01 90 00 Rev. 6-9.pdf
PDF 21 KB Posted
- Attached to
- Install Epoxy Flooring System, Hangar 1667
- Solicitation number
- N6247020R6007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amnd 0003 20R6007 FINAL .pdf | ||
| 09 67 23.16 Rev. 6-9.pdf | ||
| Amnd 0002 20R6007 FINAL .pdf | ||
| Amnd 0001 20R6007.pdf | ||
| 01 45 00.00 20 rev 5-14-2020.pdf | ||
| Pg2 Amnd 0001 20R6007.pdf | ||
| RFP 20R6007 B-1667 Epoxy Floors.pdf | ||
| Specs as One.pdf | ||
| Drawings As One.pdf | ||
| Master PPI Form Template.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTALL EPOXY FLOORING SYSTEM, HANGAR DECK B1667 6940002
DOCUMENT 01 90 00
SCOPE OF WORK
02/16
PART 1 GENERAL
1.1 CONTRACTOR RESPONSIBILITIES
The contractor will be responsible for project safety including his employees and the building occupants where they may be effected by construction activities. Provide necessary enclosures and barricades as required to effectively control access to the work area. Provided all required safety measures to insure the safety of his employees and the employees of his subcontractors. Make certain that there are no personnel under areas of construction or that would be affected by material lifting operations.
1.2 DRAWINGS
The drawings provided for this project are diagrammatic for clearness and legibility and although size and locations are shown to scale where possible, the contractor will make use of all information including manufacturers data and supplemental submittals and verify requirements at the site. It is not intended that the drawings fully indicate all requirements of the work and the contractor shall furnish such additional labor and material as may reasonably be required to complete the construction as shown. The Contractor is responsible for an on-site visit to inspect the work area and examine all conditions affecting the work.
All dimensions are the responsibility of the contractor for verification.
Adjustments that may be required will be the responsibility of this contractor and will be made with the consultation and direction of the Contracting Officer.
1.3 SUBMITTALS
Where shop drawings and/or samples are requested, furnish six copies to the government for review and approval prior to ordering or fabrication of any materials or assemblies. Incomplete submittals will not be reviewed and will be returned to the submitter for completion.
1.4 SUBCONTRACTOR/CONTRACTOR ACCOUNTABILITY
All contractors and sub-contractors for this project will be responsible for review and compliance of all requirements covered under this contract. It shall be the responsibility of this contractor to coordinate the work of all his sub-contractors. The government will not fund extra cost issues necessitated as a result of failure by this contractor to properly schedule and coordinate efforts made by him or his sub-contractors with the efforts of other sub-contractors. Work done out of sequence with other work, resulting in additional material requirements and effort and/or the removal and reinstallation of work already installed, will be the responsibility of this contractor at no additional cost to the government.
Revised 06/09/2020 SECTION 01 90 00 Page 1
1.5 SAMPLES
The government reserves the right to sample any materials at random from products delivered to the job site and test them to verify the products either conform to the project requirements or approved substitution.
Products, which do not conform, shall be removed from the job site and replaced with new products that conform to the project requirements or approved substitution.
1.6 PRECONSTRUCTION CONFERENCE
Pre-construction conference will convene after approval of submittals and before performing any associated work. The contracting officer will hold a Pre-construction conference to review the following:
a. Drawings and specifications;
b. Procedure for the manufacturer's technical representative's onsite inspection and acceptance of materials per the warranty, the name of the manufacturer's technical representatives, the frequency of the onsite visits, copies of the status reports from the technical representatives to manufacturer, and pertinent details relating to the system;
c. Contractor's plan for coordination of the work of the various trades involved in providing the completed system and other components; and
d. Safety requirements. Pre construction conference will be attended by the designer, the contractor and personnel directly responsible for the installation of the system and representatives of the materials manufacturer. Before beginning any work, confirm in writing the resolution of conflicts among those attending the pre construction conference.
PART 2 PRODUCTS
2.1 GENERAL
2.1.1 Administrative Issues
2.1.1.1 Basic Design
Design drawings are provided as a method of communicating the basic design concept that the air station desires to execute. The intent of this project is to install a five coat epoxy flooring system with an integral vapor barrier in the hanger bay area in Hanger 1667. The existing concrete slab does not have a vapor barrier. The existing concrete floor will be prepared for the new coating system and the five coat system will be installed. The work will be installed in three phases and access and scheduling will be coordinated with the building occupant or organization. Each phase will be allocated no more than 30 days. Total construction time will be no more than 90 days. Phase 1 will be the North side, Phase 2 will be the Center, and Phase 3 will be the South side.
Each Phase will be BOD prior to the start of the next phase. A dust and debris barrier at least 6 feet high will be constructed between the sections where the work is in progress and the adjacent sections. The top coat/wear layer will be installed with a non-slip surface and painted walkway area as indicated. All non-permanent fixed equipment will be
Revised 06/09/2020 SECTION 01 90 00 Page 2 removed from the hanger by Government personnel prior to floor preparation. Any existing previous roof leaks have been repaired. The building tenants will be given one week to relocate their gear and aircraft between phases. The building tenants do not have any production schedules in place that will affect the Contract Completion Date. If during the construction phases, the weather temperature falls below 60 degrees, the contractor will be responsible for heating the floor and building area prior to placing the epoxy coats.
The work includes providing all labor, supervision, tools, equipment, materials, and transportation needed to test the existing slab for moisture penetration and install a five coat epoxy flooring system with a moisture barrier.
The units will coordinate with the Contractor to put in place a three phase work plan so the work can be accomplished in a timely manner and not adversely affect the Hanger operations. The Contractor will provide the manufacturer's standard warranty or better if requested.
2.2 SITEWORK
2.2.1 Demolition
2.2.1.1 Barricades and Trash Removal
2.3 FINISHES
2.3.1 Paint
Painting will be in accord with "The Master Painters Institute", Approved Product List, Latest edition. All work will follow the paint manufacturers instructions and recommendations for proper usage, environmental conditions, mixing, thinning, and rate and method of application. Use thinners following recommendations of the specific paint manufacturer used and only with written approval of the Contracting Officer.
2.4 SPECIALTIES
Not used.
2.5 EQUIPMENT
Not used.
2.6 FURNISHINGS
Not used.
2.7 SPECIAL CONSTRUCTION
Not used.
2.8 CONVEYING SYSTEMS
Not used.
2.9 MECHANICAL
Not used.
Revised 06/09/2020 SECTION 01 90 00 Page 3
2.10 ELECTRICAL
2.10.1 Reconnection
Provide for and make reconnection to all equipment and electrical devices that have been temporarily removed and reinstalled and/or relocated as required to facilitate the work under this contract.
2.10.2 Wiring
All work will be in accord with the National Electric Code, NFPA 70. The minimum wire size will be no. 12 AWG. All wiring will be copper.
PART 3 EXECUTION
3.1 DRAWING PREPARATION
Provide project shop drawings as required to facilitate the activities of all disciplines and trades as noted under each item.
3.2 SPECIFICATIONS
Provide additional and revised specifications, as needed to complete project. These specifications may be specific with the manufacturer as well as generic in nature and shall fully delineate the items to be furnished, materials used, conditions of installation and service, and the method of installation.
3.3 POST CONSTRUCTION SERVICES
3.3.1 As-Built Drawings
Prepare final drawings as a mark-up on redlined "as-built" drawings for update of AutoCAD files by MCAS Cherry Point Facilities Engineering Department personnel. The contractor will keep daily records of the progress of construction and mark any changes made to the original design, approved by the government and incorporated into the final construction including revision to specification items. (The contractor is cautioned that the forgoing statement is not intended as a license to make changes in the design. Changes can only be made with specific requests for approval in the proper form covered elsewhere in these specifications and written approval by the government granted.)
-- End of Section --
Revised 06/09/2020 SECTION 01 90 00 Page 4
| 01 90 00 - SCOPE OF WORK |
| PART 1 GENERAL |
| 1.1 CONTRACTOR RESPONSIBILITIES |
| 1.2 DRAWINGS |
| 1.3 SUBMITTALS |
| 1.4 SUBCONTRACTOR/CONTRACTOR ACCOUNTABILITY |
| 1.5 SAMPLES |
| 1.6 PRECONSTRUCTION CONFERENCE |
| PART 2 PRODUCTS |
| 2.1 GENERAL |
| 2.1.1 Administrative Issues |
| 2.1.1.1 Basic Design |
| 2.2 SITEWORK |
| 2.2.1 Demolition |
| 2.2.1.1 Barricades and Trash Removal |
| 2.3 FINISHES |
| 2.3.1 Paint |
| 2.4 SPECIALTIES |
| 2.5 EQUIPMENT |
| 2.6 FURNISHINGS |
| 2.7 SPECIAL CONSTRUCTION |
| 2.8 CONVEYING SYSTEMS |
| 2.9 MECHANICAL |
| 2.10 ELECTRICAL |
| 2.10.1 Reconnection |
| 2.10.2 Wiring |
| PART 3 EXECUTION |
| 3.1 DRAWING PREPARATION |
| 3.2 SPECIFICATIONS |
| 3.3 POST CONSTRUCTION SERVICES |
| 3.3.1 As-Built Drawings |
File details come from the government source that posted it. Updated .