N4008519B0095 Drawings_Part6.pdf
PDF 7 MB Posted
- Attached to
- Building 17 and 17A Renovation and Addition
- Solicitation number
- N6247020R6000
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Large Cabinet.jpg | JPG image | |
| Tabernacle.jpg | JPG image | |
| 08 62 00 Translucent Wall Panels.pdf | ||
| Organ (2).jpg | JPG image | |
| Grand Piano.jpg | JPG image | |
| Baptismal Font.jpg | JPG image | |
| Organ (1).jpg | JPG image | |
| Altar (2).jpg | JPG image | |
| Amnd 0006 20R6000 Final.pdf | ||
| Altar (1).jpg | JPG image | |
| Amnd 0005 20R6000 Final.pdf | ||
| Amnd 0004 20R6000 Final.pdf | ||
| Amnd 0003 20R6000 Final.pdf | ||
| Amnd 0002 20R6000 Final.pdf | ||
| NAVFAC DWG 60025678.pdf | ||
| NAVFAC DWG 60025676.pdf | ||
| Amend 0001 20R6000.pdf | ||
| N4008519B0095 Drawings_Part8.pdf | ||
| N4008519B0095 Drawings_Part3.pdf | ||
| N4008519B0095 Specs.pdf | ||
| N4008519B0095 Drawings_Part7.pdf | ||
| 19-0095 Asbestos Survey 011020.pdf | ||
| N4008519B0095 Drawings_Part2.pdf | ||
| N4008519B0095 Drawings_Part5.pdf | ||
| RFP N62470-20-R-6000.pdf | ||
| N4008519B0095 Drawings_Part1.pdf | ||
| 19-0095 Lead Survey 011020.pdf | ||
| N4008519B0095 Drawings_Part4.pdf | ||
| N4008519B0095 Drawings_Part9.pdf | ||
| Master PPI Form Template.xls | XLS spreadsheet |
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
02/24/2020
The Walker Group Architecture, Inc PO Box 541, New Bern, NC 28563
252.636.8778 (PHONE)
252.636.8992 (FAX)
WALKER
GROUP
i n c o r p o r a t e d the
ARCHITECTURE
DISCLOSURE OF INFORMATION
CONTRACTOR SHALL COMPLY AS FOLLOWS:
(A) THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G., FILM, TAPE, DOCUMENT), PERTAINING TO ANY PART OF THIS CONTRACT OR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-
(1) THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL; OR
(2) THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF RELEASE
(B) REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL
SUBMIT ITS REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE FOR RELEASE.
(C) THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER HIS CONTRACT. SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION
TO RELEASE THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER.
DUCTLESS SPLIT SYSTEM HEAT PUMP SCHEDULE
COIL E.A.T. FAN DATA HEATING DATA ELECTRIC DATA INDOOR UNIT ELECTRIC DATA OUTDOOR UNIT
TOTAL COOLING SUPPLY TOTAL E.A.T.
TAG LOCATION CAPACITY M.B.H. ºF D.B. ºF W.B. AIR C.F.M. M.B.H (ºF) M.C.A. M.O.C.P. VOLTS PHASE TAG M.C.A. M.O.C.P. VOLTS PHASE REMARKS
DSS-1A TELECOM 9.0 80.0 67.0 265 12.0 70.0 INDOOR UNIT POWERED BY OUTDOOR UNIT DSS-1B 9.0 15.0 208 1 SEE NOTES
NOTES:
1. COOLING CAPACITY BASED ON 96º F AMBIENT, HEATING CAPACITY BASED ON 17° F.
2. PROVIDE INDOOR UNIT WITH COIL FREEZE PROTECTION, REMOTE MOUNTED THERMOSTAT, HIGH SIDE WALL CASSETTE CONFIGURATION, AND INTEGRAL CONDENSATE PUMP (5FT HEAD).
3. PROVIDE OUTDOOR UNIT WITH LOW AMBIENT CONTROL.
AIR CONTROL SCHEDULE
AIR SEPARATOR EXPANSION TANK
MAX. CAPACITY ACCEPTED APPROX. APPROX.
SYSTEM TAG G.P.M. P.D. FT. SIZE TAG (GAL.) CAPACITY (GAL.) DIAMETER HEIGHT REMARKS
HOT WATER AS-1 49.4 0.6 2 ET-1 13 11 12 38 SEE NOTES
NOTES:
1. PROVIDE COALESCING TYPE AIR SEPARATOR WITH HIGH CAPACITY AIR VENT.
2. PROVIDE VERTICAL BLADDER TYPE EXPANSION TANK WITH FLOOR SKIRT, PRE-CHARGE TO 25 PSIG.
PUMP SCHEDULE
HEAD ELECTRICAL DATA
TAG SERVICE TYPE CONTROL G.P.M. (FT.) H.P. VOLTS PHASE R.P.M. REMARKS
SHWP-1 SECONDARY HOT WATER INLINE VFD 49.4 25.0 3/4 208 3 1800 SEE NOTES
SHWP-2 SECONDARY HOT WATER INLINE VFD 49.4 25.0 3/4 208 3 1800 SEE NOTES
NOTES:
1. PROVIDE NON-OVERLOADING MOTOR SELECTION.
2. PROVIDE INVERTER DUTY RATED MOTOR SUITABLE FOR USE WITH A VFD.
AIR COOLED CHILLER SCHEDULE
CAPACITY EVAPORATOR CONDENSER FAN COMPRESSOR ELECTRICAL DATA
TAG (TONS) G.P.M. P.D. (FT.) E.W.T. (°F) L.W.T. (°F) QUANTITY F.L.A. TYPE QUANTITY R.L.A. M.C.A. M.O.C.P. VOLTS PHASE REMARKS
AC-1 80 104.6 6.2 58.2 42 6 39.4 SCROLL 4 73.9 388 450 208 3 SEE NOTES
NOTES:
1. PROVIDE WITH CONTROL VOLTAGE TRANSFORMER AND SEPARATE 120 VOLT CIRCUIT FOR EVAPORATOR HEAT TAPE.
2. PROVIDE MANUFACTURER'S PUMPING PACKAGE WITH DUAL 10.2 HP (SIZED FOR 40 FT. HEAD) PUMPS WITH INVERTER DUTY RATED MOTORS SUITABLE FOR USE WITH VARIABLE FREQUENCY DRIVES, STRAINERS, CHECK VALVES, EXPANSION TANK, AIR SEPARATOR, AND 156 GAL. BUFFER TANK. PUMPS SHALL BE CONSTRUCTED OF MANUFACTURER'S STANDARD MATERIALS SUITABLE FOR CHILLED WATER, AND PROVIDED WITH MECHANICAL SEALS, DRIP PROOF ELECTRIC MOTOR, AND NON-OVERLOADING SELECTION.
3. PROVIDE INTEGRAL CIRCUIT BREAKER, CONTROL VOLTAGE TRANSFORMERS, PUMPS, AND SEPARATE 120V CIRCUITS FOR EVAPORATOR PIPING HEAT TAPE AND BUFFER TANK HEAT TAPE.
4. PROVIDE WITH 4 STAGES OF UNLOADING. MINIMUM EFFICIENCY AT AHRI CONDITIONS: 9.066 EER / 13.527 NPLV.
5. PROVIDE WITH BACNET MS/TP INTERFACE, CONDENSER COIL GUARDS, WIDE AMBIENT CONDENSER CONTROL, AND 410A REFRIGERANT.
6. PROVIDE PHASE MONITORS FOR ALL 3 PHASE EQUIPMENT: PHASE UNBALANCE PROTECTION, OVER/UNDER VOLTAGE PROTECTION, PHASE LOSS PROTECTION, DELAY OF BREAK TIMER TO DELAY AUTOMATIC RESTARTS, NON-CRITICAL FAULT DELAY, PROGRAMMABLE AUTO/MANUAL RESTART, AND LOAD AND LINE SLIDE MONITORING.
7. CONDENSER COILS SHALL MEET 3000 HOUR SALT SPRAY TEST IN ACCORDANCE WITH ASTM B117-90.
8. EACH CIRCUIT SHALL BE PROVIDED WITH LIQUID AND SUCTION LINE SERVICE VALVES AND CORE FILTER DRIER ON THE LIQUID LINE.
9. CAPACITY BASED ON 96°F AMBIENT TEMPERATURE.
HOT WATER BOILER SCHEDULE
INPUT OUTPUT L.W.T. E.W.T. ELECTRICAL DATA
TAG FUEL (M.B.H.) (M.B.H.) G.P.M. (ºF) (ºF) M.C.A. M.O.C.P. VOLTS PHASE REMARKS
B-1 NATURAL GAS 285.0 270.8 24.7 120 100 4.5 3.6 120 1 SEE NOTES
B-2 NATURAL GAS 285.0 270.8 24.7 120 100 4.5 3.6 120 1 SEE NOTES
NOTES:
1. PROVIDE SUITABLE FOR 2 PSIG GAS PRESSURE.
2. PROVIDE SUITABLE FOR 80 PSI WORKING PRESSURE.
3. PROVIDE ALL TRIM AND APPURTENANCES RECOMMENDED FOR INDICATED APPLICATION.
4. PROVIDE BOILERS WITH INLINE PRIMARY HOT WATER PUMP RATED FOR 24.7 GPM AND 15 FT OF HEAD
5. PROVIDE MANUFACTURER'S CONDENSATE NEUTRALIZATION KIT.
SHUT OFF V.A.V. TERMINAL BOX SCHEDULE (HOT WATER)
VOL. REG. C.F.M. MAX INLET HEATING COIL
INLET S.P. W.P.D. A.P.D.
TAG SIZE (IN.) MIN. MAX. (IN. WG.) M.B.H. G.P.M. E.W.T. L.W.T. (FT. WG.) (IN. WG.) REMARKS
VAV-1 10" 290 960 0.5 21.0 2.50 120 103.0 0.34 0.55 SEE NOTES
VAV-2 6" 85 270 0.5 6.5 0.70 120 101.2 0.04 0.20 SEE NOTES
VAV-3 4" 70 225 0.5 5.7 0.59 120 100.6 0.03 0.15 SEE NOTES
VAV-4 12" 370 1230 0.5 29.1 3.20 120 101.7 0.59 0.49 SEE NOTES
VAV-5 12" 370 1230 0.5 29.1 3.20 120 101.7 0.59 0.49 SEE NOTES
VAV-6 6" 95 315 0.5 7.4 0.82 120 101.9 0.05 0.26 SEE NOTES
VAV-7 6" 120 400 0.5 9.6 1.04 120 101.5 0.05 0.52 SEE NOTES
VAV-8 6" 105 340 0.5 8.5 0.89 120 100.8 0.04 0.39 SEE NOTES
VAV-9 4" 45 145 0.5 3.5 0.38 120 101.2 0.02 0.05 SEE NOTES
NOTES:
1. HEATING COIL SELECTION BASED ON 55ºF E.A.T. AT 80% OF MAX. AIRFLOW.
2. SELECT UNITS FOR MAXIMUM NOISE CRITERIA OF 35.
AIR HANDLING UNIT SCHEDULE
SUPPLY FAN DATA CHILLED WATER COOLING COIL DATA HOT WATER HEATING COIL DATA
S.A. O.A. ELECTRICAL DATA TOTAL SENS. MAX. TOTAL MAX.
C.F.M. C.F.M. E.S.P. FAN
M.C.A. M.O.C.P.
CAPACITY CAPACITY E.D.B. E.W.B. E.W.T. L.W.T. W.P.D. CAPACITY E.D.B. E.W.T. L.W.T. W.P.D.
TAG TYPE (MAX./MIN.) (MAX./MIN.) (IN. WG.) H.P. TYPE VOLTS PHASE M.B.H. M.B.H. (ºF) (ºF) (ºF) (ºF) G.P.M. (FT. WG.) M.B.H. (ºF) (ºF) G.P.M. (ºF) (FT. WG.) REMARKS AHU-1 SZ VAV 10275/ 3085 2850/1425 1.25 10 DIRECT 208 37 60 3 526.6 288.2 79.3 69.9 42 57 70.0 8.6 296.1 54.0 120 29.7 100 0.4 SEE NOTES AHU-2 MZ VAV 5115 / 1535 1300/775 2.00 7.5 DIRECT 208 28 50 3 260.7 142.3 79.2 69.9 42 57 34.6 5.6 52.7 26.0 120 5.3 100 0.1 SEE NOTES
NOTES:
1. LEAVING AIR TEMPERATURE IS TO BE PROVIDED AT THE UNIT DISCHARGE, TOTAL & SENSIBLE CAPACITIES ARE "NET" VALUES TO BE PROVIDED DOWNSTREAM OF THE SUPPLY AIR FAN.
2. PROVIDE INVERTER DUTY RATED MOTOR AND VFD.
3. PROVIDE AHU-1 WITH THE FOLLOWING SECTIONS: MERV 8 FILTER, MIXING BOX, ACCESS PANEL, COOLING COIL, ACCESS PANEL, REHEAT COIL, ACCESS PANEL, AND FAN.
4. PROVIDE AHU-2 WITH THE FOLLOWING SECTIONS: MERV 8 FILTER, MIXING BOX, ACCESS PANEL, PREHEAT COIL, ACCESS PANEL, COOLING COIL, ACCESS PANEL, AND FAN.
5. PROVIDE AIR HANDLER UNITS WITH BACNET MS/TP INTERFACE.
FAN SCHEDULE
E.S.P. ELECTRICAL DATA
TAG LOCATION FAN TYPE C.F.M. (IN. WG.) DRIVE H.P. WATTS VOLTS PHASE REMARKS
EF-1 UNISEX 107 CABINET 75 0.3 DIRECT - 16 120 1 SEE NOTES
EF-2 UNISEX 312 CABINET 75 0.3 DIRECT - 16 120 1 SEE NOTES
EF-3 MENS 305/ WOMENS 306 INLINE 500 0.5 DIRECT 1/8 - 120 1 SEE NOTES
EF-4 MECH 110 SIDEWALL PROPELLER 550 0.3 DIRECT 1/8 - 120 1 SEE NOTES
EF-5 MECH/ELEC 309 INLINE 335 0.3 DIRECT 1/25 - 120 1 SEE NOTES
NOTES:
1. PROVIDE DIRECT DRIVE FANS WITH ELECTRONIC SPEED CONTROLLER.
2. PROVIDE INLINE FANS WITH CHATTERPROOF BACKDRAFT DAMPER, INTEGRAL ELECTRICAL DISCONNECT, AND GALVANIZED STEEL HOUSING.
3. PROVIDE CABINET CEILING FANS WITH CHATTERPROOF BACKDRAFT DAMPER, INTEGRAL ELECTRICAL DISCONNECT, DUCT FLANGE, AND INTEGRAL
OFF-WHITE ALUMINUM INTAKE GRILLE.
UNIT HEATER SCHEDULE
NOMINAL INPUT OUTPUT
TAG TYPE CFM WATTS MBH MBH MOTOR HP VOLTS PHASE REMARKS
UH-1 GAS-FIRED 505 - 30 24 1/15 120 1 SEE NOTES
UH-2 ELECTRIC 380 3000 - - 1/40 208 1 SEE NOTES
NOTES:
1. PROVIDE UH-1 WITH SINGLE STAGE COMBINATION GAS VALVE AND HORIZONTAL CONCENTRIC VENT OUTLET.
2. PROVIDE WITH REMOTE-WIRED THERMOSTAT, PROPELLER FAN, AND ADJUSTABLE HORIZONTAL LOUVERS.
LOUVER SCHEDULE
MIN. FREE AREA
TAG SERVICE SIZE (IN.) WxH (SF) C.F.M. SERVES REMARKS L-1 INTAKE 52x32 5.9 2850 AHU-1 SEE NOTES
L-2 INTAKE 40X24 2.8 1300 AHU-2 SEE NOTES
L-3 EXHAUST 10X10 0.19 75 EF-1, EF-2 SEE NOTES
L-4 EXHAUST 12X12 0.3 180 KITCHEN SEE NOTES
L-5 INTAKE 24x20 1.2 550 MECH 110 SEE NOTES L-6 INTAKE 20x18 0.7 335 MECH/ELEC 309 SEE NOTES L-7 EXHAUST 20x18 0.9 600 EF-3 SEE NOTES L-8 EXHAUST 18x14 0.5 335 EF-5 SEE NOTES L-9 RELIEF 48x48 8.8 2500 AHU-1 SEE NOTES L-10 EXHAUST 18x18 0.8 550 EF-4 SEE NOTES
NOTES:
1. PROVIDE INSECT SCREEN FOR INTAKE SERVICE, BIRDSCREEN FOR EXHAUST SERVICE.
2. PROVIDE ALUMINUM STORMPROOF CONSTRUCTION.
3. PROVIDE COLOR CHART FOR FINISH SELECTION BY COTR.
4. LOUVERS SHALL BE MIAMI-DADE COUNTY APPROVED, LISTED FOR AMCA 550 FOR WIND-DRIVEN RAIN RESISTANCE.
5. INTAKE LOUVERS SHALL BE AT MINIMUM 10 FEET ABOVE FINISHED FLOOR.
GRILLE, REGISTER & DIFFUSER SCHEDULE
C.F.M. NECK MAX.
TAG TYPE SERVICE RANGE SIZE P.D. REMARKS
A REGISTER SUPPLY 435 18x6 0.1 20 x 8 PANEL, DUCT MOUNTED, DRUM LOUVER, 3" BLADE SPACING C DIFFUSER SUPPLY 115 - 230 8"Ø 0.1 LAY IN, 24 x 24 PANEL, 4-WAY BLOW PATTERN D DIFFUSER SUPPLY 235 - 380 10"Ø 0.1 LAY IN, 24 x 24 PANEL, 4-WAY BLOW PATTERN E REGISTER SUPPLY 40 6x6 0.1 SURFACE MOUNTED, SINGLE DEFLECTION, 3/4" BLADE SPACING F REGISTER SUPPLY 100 6x6 0.1 8 x 8 PANEL, DUCT MOUNTED, DOUBLE DEFLECTION, 3/4" BLADE SPACING G REGISTER SUPPLY 200 16x6 0.1 SURFACE MOUNTED, SINGLE DEFLECTION, 3/4" BLADE SPACING K GRILLE RETURN 50 - 200 8 x 8 0.1 LAY IN, 24 x 24 PANEL, 35 DEG DEFLECTION, 1/2" BLADE SPACING L GRILLE RETURN 205 - 350 10 x 10 0.1 LAY IN, 24 x 24 PANEL, 35 DEG DEFLECTION, 1/2" BLADE SPACING M GRILLE RETURN 750 - 950 16 x 16 0.1 LAY IN, 24 x 24 PANEL, 35 DEG DEFLECTION, 1/2" BLADE SPACING N GRILLE RETURN 555 - 745 14 x 14 0.1 LAY IN, 24 x 24 PANEL, 35 DEG DEFLECTION, 1/2" BLADE SPACING O GRILLE RETURN 3850 46x34 0.1 48 x 36 PANEL, HEAVY DUTY, 30 DEG DEFLECTION, 3" BLADE SPACING T GRILLE EXHAUST 115-250 10x10 0.1 24 x 24 PANEL, 35 DEG DEFLECTION, 3/4" BLADE SPACING U GRILLE TRANSFER - 38x38 0.1 40x40 PANEL, HEAVY DUTY, 30 DEG DEFLECTION, 3" BLADE SPACING V GRILLE EXHAUST 50 6x6 0.1 12x12 PANEL, 35 DEG DEFLECTION, 3/4" BLADE SPACING
THE FOLLOWING NOTES ARE TYPICAL UNLESS OTHERWISE NOTED:
1. PROVIDE ALUMINUM DIFFUSERS AND REGISTERS WITH OPPOSED BLADE VOLUME DAMPERS, BAKED STANDARD WHITE ENAMEL FINISH (INCLUDING HEAD OF SCREWS), MAXIMUM NC=25 AT HIGHEST CFM AND PROVIDE SQUARE TO ROUND TRANSITION AS REQUIRED.
2. PROVIDE 4-WAY PATTERN CEILING DIFFUSERS, U.O.N. ON PLANS OR SCHEDULE.
3. MAXIMUM PRESSURE DROP SHALL INCLUDE VOLUME DAMPER WHERE DAMPER IS PROVIDED.
4. "A" TYPE REGISTER SHALL BE PAINTED DARK BROWN AND SHALL BE PROVIDED WITH PAINT GRIP FINISH. SEE ARCHITECTURAL DRAWINGS/SPECIFICATIONS FOR PAINTING REQUIREMENTS.
5. CONTRACTOR SHALL CONFIRM EXISTING OPENING DIMENSION OF TYPE "O" PRIOR TO ORDERING.
KITCHEN EXHAUST HOOD SCHEDULE
TAG LENGTH WIDTH
MINIMUM ELECTRICAL REMARKSEXHAUST
C.F.M. VOLTS PHASE AMPS
H-1 30" 20" 180 120 1 1.6 SEE NOTES
NOTES:
1. PROVIDE CONTROL PANEL FOR SINGLE POWER POINT CONNECTION, LIGHTS, ALUMINUM GREASE FILTERS, ADJUSTABLE FAN AND LIGHT CONTROL, CONVERTIBLE DISCHARGE CONNECTION, STAINLESS STEEL CONSTRUCTION, AND ENERGY STAR QUALIFIED.
PO Box 541, New Bern, NC 28563
252.636.8778 (PHONE)
252.636.8992 (FAX)
WALKER
GROUP
i n c o r p o r a t e d the
ARCHITECTURE
DISCLOSURE OF INFORMATION
CONTRACTOR SHALL COMPLY AS FOLLOWS:
(A) THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G., FILM, TAPE, DOCUMENT), PERTAINING TO ANY PART OF THIS CONTRACT OR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-
(1) THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL; OR
(2) THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF RELEASE
(B) REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL
SUBMIT ITS REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE FOR RELEASE.
(C) THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER HIS CONTRACT. SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION
TO RELEASE THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER.
VAV SHUT-OFF TERMINAL UNITS
GENERAL: AN OVERRIDE SWITCH INTEGRAL TO EACH ZONE TEMPERATURE SENSOR SHALL RETURN THE RESPECTIVE AHU FROM UNOCCUPIED TO OCCUPIED BUT ONLY THE ZONE OVERRIDDEN SHALL RETURN TO OCCUPIED MODE. WHEN ANY OVERRIDE SWITCH IS ENERGIZED, AHU AND ALL VAV BOXES ASSOCIATED WITH THE ZONE OVERRIDDEN SHALL BE ENERGIZED THROUGH DDC CONTROL BUT ONLY THE ZONE OVERRIDDEN SHALL RETURN TO OCCUPIED MODE TEMPERATURE SETPOINTS. AFTER TWO HOURS, THE ZONE SHALL RETURN TO UNOCCUPIED MODE. ENERGIZED AHU AND ALL ASSOCIATED VAV BOXES SHALL BE DE-ENERGIZED UNLESS AHU IS UNDER CONTROL OF ANOTHER ZONE IN OVERRIDE POSITION. REFER TO GLOBAL
TEMPERATURE SETPOINT NOTE THIS SHEET.
COOLING-OCCUPIED: THE ZONE TEMPERATURE SENSOR THROUGH DDC CONTROL SHALL MODULATE THE PRIMARY AIR VALVE IN THE VAV BOX TO MAINTAIN GLOBAL ZONE TEMPERATURE SETPOINT, OPENING THE AIR VALVE ON A RISE IN SPACE TEMPERATURE, OR CLOSING IT ON A FALL IN SPACE
TEMPERATURE, (NOT TO FALL BELOW MINIMUM SCHEDULED PRIMARY AIR QUANTITY).
HEATING-OCCUPIED: THE PRIMARY AIR VALVE SHALL START IN ITS MINIMUM SCHEDULED POSITION THRU DDC CONTROL. THE ZONE TEMPERATURE SENSOR THROUGH DDC CONTROL SHALL MODULATE THE HOT WATER CONTROL VALVE TO MAINTAIN GLOBAL ZONE TEMPERATURE SETPOINT. ON A RISE IN ZONE TEMPERATURE, THE OPPOSITE SHALL OCCUR. IF SPACE TEMPERATURE IS SLOW TO RESPOND, CONTROLLER SHALL MODULATE PRIMARY AIR VALVE OPEN TO A MAX OF 80%. ON A RISE IN ZONE TEMPERATURE, THE OPPOSITE SHALL OCCUR.
COOLING-UNOCCUPIED: THE VAV BOX PRIMARY AIR VALVE SHALL BE FULLY CLOSED UNLESS THE ASSOCIATED AHU SUPPLY FAN IS ENERGIZED. ON A RISE IN ZONE TEMPERATURE ABOVE SETBACK SETPOINT (85°F, ADJ.) THE VAV BOX PRIMARY AIR VALVE SHALL MODULATE TO MAINTAIN SETPOINT. DDC CONTROLLER SHALL MAINTAIN 55°F SUPPLY AIR TEMPERATURE. AHU SHALL REMAIN ENERGIZED UNTIL ZONE SETBACK TEMPERATURE SETPOINT IS ACHIEVED. IF ZONE TEMPERATURE FALLS BELOW SETBACK SETPOINT, VAV BOX SHALL CLOSE AIR VALVE TO MIN. POSITION.
HEATING-UNOCCUPIED: THE VAV BOX PRIMARY AIR VALVE SHALL BE FULLY CLOSED UNLESS THE ASSOCIATED AHU SUPPLY FAN IS ENERGIZED. ON A FALL IN ZONE TEMPERATURE BELOW SETBACK SETPOINT (60°F, ADJ.) THE PRIMARY AIR VALVE SHALL OPEN TO 80%. DDC CONTROLLER SHALL MODULATE VAV BOX HOT WATER CONTROL VALVE TO MAINTAIN ZONE SETBACK TEMPERATURE SETPOINT. IF ZONE TEMPERATURE RISES ABOVE SETBACK
SETPOINT, THE OPPOSITE SHALL OCCUR.
DDC/EMCS SIGNAL-FUNCTION:
ZONE TEMPERATURE SENSOR - AIR VALVE CONTROL, HOT WATER VALVE CONTROL, STATUS, ALARM
OVERRIDE SWITCH - OCCUPIED CONTROL, STATUS
HOT WATER CONTROL VALVE - ZONE TEMPERATURE CONTROL, STATUS
AIR VALVE - ZONE TEMPERATURE CONTROL, STATUS (AIRFLOW)
SUPPLY
TO SPACE
AIR FLOW
TS
OVER-RIDE
PUSH-BUTTON
SENSOR W/
SPACE TEMPERATURE
AIR SUPPLY
PRIMARY VAV BOX
AIR VALVE
HW VALVE CONTROL
AIR VALVE CONTROL
AN
AL
OG
SHUT-OFF VAV TERMINAL UNIT
LOCAL DDC CONTROLLER
SPACE TEMP.
AIRFLOW QUANTITY
DISCHARGE AIR TEMP.
SPACE TEMP. SETPOINT
HWS
HWR
OVERRIDE
AN
AL
OG
DI
GI
TA
L
OUTPUTS
INPUTS
2-WAY CONTROL VALVE U.O.N. PROVIDE 3-WAY
CONTROL VALVE FOR VAV-5 AND VAV-6
AO2
AO1
DI1
AI4
AI3
AI2
AI1
AO2
TS
AI3
DI1
AI2AI1
AO1
AI4
ZONE TEMPERATURE SET POINTS SHALL BE DETERMINED BY A GLOBAL
TEMPERATURE SET POINT. THE ZONE TEMPERATURE SET POINT SHALL BE
MADE ADJUSTABLE BY BUILDING OCCUPANTS +/- 3°F FROM THE GLOBAL SET
POINT. IF AMBIENT TEMPERATURE IS LESS THAN 50°F, THE GLOBAL ZONE
TEMPERATURE SET POINT SHALL BE 70°F. IF AMBIENT TEMPERATURE IS
GREATER THAN 80°F, THE ZONE TEMPERATURE SHALL BE 76°F. IF AMBIENT
TEMPERATURE IS BETWEEN 50°F AND 80°F, THE GLOBAL SET POINT
TEMPERATURE SHALL BE RESET LINEARLY OR IN NO FEWER THAN 3 STEPS.
ZONE TEMPERATURE SET POINT SHALL BE +/- 1°F FROM GLOBAL SET POINT.
GLOBAL TEMPERATURE SETPOINT NOTE:
INPUTS
DI
GI
TA
L
AO1
OUTPUTS
AN
AL
OG
SPEED, %
KWH CONSUMPTION
CURRENT, AMPS
DRIVE STATUS
DRIVE FAULT
DI1
DI2
AI2
AI1
AI3
AN
AL
OG
LOCAL DDC CONTROLLER
VFD
SPEED CONTROL
VFD
AO1 DO1
DI1
DI2
AI1
AI2
AI3
DO1
DI
GI
TA
L
ENABLE/DISABLE
VFD CONTROL DIAGRAM (TYP. U.O.N.)
SCALE: NO SCALE M-701B
VAV SHUT-OFF TERMINAL UNIT CONTROL DIAGRAM (DDC)
SCALE: NO SCALE M-701E
EMERGENCY HVAC
SHUTDOWN
PULL TO
RESET
NOTES:
1. EMERGENCY AIR DISTRIBUTION (LOCATION AS SHOWN ON PLAN
AND AS DETERMINED BY THE CONTRACTING OFFICER).
2. UPON ACTIVATION OF EMERGENCY PUSHBUTTON, ALL AIR
HANDLING UNITS AND EXHAUST FANS EF-1,-2, AND -3 SHALL
BE DISABLED AND REMAIN OFF UNTIL A MANUAL RESET HAS OCCURRED.
3. UPON ACTIVATION OF EMERGENCY PUSHBUTTON,
OUTSIDE AIR DAMPERS FOR AHU-1 AND AHU-2 SHALL CLOSE FULLY.
4. SHUTOFF SWITCH SHALL BE MUSHROOM BUTTON WITH CLEAR
HINGED, PULL TO RESET, LABELED "EMERGENCY HVAC
SHUTDOWN".
EMERGENCY AIR DISTRIBUTION SYSTEM SHUTOFF SWITCH
SEQUENCE OF OPERATION
PER THE REQUIREMENTS OF UFC 4-010-01, SECTION 3-19, THE FACILITY SHALL BE OUTFITTED WITH AN EMERGENCY AIR DISTRIBUTION SYSTEM SHUTOFF SWITCH WHICH SHALL, THROUGH THE DDC SYSTEM, IMMEDIATELY SHUT DOWN ALL AIR DISTRIBUTION SYSTEM COMPONENTS ASSOCIATED WITH AHU-1 AND AHU-2 AND CLOSE ASSOCIATED ISOLATION DAMPERS. THE EMERGENCY SWITCH SHALL ALSO INITIATE AN AUDIBLE ALARM NOTIFICATION. SWITCH SHALL BE ACTIVATED IF BUILDING OCCUPANTS SUSPECT AIRBORNE CONTAMINANTS MAY BE PRESENT IN THE VICINITY OF THE FACILITY. LOCATE THE SHUTOFF SWITCH (OR SWITCHES) SUCH THAT THEY ARE EASILY ACCESSIBLE BY BUILDING OCCUPANTS BY LOCATING THEM ADJACENT TO MANUAL FIRE ALARM PULL STATIONS. A MINIMUM OF ONE SWITCH SHALL BE PROVIDED PER FLOOR. ADDITIONAL SWITCHES SHALL BE PROVIDED AS REQUIRED TO ENSURE THAT THE TRAVEL DISTANCE TO THE NEAREST SHUTOFF SWITCH IS NOT IN EXCESS OF 200 FEET. SHUTOFF SWITCHES SHALL BE WELL LABELED AND BE OF A DIFFERENT COLOR THAN THE FIRE ALARM PULL STATIONS. COORDINATE COLOR AND APPEARANCE REQUIREMENTS OF THE SHUTOFF SWITCHES WITH THE GOVERNMENT PRIOR TO ORDERING.
EMERGENCY AIR DISTRIBUTION SHUT OFF LOCAL DDC CONTROLLER:
1) SHUT-OFF SWITCH STATUS (DI)
2) AUDIBLE ALARM (DO)
3) ENABLE/DISABLE (DO)
HVAC EMERGENCY SHUTOFF SWITCH
SCALE: NO SCALE M-701C
GENERAL: AHU SUPPLY FAN SPEED SHALL BE DETERMINED BY DISCHARGE AIR PRESSURE AND
POLLING OF VAV BOX DAMPER POSITIONS. AIR PRESSURE SETPOINT SHALL BE 1.5" W.G.,
ADJUSTABLE.
COOLING-OCCUPIED/OVERRIDE: AHU SUPPLY FAN SHALL BE ENERGIZED AND RUN CONTINUOUSLY.
OUTSIDE AND RETURN AIR DAMPERS SHALL MODULATE TO MAINTAIN MIN. O.A. FLOW AS MEASURED BY THE OUTSIDE AIR AIRFLOW MEASUREMENT STATION. THE O.A. DAMPER SHALL FULLY STROKE
BEFORE THE R.A. DAMPER STARTS MODULATING. DISCHARGE AIR TEMPERATURE CONTROLLER
SHALL MODULATE THE CHILLED WATER VALVE TO MAINTAIN 53°F (ADJ.) LEAVING AIR TEMPERATURE.
HOT WATER CONTROL VALVE SHALL BE FULLY CLOSED TO COIL. A SUPPLY AIR TEMPERATURE RESET
STRATEGY SHALL BE EMPLOYED. SUPPLY AIR TEMPERATURE SHALL BE RAISED IN ONE DEGREE
INCREMENTS UNTIL ONE ZONE DAMPER IS 90% OPEN. IF OA DRY BULB TEMPERATURE IS 65°F (ADJ.)
OR LOWER, THE SUPPLY AIR TEMPERATURE RESET SHALL BE NO HIGHER THAN 58°F (ADJ.). IF ANY
ZONE DAMPER IS 100% OPEN AND ZONE TEMPERATURE RISES ABOVE SETPOINT, SUPPLY AIR
TEMPERATURE SHALL BEGIN TO RESET LOWER.
COOLING-UNOCCUPIED: UNIT SHALL BE DE-ENERGIZED UNLESS THE AVERAGE OF THE ZONE
TEMPERATURES RISES ABOVE THE SETBACK TEMPERATURE SETPOINT. THE OA DAMPER SHALL BE
CLOSED.
HEATING-OCCUPIED: AHU SUPPLY FAN SHALL BE ENERGIZED AND RUN CONTINUOUSLY. O.A. FLOW
SHALL BE MAINTAINED AS DESCRIBED IN COOLING-OCCUPIED MODE ABOVE. WHEN MIXED AIR
TEMPERATURE DROPS TO 52°F, DISCHARGE AIR TEMPERATURE CONTROLLER THRU DDC CONTROL
SHALL MODULATE THE HOT WATER VALVE TO MAINTAIN 55°F LEAVING AIR TEMPERATURE. THE
CHILLED WATER VALVE SHALL BE FULLY CLOSED TO THE COIL.
HEATING-UNOCCUPIED: IF THE AVERAGE OF THE ASSOCIATED ZONE TEMPERATURES FALLS BELOW
THE HEATING NIGHT SETBACK TEMPERATURE THE AHU SHALL BE ENERGIZED. THE OA DAMPER
SHALL BE FULLY CLOSED. THE SUPPLY FAN SHALL MODULATE TO MAINTAIN DUCT STATIC PRESSURE WHILE THE VAV BOXES ARE INITIALLY AT MAXIMUM AIRFLOW. THE HOT WATER CONTROL VALVE SHALL REMAIN CLOSED UNLESS DISCHARGE AIR TEMPERATURE FALLS BELOW 55°F. ZONE HEATING SHALL BE MAINTAINED AT VAV BOXES. AS VAV BOX ZONES REACH SETPOINT, AIR VALVES SHALL
MODULATE TO MAINTAIN SETPOINT.
TRANSITION FROM OCCUPIED TO UNOCCUPIED: AUTOMATICALLY THRU DDC CONTROL AND PRESET
TIME SCHEDULE. SYSTEM SHALL ALSO BE ABLE TO BE RETURNED TO OCCUPIED MODE FROM
UNOCCUPIED MODE BY THE OPERATOR WORKSTATION. TRANSITION FROM COOLING TO HEATING
SHALL OCCUR WHEN CHILLED WATER CONTROL VALVE IS CLOSED AND MIXED AIR TEMP. FALLS
BELOW 52°F.
PRESSURE PROTECTION: A HIGH PRESSURE TRANSMITTER LOCATED AT THE SUPPLY FAN
DISCHARGE SHALL DE-ENERGIZE THE SUPPLY AIR FAN IF ITS SETPOINT, 5" WG, IS REACHED.
SEQUENCE OF OPERATION
COIL
HOT WATER
FROM VARIABLE
FREQUENCY DRIVE
FREEZESTAT
AIR
OPPOSED
DAMPER
BLADE
FILTER
OUTSIDE
NC
OPPOSED
DAMPER
BLADE
CW
R
NO
HW
R
HW
S
CW
S
NC
SET AT
5" WG
CHILLED WATER
SUPPLY FAN
M
COIL
PRIMARY
AIR
SAFETY CONTROL: SMOKE DETECTOR SHALL BE PROVIDED BY FIRE ALARM
CONTRACTOR. THROUGH DDC CONTROL IT SHALL DE-ENERGIZE THE ASSOCIATED AHU,
SIGNAL FIRE ALARM PANEL AND CLOSE THE OUTSIDE AIR DAMPER UPON THE
DETECTION OF THE PRODUCTS OF COMBUSTION.
FREEZE PROTECTION: IF HOT WATER COIL DISCHARGE AIR TEMPERATURE FALLS
BELOW 40°F DURING HEATING MODE, THE FREEZESTAT SHALL CLOSE THE OUTSIDE AIR
DAMPER, DE-ENERGIZE THE AHU SUPPLY FAN AND FULLY OPEN THE HOT WATER AND
CHILLED WATER VALVES TO COIL.
CONDENSATE HIGH LEVEL PROTECTION: IF CONDENSATE HIGH LEVEL SWITCH IS
ACTIVATED, UNIT SHALL BE DE-ACTIVATED AND AN ALARM INITIATED.
MORNING WARM-UP: AHU SHALL EMPLOY OPTIMUM START PRIOR TO OCCUPIED
STATUS. THE OA DAMPER SHALL BE FULLY CLOSED. THE SUPPLY FAN SHALL MODULATE
TO MAINTAIN DUCT STATIC PRESSURE WHILE VAV BOXES ARE INITIALLY AT MAXIMUM
AIRFLOW. HOT WATER COIL VALVE SHALL BE FULLY OPEN. AS VAV BOX ZONES REACH
SETPOINT, PRIMARY AIR VALVES SHALL MODULATE TO MINIMUM AIRFLOW.
MORNING COOL-DOWN: THE UNIT SHALL EMPLOY OPTIMUM START PRIOR TO OCCUPIED
STATUS, THE UNIT SHALL GO INTO MORNING COOL-DOWN. THE OA DAMPER SHALL
FULLY CLOSE, THE SUPPLY FAN SHALL MODULATE TO MAINTAIN DUCT STATIC
PRESSURE, THE CW VALVE SHALL MODULATE TO MAINTAIN A 53°F (ADJ.) LEAVING AIR
TEMPERATURE AND THE HOT WATER VALVE SHALL BE FULLY CLOSED TO THE COIL.
ASSOCIATED VAV BOX AIR VALVES SHALL INITIALLY BE FULLY OPEN AND THEN
MODULATE TO MAINTAIN SPACE OCCUPIED TEMPERATURE SETPOINT, VAV BOX HW
VALVES SHALL BE FULLY CLOSED TO THE COIL.
ALARMS: ALARM IF LEAVING AIR TEMPERATURE EXCEEDS 60°F IN COOLING MODE OR
DROPS BELOW 50°F IN HEATING MODE. ALARM IF AHU SUPPLY FAN FAILS TO START OR
FAILS DURING OPERATION. ALARM IF UNIT DISCHARGE STATIC PRESSURE EXCEEDS 5"
W.G. ALARM IF CONDENSATE REACHES HIGH LEVEL. ALARM UPON SMOKE DETECTOR
ACTIVATION.
DEMAND CONTROL VENTILATION: IF ANY SPACE CARBON DIOXIDE LEVEL FALLS BELOW
SETPOINT (1,000 PPM, ADJ.), THE OUTSIDE AIRFLOW RATE SHALL BE AT THE MINIMUM
SCHEDULED VALUE AS INDICATED IN THE EQUIPMENT SCHEDULE. AS LEVEL INCREASES
ABOVE SETPOINT, THE OUTSIDE AIR DAMPER SHALL PROPORTIONALLY MODULATE
OPEN TO GENERATE THE SCHEDULED MAX OUTSIDE AIRFLOW RATE OVER A 1 HOUR
(ADJ.) TIME PERIOD UNTIL THE LEVEL FALLS BELOW THE SETPOINT, AFTER WHICH THE
DAMPER POSITION SHALL RETURN TO MINIMUM.
INPUTS
DI
GI
TA
L
HW VALVE CONTROL
CW VALVE CONTROL
A02
AO1
OUTPUTS
A03AN
AL
OG
SUPPLY AIR FAN STATUS
SMOKE DETECTOR
FREEZESTAT
MIXED AIR TEMPERATURE
SUPPLY AIR TEMPERATURE
HW COIL DISCHARGE AVERAGE
UNIT DISCHARGE STATIC PRESSURE
SA DOWN DUCT PRESSURE TRANSMITTER
AI4
AI5
DI1
DI3
DI2
AI2
AI1
AI3
AN
AL
OG
LOCAL DDC CONTROLLER
AHU
OA AIRFLOW MEASURE MOUNT STATIONAI6
A04 OUTSIDE AIR DAMPER CONTROL
AO1
AO4
DM
DM
AMSAI6
AI1
TS FSDI3
AO2 TS
AI3
AO3 AI2
VFD TS SPS
AI4 AI5
SPS
DI1
DPS
NO
LOCATE AT 2/3 DOWN
DUCT FROM AHU
AI7
CONDENSATE HI-LEVELDI4
DI4
LS
RA TEMPERATUREAI8
AI8 TS
AI7 HS
PROVIDE 3-WAY CONTROL VALVE.
PROVIDE 3-WAY CONTROL VALVE
SEE VFD CONTROL DIAGRAM
AIR
RETURN
DI2
SD
RA HUMIDITY
RETURN AIR DAMPER CONTROL
MULTIZONE VAV AHU CONTROL DIAGRAM (DDC)
SCALE: NO SCALE M-701A
AI9
CO2
CO2 SENSORAI9
REPEAT POINT FOR
EACH SENSOR
MOTOR STARTER
FREEZE STAT
AIR FLOW MEASURING STATION
AIR TEMPERATURE SENSOR
DIGITAL INPUT
DIGITAL OUTPUT
ANALOG INPUT POINT
DAMPER MOTOR ACTUATOR
DIFFERENTIAL PRESSURE SWITCH (DIGITAL) OR SENSOR (ANALOG)
ANALOG OUTPUT POINT
HUMIDITY SENSOR
SMOKE DETECTOR
STATIC PRESSURE SENSOR
VARIABLE FREQUENCY DRIVE
TEMPERATURE SENSOR
DPS
SP
VFD
TS
FS
SD
H
AO1
DI1
DO1
DM
AMS
ATS
AI1
CURRENT SENSING RELAY
PRIMARY HOT WATER PUMP DESIGNATION
EXHAUST AIR
EXHAUST FAN
EXHAUST FAN DESIGNATION
RETURN AIR
PUMP DESIGNATION
SECONDARY HOT WATER PUMP DESIGNATION
TYPICAL
SUPPLY AIR
UNIT HEATER DESIGNATION
SA
SHWP-1
(TYP.)
UH-1
EF-1
P-1
RA
CSR
EA
EF
RP-1
CHILLED WATER RETURNCWR
CHILLED WATER SUPPLYCWS
HOT WATER RETURNHWR
HOT WATER SUPPLYHWS
AIR HANDLING UNIT DESIGNATION
CHILLER DESIGNATIONAC-1
BOILER DESIGNATIONB-1
NORMALLY CLOSEDN.C.
NORMALLY OPENN.O.
MOTOR ACTUATORM
FLOW METERFM
CURRENT SENSING RELAYCSR
LIMIT SWITCHLS
AHU-1
CONTROLS LEGEND
CHILLED WATER PUMP DESIGNATIONCWP-1
HEATER MANUFACTURER'S
THERMOSTAT
UNIT SHALL BE CONTROLLED BY A WALL MOUNTED THERMOSTAT.
UPON A FALL IN SPACE TEMPERATURE BELOW 65°F, THE UNIT
SHALL BE ENERGIZED. UPON A RISE IN SPACE TEMPERATURE
ABOVE 68°F, THE OPPOSITE SHALL OCCUR.
SEQUENCE OF OPERATION
LINE VOLTAGE
T
FAN MOTOR
UNIT HEATER CONTROL DIAGRAM (NON-DDC)
SCALE: NO SCALE M-701F
AI1
DPS
INTERIOR EXTERIOROPPOSED
DAMPER
BLADE
NC DM
AO1
AN
AL
OG
RELIEF DAMPER CONTROLAO1
OUTPUTS
RELIEF PRESSURE SETPOINT
AN
AL
OG
AI1
LOCAL DDC CONTROLLER
INPUTS
L-9
RELIEF DAMPER CONTROL DIAGRAM (DDC)
SCALE: NO SCALE M-701D
MOTORIZED DAMPER SHALL BE CONTROLLED TO MAINTAIN A
DIFFERENTIAL PRESSURE SETPOINT BETWEEN THE BUILDING
INTERIOR AND EXTERIOR. DAMPER SHALL OPEN UPON A
DIFFERENTIAL PRESSURE OF 0.001 IN W.G. (ADJ.)
SEQUENCE OF OPERATION
PO Box 541, New Bern, NC 28563
252.636.8778 (PHONE)
252.636.8992 (FAX)
WALKER
GROUP
i n c o r p o r a t e d the
ARCHITECTURE
DISCLOSURE OF INFORMATION
CONTRACTOR SHALL COMPLY AS FOLLOWS:
(A) THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G., FILM, TAPE, DOCUMENT), PERTAINING TO ANY PART OF THIS CONTRACT OR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-
(1) THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL; OR
(2) THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF RELEASE
(B) REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL
SUBMIT ITS REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE FOR RELEASE.
(C) THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER HIS CONTRACT. SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION
TO RELEASE THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER.
CHILLED WATER SYSTEM :
GENERAL: THE FACILITY SHALL BE SUPPLIED WITH CHILLED WATER FROM AIR-COOLED CHILLER, AC-1. THE DESIGN CHILLED WATER SUPPLY TEMPERATURE IS 42°F.
COOLING: A CALL FOR COOLING IS DETERMINED BY ANY COOLING COIL VALVE BEING 30 PERCENT OPEN FOR A PERIOD OF MORE THAN 3 MINUTES. UPON A CALL FOR COOLING, THE CHILLER AND INTEGRAL PUMPING PACKAGE SHALL BE ENERGIZED AND RUN FOR A MINIMUM OF 30 MINUTES. THE CHILLER MANUFACTURER'S CONTROL PANEL SHALL MAINTAIN CHILLED WATER SETPOINT (42°F). AN ANTI-CYCLE TIMER SHALL PREVENT THE CHILLER FROM BEING STARTED FOR A PERIOD OF 15 MINUTES AFTER IT SHUTS DOWN DUE TO LOW BUILDING COOLING DEMAND. THE CHILLER MANUFACTURER'S MINIMUM ON AND OFF TIMES MUST BE OBSERVED. THE ABOVE SEQUENCE SHALL BE ACCOMPLISHED THROUGH THE BUILDING DDC SYSTEM AND CHILLER MANUFACTURER'S CONTROL PANEL. ANY OTHER ALARMS OR POINT INFORMATION AS IT RESIDES IN THE CHILLER
CONTROL PANEL, SHALL BE AVAILABLE THROUGH THE BUILDING DDC SYSTEM.
CHILLER SHALL UTILIZE AN INTEGRAL PUMPING PACKAGE. PUMPS SHALL BE EQUIPPED WITH VARIABLE FREQUENCY DRIVES BUT SHALL OPERATE AT CONSTANT SPEED. PUMPS SHALL OPERATE IN A LEAD/STANDBY CONFIGURATION, AND THE LEAD PUMP DESIGNATION SHALL ALTERNATE ON A WEEKLY BASIS. IN THE EVENT THE PRIMARY PUMP FAILS TO START DURING OPERATION, IF THE LEAD PUMP PROOF SWITCH DOES NOT DETECT FLOW WITHIN 30 SECONDS FROM START SIGNAL, THE DDC CONTROLLER SHALL DE-ENERGIZE THE FAILED PUMP, START THE STANDBY PUMP, AND TRANSMIT A PUMP FAILURE ALARM. A PROGRAMMED ANTI-RECYCLE TIMER SHALL PREVENT PUMP SHORT CYCLING. THE DDC CONTROLLER SHALL AUTOMATICALLY ATTEMPT A RESTART OF THE CIRCULATING PUMPS ON A PERIODIC BASIS TO ACCOMMODATE SERVICE SHUTDOWNS AND EXTENDED
POWER OUTAGES.
SEQUENCE OF OPERATION
ALARMS: ALARM IF CWS TEMPERATURE RISES ABOVE 47°F.
DDC/EMCS SIGNAL/FUNCTION:
CWS TEMPERATURE - STATUS, ALARM
CWR TEMPERATURE - STATUS
CWR TEMPERATURE
INTEGRAL CHILLER WATER PUMP CWP-1 - STATUS, ALARM
INTEGRAL CHILLER WATER PUMP CWP-2 - STATUS, ALARM
DIFFERENTIAL PRESSURE SENSOR - STATUS
CHILLED WATER FLOWMETER - COOLING LOAD (TONS), STATUS
CWS
CWR
CWS
CWR CWR
TO BUILDING
CWP-1
CWP-2
DPS
DI1
DPS
DI2
FMAI3
TS AI2
TS
AI1
VFD
VFD
AIR-COOLED CHILLER AC-1
FS DI3
REPRESENTS COMPONENTS
WHICH ARE INTEGRAL TO
CHILLER PACKAGE
DI4
DDCDO1
AO1
AI4
CONTROL
PANEL
CW
R
3"
PRESSURE GAUGE
(0-100 PSIG TYP.)
COMPOUND
PRIOR TO TAB WORK (TYP.)
REMOVE START-UP STRAINER
FLEX CONNECTION
(TYP. BOTH SIDES)
CWP-1
CWP-2
1/4"
1/4"
3"
3" 2-1/2"
CW
S (4 2° F)
CWR (57°F)
3"
3"
1"
TANGENTIAL AIR
SEPARATOR, AS-1
HIGH CAPACITY
AIR VENT
DIAPHRAGM EXPANSION TANK,
PRECHARGE TO 15 PSIG
3/4"
ET-1
3/4" DRAIN WITH
THREADED HOSE BIBB
PRESSURE GAUGE
(O-100 PSIG)
VENTURI BALANCE
VALVE, 105 GPM
PROVIDE 8 WATT/SF SELF
REGULATING HEAT TAPE ON
EXTERIOR PIPING
WELLS FOR PRESSURE /
TEMPERATURE TAP
CONNECTIONS (TYP FOR 4)
AC-1
INTEGRAL TO AIR-COOLED
CHILLER AC-1 CW
S
STRAINER W/
BLOWDOWN VALVE
UNION
CHECK VALVE
TEST WELL
FLOW SWITCH
1" DRAIN LINE AND BALL VALVE
AT LOW POINT IN PIPING (TYP.)
VALVE-SET AT 20 PSIG
PRESSURE REGULATION
SET AT 50 PSIG
RELIEF VALVE
3/4" BYPASS
GLOBE VALVE TO FD
1" MAKE-UP WATER, REFER TO
PLUMBING DRAWINGS FOR
BACKFLOW PREVENTER AND
CONTINUATION
1" TO CHILLER
THERMOMETER
1" COLD WATER
MAKE-UP
CW
R
CW
S
SHOT FEEDER IN
MECH 110
CHILLED WATER SYSTEM FLOW DIAGRAM
SCALE: NO SCALE M-702A
CHILLED WATER SYSTEM CONTROL DIAGRAM (DDC)
SCALE: NO SCALE M-702B
DSS-1 CONDENSING UNIT
DSS-1 EVAPORATOR
COOLING: UNIT SHALL BE CONTROLLED BY THE MANUFACTURERS INTEGRAL THERMOSTAT.
WHEN THE SPACE TEMPERATURE RISES ABOVE THE COOLING SETPOINT (75°F), THE
THERMOSTAT SHALL ENERGIZE THE DSS UNITS AND ENERGIZE THE INDOOR UNIT SUPPLY
FAN. WHEN THE SPACE TEMPERATURE DROPS BELOW THE THERMOSTAT SETPOINT, THE
OPPOSITE SHALL OCCUR.
HEATING: UPON A FALL IN SPACE TEMPERATURE BELOW HEATING SETPOINT (68°F), THE
THERMOSTAT SHALL ENERGIZE THE INDOOR UNIT SUPPLY FAN AND OUTDOOR
COMPRESSORS. UPON A FURTHER DROP IN TEMPERATURE, THE UNITS ELECTRIC HEATING
COIL SHALL BE ENERGIZED. UPON A RISE IN SPACE TEMPERATURE ABOVE HEATING
SETPOINT, THE OPPOSITE SHALL OCCUR.
SEQUENCE OF OPERATION
MANUFACTURER'S INTEGRAL
THERMOSTAT
RS/RLT
3" TEMPORARY
CHILLER
CONNECTION
EF-1,-2
EXHAUST FANS SHALL OPERATE BY WALL SWITCH. ALL WIRING SHALL BE CONCEALED IN CONDUIT IN ACCORDANCE WITH
DIVISION 26 SPECIFICATIONS.
EF-3
EXHAUST FAN SHALL OPERATE CONTINUOUSLY DURING OCCUPIED HOURS. COORDINATE OCCUPIED HOURS WITH THE
GOVERNMENT.
DI
GI
TA
L
FAN START/STOPDO1
OUTPUTS
FAN STATUS
DI
GI
TA
L
DI1
LOCAL DDC CONTROLLER
INPUTS
EF-1, -2, -3
SEQUENCE OF OPERATION - EF-1, EF-2, EF-3
DO1
EF
CSR DI1
System 600
POWERS POWERS
System 600
HEATING PLANT
CONTROLLER
POWERS
System 600
COOLING PLANT
CONTROLLER
POWERS
System 600
FIELD PANEL
AHU-1MECHANICAL ROOM
FIRST FLOOR
FIELD PLUG-IN
PORTABLE
OPERATOR'S
WORKSTATION
CWP-2
AC-1
· ENABLE/DISABLE
· SPEED
BOILER
RP-2
BACNET MSTP BUS (TYP)
· ON/OFF
· STATUS
BOILER
RP-1
POWERS
System 600
PUMP
CONTROLLER
SUPERVISORY BUILDING
CONTROLLER
SHWP-2
SHWP-1
VAV
ASC
CWP-1
· ON/OFF
· STATUS
POWERS
System 600
FIELD PANEL
AHU-2
SEQUENCE OF OPERATION - EF-4, EF-5
EXHAUST FAN SHALL BE CONTROLLED BY THERMOSTAT ACTIVATION.
WHEN THE SPACE TEMPERATURE RISES ABOVE 85°F, THE ASSOCIATED
EXHAUST FAN SHALL BE ENERGIZED. WHEN THE SPACE TEMPERATURE IS
BELOW 85°F, THE ASSOCIATED EXHAUST FAN SHALL BE DE-ENERGIZED.
LINE
VOLTAGE
THERMOSTAT FAN
MOTORT
EXHAUST FAN CONTROL DIAGRAM (DDC)
SCALE: NO SCALE M-702C
DSS-1 CONTROL DIAGRAM (NON-DDC)
SCALE: NO SCALE M-702D
EXHAUST FAN WITH THERMOSTAT (NON-DDC)
SCALE: NO SCALE M-702E
DO2
DO3
CHILLED WATER SYSTEM
LOCAL DDC CONTROLLER
AN
AL
OG
INPUTS
CWS TEMPERATURE
DI
GI
TA
L
PUMP CWP-1 STATUS (ON/OFF)
CWR TEMPERATURE
AN
AL
OG
OUTPUTS
AI1
AI2
AI3
DI1
AO1
PUMP CWP-2 STATUS (ON/OFF)DI2
CHILLED WATER FLOWMETER
AC-1 FLOW SWITCHDI3
AC-1 STATUS (ON/OFF)DI4
DI
GI
TA
L AC-1 ENABLE/DISABLEDO1
CWS SETPOINT
AC-1 PERCENTAGE OF LOADAI4
CWP-1 ENABLE/DISABLEDO2
CWP-2 ENABLE/DISABLEDO3
PO Box 541, New Bern, NC 28563
252.636.8778 (PHONE)
252.636.8992 (FAX)
WALKER
GROUP
i n c o r p o r a t e d the
ARCHITECTURE
DISCLOSURE OF INFORMATION
CONTRACTOR SHALL COMPLY AS FOLLOWS:
(A) THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G., FILM, TAPE, DOCUMENT), PERTAINING TO ANY PART OF THIS CONTRACT OR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-
(1) THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL; OR
(2) THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF RELEASE
(B) REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL
SUBMIT ITS REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE FOR RELEASE.
(C) THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER HIS CONTRACT. SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION
TO RELEASE THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER.
02/24/2020
1" COLD WATER, SEE PLUMBING
M-703 FOR CONTROLS SCHEMATIC (TYP.)
TEMPERATURE SENSOR AND WELL. SEE SHEET
ROOM WALL (TYP. FOR 2)
VALVE AT EQUIPMENT
TO BUILDING HW SYSTEM
SEE SHEET M-201 FOR CONTINUATION
ET-1
SHWR
SHWS
COALESCING AIR
SEPARATOR
FLOOR DRAIN
1" TO
NEAREST
3/4"
PRESSURE REGULATION
RELIEF VALVE-
AIR VENT
SET AT 50 PSIG
VALVE-SET AT 20 PSIG
1" BYPASS
SHWS
3/4"
SHWP-2
3/4"
(0-100 PSIG TYP.)
PRESSURE GAUGE
SHWP-1
2"
HIGH CAPACITY
2" 2"
2"
2"
LINE SIZE
REMOVE START-UP STRAINER
PRIOR TO TAB WORK (TYP.)
1/4"
1/4"
SHEETS FOR BACKFLOW PREVENTER,
AND CONTINUATION
4" CONCRETE
EQUIPMENT PAD
PH
W
S
PH
W
R
2"
RP-1
INLINE PUMP, SEE
DETAIL FOR VALVE
WORK REQUIRED
PH
W
R
PH
W
S
2"
2"
30 PSIG RELIEF VALVE
BY MANUFACTURER
(TYP)
FULL SIZE OF OUTLET,
PIPE TO FLOOR DRAIN
(TYP)
B-2
3/4" DRAIN AND BALL
VALVE (TYP)
B-1
SHWS
SHOT FEEDER
5 GALLON
HOT WATER FLOW DIAGRAM
SCALE: NO SCALE M-703B
1" 3/4"
CONDENSATE
NEUTRALIZATION KIT
BRIDGE
RP-2
HEATING HOT WATER SYSTEM
GENERAL: THE HOT WATER SYSTEM SHALL BE CONTROLLED BY THE BOILER MANAGEMENT SYSTEM. CONTROLLER SHALL MONITOR BOILERS' STATUS AND HOT WATER SUPPLY TEMPERATURES. BOILERS SHALL OPERATE IN LEAD/LAG CONFIGURATION AND THE PUMPS SHALL OPERATE IN A LEAD/STAND-BY CONFIGURATION ALTERNATING LEAD BOILERS/PUMPS STATUS WEEKLY BY SELECTING BOILER/PUMP WITH THE LEAST TOTAL ACCUMULATED RUN TIME (HOURS). SECONDARY PUMPS ARE SIZED FOR CONNECTED LOAD AND ARE FULLY REDUNDANT.
IF THERE IS AN ALARM IN ANY BOILER OR IF A FAULT OCCURS IN THE BOILER MANAGEMENT SYSTEM, (AS DETERMINED FROM THE BINARY FAULT OUTPUT OF THE CONTROLLER), THE ASSOCIATED BOILER WILL BE COMMANDED OFF, AND AN ALARM SHALL BE GENERATED.
ON DETECTION OF A HIGH DISCHARGE BOILER TEMPERATURE, AS DETERMINED BY THE BOILER HIGH LIMIT ALARM, THE BOILER SHALL BE
DISABLED, AND AN ALARM SHALL BE GENERATED.
BOILER (B-1, B-2 ) AND PRIMARY HOT WATER PUMP CONTROL (RP-1, RP-2 ): ON A CALL FOR HEATING AT ANY AHU OR VAV TERMINAL FOR MORE THAN THREE (3) MINUTES, THE DDC CONTROLLER SHALL SEND A SIGNAL TO THE BOILER MANAGEMENT SYSTEM THAT HEATING IS REQUIRED.
WHEN THE DDC CONTROL SYSTEM RECEIVES A CALL FOR HEATING, THE BOILER MANAGEMENT SYSTEM SHALL BE ENGAGED AND SHALL ENABLE THE LEAD BOILER. THE LEAD BOILER AND ASSOCIATED PRIMARY HOT WATER PUMP SHALL BE ENERGIZED. UPON A DROP IN MAIN HW LOOP TEMPERATURE BELOW SETPOINT, THE LAG BOILER AND ASSOCIATED PRIMARY HOT WATER PUMP SHALL BE ENERGIZED.
SECONDARY HOT WATER PUMPS, SHWP-1 AND SHWP-2: THE CONTROL STRATEGY INCLUDES OPERATING VARIABLE SPEED PUMPS IN ORDER TO MINIMIZE PUMPING POWER REQUIREMENTS. THE SPEED DRIVE OF THE VARIABLE SPEED PUMP(S) IS CONTROLLED TO MAINTAIN A DIFFERENTIAL PRESSURE SETPOINT. THE DDC CONTROLLER SHALL BE DESIGNED TO START AND STOP THE PUMPS AND MODULATE THEIR SPEEDS AS REQUIRED TO MEET THE SYSTEM DEMANDS. THE SYSTEM SHALL BE DESIGNED TO MAINTAIN A DIFFERENTIAL PRESSURE
SETPOINT AT A REMOTE LOCATION.
SECONDARY HOT WATER PUMPS SHALL BE CONTROLLED BY THE DDC SYSTEM. PUMPS SHALL BE ENERGIZED AND RUN ON A CALL FOR HEATING AT ANY AHU OR VAV TERMINAL FOR MORE THAN THREE (3) MINUTES. THE DDC CONTROLLER SHALL ALTERNATE PUMP LEAD STATUS WEEKLY BY SELECTING THE PUMP WITH THE LEAST TOTAL ACCUMULATED RUN TIME AS CALCULATED AND STORED AT THE DDC CONTROLLER. IF EITHER SELECTED LEAD PUMP'S PROOF SWITCH DOES NOT DETECT FLOW WITHIN 30 SECONDS FROM THE START SIGNAL, THE DDC CONTROLLER SHALL DE-ENERGIZE THE FAILED PUMP, START THE STANDBY PUMP, AND TRANSMIT A PUMP FAILURE ALARM. A PROGRAMMED ANTI-RECYCLE TIMER SHALL PREVENT PUMP SHORT CYCLING. THE DDC CONTROLLER SHALL AUTOMATICALLY ATTEMPT A RESTART OF THE CIRCULATING PUMPS ON A PERIODIC BASIS TO ACCOMMODATE SERVICE SHUTDOWNS AND EXTENDED POWER OUTAGES.
HOT WATER RESET CONTROL: THE SECONDARY HOT WATER SUPPLY TEMPERATURE SETPOINT SHALL BE DETERMINED BY THE OUTSIDE AIR TEMPERATURE. THE HOT WATER SUPPLY TEMPERATURE SETPOINT SHALL BE RESET PROPORTIONALLY AS FOLLOWS: AS AIR TEMPERATURE RISES
FROM 20°F TO 60°F, RESET SECONDARY HWS FROM 120°F DOWN TO 100°F.
BOILER EMERGENCY SHUT-OFF CONTROL: PROVIDE TWO POSITION "ON-OFF" SWITCHES LABELED "BOILER EMERGENCY SHUT-OFF" LOCATED AS INDICATED WHICH SHALL BE HARDWIRE INTERLOCKED WITH THE BOILERS' CONTROL PANEL. WHEN INDEXED TO THE "ON" POSITION, THE BOILERS SHALL OPERATE UNDER NORMAL CONTROL OF THE DDC CONTROL SYSTEM. WHEN INDEXED TO THE "OFF" POSITION, THE BOILERS SHALL BE DISABLED, AND THE GAS BURNERS TO EACH BOILER SHALL BE SHUTDOWN. MANUAL RESET SHALL BE REQUIRED.
ALARMS: IF THERE IS AN ALARM IN ANY BOILER OR IF A FAULT OCCURS IN THE BOILER MANAGEMENT SYSTEM, (AS DETERMINED FROM THE BINARY FAULT OUTPUT OF THE CONTROLLER), THE ASSOCIATED BOILER ISOLATION VALVE SHALL CLOSE, AND AN ALARM SHALL BE GENERATED. ON DETECTION OF A HIGH DISCHARGE BOILER TEMPERATURE, AS DETERMINED BY THE BOILER HIGH LIMIT ALARM, THE BOILER MANAGEMENT SYSTEM SHALL BE DISABLED AND AN ALARM SHALL BE GENERATED. ALARM FOR LEAVING WATER TEMPERATURE EXCEEDING 140°F OR FALLING 10°F BELOW THE SCHEDULED HWS TEMPERATURE SETPOINT. ALARM IF ANY BOILER OR PUMP FAILS TO START OR FAILS
DURING OPERATION.
DDC/EMCS SIGNAL-FUNCTION:
RETURN WATER TEMPERATURE - STATUS
LEAVING WATER TEMPERATURE - STATUS
PUMP RP-1 - START/STOP, STATUS, ALARM
PUMP RP-2 - START/STOP, STATUS, ALARM
PUMP SHWP-1 MOTOR - START/STOP, STATUS, RUNTIME, ALARM
PUMP SHWP-2 MOTOR - START/STOP, STATUS, RUNTIME, ALARM
DIFFERENTIAL PRESSURE SENSOR - PUMP SHWP-1 AND SHWP-2 VFD CONTROL
BOILER MANAGEMENT SYSTEM - ALARM, STATUS, START/STOP
EMERGENCY GAS SHUT OFF SWITCH - BOILER B - 1, 2, START/STOP, ALARM
BOILER CONDENSATE PUMP - ALARM
PHWS
BOILER
CONTROL
PANEL
PHWS
BOILER
B-1
AN
AL
OG
HWS TEMPERATURE
DIFFERENTIAL PRESSURE
DI
GI
TA
L
AN
AL
OG
OUTPUTS
DI
GI
TA
L
SHWP-1 SPEED CONTROL
SHWP-2 SPEED CONTROL
SHWP-1 VFD, ENABLE/DISABLE
BOILER, ENABLE/DISABLE
SHWP-2 VFD, ENABLE/DISABLE
BOILER ALARM
SHWP-2
SHWR HWR TEMPERATURE
INPUTS
LOCAL DDC CONTROLLER
HEATING HOT WATER SYSTEM
RP-1 - STATUS
RP-2 - STATUS
SHWP-1 - STATUS
SHWP-2 - STATUS
EMERGENCY SWITCH
BOILER MANAGEMENT SYSTEM
BOILER LOOP SUPPLY TEMPERATURE
B-1 SUPPLY TEMPERATURE
RP-1, ENABLE/DISABLE
BRIDGE
BOILER
B-2
B-2 SUPPLY TEMPERATURE
EMERGENCY GAS
SHUTOFF SWITCH
SHWP-1
HW FLOWRATE
SHWP-1 VFD SPEED (Hz)
SHWP-2 VFD SPEED (Hz)
RP-2, ENABLE/DISABLE
GAS, ON/OFF
AI1
AI2
AI3
AI4
AI5
AI6
AI8
AI9
AI10
DI1
DI2
DI3
DI5
DI6
AO1
AO2
DO1
DO2
DO3
DO4
DO5
DO1DI1
AI5
AI4
DI6
AI3 DPS
VFD
VFD
DPS
DPS
AI2 AI8
DI4
DI5
AI1
AO2DO3
DO2 AO1 SHWSSHWS
PH
W
R
AI9
AI10
AI7
DI4
DO6
TS
TS
TS FM
TS
ES
SEQUENCE OF OPERATION
SEE SHEET M-201 FOR LOCATION
G
D06
M
DPS
DI2
DO4
RP-1
DPS
DI3
DO5
AI6TS
BOILER LOOP RETURN TEMPERATUREAI7 TS
RP-2
HEATING HOT WATER SYSTEM CONTROL DIAGRAM
SCALE: NO SCALE M-703A
| 60025686 |
| Sheets and Views |
| M-601 MECHANICAL SCHEDULES |
| 60025687 |
| Sheets and Views |
| M-701 MECHANICAL CONTROLS |
| 60025688 |
| Sheets and Views |
| M-702 MECHANICAL CONTROLS |
| 60025689 |
| Sheets and Views |
| M-703 MECHANICAL CONTROLS |
| 60025690 |
| Sheets and Views |
| M-704 MECHANICAL CONTROLS |
| 60025691 |
| 60025692 |