVE ACQUISITION. The first page shall include the solicitation number, name, address, telephone number facsimile number, Dun & Bradstreet Number, Cage Code, and Tax Identification Number (TIN) of the offeror. In addition, it shall contain a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the prices stated for each item. Furthermore, it shall contain the names, titles, and signatures of persons authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office. This page will not be included in the page count of the proposal.

File naming of proposal information: The file naming convention of Volume II - Cost proposal shall be as follows:

Factor 4- Cost Model Tab 4A - Proposal SF-33 Tab 4B – Joint Venture Agreement (if applicable) Tab 4C – Cost Proposal with Supporting Documentation Tab 4D – Cost Model Information

Tab 4E – Cost Pool, Financial/Accounting Systems and Audit Information Tab 4F – Appendices Tab 4G – Responsibility Determination Documents (Certifications, Financial

Questionnaire and VETS-4212 Refer to Section L4)

4) Offeror(s) shall submit proposal copies as follows:

a. Page limits, if stipulated, must be adhered to. Page size shall be 8.5" x 11". Font size shall be 10 - 12 point. For any JL attachment provided on any size other than 8.5" x 11", paper submission may be provided on 11x17 and folded to fit 8.5x11 within the three-ring binder.

b. Volume #1 – Submit one (1) original and four (4) paper copies of the non-cost proposal in a three ring binder with content as specified and labeled as stated above. In addition, submit three (3) electronic copies, on CD, of the complete non-cost proposal (bookmark all sections the same as the tabs in the paper copies).

c. Volume #2 – Submit one (1) original and two (2) paper copies of the cost proposal in a three ring binder with content as specified and labeled as stated above. In addition, submit two (2) electronic copies on CD. Spreadsheets should be in Microsoft Excel. Electronic documents should be compatible with Microsoft Office 2010 and fully editable to allow Government evaluators to make cost analysis adjustments. There is no page limitation for Volume #2.

Proposals shall be delivered to the following address in accordance with the date and time set for receipt of proposals.

NAVAL FACILITIES ENGINEERING COMMAND, SOUTHWEST

ENVIRONMENTAL RESTORATION

ATTN : CODE ACQ4, JENNIFER DE VERA

1220 PACIFIC HIGHWAY, BLDG 127 MAILROOM, BLDG 128

SAN DIEGO, CA 92132

PLEASE NOTE: Proposals not received or received and not date stamped at the above address on or before the hour and date set forth for receipt of proposals shall be subject to the provisions of FAR 52.215- 1(c), “submission, modification, revision and withdrawal of proposals.”

5) Proposal Submission Requirements are stated below for all evaluation factors.

FACTOR 1: SPECIALIZED EXPERIENCE

(i) Solicitation Submittal Requirements:

(1) Offerors (Prime/Joint Venture) shall provide a total of five (5) specialized experience submissions that best demonstrate relevant experience similar in size, scope, and complexity to the work as per the PWS and shall have been completed or substantially completed (see definition in 2a and 2b) within five (5) years of the solicitation issuance date.

Offerors must demonstrate the following:

• Relevant experience performing environmental remedial actions under a broad range of environmental programs with a variety of contaminants, media types, site types, environmental services, phases, and remediation methods.

• Experience managing concurrent multiple task orders under Indefinite Delivery/Indefinite Quantity (IDIQ) contracts for relevant work.

• Management of cost reimbursement contracts for federal agencies.

(2) Of the five (5) Specialized experience submissions from the Offeror, four (4) shall be projects and one (1) shall be a cost reimbursement IDIQ contract under which the offeror performed as the Prime contractor.

a. For submission and evaluation purposes, a project is defined as one complete, singular effort of work ordered or contracted for by a single contractual instrument. A scope of work (effort of work) performed as a stand-alone contract, or as an individual task or delivery order under an IDIQ contract, is an example of a project. An IDIQ contract by itself (i.e., without regard to any task or delivery order(s) that may have been placed against it), or together with a combination of multiple individual task or delivery orders that may have been placed against it IS NOT considered a project and will not be evaluated as one. In addition, the project shall have been completed or substantially completed. Substantially completed is defined as the project is at least 80% physically complete as of solicitation issuance date.

b. For submission and evaluation purposes, an a cost IDIQ contract is defined as a single cost reimbursement contract pursuant to the contract types identified in FAR Subpart 16.3 under which multiple individual task or delivery orders are placed against it. In addition, the cost IDIQ contract shall have been completed or substantially completed. Substantially completed is defined as the cost IDIQ contract is awarded no earlier than 730 days (or two (2) years) from solicitation issuance date and no later than five (5) years from solicitation issuance date. include the submission of five (5), recent task orders awarded under it, with all five (5) task orders completed or being at least 80% physically complete within five (5) years of solicitation issuance date.

(3) At a minimum, the five (5) Specialized experience submissions shall meet the following:

• Four (4) individual projects, as defined in 2a., shall be valued separately at $3M or greater as of solicitation issuance date; one (1) of these projects shall be valued at $10M or greater as of solicitation issuance date; one (1) of these projects shall be a cost plus award fee type reimbursement task order or contract;

• One Cost Reimbursement (1) IDIQ contract, as defined in 2b., shall be valued at $30M or greater; the cost IDIQ contract submission shall specify five (5) individual task or delivery orders from the cost IDIQ contract that demonstrate relevant experience similar in size, scope, and complexity to the work anticipated under this contract. Please indicate percentage of completion of award amount for each task order under the cost IDIQ contract. The projects provided five (5) task orders submitted under the cost IDIQ contract submission shall not be the same as any of the four (4) individual project submissions.

(4) Offerors shall use Attachment JL.11 Cost IDIQ Contract Submission Data Sheet and Attachment

JL.11A, Project Submission Data Sheet to submit specialized experience to be evaluated. Attachment JL.11 and JL.11A submissions for Factor 1 – Specialized Experience shall be sequentially numbered with a Submission Number as indicated on the middle header section of the respective JL.11 and JL.11A forms.

Fully complete the various blocks and sections of the form as applicable to project submissions. Failure to fully complete the form may result in a lower rating. Concise and detailed descriptive responses are highly desired. Vague or ambiguous responses may result in a lower rating. Offeror(s) shall not deviate from the basic format of the form. Submissions not received on this form WILL NOT BE EVALUATED.

Submissions shall be limited to five (5) submissions and a maximum of ten (10) pages (eight (8) pages total for all four (4) project submissions and two (2) pages total for one (1) IDIQ cost contract submission). Any submissions or additional pages exceeding the page limitations shall not be considered during the evaluation process. Projects and Cost IDIQ Contract Submissions submitted in JL.11 and JL.11A shall have been completed or substantially completed in accordance with the definitions in 2a and 2b within five

(5) years from the solicitation issuance date. Submissions shall include a variety of environmental remediation projects that are the same or similar in scope, size, and complexity to the project work described in Section C of the solicitation.

(5) Offerors shall complete Attachment JL.12 – Specialized Technical Experience on Example Submissions by indicating in each block with an “x” those services in which they have specialized technical experience for each of their proposed example submissions detailed on Attachments JL.11 and JL.11A. Offerors shall not deviate from the format of the attachment. Only one (1) Attachment JL.12 shall be submitted to cover all example submissions and shall be limited to four (4) pages. Any additional pages shall not be considered during the evaluation process. Example submissions identified under JL.12 shall coincide with the projects/cost IDIQ contract identified under Attachments JL.11 and JL.11A. Offerors shall provide the contract number and title for each example project in the appropriate columns on Attachment JL.12. The proposal narrative should provide supporting information for each element containing an “x” in Attachment JL.12. If supporting information is not provided, the Government may not give credit for Specialized Experience specified in Attachment JL.12. (For purpose of this attachment, the specialized technical experience for the cost IDIQ contract is not limited to only those task orders completed/substantially completed after solicitation issuance date, but can include all task orders completed under the entire cost IDIQ Contract.)

(6) All example projects and the IDIQ contract provided must have been performed by the Offeror as the prime contractor or as a member of a Joint Venture as opposed to performance as a subcontractor under another firm’s contract. Specialized Experience presented for any other entity, including but not limited to proposed subcontractors, will not be evaluated.

(7) If the Offeror is a Joint Venture (JV), at least one (1) of the projects should be submitted for the JV entity.

If the JV does not have shared relevant experience, at least one (1) project shall be submitted for each JV member. Offerors who fail to submit experience for all JV members may be rated lower.

(8) If a submitted project was performed by a JV, and not all members of that JV are on the JV proposed for this contract, the offeror shall clearly demonstrate what portion of the work was performed by the JV member offering on this contract. The JV member proposed for this contract shall specifically address fieldwork performed by that JV member including field staffing and direct fieldwork oversight. The JV member proposed for this contract shall also address home office management performed by that JV member including the number/percent of employees provided for the overall contract by the JV member as well as the overall percentage of work performed by the JV member. If the Offeror does not specifically address what portion of the work under the submitted project was performed by the JV member offering on this contact, the project will not be evaluated.

(ii) Factor 1- Specialized Experience proposal shall be submitted in Volume #1 – Technical Proposal as follows:

Tab 1A - Attachment JL.11, Cost IDIQ Contract Submission Data Sheet and Attachment JL.11A, Project Submission Data Sheet specialized experience shall be limited to 5 submissions and a maximum of ten (10) pages (eight (8) pages total for all four (4) project submissions and two (2) pages total for one (1) cost IDIQ contract submission). Any additional pages shall not be considered during the evaluation process.

Tab 1B – Attachment JL12, Specialized Technical Experience on Example Project

Submissions shall be limited to four (4) pages. Table 1, Submission Summary Table, to JL.12 is limited to one (1) page. Any additional pages shall not be considered during the evaluation process. Example submissions identified under JL.12 shall coincide with the projects/cost IDIQ contract identified under Attachments JL.11 and JL.11A.

FACTOR 2: SAFETY

Solicitation Submittal Requirements:

The Offeror shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each contractor who is part of the partnership or joint venture; however, only one safety narrative is required. EMR and DART Rates shall not be submitted for subcontractors.)

(1) TAB 2A - Experience Modification Rate (EMR): Experience Modification Rate (EMR) – Submit data for three previous calendar years’ (e.g. 2018, 2017, 2016). This rate compares company’s annual losses in insurance claims against its policy premiums. The Offeror may submit an insurance company-provided equivalent rate if no EMR exists. If the Offeror has no EMR or premium, for any year, affirmatively state so and explain why. Any extenuating circumstances that affect the EMR and negative trends shall be addressed as part of the element.

(2) TAB 2B - OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) and Total

Recordable Case (TRC) Rates - Submit data for three previous calendar years’ (e.g. 2018, 2017, 2016). If an Offeror cannot submit OSHA DART and TRC rates, for any year, affirmatively state so and explain why. Any extenuating circumstances that affected the OSHA DART and TRC rate data negatively shall be addressed as part of this element.

(3) TAB 2C - Technical Approach for Safety – Describe the plan for safety that will be implemented to evaluate safety performance of potential subcontractors as part of the selection process for all levels of subcontractors. The Offeror shall submit a narrative that fully describes the safety management system that they will use to oversee the safety compliance and performance of self-performed and sub-contractor performed work. The Offeror shall describe any innovative methods that will be employed to ensure and monitor safe work practices at self-performed and all subcontractor levels.

Additionally, describe the methodology to execute an effective program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps, including a description of your “Good Catch” Program. A “Good Catch” Program is defined as a program that recognizes and rewards employees for reporting unsafe and/or unhealthful situations and acts to create a climate of trust and safety. The program should also have procedures in place to address deficiencies and unsafe situations immediately and to document those actions accordingly. The technical approach to safety narrative shall be limited to one-double sided page or two single-sided pages.

Factor 2, Safety shall be submitted in Volume #1 – Technical Proposal as follows:

Tab 2A - EMR and Tab 2B - OSHA/DART and TRC have no page limits.

Tab 2C – Technical Approach for Safety is limited to two (2) pages

FACTOR 3: PAST PERFORMANCE

(1) If a completed CPARS evaluation is available, it shall be submitted on CD with the proposal for each submission (individual projects and IDIQ cost contract) listed in Factor 1, Specialized Experience. If a final CPARS evaluation is not available or if the final CPARS evaluation does not provide cumulative information, Offeror(s) are to submit all interim evaluations, if available, for the entire period for all projects and IDIQ cost contract submitted for Factor 1. Offeror(s) should include a summary sheet with its proposal of all CPARS being submitted on CD to include contract number, task order number and indicate if the CPARS evaluation was an interim or final. Note: CPARS evaluations are only to be submitted on CD for this Factor.

(2) IF A CPARS EVALUATION IS NOT AVAILABLE for the projects and/or IDIQ cost contract submission, listed under Factor 1, Specialized Experience, the offeror shall submit a Past Performance Questionnaire (PPQ), Attachment JL.14, included in the solicitation. The offeror must ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your non-cost proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror shall complete and submit with the proposal the first page of the PPQ (Attachment JL.14), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Jennifer De Vera via email at jennifer.devera@navy.mil prior to the proposal closing date. AN OFFEROR SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CPARS IS AVAILABLE. Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

(3) The offeror should also include any copies of award fee determinations pertaining to the projects provided under Factor 1, Specialized Experience since solicitation issuance date. Award fee determinations provided will not count towards the page limitations.

(4) In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

(5) The Government reserves the right to contact references for verification or additional information.

(6) While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

(7) The offeror may also provide an explanation of any past performance problems that may have developed on the projects submitted under Factor 1 and any corrective actions taken. Explanations shall not exceed one (1) double-sided page (or two (2) single-sided pages) in total.

Factor 3- Past Performance proposal shall be submitted in Volume #1 – Technical Proposal as follows:

Tab 3A – CPARS Evaluation, or Attachment JL.14, PPQ, for each submission under Factor 1 Specialized Experience. CPARS evaluations shall be numbered sequentially to correspond with sample submissions detailed under Factor 1.

FACTOR 4: COST MODEL

Organization of Cost Proposal

All cost and pricing information shall be furnished in Volume II- Cost Proposal. The Government will not be responsible for cost or pricing information provided in the Non-Cost Proposal (Technical and Past Performance) but not included in the cost proposal. “Data Other than Certified Cost or Pricing Data” shall be submitted by the Offeror to support cost realism, price reasonableness, and the completeness of the proposal. All “Data Other than Certified Cost or Pricing Data” submitted pursuant to this section is for the exclusive use of the Government. The content and format for submitting cost data shall be in accordance with general format outlined above and Section L Clause entitled, “Cost Proposal Submission Requirements,” as follows:

SECTION I - STANDARD FORM 33

Tab 4A - Signed and completed SF33 (solicitation, Offer and award) and SF30’s (if issued). Indicate period of validity of the offeror’s proposal in block 12 (at least 180 days) and the following information:

a. Cage Code, DUNS, and tax ID numbers for prime contractor. For joint ventures the cage code for each member of the joint venture, as well as the joint venture should be provided.

b. Date of Last Equal Employment Opportunity Report (EEO-1) certified filing for prime contractor or each member of a joint venture.

Tab 4B - When proposing as a joint venture, all members of the joint venture shall sign the SF 33 unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirement may eliminate the proposal from further consideration.

If the joint venture is subject to the SBA Mentor-Protégé Program, a copy of the SBA approval of the joint venture arrangement Mentor-Protégé agreement shall be included.

SECTION II - COST AND RELATED INFORMATION

The Cost Submission shall include the following:

• Attachment JL.1, Direct Labor Bid and Billing Rate Submission

• Attachment JL.1A, Direct Labor Rate Escalation Submission

• Attachment JL.2, Identification of Uncompensated Overtime Ratios

• Attachment JL.3, Indirect Ceiling Rates Build-Up, Award Fee Application and Distribution of Cost- Reimbursable Work

• Attachment JL.3A, Indirect Ceiling Rate Back Up Form 9.0

• Attachment JL.4, Indirect Ceiling Rate Form and Award Fee Application

• Attachment JL.5, Service Contract Labor Standards (formerly SCA) and Wage Rate Requirements

(Construction) (formerly DBA) Ceiling Labor Rate Form

• Attachment JL.6, Proposed, Historical and Year to Date Indirect Rates

• Attachment JL.7, Cost Model Worksheet

• Attachment JL.7A, Cost Model Summary Sheet

• Attachment JL.8, Program Management Office (PMO) Rate Form

Notes:

(1) If the offeror is a joint venture, and the joint venture partners are proposing separate rates, information must be provided in the same level of detail for each member of the joint venture team. One submittal may be submitted for the Joint Venture (JV) entity only if the JV has an established separate cost center for the JV entity with an adequate accounting system for a cost reimbursable contract. Subcontractor information may be submitted separately for proposal purposes.

(2) Offerors shall not deviate from the basic format of the forms identified in this solicitation. However, offerors may adjust columns, rows and cost elements under Attachments JL.3, JL.4, JL.6, and JL.7 in order to be consistent with their cost accounting systems. The cost proposal shall include the completed mandatory rate forms and supporting information in the general format outlined below:

(3) The cost proposal shall be a complete and detailed cost breakdown of all cost elements and other cost information required herein. Offerors shall submit proposals consistent with the structure of their established and/or disclosed accounting practices. The composition of indirect expense pools and bases thereof (Overhead, General and Administrative, Material Handling, etc.) shall be consistent with those actually being utilized by the company.

Proposed rates shall be based on recent history and/or budgetary projections. Pool expenses shall not include any of those expenses identified in FAR Part 31 as unallowable. The cost and pricing information shall be completed in accordance with the following:

Tab 4C - COST PROPOSAL WITH SUPPORTING DOCUMENTATION

a. DIRECT LABOR RATE SUBMISSION-ATTACHMENTS JL.1, JL.1A JL.2, and JL.5

Separate rate sheets shall be submitted by the prime or each joint venture member. Note: If the offeror is a JV and the JV members are proposing separate rates, separate rate sheets must be provided by each member of the JV.

ONE SUBMITTAL MAY BE SUBMITTED FOR THE JV ENTITY ONLY IF THE JV HAS AN ESTABLISHED

SEPARATE COST CENTER FOR THE JV ENTITY WITH AN ADEQUATE ACCOUNTING SYSTEM FOR A

COST REIMBURSEMENT CONTRACT.

(1) The labor categories and labor rates identified in Attachment JL.1 will become a part of the contract.

The labor categories and labor rates identified on Attachment JL.1 establish provisional/bid rates for negotiating/establishing baseline costs and maximum ceilings for Direct Labor during the base period and all option periods (if exercised) of the contract. The provisional/bid rates will be used by the Contractor to build their cost proposal at the task order level, and rates billed against specific task orders will be based on the actual labor rates in effect, not to exceed the ceiling rates allowed under the contract on Attachment JL.1.

Ceiling rates shall not exceed 10% above the proposed provisional rate for each contract period, unless approval is obtained in accordance with Section H5-Professional Labor Rates and Escalation Ceilings.

It is noted that the labor categories listed on Attachments JL.1 and JL.1A are for exempt employees (home office, supervisory, and specialty field and UXO personnel). Service Contract Labor Standards (SCA) or Wage Rate

Requirements Construction (DBA) categories are not included. However, it is recognized that the secretary, engineering technician, senior drafter, and drafter labor categories included in JL.1 could be classified as SCA labor categories under an individual task order, when a Service Contract Labor Standards Wage Determination is incorporated into the task order. The SCA and DBA rates used for proposals and billing purposes under individual task orders SHALL REFLECT THE MINIMUM RATES set forth on the applicable wage determination, unless a higher rate is otherwise approved by the Contracting Officer for use under the respective task order(s). The higher rate shall not exceed the SCA or DBA rate plus the applicable wage determination ceiling percent proposed under Attachment JL.5 (incorporated in the contact), for the particular trade, unless an exception is made in accordance with Section H6-Service Contract Labor Standards and Wage Rate Requirements (Construction) Base and Ceiling.

(2) Each prime or JV member shall provide average bid level (including any adjustment for uncompensated overtime -see attachment JL.2) and ceiling labor rates for ALL LABOR CATEGORIES listed on attachment JL.1 and JL.1A., regardless of whether the offeror currently employs personnel in every required category or intends to rely on team members/subcontractors for the particular labor categories. If the contractor/subcontractor does not currently employ an employee(s) under the listed category, a market rate shall be provided. All labor categories listed on JL.1 shall be tied to an internal labor category or categories. If an offeror is planning on using E-levels, then the E-level (i.e. E-1, E-2) also needs to be provided under the Company Equivalent Labor Category on Attachment JL.1.

(3) Offerors SHALL NOT ADD ADDITIONAL labor categories on JL.1. If it is determined that a labor category not listed on JL.1 is required for a task order, the Contract Administrator listed under Section G1-Contract Administration Data, paragraph (c), may approve the labor category and the corresponding bid/ceiling rate for the specific task order and, if applicable, may incorporate the labor category into the basic contract. Additionally, where it is determined necessary to utilize a specific individual on a task order, whose actual labor rate exceeds the established ceiling for the respective labor category, the Contractor will be required to obtain prior written approval from the Contract Administrator listed under Section G1. In the event that such approval is not properly obtained, the Government will only be required to reimburse the Contractor at the ceiling rate established in the contract. See Section H5 Professional Labor Rates and Escalation Ceiling concerning the addition of other labor categories and exceeding labor category ceiling rates.

(4) Attachment JL.1A reflects the escalation rate applied to the direct labor bid rate for Base Period (Year 1 and 2) and each year (Year 3,4, and 5) thereafter under Option Period 1. No additional escalation will be applied to the provisional rates when the option period is exercised. Therefore, offerors should factor escalation into their provisional rates for the Option Period (Years 3, 4, and 5). For each labor category, the Offeror shall enter its escalation factors applied to the provisional rates for each option period on Attachment JL.1A. The offeror shall also provide the basis for any proposed/projected escalation and the assumptions used: forecast source (such as Global Insight), index used (index number and title), calculations (index values used: base and projected values), and dates used (month and year of applicable index numbers). The offeror shall provide copies of the escalation forecasts as support documentation in their proposal.

(5) Cost proposal shall address CEILING RATES FOR SERVICE CONTRACT LABOR STANDARDS AND WAGE RATE REQUIREMENTS (CONSTRUCTION) labor categories by completing ATTACHMENT JL5.

(6) Offerors shall provide the following information to support the proposed direct labor rates:

Offerors shall provide and discuss how the proposed labor rate ceilings on JL.1 were derived. Provide information on the basis of the base rates used to arrive at the ceiling rates, such as whether the base rates were based on actual individual rates for personnel, average or weighted rates for current employees, forward pricing rates, market sources such as Bureau of Labor Statistics or salary.com, or the offeror’s estimate, etc. (Note: Regardless of how the base rate was derived, such as an individual rate, all employees proposed under that Contract Labor Category/Company Equivalent Labor Category will be subject to the proposed ceiling rate.) If a composite labor rate is utilized or a labor rate is prorated over fiscal years, provide the specific details/calculations used to determine the rate. If forward pricing rates apply, provide a copy in Appendix A. Any deviation from forward pricing rates, current rates, etc. shall be clearly documented. Note the percent markup used on the base rates to arrive at the proposed ceiling rate for each labor category. Complete JL.1 showing the base rate for each labor category, percentage markup for each labor category and ceiling rate for the base and option years.

If uncompensated overtime is proposed and used in calculating individual and average labor rates for Fair Labor Standards Act exempt employees listed in Attachment JL.1 and JL.1A, complete, Attachment JL.2 (IDENTIFICATION OF RATIOS) for each affected labor category. Additionally, provide in Appendix B: (1) required information per provision FAR 52.237-10 Identification of Uncompensated Overtime (Mar 2015); (2) historical number of hours in excess of 40 hours per week for each labor category; and (3) evidence of the Defense Contract Audit Agency or Defense Contract Management Agency approval of the corporate policy addressing uncompensated effort.

Shown below are sample entries for the JL.1, Direct Labor Bid and Billing Rate Form:

Contract Labor Category

Company Equivalent Labor Category (Do not list an individual name in this Column)

Source Base Year Individual or Average Bid Level Rate

Percent Mark-Up for Direct Labor Ceiling Rate

Base Year Maximum Ceiling Rate for Billing Purposes

Program Manager

Program Manager I, E-6 Individual Rate (Jane Doe)

$000 0% $000

Sr Project Engineer

Sr. Associate Engineer E-4

2017 Avg. Rate $000 0% $000

Project Superintendent/ Construction Site Manager

Construction Site Supervisor-3 and Construction Manager -

2017 Average Rates

$000 0% $000

Senior Drafter Drafter 3 Market Rate $000 0% $000

Shown below are sample entries for the JL.1A, Direct Labor Rate Escalation Form:

Contract Labor Category

Company Equivalent Labor Category

Source Base Year Individual or Average Bid Level Rate

Escalation Factor Applied to Option Year

Option Year 1 Individual/ Average Bid Level Rate

Program Manager

Program Manager I, E-6 Individual Rate (Jane Doe)

$000 0% $000

Sr Project Engineer

Sr. Associate Engineer- E-4

2017 Avg.

Rates

$000 0% $000

Project Superintendent/ Construction Site Manager

Construction Site Supervisor-3 and Construction Manager -

2017 Average Rates

$000 0% $000

Senior Drafter Drafter 3 Market Rate $000 0% $000

b. INDIRECT RATES SUBMISSION - ATTACHMENTS JL.3, JL.3A, JL.4 AND JL.6

1. INDIRECT RATES, FEE APPLICATION FORM AND DISTRIBUTION OF COST-REIMBURSABLE

WORK - (A separate rate sheet shall be submitted by the prime and each joint venture member. A separate rate sheet shall also be provided for unpopulated JVs in which the JV itself has fees/markups.) (NOTE: If the JV has an established separate cost center for the JV entity with an adequate accounting system for a reimbursement contract, one form may be submitted for the JV entity). The indirect ceiling rates proposed will be the maximum allowable rates that can be proposed or billed under task orders issued during the ordering period. These are not bid rates.

Indirect rates proposed for individual task orders may be less and should be in accordance with the offeror’s disclosed estimating system practices and, if applicable, forward pricing rate agreements. Additionally, should actual rates experienced during performance of the contract be lower than the ceiling rates shown, actual rates will be billed. The indirect rate ceilings will be incorporated into the awarded contract as stated under Section H hereto.

(1) The offeror shall submit a completed Indirect Ceiling Rates Build-Up, Award Fee Application and Distribution of Cost-Reimbursable…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .