Amnd 0006 20R6000 Final.pdf

PDF 831 KB Posted

Attached to
Building 17 and 17A Renovation and Addition
Solicitation number
N6247020R6000
Issued by

View the file

Other files

File Type Posted
Large Cabinet.jpg JPG image
Tabernacle.jpg JPG image
08 62 00 Translucent Wall Panels.pdf PDF
Organ (2).jpg JPG image
Grand Piano.jpg JPG image
Baptismal Font.jpg JPG image
Organ (1).jpg JPG image
Altar (2).jpg JPG image
Altar (1).jpg JPG image
Amnd 0005 20R6000 Final.pdf PDF
Amnd 0004 20R6000 Final.pdf PDF
Amnd 0003 20R6000 Final.pdf PDF
Amnd 0002 20R6000 Final.pdf PDF
NAVFAC DWG 60025678.pdf PDF
NAVFAC DWG 60025676.pdf PDF
Amend 0001 20R6000.pdf PDF
N4008519B0095 Drawings_Part8.pdf PDF
N4008519B0095 Drawings_Part3.pdf PDF
N4008519B0095 Drawings_Part6.pdf PDF
N4008519B0095 Specs.pdf PDF
N4008519B0095 Drawings_Part7.pdf PDF
19-0095 Asbestos Survey 011020.pdf PDF
N4008519B0095 Drawings_Part2.pdf PDF
N4008519B0095 Drawings_Part5.pdf PDF
RFP N62470-20-R-6000.pdf PDF
N4008519B0095 Drawings_Part1.pdf PDF
19-0095 Lead Survey 011020.pdf PDF
N4008519B0095 Drawings_Part4.pdf PDF
N4008519B0095 Drawings_Part9.pdf PDF
Master PPI Form Template.xls XLS spreadsheet
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

19-0095 Building 17 and 17A Renovation and Addition Solicitation N6247020R6000 Marine Corps Base Camp Lejeune, North Carolina Amendment 0006

Block 14. DESCRIPTION OF AMENDMENT (cont.)

A. Add the following scope of work:

The Contractor shall provide one (1), 40 foot connex container for the storage of furniture upon contract award. The Contractor shall coordinate with the project Construction Manager/Engineering Technician to identify an appropriate location in the vicinity of BLDG 17 for the connex container. Once delivered, the Contractor shall allow the Marines fourteen (14) days to move furniture into the connex container. Periodic access shall be provided to the connex container. Upon renovation completion, the Contractor shall allow the Marines fourteen (14) days to move the furnishings from the connex container back into the building(s). Once the connex container is emptied, the Contractor shall remove the connex container from the site.

B. The following provides the Government’s responses to pre-award inquiries:

REFERENCE QUESTION GOVERNMENT RESPONSE

Page Section Para.

The plans call for us to figure 15% sheeting replacement on the main sanctuary. This material on the drawings looks to be about ¾” material. The specifications (Div. 6100) seems to imply that it is 2” thick material. I tend to agree that it is at least 1.5”, probably V-groove, material. The drawings also call for ½” sheeting overlay following up with Poli-Iso and another layer of ½” sheeting as a recovery board. Drwg S-302 Details 1 & 2 tells us to see Arch’s drwgs for roof make up. A – 201 Mark 13 says See structural drwgs. The SSMR spec is a Garland type specification, They usually require at least a 5/8” substrate to attach their panel to in a high wind zone. Remember that we can’t attach all the way thru the 1.5” roof sheeting because it is exposed on the inside of the building. The reason I am bringing this up is you are limited to the length of the longer screws that will be used to attach the SSMR clips thru all these different layers and the tips of these screws are usually 1/2'” long or longer.

Question: Is the ½” plywood overlay thick enough for screw take up for attachment of the other layers and the SSMR panel clips or do we need to use a thicker material for the first

Contractor shall bid per plans and specifications.

19-0095 Building 17 and 17A Renovation and Addition Solicitation N6247020R6000 Marine Corps Base Camp Lejeune, North Carolina Amendment 0006 overlay layer?

Solution: We could use 5/8” in place of the ½” overlay and possibly not have to have a recovery sheet on the top of the Poli-Iso. We could use a bearing plate beneath the SSMR clips in lieu of the recovery board?

We can find no specifications on the Translucent panels for the entry area of the fellowship hall. Please advise on basis of design and layout as layout will affect truss design.

Specification "08 62 00 Translucent Wall Panels" has been attached.

2 Amd, A Please provide information on Tabernacle, Organ, Piano, Large Cabinet, Baptismal Font and Alter.

Size, Model & Pictures?

Dimensions are as follows (L x W x H):

Tabernacle: 2’ x 2’ x 3’ and approx. 300 lbs., made of solid brass.

Organ: 5’ x 5’ x 4’ Grand piano: 7’ x 5’ x 3’ Large cabinet: 3’ x 3’ x 6’, has glass windows and is made of solid wood.

Baptismal font: 2’ x 2’ x 5’ Altar: 8’ x 4’ x 4’, approx.

200 lbs.

Photographs have been attached.

C. This amendment incorporates the following attachments:

1. 08 62 00 Translucent Wall Panels

2. Tabernacle (JPG File)

3. Organ (1) (JPG File)

4. Organ (2) (JPG File)

5. Grand Piano (JPG File)

6. Large Cabinet (JPG File)

7. Baptismal Font (JPG File)

8. Altar (1) (JPG File)

9. Altar (2) (JPG File)

D. All other contract terms and conditions remain unchanged.

Amnd 0006 20R6000
Untitled
Untitled

Pg2 Amnd 0006 20R6000

IDCode:
Page: 1
Pages: 3
AmendNo: AMENDMENT NO. 0006
EffDate: 05/22/20
ReqNo:
ProjNo: 19-0095
IssCode: ROICC81
IssuedBy: OICC FLORENCE

ROICC FLORENCE CAMP LEJEUNE

1121A HAMMOND ROAD

CAMP LEJEUNE, NC 28547

AdmCode:
AdminBy: See Item 6
ContName:
ContStrt:
ContCnty:
ContSt:
ContZIP:
Code:
FacCode:
SolChgYs: Yes
SolChgNo: Off
SolAmdNo: N6247020R6000
AmendDate: 04/16/20
ModNo:
ModDate:
NoCopies: 1
Amended: Yes
OffrExt: Off
OffrNoEx: No
ApprData:
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript:

N6247020R6000 Building 17 and 17A Renovation and Addition

The date and the hour for the receipt of proposals remains 29 May 2020 no later than 2:00 pm (EST).