ELINS.xls

XLS spreadsheet 114 KB Posted

Attached to
repair and service vehicles and automotive type equipment
Solicitation number
N6247318Q2222
Issued by

View the file

Other files

File Type Posted
1and2.pdf PDF
Combined_Synopsis_and_Solicitation_Maintnenace.docx DOCX document
1700000_BSVE.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #<<FILL IN>>>
EXHIBIT A - E - CLIN 0001
Line Item 0001 Indefinite Delivery / Indefinite Quantity Price - Summary
PROVIDE PRICES FOR BSVE VEHICLE REPAIR - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
Summary Sheet Base and all Two Option Periods
DescriptionTotal
Base Period IDIQ$0.00
Option Period One IDIQ$0.00
Option Period Two IDIQ$0.00
TOTAL IDIQ$0.00

ELINs-Base Period-IDIQ

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #<<FILL IN>>>
EXHIBIT A - CLIN 0001
Line Item 0001 Indefinite Delivery / Indefinite Quantity Price - Base Period
PROVIDE PRICES FOR BSVE VEHICLE REPAIR- INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs A001 through A017
ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC(s)
A001Mechanic Labor Rate - Light DutyMechanic fully burdened labor rate for Light Duty vehicles - Contractor's location

- Class 1 Vehicles - up to 6,000 lbs. GVW

- Class 2 Vehicles - 6,001 - 10,000 lbs GVW10HR$0.00$0.00
A002Mechanic Labor Rate - Medimum DutyMechanic fully burdened labor rate for Medium Duty vehicles - Contractor's location

- Class 3 Vehicles - 10,001 - 14,000 lbs. GVW

- Class 4 Vehicles - 14,001 - 16,000 lbs. GVW

- Class 5 Vehicles - 16,001 - 19,500 lbs. GVW

- Class 6 Vehicles - 19,501 - 26,000 lbs. GVW15HR$0.00$0.00
A003Mechanic Labor Rate - Heavy DutyMechanic fully burdened labor rate for Heavy Duty vehicles - Contractor's location

- Class 7 Vehicles - 26,001 - 33,000 lbs. GVW

- Class 8 Vehicles - >33,001 lbs. GVW30HR$0.00$0.00
A004Mobile Mechanic Labor Rate - Light DutyContractor shall complete the requested repair at the Government designated location. This line item is for the Mobile Mechanic's fully burdened labor rate for light duty vehicles

- Class 1 Vehicles - up to 6,000 lbs. GVW

- Class 2 Vehicles - 6,001 - 10,000 lbs GVW240HR$0.00$0.00
A005Mobile Mechanic Labor Rate - Medimum DutyContractor shall complete the requested repair at the Government designated location. This line item is for the Mobile Mechanic's fully burdened labor rate for medium duty vehicles

- Class 3 Vehicles - 10,001 - 14,000 lbs. GVW

- Class 4 Vehicles - 14,001 - 16,000 lbs. GVW

- Class 5 Vehicles - 16,001 - 19,500 lbs. GVW

- Class 6 Vehicles - 19,501 - 26,000 lbs. GVW1,810HR$0.00$0.00
A006Mobile Mechanic Labor Rate - Heavy DutyContractor shall complete the requested repair at the Government designated location. This line item is for the Mobile Mechanic's fully burdened labor rate for heavy duty vehicles

- Class 7 Vehicles - 26,001 - 33,000 lbs. GVW

- Class 8 Vehicles - >33,001 lbs. GVW2,146HR$0.00$0.00
A007Vehicle Transportation - Light DutyWhen a vehicle is to be repaired at the Contractor's location, the Contractor shall transport the vehicle to be repaired from vehicle's location to the contractor's facility. Upon the completion of the repair the contractor will transport the vehicle back to the location designated by the Government.360MI$0.00$0.00
A008Vehicle Transportation - Medium DutyWhen a vehicle is to be repaired at the Contractor's location, the Contractor shall transport the vehicle to be repaired from vehicle's location to the contractor's facility. Upon the completion of the repair the contractor will transport the vehicle back to the location designated by the Government.690MI$0.00$0.00
A009Vehicle Transportation - Heavy DutyWhen a vehicle is to be repaired at the Contractor's location, the Contractor shall transport the vehicle to be repaired from vehicle's location to the contractor's facility. Upon the completion of the repair the contractor will transport the vehicle back to the location designated by the Government.360MI$0.00$0.00
TOTAL INDEFINITE QUANTITY PRICE BASE YEAR$0.00

ELINs-1st Opt Period-IDIQ

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #<<FILL IN>>>
EXHIBIT B - CLIN 0001
Line Item 0001 Indefinite Delivery / Indefinite Quantity Price - Option Period 1
PROVIDE PRICES FOR BSVE - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs B001 through B017
ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC(s)
B001Mechanic Labor Rate - Light DutyMechanic fully burdened labor rate for Light Duty vehicles - Contractor's location

- Class 1 Vehicles - up to 6,000 lbs. GVW

- Class 2 Vehicles - 6,001 - 10,000 lbs GVW10HR$ - 0$0.00
B002Mechanic Labor Rate - Medimum DutyMechanic fully burdened labor rate for Medium Duty vehicles - Contractor's location

- Class 3 Vehicles - 10,001 - 14,000 lbs. GVW

- Class 4 Vehicles - 14,001 - 16,000 lbs. GVW

- Class 5 Vehicles - 16,001 - 19,500 lbs. GVW

- Class 6 Vehicles - 19,501 - 26,000 lbs. GVW15HR$ - 0$0.00
B003Mechanic Labor Rate - Heavy DutyMechanic fully burdened labor rate for Heavy Duty vehicles - Contractor's location

- Class 7 Vehicles - 26,001 - 33,000 lbs. GVW

- Class 8 Vehicles - >33,001 lbs. GVW30HR$ - 0$0.00
B004Mobile Mechanic Labor Rate - Light DutyContractor shall complete the requested repair at the Government designated location. This line item is for the Mobile Mechanic's fully burdened labor rate for light duty vehicles

- Class 1 Vehicles - up to 6,000 lbs. GVW

- Class 2 Vehicles - 6,001 - 10,000 lbs GVW240HR$ - 0$0.00
B005Mobile Mechanic Labor Rate - Medimum DutyContractor shall complete the requested repair at the Government designated location. This line item is for the Mobile Mechanic's fully burdened labor rate for medium duty vehicles

- Class 3 Vehicles - 10,001 - 14,000 lbs. GVW

- Class 4 Vehicles - 14,001 - 16,000 lbs. GVW

- Class 5 Vehicles - 16,001 - 19,500 lbs. GVW

- Class 6 Vehicles - 19,501 - 26,000 lbs. GVW1,810HR$ - 0$0.00
B006Mobile Mechanic Labor Rate - Heavy DutyContractor shall complete the requested repair at the Government designated location. This line item is for the Mobile Mechanic's fully burdened labor rate for heavy duty vehicles

- Class 7 Vehicles - 26,001 - 33,000 lbs. GVW

- Class 8 Vehicles - >33,001 lbs. GVW2,146HR$ - 0$0.00
B007Vehicle Transportation - Light DutyWhen a vehicle is to be repaired at the Contractor's location, the Contractor shall transport the vehicle to be repaired from vehicle's location to the contractor's facility. Upon the completion of the repair the contractor will transport the vehicle back to the location designated by the Government.360MI$ - 0$0.00
B008Vehicle Transportation - Medium DutyWhen a vehicle is to be repaired at the Contractor's location, the Contractor shall transport the vehicle to be repaired from vehicle's location to the contractor's facility. Upon the completion of the repair the contractor will transport the vehicle back to the location designated by the Government.690MI$ - 0$0.00
B009Vehicle Transportation - Heavy DutyWhen a vehicle is to be repaired at the Contractor's location, the Contractor shall transport the vehicle to be repaired from vehicle's location to the contractor's facility. Upon the completion of the repair the contractor will transport the vehicle back to the location designated by the Government.360MI$ - 0$0.00
TOTAL INDEFINITE QUANTITY PRICE OPTION YEAR ONE$0.00

ELINs-2nd Opt Period-IDIQ

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #<<FILL IN>>>
EXHIBIT C - CLIN 0001
Line Item 0001 Indefinite Delivery / Indefinite Quantity Price - Option Period Two
PROVIDE PRICES FOR BSVE - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs C001 through C017
ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC(s)
C001Mechanic Labor Rate - Light DutyMechanic fully burdened labor rate for Light Duty vehicles - Contractor's location

- Class 1 Vehicles - up to 6,000 lbs. GVW

- Class 2 Vehicles - 6,001 - 10,000 lbs GVW10HR$ - 0$0.00
C002Mechanic Labor Rate - Medimum DutyMechanic fully burdened labor rate for Medium Duty vehicles - Contractor's location

- Class 3 Vehicles - 10,001 - 14,000 lbs. GVW

- Class 4 Vehicles - 14,001 - 16,000 lbs. GVW

- Class 5 Vehicles - 16,001 - 19,500 lbs. GVW

- Class 6 Vehicles - 19,501 - 26,000 lbs. GVW15HR$ - 0$0.00
C003Mechanic Labor Rate - Heavy DutyMechanic fully burdened labor rate for Heavy Duty vehicles - Contractor's location

- Class 7 Vehicles - 26,001 - 33,000 lbs. GVW

- Class 8 Vehicles - >33,001 lbs. GVW30HR$ - 0$0.00
C004Mobile Mechanic Labor Rate - Light DutyContractor shall complete the requested repair at the Government designated location. This line item is for the Mobile Mechanic's fully burdened labor rate for light duty vehicles

- Class 1 Vehicles - up to 6,000 lbs. GVW

- Class 2 Vehicles - 6,001 - 10,000 lbs GVW240HR$ - 0$0.00
C005Mobile Mechanic Labor Rate - Medimum DutyContractor shall complete the requested repair at the Government designated location. This line item is for the Mobile Mechanic's fully burdened labor rate for medium duty vehicles

- Class 3 Vehicles - 10,001 - 14,000 lbs. GVW

- Class 4 Vehicles - 14,001 - 16,000 lbs. GVW

- Class 5 Vehicles - 16,001 - 19,500 lbs. GVW

- Class 6 Vehicles - 19,501 - 26,000 lbs. GVW1,810HR$ - 0$0.00
C006Mobile Mechanic Labor Rate - Heavy DutyContractor shall complete the requested repair at the Government designated location. This line item is for the Mobile Mechanic's fully burdened labor rate for heavy duty vehicles

- Class 7 Vehicles - 26,001 - 33,000 lbs. GVW

- Class 8 Vehicles - >33,001 lbs. GVW2,146HR$ - 0$0.00
C007Vehicle Transportation - Light DutyWhen a vehicle is to be repaired at the Contractor's location, the Contractor shall transport the vehicle to be repaired from vehicle's location to the contractor's facility. Upon the completion of the repair the contractor will transport the vehicle back to the location designated by the Government.360MI$ - 0$0.00
C008Vehicle Transportation - Medium DutyWhen a vehicle is to be repaired at the Contractor's location, the Contractor shall transport the vehicle to be repaired from vehicle's location to the contractor's facility. Upon the completion of the repair the contractor will transport the vehicle back to the location designated by the Government.690MI$ - 0$0.00
C009Vehicle Transportation - Heavy DutyWhen a vehicle is to be repaired at the Contractor's location, the Contractor shall transport the vehicle to be repaired from vehicle's location to the contractor's facility. Upon the completion of the repair the contractor will transport the vehicle back to the location designated by the Government.360MI$ - 0$0.00
TOTAL INDEFINITE QUANTITY PRICE OPTION YEAR TWO$0.00

NAVFAC UOMs

ACAcreFRFramePDPad
AMAmpouleFTFootPGPackage
ATAssortmentFVFivePIPillow
AYAssemblyFYFiftyPMPlate
BABallGGGreat GrossPRPair
BDBundleGIGillPTPint
BEBaleGLGallonPXPellet
BFBoard FootGMGramPZPacket
BGBagGNGrainQTQuart
BKBookGPGroupRARation
BLBarrelGRGrossRDRound
BOBoltHDHundredRLReel
BQBriquetHFHundred FeetRMReam
BRBarHKHankRORoll
BTBottleHPHundred PoundsRXThousand Rounds
BXBoxHRHoursSBSquare Mile
CACartridgeHSHundred Square FeetSCSquare Centimeters
CBCarboyHWHundred WeightSDSkid
CCCubic CentimeterHYHundred YardsSESet
CDCubic YardINInchSFSquare Foot
CEConeJRJarSHSheet
CFCubic FootKGKilogramSISquare Inch
CGCentigramKMKilometerSKSkein
CICubic InchKRCaratSLSpool
CKCakeKTKitSMSquare Meter
CLCoilLBPoundSOShot
CMCentimeterLFLinear FootSPStrip
CNCanLGLengthSQSquare
COContainerLHLabor HoursSXStick
CUCurieLILiterSYSquare Yard
CYCylinderLMLinear MeterTCTruckload
CZCubic MeterLOLotTDTwenty-Four
DADaysLSLump SumTETen
DCDecagramLYLinear YardTFTwenty-Five
DEDecimeterMCThousand Cubic FeetTGGross Ton
DGDecigramMEMealTNTon
DLDeciliterMFThousand FeetTOTroy Ounce
DMDramMGMilligramTSThirty-Six
DODollarsMIMileTTTablet
DRDrumMLMilliliterTUTube
DWPennyweightMMMillimeterUNUnit
DZDozenMOMonthsUSUS U.S.P Unit
EAEachMRMeterVIVial
ENEach CollectionMXThousandWKWeek
EXExposureOTOutfitYDYard
FDFoldOZOunceYRYears

File details come from the government source that posted it.