N62473-18-R-2290_AMENDMENT_0002_WITH_ATTACHED_WD.pdf
PDF 313 KB Posted
- Solicitation number
- N6247318R2290
About this file
This document provides details for a competitive procurement for an Indefinite Delivery Indefinite Quantity Job Order Contract for electrical projects at various government facilities within the Naval Base Ventura County Area of Responsibility in California. The contract term is for a base period of two years and one three-year option period, with a maximum total performance period of five years. The North American Industry Classification System code is 238210 for Electrical Contractors and Other Wiring Installation Contractors, with a small business size standard of $15 million. The estimated maximum contract value including all options is approximately $24 million. Task orders will range from $2,000 to $750,000, and one seed project is expected to be awarded initially. Proposals will be evaluated on ability to manage multiple projects, experience, past performance, safety, and price based on the seed project. The solicitation will be available on the Navy Electronic Commerce Online website starting around September 17, 2018.
N62473-18-R-2290_AMENDMENT_0002_WITH_ATTACHED_WD.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6247318R2290_AMENDMENT_0001.pdf | ||
| COMBINED_JOC_RFP_EXHIBITS.pdf | ||
| VENTURA_JOC_WAGE_DECISION_091718.pdf | ||
| VENTURA_ELECTRICAL_NAICS_238210_JOC_PTO_0001.xlsx | XLSX spreadsheet | |
| N62473-18-R-2290_IDIQ_JOC_238210_RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
THE PURPOSE OF THIS AMENDMENT IS TO:
(1) CORRECT SECTION M LANGUAGE CONCERNING TYPE OF PROJECTS COVERED BY THIS SOLICITATION;
(2) INCORPORATE ADDITIONAL WAGE DETERMINATION FOR FORT HUNTER LIGGETT WORK (MONTEREY COUNTY), CA; and
(3) EXTEND PROPOSAL RECEIPT DATE TO NOVEMBER 13, 2018 AT 2:00 PM LOCAL SAN DIEGO, CA TIME.
SEE PAGE 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247318R2290
X 9B. DATED (SEE ITEM 11)
17-Sep-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Sep-2018
CODE
NAVFAC SOUTHWEST
CAPITAL IMPROVEMENTS CONTRACTS CORE
CODE: FOCAS
1220 PACIFIC HIGHWAY
SAN DIEGO CA 93132-5190
N62473 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247318R2290
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 10-Nov-2018 02:00 PM to 13-Nov-2018 02:00 PM.
SECTION M - EVALUATION FACTORS FOR AWARD
The following have been modified:
SECTION M
BASIS FOR AWARD
EVALUATION FACTORS FOR AWARD
1. The solicitation requires the evaluation of price and the following non-price factors:
Factor 1 – Ability to Manage Multiple Simultaneous Projects
Factor 2 – Experience
Factor 3 – Past Performance
Factor 4 – Safety
Factor 5 – Price - Based on Proposed Task Order 0001 (Exhibit M)
The distinction between corporate experience and past performance is corporate experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
2. The relative order of importance of the non-price evaluation factors:
Factor 1 (Ability to Manage Multiple Simultaneous Projects) will be rated as either Acceptable or Unacceptable. If an Offeror is rated Unacceptable for Factor 1, they will not be eligible for award. Factors 2 through 4 and price will be considered. The technical factors (2 and 4) are of equal importance to each other, respectively, and, when combined, are of equal importance to the performance confidence assessment (Factor 3, Past Performance). The combined non-price factors are approximately equal to price.
The importance of price will increase if the Offerors’ non-price proposals are considered essentially equal in terms of overall quality, or if price is so high, or low, as to significantly diminish the value of a non-price proposal’s superiority to the Government. Award will be made to the responsible Offeror(s) whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered.
3. Definitions:
DEFICIENCY: A material failure of a proposal to meet a solicitation requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.
WEAKNESS: A flaw in the proposal that increases the risk of unsuccessful contract performance.
SIGNIFICANT WEAKNESS: A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance.
STRENGTH: An aspect of a proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
PAST PERFORMANCE: Relates to how well an Offeror and Offeror's Team has performed; e.g., the quality of work accomplished, schedule compliance, customer satisfaction.
EXPERIENCE: Pertains to work performed by an Offeror and Offeror's Team, within the prescribed timeframe, which is the same or similar to the work that may be ordered under this contract in terms of size, scope, and complexity. Experience is distinct from past performance (how well an Offeror has performed).
PROJECT: A design-build or design-bid-build construction activity or task, with a single starting point and a single ending point.
COMBINED PROJECT(S): Projects with multiple starting and ending points, performed under separate task orders, delivery orders, or multiple contracts combined in a single description. No credit will be given for work performed under MACC/IDIQ contracts in the aggregate or for multiple projects completed under more than one task/delivery order.
RENOVATION, REPAIR, ALTERATION PROJECT TYPES: Refers to projects where the work modifies existing facilities.
NEW CONSTRUCTION: Refers to creating entirely new facilities (or new expansions/ additions to existing facilities where a new structure and foundation are provided as part of the expansion/addition).
100% COMPLETE: The facility is completely constructed and ready for the intended use.
OFFEROR: Refers to the Contractor submitting the proposal as Offeror, including joint ventures, whose name and address appears in Block 14 of Standard Form (SF) 1442 (Solicitation, Offer and Award). In the event of a conflict or inconsistency between the Offeror's name and address cited on the SF 1442 and any other part of the proposal, the
SF 1442 is the conclusive document in determining the Offeror who is submitting the proposal.
JOINT VENTURE (JV): A legal business entity formed between two or more companies (parties) to undertake the performance activities of a contract together. This does not include other arrangements such as "teaming agreement" or "strategic alliance," which are not recognized as bona fide joint ventures for the purposes of this solicitation.
FIVE-YEAR PERIOD: The prescribed timeframe for this solicitation that refers to the period of time for which projects may be submitted for experience or past performance. The five-year period is calculated by counting back five years from the initial RFP issuance date.
DESIGN-BID-BUILD: Refers to the traditional delivery method where design and construction are sequential and contracted for separately, with two separate contracts and contractors; one for an A-E contract and one for a construction contract.
SELF-PERFORM: Refers to performing relevant, major construction trade work in-house without subcontractors.
This does not include project administration or management functions (such as quality control or safety program) and miscellaneous work (such as housekeeping or cleanup). Relevant, major construction trade work is that which is the same or similar to the work that may be ordered under this contract.
PAGE: Refers to one printed side of a piece of paper. (For example, 5 pieces of paper printed on both sides would result in 10 pages of narrative.)
FACTOR 1: ABILITY TO MANAGE MULTIPLE SIMULTANEOUS PROJECTS
a. Proposal Submission Requirements:
The current composition and proposed staffing of the firm to manage multiple simultaneous projects will be evaluated in this factor.
The Offeror shall submit the following information under Tab “1”:
(1) Using Exhibit “A” (Current Composition and Proposed Staffing), provide a narrative describing the current
Offeror composition and the proposed staffing if awarded the single contract. Provide the role, responsibilities, and contractual relationships between the various firms (see FAR Subpart 9.6). On a separate sheet, include a simple organizational chart that clearly identifies the lines of authority between the entities. If the experience of an entity is being claimed in Factor 2, that entity must be named in the above narrative and organizational chart.
(2) In addition to the narrative, and if applicable, the Offeror shall submit a signed copy of a joint venture agreement, partnership agreement, teaming agreement, or approved mentor-protégé agreement (MPA).
b. Basis of Evaluation:
The assessment of the Offeror’s current composition and proposed staffing will be used as a means to evaluate the
Offeror’s likely ability to manage multiple simultaneous projects. This factor will be rated on an Acceptable or
Unacceptable basis.
FACTOR 2: EXPERIENCE (See definition)
Submit Exhibit “B” (Construction Experience Project Data Sheet) under Tab “2.”
Construction Experience:
Submit a maximum of five (5) relevant construction projects for the Offeror that best demonstrate your experience on projects that are similar in size, scope, and complexity to projects that may be ordered under this contract. For purposes of this evaluation, relevant projects are further defined as ELECTRICAL SYSTEMS alteration, repair, and construction projects and associated related work within the construction cost range of $2,000 to $750,000.
In addition, the Offeror shall meet the following minimum requirements:
At least two (2) relevant construction projects shall have a construction cost of $500,000 or more. This refers to the total contract cost if the work was performed by the Offeror as prime contractor, and the subcontract cost if the work was performed by the Offeror as a subcontractor.
At least one project demonstrating self-performed construction experience.
Exhibit “B” must clearly address how the project meets the above requirements.
Projects submitted for the Offeror shall be 100% complete (see definition) within the past five (5) years of the date of issuance of this RFP.
A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project;
rather Offerors shall submit the work performed under a task order as a project.
The attached Construction Experience Project Data Sheet (Exhibit “B”) is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).
For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (how the project meets the requirements listed above).
If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the
Joint Venture entity. If the Joint Venture does not have shared experience, projects shall be submitted for the Joint
Venture members. Offerors who fail to submit experience for all Joint Venture members may be rated lower.
Offerors are still limited to a total of five (5) projects combined.
If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies
(name and address is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent/LLC/LTD firm will have meaningful involvement in the performance of this contract.
Regarding any such submitted project, if the Offeror fails to demonstrate the affiliate/subsidiary/parent/LLC/LTD firm’s meaningful involvement in the performance of this contract, the project will not be considered relevant and will not be evaluated.
The Offeror may not utilize experience of a subcontractor to demonstrate construction experience under this evaluation factor.
The basis of evaluation will include the Offeror’s Team’s demonstrated experience and depth of experience in performing relevant construction projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review five projects (5) for construction. Any projects submitted in excess of the five (5) for Construction Experience will not be considered.
Offerors who submit relevant projects that demonstrate experience self-performing major construction trade work on two (2) or more relevant construction projects may receive a higher rating than those who do not demonstrate self-performance (see definition).
FACTOR 3: PAST PERFORMANCE
Submit Past Performance Questionnaires (Exhibit “C”) and CCASS/ACASS/CPARS evaluations under Tab “2” immediately following each of the project data sheets to which they pertain. Submit any other past performance information under Tab “3.”
If a completed Construction Contractor Appraisal Support System (CCASS) or Contractor Performance Assessment
Rating System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in
Factor 2 for construction experience. If there is not a completed CCASS, ACASS, or CPARS evaluation, submit a
Past Performance Questionnaire (Exhibit “C”) for each project included in Factor 2 for both Construction
Experience and Design Experience. The Offeror should provide completed Past Performance Questionnaires (PPQ) in the proposal. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other
RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. If the client requests questionnaires may be submitted directly to the Government’s point of contact BRAD CRAWFORD at bradley.crawford@navy.mil..
mailto:bradley.crawford@navy.mil
Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 2 – Experience. Offerors may also address any adverse past performance issues.
Explanations shall not exceed one (1) double-sided page (or two (2) single-sided pages) in total.
The Government reserves the right to contact references for verification or additional information. The
Government’s inability to contact any of the Offeror’s references or the references unwillingness to provide the information requested may affect the Government’s evaluation of this factor.
Performance award or additional information submitted will not be considered.
This evaluation focuses on how well the Offeror performed on the recent, relevant projects submitted under Factor 2
– Experience. In addition to the above, the Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance
Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of Contractors who are part of a partnership or joint venture identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee
Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
The Government will consider the currency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s and design firms’ performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the Offeror’s team’s past performance will be used as a means of evaluating the Offeror’s team’s probability to successfully meet the requirements of the RFP.
With respect to relevancy, past performance of greater relevancy will have more influence on the past performance confidence assessment than past performance of lesser relevance.
Offerors lacking relevant past performance history will not be evaluated favorably or unfavorably in past performance and will receive a Neutral Confidence rating.
FACTOR 4: SAFETY
Submit Exhibit “D” (Safety Data Sheet / Safety Narrative) under Tab “4.” Individual blocks on this form may be expanded.
For a partnership or joint venture, EMR, DART, and TRC rates are required for each entity that is part of the partnership or joint venture; however, only one safety narrative is required. Rates shall not be submitted for subcontractors.
The Offeror shall submit the following information:
(1) Experience Modification Rate (EMR):
For the three (3) previous complete calendar years (2015, 2016, and 2017), submit your EMR (which compares your company’s annual losses in insurance claims against its policy premiums over a three-year period). If you have no
EMR, affirmatively state so and explain why. Any extenuating circumstances that affected the EMR and upward or downward trends should be addressed as part of this element. Lower EMRs will be given greater weight in the evaluation.
(2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) and Total Recordable Case
(TRC) Rates:
For the three (3) previous complete calendar years (2015, 2016, and 2017), submit your OSHA DART rate, as defined by the U. S. Department of Labor, Occupational Safety and Health Administration. If you cannot submit an
OSHA DART or TRC Rates, affirmatively state so and explain why. Any extenuating circumstances that affected the OSHA DART and TRC Rates and upward or downward trends should be addressed as part of this element.
Lower OSHA DART and TRC Rates will be given greater weight in the evaluation.
(3) Technical Approach to Safety:
Describe the plan that the Offeror will implement to evaluate safety performance of potential subcontractors, as a part of the selection process for all levels of subcontractors. Also, describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at all subcontractor levels. The Safety narrative shall be limited to two pages.
The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for its self-performed work and the work of its subcontractors. The Government will evaluate the Offeror’s overall safety record, the Offeror’s plan to select and monitor subcontractors, and any innovative safety methods that the Offeror plans to implement for this procurement. The Government’s sources of information for evaluating safety will include, but are not limited to:
OSHA, NAVFAC’s Enterprise Safety Applications Management System (ESAMS) database, and other related databases. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete safety information regarding these submittal requirements rests with the Offeror.
The evaluation will collectively consider the following:
Experience Modification Rate (EMR)
OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate
Total Recordable Cases (TRC) Rate
Offeror Technical Approach to Safety
Other sources of information available to the Government
(1) Experience Modification Rate (EMR):
The Government will evaluate the EMR to determine if the Offeror has demonstrated a history of safe work practices taking into account any upward or downward trends and extenuating circumstances that impact the rates.
Lower EMRs will be given greater weight in the evaluation.
(2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) and Total Recordable Cases
(TRC) Rate:
The Government will evaluate the OSHA DART and TRC Rates to determine if the Offeror has demonstrated a history of safe work practices taking into account any upward or downward trends and extenuating circumstances that impact the rates. Lower OSHA DART and TRC Rates will be given greater weight in the evaluation.
(3) Technical Approach to Safety:
The Government will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on projects under this procurement. The Government will also evaluate the narrative to determine the degree to which innovations are being proposed that may enhance safety on projects under this procurement. Those Offerors whose plan demonstrates a commitment to hire subcontractors with a culture of safety and who propose innovative methods to enhance a safe working environment may be given greater weight in the evaluation.
FACTOR 5: PRICE – Based on Proposed Task Order 0001 (Exhibit M)
The Offeror (see definition) shall complete and submit (in a sealed envelope) the following in the order shown below under Tab “5” of the original proposal only.
SF1442 (Solicitation, Offer, and Award) with blocks 14 through 20c completed;
Bid Guarantee (in the contract minimum guarantee amount of $5,000);
Copies of pages or screen shots from most recent 2018 R. S. Means Facilities Construction Cost Data software used to provide pricing; and
Completed Exhibit K Coefficient Breakdown Form with Profit Language
Completed Exhibit M PTO #0001 Worksheet
With regard to price as shown on the SF 1442, the only Contract Line Item that Offerors are to complete is Line
Item 0002 of Section B SUPPLIES OR SERVICES AND PRICES for Proposed Task Order 0001.
Failure to submit a Bid Bond conforming to the requirements of the solicitation may result in an Offeror's proposal being rejected as unacceptable.
The price proposal for Proposed Task Order 0001 will be evaluated to determine the reasonableness and completeness of the Offeror’s proposal. The following techniques will be used to ensure a fair and reasonable price:
- Comparison of proposed prices received in response to the solicitation.
- Comparison of proposed prices with the independent Government estimate.
In addition, one or more of the following techniques may also be utilized:
- Comparison of proposed prices with available historical information.
- Comparison of proposed prices with resources proposed.
(End of Summary of Changes)
General Decision Number: CA180029 09/07/2018 CA29
Superseded General Decision Number: CA20170029
State: California
Construction Types: Building, Heavy (Heavy and Dredging) and Highway
Counties: Alameda, Calaveras, Contra Costa, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus and Tuolumne Counties in California.
BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 01/19/2018 3 01/26/2018 4 02/09/2018 5 03/02/2018 6 04/06/2018 7 04/13/2018 8 05/04/2018 9 06/01/2018 10 06/15/2018 11 06/29/2018 12 07/06/2018 13 07/13/2018 14 07/20/2018 15 07/27/2018 16 08/17/2018 17 08/24/2018 18 08/31/2018
9/19/2018https://www.wdol.gov/wdol/scafiles/davisbacon/CA29.dvb?v=19
19 09/07/2018
* ASBE0016-004 05/01/2018
AREA 1: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED,
MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS &
TOULMNE COUNTIES
AREA 2: ALAMEDA, CONTRA COSTA, SAN FRANSICO, SAN MATEO & SANTA
CLARA COUNTIES
Rates Fringes
Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not) Area 1......................$ 28.20 9.45 Area 2......................$ 35.03 9.45
ASBE0016-008 01/01/2018
AREA 1: ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN
FRANSICO, SAN MATEO, SANTA CLARA, & SANTA CRUZ
AREA 2: CALAVERAS, COLUSA, FRESNO, KINGS, MADERA, MARIPOSA,
MERCED, SAN JOAQUIN, STANISLAU, & TUOLUMNE
Rates Fringes
Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1......................$ 65.36 23.10 Area 2......................$ 49.46 23.10
BOIL0549-001 10/01/2016
AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA
CLARA COUNTIES
AREA 2: REMAINING COUNTIES
Rates Fringes
BOILERMAKER
Area 1......................$ 43.28 37.91 Area 2......................$ 39.68 35.71
BRCA0003-001 08/01/2017
Rates Fringes
MARBLE FINISHER..................$ 32.60 15.31
BRCA0003-003 08/01/2017
Rates Fringes
MARBLE MASON.....................$ 44.60 26.83
BRCA0003-005 05/01/2017
Rates Fringes
BRICKLAYER
( 1) Fresno, Kings, Madera, Mariposa, Merced....$ 38.45 21.22 ( 7) San Francisco, San Mateo.......................$ 42.34 25.83 ( 8) Alameda, Contra Costa, San Benito, Santa Clara.......................$ 44.16 21.71 ( 9) Calaveras, San Joaquin, Stanislaus, Toulumne....................$ 39.66 20.76
(16) Monterey, Santa Cruz...$ 39.51 23.49
BRCA0003-008 09/01/2017
Rates Fringes
TERRAZZO FINISHER................$ 35.14 16.87
TERRAZZO WORKER/SETTER...........$ 44.11 26.36
BRCA0003-011 04/01/2018
AREA 1: Alameda, Contra Costa, Monterey, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz
AREA 2: Calaveras, San Joaquin, Stanislaus, Tuolumne
AREA 3: Fresno, Kings, Madera, Mariposa, Merced
Rates Fringes
TILE FINISHER
Area 1......................$ 28.56 15.87 Area 2......................$ 25.60 14.30 Area 3......................$ 25.88 15.17 Tile Layer Area 1......................$ 47.77 18.29 Area 2......................$ 42.67 16.81 Area 3......................$ 38.15 17.70
CARP0022-001 07/01/2018
San Francisco County
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 48.55 29.32 Journeyman Carpenter........$ 48.40 29.32 Millwright..................$ 48.50 30.91
CARP0034-001 07/01/2018
Rates Fringes
Diver Assistant Tender, ROV Tender/Technician...........$ 47.65 32.52 Diver standby...............$ 52.61 32.52 Diver Tender................$ 51.82 32.52 Diver wet...................$ 97.17 32.52 Manifold Operator (mixed gas)........................$ 56.82 32.52 Manifold Operator (Standby).$ 51.82 32.52
DEPTH PAY (Surface Diving):
050 to 100 ft $2.00 per foot 101 to 150 ft $3.00 per foot 151 to 220 ft $4.00 per foot
SATURATION DIVING:
The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.
DIVING IN ENCLOSURES:
Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48" in height, the premium will be $1.00 per foot.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
CARP0034-003 07/01/2017
Rates Fringes
Piledriver.......................$ 46.65 31.91
CARP0035-007 07/01/2017
AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties
AREA 2: Monterey, San Benito, Santa Cruz Counties
AREA 3: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San Joaquin, Stanislaus, Tuolumne Counties
Rates Fringes
Modular Furniture Installer Area 1 Installer I................$ 25.61 20.42 Installer II...............$ 22.18 20.42 Lead Installer.............$ 29.06 20.92 Master Installer...........$ 33.28 20.92 Area 2 Installer I................$ 22.96 20.42 Installer II...............$ 20.01 20.42 Lead Installer.............$ 25.93 20.92 Master Installer...........$ 29.56 20.92 Area 3 Installer I................$ 22.01 20.42 Installer II...............$ 19.24 20.42 Lead Installer.............$ 24.81 20.92 Master Installer...........$ 31.83 20.92
CARP0035-008 08/01/2018
AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties
AREA 2: Monterey, San Benito, Santa Cruz Counties
AREA 3: San Joaquin
AREA 4: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, Stanislaus, Tuolumne Counties
Rates Fringes
Drywall Installers/Lathers:
Area 1......................$ 48.40 29.76 Area 2......................$ 42.52 29.76 Area 3......................$ 41.02 29.15 Area 4......................$ 41.67 29.76 Drywall Stocker/Scrapper Area 1......................$ 24.20 17.29 Area 2......................$ 21.26 17.29 Area 3......................$ 20.51 16.88 Area 4......................$ 20.84 17.29
CARP0152-001 07/01/2018
Contra Costa County
Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 48.55 29.32 Journeyman Carpenter........$ 48.40 29.32 Millwright..................$ 48.50 30.91
CARP0152-002 07/01/2018
San Joaquin County
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 42.67 29.32 Journeyman Carpenter........$ 42.52 29.32 Millwright..................$ 45.02 30.91
CARP0152-004 07/01/2018
Calaveras, Mariposa, Merced, Stanislaus and Tuolumne Counties
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 41.32 29.32 Journeyman Carpenter........$ 41.17 29.32 Millwright..................$ 43.67 30.91
CARP0217-001 07/01/2018
San Mateo County
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 48.55 29.32 Journeyman Carpenter........$ 48.40 29.32 Millwright..................$ 48.50 30.91
CARP0405-001 07/01/2018
Santa Clara County
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 48.55 29.32 Journeyman Carpenter........$ 48.40 29.32 Millwright..................$ 48.50 30.91
CARP0405-002 07/01/2018
San Benito County
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 42.58 29.32 Journeyman Carpenter........$ 42.52 29.32 Millwright..................$ 45.02 30.91
CARP0505-001 07/01/2018
Santa Cruz County
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 42.67 29.32 Journeyman Carpenter........$ 42.52 29.32 Millwright..................$ 45.02 30.91
CARP0605-001 07/01/2018
Monterey County
Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 42.67 29.32 Journeyman Carpenter........$ 42.52 29.32 Millwright..................$ 45.02 30.91
CARP0701-001 07/01/2018
Fresno and Madera Counties
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 41.32 29.32 Journeyman Carpenter........$ 41.17 29.32 Millwright..................$ 43.67 30.91
CARP0713-001 07/01/2018
Alameda County
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 48.55 29.32 Journeyman Carpenter........$ 48.40 29.32 Millwright..................$ 48.50 30.91
CARP1109-001 07/01/2018
Kings County
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 48.40 29.32 Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 41.32 29.32 Journeyman Carpenter........$ 41.17 29.32 Millwright..................$ 43.67 30.91
ELEC0006-004 12/01/2017
SAN FRANCISCO COUNTY
Rates Fringes
Sound & Communications Installer...................$ 38.52 3%+18.05 Technician..................$ 44.30 3%+18.05
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.
ELEC0006-007 06/01/2018
SAN FRANCISCO COUNTY
Rates Fringes
ELECTRICIAN......................$ 71.00 3%+31.215
* ELEC0100-002 09/01/2018
FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
ELECTRICIAN......................$ 38.25 22.55
ELEC0100-005 12/01/2016
FRESNO, KINGS, MADERA
Rates Fringes
Communications System Installer...................$ 30.64 3%+17.86 Technician..................$ 34.89 3%+17.86
SCOPE OF WORK
Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems.
A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS
Background foreground music, Intercom and telephone interconnect systems, Telephone systems Nurse call systems, Radio page systems, School intercom and sound systems, Burglar alarm systems, Low voltage, master clock systems, Multi-media/multiplex systems, Sound and musical entertainment systems, RF systems, Antennas and Wave Guide, B. FIRE ALARM SYSTEMS Installation, wire pulling and testing
C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems Video security systems, Video entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV
D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems, Sonar/infrared monitoring equipment
E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE
INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO
THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems, Digital Data Systems Broadband and Baseband and Carriers Point of Sale Systems, VSAT Data Systems Data Communication Systems RF and Remote Control Systems, Fiber Optic Data Systems
WORK EXCLUDED Raceway systems are not covered (excluding Ladder-Rack for the purpose of the above listed systems).
Chases and/or nipples (not to exceed 10 feet) may be installed on open wiring systems. Energy management systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the scope). Fire alarm systems when installed in raceways (including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two
(2) conditions apply:
1. The project involves new or major remodel building trades construction.
2. The conductors for the fire alarm system are installed in conduit.
ELEC0234-001 06/01/2018
MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES
Rates Fringes
ELECTRICIAN
Zone A......................$ 46.15 25.48 Zone B......................$ 50.77 25.48
Zone A: All of Santa Cruz, Monterey, and San Benito Counties within 25 air miles of Highway 1 and Dolan Road in Moss Landing, and an area extending 5 miles east and west of Highway 101 South to the San Luis Obispo County Line
Zone B: Any area outside of Zone A
ELEC0234-003 12/01/2017
MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES
Rates Fringes
Sound & Communications Installer...................$ 38.02 18.69 Technician..................$ 43.72 18.86
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.
ELEC0302-001 01/01/2018
CONTRA COSTA COUNTY
Rates Fringes
CABLE SPLICER....................$ 56.17 26.59
ELECTRICIAN......................$ 49.76 26.59
ELEC0302-003 12/01/2017
CONTRA COSTA COUNTY
Rates Fringes
Sound & Communications Installer...................$ 37.22 18.66 Technician..................$ 42.80 18.83
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.
ELEC0332-001 06/01/2018
SANTA CLARA COUNTY
Rates Fringes
CABLE SPLICER....................$ 75.35 35.491
ELECTRICIAN......................$ 65.52 35.196
FOOTNOTES: Work under compressed air or where gas masks are required, orwork on ladders, scaffolds, stacks, "Bosun's chairs," or other structures and where the workers are not protected by permanent guard rails at a distance of 40 to 60 ft. from the ground or supporting structures: to be paid one and one-half times the straight-time rate of pay.
Work on structures of 60 ft. or over (as described above):
to be paid twice the straight-time rate of pay.
ELEC0332-003 12/01/2017
SANTA CLARA COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 38.02 18.69 Technician..................$ 43.72 18.86
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.
ELEC0595-001 06/01/2018
ALAMEDA COUNTY
Rates Fringes
CABLE SPLICER....................$ 61.03 3%+35.72
ELECTRICIAN......................$ 54.25 3%+35.72
ELEC0595-002 06/01/2018
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
CABLE SPLICER....................$ 42.55 7.45%+24.58
ELECTRICIAN
(1) Tunnel work.............$ 38.85 7.45%+24.58
(2) All other work.........$ 37.00 7.45%+24.58
ELEC0595-006 12/01/2017
ALAMEDA COUNTY
Rates Fringes
Sound & Communications Installer...................$ 38.02 3%+17.96 Technician..................$ 43.72 3%+17.96
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.
ELEC0595-008 12/01/2017
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
Communications System Installer...................$ 38.02 3%+17.96 Technician..................$ 43.72 3%+17.96
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.
ELEC0617-001 06/01/2018
SAN MATEO COUNTY
Rates Fringes
ELECTRICIAN......................$ 61.00 34.62
ELEC0617-003 12/01/2017
SAN MATEO COUNTY
Rates Fringes
Sound & Communications Installer...................$ 38.02 19.27 Technician..................$ 43.72 19.27
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.
ELEC0684-001 06/01/2018
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES
Rates Fringes
ELECTRICIAN......................$ 38.00 3%+21.33
CABLE SPLICER = 110% of Journeyman Electrician
ELEC0684-004 12/01/2016
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES
Rates Fringes
Communications System Installer...................$ 30.64 3%+17.86 Technician..................$ 34.89 3%+17.86
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or…