RFP,_N62470-18-R-2012.pdf
PDF 805 KB Posted
- Solicitation number
- N6247018R2012
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0006.pdf | ||
| Amendment_0005.pdf | ||
| SF30_Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| Amendment_0002.pdf | ||
| Amendment_0001.pdf | ||
| Contracting_Office_Address.docx | DOCX document | |
| N6247018R2012_Pre-Sol_Synopsis_18-2012.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 12 Jun 2019
X
A X B X C X D
EX
X
G F 38 - 43
44 - 49 X H 50 - 57 luke.clay@navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DO-C9 1 57
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N62470 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 3 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
Bldg. 491, Portsmouth, VA conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
LUKE CLAY (757) 967-3821
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 8
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
11 - 12 13 - 14
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 15 - 17 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 18 - 19 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
20 - 36
PART II - CONTRACT CLAUSES
COMMANDER NAVFAC ATLANTIC
NAVY CRANE CENTER
NORFOLK NAVAL SHIPYARD
BLDG 491
PORTSMOUTH VA 23709-5000
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
24 Apr 2019
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N6247018R2012
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each
175 TON PORTAL CRANE, PSNSY
FFP
Provide all supervision, labor, equipment and materials to design, fabricate, assemble, shop test, deliver, install, and field test one 175-ton portal crane for Puget Sound Naval Shipyard, in accordance with the specification (Attachment A).
NOTE: Upon acceptance of the crane, 3% of CLIN 0001 will be withheld until completion of a one year warranty period. The 3% of funds withheld from CLIN 0001 for the Contractor’s performance during the warranty period, will be adjusted at time of award and shown as a separate line item. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the offeror shows only the total price, but fails to enter a unit price, the total divided by the estimated quantity will be held to the intended unit price.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
NET AMT
0002 1 Each
OPTION 175 TON PORTAL CRANE, PSNSY
FFP
Provide all supervision, labor, equipment and materials to design, fabricate, assemble, shop test, deliver, install, and field test one 175-ton portal crane for Puget Sound Naval Shipyard, in accordance with the specification (Attachment A).
This option may be exercised up to 2,555 calendar days after contract award.
NOTE: Upon acceptance of the crane, 3% of CLIN 0002 will be withheld until completion of a one year warranty period. The 3% of funds withheld from CLIN 0002 for the Contractor’s performance during the warranty period, will be adjusted at time of award and shown as a separate line item. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the offeror shows only the total price, but fails to enter a unit price, the total divided by the estimated quantity will be held to the intended unit price.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
0003 1 Each
OPTION 175 TON PORTAL CRANE, NNSY
FFP
Provide all supervision, labor, equipment and materials to design, fabricate, assemble, shop test, deliver, install, and field test one 175-ton portal crane for Norfolk Naval Shipyard, in accordance with the specification (Attachment A). This option may be exercised up to 2,555 calendar days after contract award.
NOTE: Upon acceptance of the crane, 3% of CLIN 0003 will be withheld until completion of a one year warranty period. The 3% of funds withheld from CLIN 0003 for the Contractor’s performance during the warranty period, will be adjusted at time of award and shown as a separate line item. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the offeror shows only the total price, but fails to enter a unit price, the total divided by the estimated quantity will be held to the intended unit price.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
0004 1 Each
OPTION 175 TON PORTAL CRANE, NNSY
FFP
Provide all supervision, labor, equipment and materials to design, fabricate, assemble, shop test, deliver, install, and field test one 175-ton portal crane for Norfolk Naval Shipyard, in accordance with the specification (Attachment A). This option may be exercised up to 2,555 calendar days after contract award.
NOTE: Upon acceptance of the crane, 3% of CLIN 0004 will be withheld until completion of a one year warranty period. The 3% of funds withheld from CLIN 0004 for the Contractor’s performance during the warranty period, will be adjusted at time of award and shown as a separate line item. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the offeror shows only the total price, but fails to enter a unit price, the total divided by the estimated quantity will be held to the intended unit price.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
0005 1 Each
OPTION 175 TON PORTAL CRANE, PNSY
FFP
Provide all supervision, labor, equipment and materials to design, fabricate, assemble, shop test, deliver, install, and field test one 175-ton portal crane for Portsmouth Naval Shipyard, in accordance with the specification (Attachment A).
This option may be exercised up to 2,555 calendar days after contract award.
NOTE: Upon acceptance of the crane, 3% of CLIN 0005 will be withheld until completion of a one year warranty period. The 3% of funds withheld from CLIN 0005 for the Contractor’s performance during the warranty period, will be adjusted at time of award and shown as a separate line item. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the offeror shows only the total price, but fails to enter a unit price, the total divided by the estimated quantity will be held to the intended unit price.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
0006 1 Each
OPTION 175 TON PORTAL CRANE, PNSY
FFP
Provide all supervision, labor, equipment and materials to design, fabricate, assemble, shop test, deliver, install, and field test one 175-ton portal crane for Portsmouth Naval Shipyard, in accordance with the specification (Attachment A).
This option may be exercised up to 2,555 calendar days after contract award.
NOTE: Upon acceptance of the crane, 3% of CLIN 0006 will be withheld until completion of a one year warranty period. The 3% of funds withheld from CLIN 0006 for the Contractor’s performance during the warranty period, will be adjusted at time of award and shown as a separate line item. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the offeror shows only the total price, but fails to enter a unit price, the total divided by the estimated quantity will be held to the intended unit price.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
0007 1 Each
OPTION 175 TON PORTAL CRANE, PHNSY
FFP
Provide all supervision, labor, equipment and materials to design, fabricate, assemble, shop test, deliver, install, and field test one 175-ton portal crane for Pearl Harbor Naval Shipyard, in accordance with the specification (Attachment A). This option may be exercised up to 2,555 calendar days after contract award.
NOTE: Upon acceptance of the crane, 3% of CLIN 0007 will be withheld until completion of a one year warranty period. The 3% of funds withheld from CLIN 0007 for the Contractor’s performance during the warranty period, will be adjusted at time of award and shown as a separate line item. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the offeror shows only the total price, but fails to enter a unit price, the total divided by the estimated quantity will be held to the intended unit price.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD
Section C - Descriptions and Specifications
DESCRIPTIONS AND SPECIFICATION
C1 DESCRIPTION OF WORK
Procure one 175-ton portal crane to be installed at Puget Sound Naval Shipyard & Intermediate Maintenance Facility (IMF) with options to procure six additional portal cranes for various shipyards. The cranes shall be a portal type with a rotating superstructure, luffing boom, main hoist, and an auxiliary (aux) hoist designed to meet the dimensional and functional requirements of the specification. The cranes shall be built to the design of a registered professional engineer. The cranes shall be designed, fabricated, assembled, shop tested, delivered, installed, inspected, field tested, and made ready for use in accordance with the specification, as contained as Attachment A in Section J of this solicitation.
C2 CONTRACT AWARD
This solicitation is anticipated to result in the award of a single firm fixed price contract.
The acceptance period for this solicitation is ninety (90) calendar days. Offerors providing less than ninety (90) calendar days for Government acceptance after the date offers are due, will not be considered and will be rejected.
C3 NORTH AMERICAN INDUSTRY STANDARD (NAIC)
The NAICs code assigned to this procurement is 333923, and the corresponding small business size standard is 1,250 employees.
C4 WAGE DETERMINATION
General Decision Number WA190071(Attachment B), dated 01/04/2019, is applicable to work done at Puget Sound Naval Shipyard.
General Decision Number VA190055(Attachment O), dated 02/01/2019, is applicable to work done at Norfolk Naval Shipyard.
General Decision Number ME190033(Attachment P), dated 01/04/2019, is applicable to work done at Portsmouth Naval Shipyard.
General Decision Number HI190001(Attachment Q), dated 03/01/2019, is applicable to work done at Pearl Harbor Naval Shipyard.
C5 BONDING
A Standard Form 24, Bid Bond (Attachment C), in the amount of 20% or $3 million, whichever is less, shall be included with your proposal. Performance (Attachment D) and Payment (Attachment E) Bonds, each in the amount of 100% of the award price, shall be provided by the contractor within fifteen (15) days after contract award, but in any event, before starting work. Additional bonding and consent of surety is required if options are exercised.
Consequently, the performance and payment bonds must reflect 100 percent of the aggregate amount of all awarded items. See FAR 52.228-1 and 52.228-16 for more details on bonding requirements.
Section D - Packaging and Marking
D1 PRESERVATION AND PACKAGING
Equipment and supplies shall be preserved and packaged in accordance with the contractor’s standard commercial practice, consistent with applicable ASTM/ANSI requirements and other applicable Industry or Federal Standards, which shall insure acceptance by the carrier for safe delivery and arrival, and shall provide adequate protection for outside storage.
D2 MARKING
Interior packages, shipping containers, bundles, and loose pieces shall be marked in accordance with the Contractor’s standard practice in accordance with STM, ANSI or other applicable Industry/Federal Standards.
Section E - Inspection and Acceptance
E1 INSPECTION AND ACCEPTANCE (DESTINATION)
Inspection and acceptance of the supplies to be furnished hereunder shall be made at destination by the Contracting Officer’s Representative (COR) or Project Manager.
E2 ACCEPTANCE
The performance and quality of work delivered by the contractor, including supplies rendered and any documentation or written material compiled shall be subject to inspection, review, and acceptance by the government.
E3 GOVERNMENT QUALITY ASSURANCE
In accordance with FAR 52.246-2, "INSPECTION OF SUPPLIES-FIXED PRICE (AUG 1996)," supplies rendered under this contract are subject to government inspection during both the contractor's operations and after completion of the tasks. The Government’s Quality Assurance Surveillance Program is not a substitute for Quality Control by the Contractor.
E4 PERFORMANCE EVALUATION MEETINGS
The Contractor shall meet with the Government at times designated by the Government and at no cost to the government to discuss overall management of the contract. A mutual effort shall be made to resolve all problems identified. The written minutes of these meetings, prepared by the Government, shall be signed by the Contractor’s representative and the Government's representative. Should the Contractor not concur with the minutes, the Contractor shall state in writing to the Contracting Officer any areas of disagreement within fifteen (15) calendar days.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-2 Inspection Of Supplies--Fixed Price AUG 1996
52.246-15 Certificate of Conformance APR 1984 52.246-16 Responsibility For Supplies APR 1984
Section F - Deliveries or Performance
DELIVERIES OR PERFORMANCE
F1 TIME OF DELIVERY
The contract completion date for CLIN 0001 175 Ton Portal Crane shall be 1,440 calendar days from the time of award. The contract will contain options for additional cranes that may be unilaterally exercised up to 2,555 days (7 years) after contract award. Options exercised up to 365 days from the base award will have a contract completion date of 1,080 calendar days from the time the option is exercised. Options exercised after 365 days from the base award will have a contract completion date of 720 calendar days from the time the option is exercised.
F2 CONTRACTOR PERFORMANCE
Contractor’s performance will be evaluated using the respective contractor performance evaluation report entry system located on the website http://www.cpars.gov/. Prior to commencement of work the contractor is required to provide the government with the name, phone number and email address of the “Contractor’s Representative” that will be responsible for receipt and review of draft performance evaluations prepared by the government in the appropriate system. It is the contractor’s responsibility to keep this contact information current.
F3 PLACE OF DELIVERY: DESTINATION
The contractor shall deliver the equipment F.O.B. to the destination.
F. O. B. means free on board at destination; i.e., the seller or consignor delivers the goods on seller’s or consignor’s conveyance at destination. The cost of shipping and risk of loss are borne by the seller or consignor. Offloading, post-delivery testing and other post-delivery services are included in this delivery. Refer to FAR clause 52.247-34, F.o.b. Destination, incorporated herein by reference.
52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.247-34 F.O.B. Destination NOV 1991 52.247-58 Loading, Blocking, And Bracing Of Freight Car Shipment APR 1984
CLAUSES INCORPORATED BY FULL TEXT
52.211-11 LIQUIDATED DAMAGES--SUPPLIES, SERVICES, OR RESEARCH AND DEVELOPMENT (SEP 2000)
(a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, the Contractor shall, in place of actual damages, pay to the Government liquidated damages as identified below for each calendar day of delay:
CLIN 0001 – $32,450
CLIN 0002 – $32,300
CLIN 0003 – $32,300
CLIN 0004 – $32,300
CLIN 0005 – $32,300
CLIN 0006 – $32,300
CLIN 0007 – $32,300
Liquidated damages shall not exceed 5% of the total contract price. Liquidated damages for a particular CLIN may exceed 5% of the price for that CLIN, but shall not exceed 5% of the total for all awarded CLINs.
(b) If the Government terminates this contract in whole or in part under the Default--Fixed-Price Supply and Service clause, the Contractor is liable for liquidated damages accruing until the Government reasonably obtains delivery or performance of similar supplies or services. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(c) The Contractor will not be charged with liquidated damages when the delay in delivery or performance is beyond the control and without the fault or negligence of the Contractor as defined in the Default--Fixed-Price Supply and Service clause in this contract.
(End of clause)
52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)
Any contract awarded as a result of this solicitation will be a DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation.
(End of provision)
Section G - Contract Administration Data
G1 RESPONSIBILITIES FOR CONTRACT ADMINISTRATION
(a) The cognizant Defense Contract Management Agency (DCMA), as identified on the award document will be designated to perform field administration of this contract. This includes the functions of progress payments, quality assurance (as assigned), production progressing to insure timely and complete delivery of all items under the contract including technical data as required, and preparation and issuance of Government Bills of Lading (GBL), unless otherwise provided for in the contract.
(b) The cognizant paying office identified on the award document will make payments.
(c) Final payment of each delivery order will be issued upon completion of all requirements of Section E.
G2 CONTRACTING OFFICER’S REPRESENTATIVE (COR)
If a COR is designated, the Contracting Officer upon contract award will appoint the individual in writing. A Contracting Officer’s Representative (COR) is NOT a Contracting or Ordering Officer and DOES NOT have authority to take any action, either directly or indirectly, that would change the pricing, quantity, quality, place of performance, delivery schedule, or any other terms and conditions of the contract (or delivery order), or to direct the accomplishment of effort which goes beyond the scope of the Statement of Work in the contract (or delivery order).
The COR is technically responsible for monitoring of contractor performance and is the sole technical point of contact. The Contracting Officer may also appoint, in writing, an alternate COR to perform the responsibilities and functions of the COR.
G3 TECHNICAL DIRECTION
(a) As provided by the contract provision DFARS 252.201-7000, “CONTRACTING OFFICER’S
REPRESENTATIVE (COR).”
G4 INVOICING INSTRUCTIONS
All invoices will be processed through Wide Area Work Flow (WAWF) pursuant to DFARS 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Specific instructions will be provided on the awarded contract pursuant to DFARS 252.232-7006 Wide Area Workflow Payment Instructions.
G5 GOVERNMENT FINANCING
Proposed pricing and contract award will be based on customary progress payment financing in accordance with FAR 32.005(a)(1). Prior to approval of progress payments, the government must determine the adequacy of the contractor’s accounting system and controls. If a current (within the last 12 months) audit is not available, the administrative contracting officer may request an audit of the contractor’s books and records by the audit agency (see FAR 32.503-3).
52.232-13 Notice Of Progress Payments APR 1984 52.232-16 Progress Payments APR 2012 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
252.232-7004 DOD PROGRESS PAYMENT RATES (OCT 2014)
If the Contractor is a small business concern, the Progress Payments clause of this contract is modified to change each mention of the progress payment rate and liquidations rate (excepting paragraph (k), Limitations on Undefinitized Contract Actions) to 90 percent.
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
(Contracting Officer: Insert applicable document type(s). Note: If a “Combo” document type is identified but not supportable by the Contractor's business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
(Contracting Officer: Insert inspection and acceptance locations or “Not applicable”.)
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC ____ Issue By DoDAAC ____ Admin DoDAAC ____ Inspect By DoDAAC ____ Ship To Code ____ Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) ____ Service Acceptor (DoDAAC) ____ Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____
(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
(Contracting Officer: Insert applicable email addresses or “Not applicable.”)
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
Section H - Special Contract Requirements
SPECIAL CONTRACT REQUIREMENTS
H1 SITE SPECIFIC REQUIREMENTS
Site specific requirements for Puget Sound Naval Shipyard & Intermediate Maintenance Facility, Portsmouth Naval Shipyard, Norfolk Naval Shipyard, and Pearl Harbor Naval Shipyard are provided in the following attachments:
1. Attachment K, Puget Sound Naval Shipyard & Intermediate Maintenance Facility
2. Attachment L, Portsmouth Naval Shipyard
3. Attachment M, Norfolk Naval Shipyard
4. Attachment N, Pearl Harbor Naval Shipyard
H2 SPECIAL CONTRACT REQUIREMENTS
The contractor shall procure and maintain during the entire period of performance under this contract the following minimum insurance:
COVERAGE
Type of Insurance: Per Person Per Accident Property General Liability $ 500,000.00 Automobile $200,000.00 $ 500,000.00 $20,000.00 Liability Workmen’s As Required Under FAR 28.307-2 Compensation (Other as required by State Law)
A Certificate of Insurance shall be submitted to the Contracting Officer for review and approval. No work shall commence until this notice has been presented to the Contracting Officer.
The only wording that is acceptable to the Government in the Cancellation section of the Certificate of Insurance is the endorsement stating:
"ANY CANCELLATION OR MATERIAL CHANGE IN THE
COVERAGE ADVERSELY AFFECTING THE GOVERNMENT'S
INTEREST SHALL NOT BE EFFECTIVE FOR SUCH PERIOD AS THE
LAWS OF THE STATE IN WHICH THIS CONTRACT IS TO BE
PERFORMED PRESCRIBE; OR UNTIL 30 DAYS AFTER THE INSURER
OR THE CONTRACTOR GIVES WRITTEN NOTICE TO THE
CONTRACTING OFFICER, WHICHEVER PERIOD IS LONGER."
The Certificate Holder will be Commander, NAVFAC Atlantic, Navy Crane Center, Norfolk Naval Shipyard, Building 491, Portsmouth, VA 23709-5000.
See FAR 52.228-5 for additional requirements with regard to insurance.
AUTHORITY
1. No person other than the Contracting Officer has authority to bind the Government with respect to this contract.
2. No action or omission of any government employee or representative other than the Contracting Officer shall increase or decrease the scope of this contract or shall otherwise modify the terms and conditions of this contract.
3. In no event shall any of the following be effective or binding on the Government or imputed to the Contracting Officer with respect to this contract:
(a) An understanding or agreement between the Contractor and anyone other than the Contracting Officer;
NOTICE OF BONDING REQUIREMENTS
Within 15 days after receipt of award, the bidder/offeror to whom the award is made shall furnish the bonds required by FAR Clause 52.228-16.
Bidders/offerors are hereby notified that the contract time for purposes of fixing the completion date, default, and liquidated damages will be as stated in FAR Clause 52.211-10 Commencement, Prosecution, and Completion of Work, regardless of when performance and payment bonds or deposits in lieu of surety are executed.
UTILITIES FOR CONSTRUCTION AND TESTING
The Contractor shall be responsible for obtaining, either from available Government sources or local utility companies, all utilities required for construction and testing. The Contractor shall provide these utilities at his expense, paid for at the current utility rate delivered to the job site. The Contractor shall provide and maintain all temporary utility connections and distribution lines, and all meters required to measure the amount of each utility used.
Section I - Contract Clauses
52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.203-13 Contractor Code of Business Ethics and Conduct OCT 2015 52.203-17 Contractor Employee Whistleblower Rights and Requirement
To Inform Employees of Whistleblower Rights
APR 2014
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
JAN 2017
52.204-2 Security Requirements AUG 1996 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
OCT 2018
52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-21 Basic Safeguarding of Covered Contractor Information Systems
JUN 2016
52.204-22 Alternative Line Item Proposal JAN 2017 52.204-23 Prohibition on Contracting for Hardware, Software, and
Services Developed or Provided by Kaspersky Lab and Other Covered Entities.
JUL 2018
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
OCT 2015
52.209-7 Information Regarding Responsibility Matters OCT 2018 52.209-9 Updates of Publicly Available Information Regarding
Responsibility Matters
OCT 2018
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.209-13 Violation of Arms Control Treaties or Agreements -- Certification.
JUN 2018
52.210-1 Market Research APR 2011 52.211-5 Material Requirements AUG 2000 52.211-15 Defense Priority And Allocation Requirements APR 2008 52.215-2 Audit and Records--Negotiation OCT 2010 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data--
Modifications
AUG 2011
52.215-13 Subcontractor Certified Cost or Pricing Data--Modifications OCT 2010 52.215-14 Integrity of Unit Prices OCT 2010 52.215-15 Pension Adjustments and Asset Reversions OCT 2010 52.215-17 Waiver of Facilities Capital Cost of Money OCT 1997
52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits (PRB) Other than Pensions
JUL 2005
52.215-19 Notification of Ownership Changes OCT 1997 52.215-21 Requirements for Certified Cost or Pricing Data and Data
Other Than Certified Cost or Pricing Data -- Modifications
OCT 2010
52.219-8 Utilization of Small Business Concerns OCT 2018 52.219-9 Small Business Subcontracting Plan AUG 2018 52.219-16 Liquidated Damages-Subcontracting Plan JAN 1999 52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards - Overtime
Compensation
MAY 2018
52.222-5 Construction Wage Rate Requirements--Secondary Site of the Work
MAY 2014
52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records AUG 2018 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and
Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-19 Child Labor -- Cooperation with Authorities and Remedies JAN 2018 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment
Exceeding $15,000
MAY 2014
52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-23 Notice of Requirement for Affirmative Action to Ensure
Equal Employment Opportunity for Construction
FEB 1999
52.222-24 Preaward On-Site Equal Opportunity Compliance Evaluation FEB 1999 52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for
Construction
APR 2015
52.222-29 Notification Of Visa Denial APR 2015 52.222-30 Construction Wage Rate Requirements--Price Adjustment
(None or Separately Specified Method)
AUG 2018
52.222-35 Equal Opportunity for Veterans OCT 2015 52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-37 Employment Reports on Veterans FEB 2016 52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-50 Combating Trafficking in Persons MAR 2015 52.222-54 Employment Eligibility Verification OCT 2015 52.222-55 Minimum Wages Under Executive Order 13658 DEC 2015 52.222-56 Certification Regarding Trafficking in Persons Compliance
Plan.
MAR 2015
52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
AUG 2011
52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements
MAY 2014
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.227-1 Authorization and Consent DEC 2007 52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
DEC 2007
52.227-3 Patent Indemnity APR 1984 52.228-1 Bid Guarantee SEP 1996 52.228-2 Additional Bond Security JUN 1996 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 Pledges Of Assets AUG 2018 52.228-14 Irrevocable Letter of Credit NOV 2014 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-1 Payments APR 1984 52.232-8 Discounts For Prompt Payment FEB 2002 52.232-11 Extras APR 1984 52.232-17 Interest MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-23 Alt I Assignment of Claims (May 2014) - Alternate I APR 1984 52.232-25 Prompt Payment JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
OCT 2018
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-4 Physical Data APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-21 Specifications and Drawings for Construction FEB 1997 52.242-5 Payments to Small Business Subcontractors JAN 2017 52.242-13 Bankruptcy JUL 1995 52.243-1 Changes--Fixed Price AUG 1987 52.244-6 Subcontracts for Commercial Items OCT 2018 52.246-17 Warranty Of Supplies Of A Noncomplex Nature JUN 2003 52.246-24 Limitation Of Liability--High-Value Items FEB 1997 52.247-15 Contractor Responsibility for Loading and Unloading APR 1984 52.247-21 Contractor Liability for Personal Injury and/or Property
Damage
APR 1984
52.247-64 Preference for Privately Owned U.S. - Flag Commercial Vessels
FEB 2006
52.248-1 Value Engineering OCT 2010 52.249-2 Termination For Convenience Of The Government (Fixed-
Price)
APR 2012
52.249-8 Default (Fixed-Price Supply & Service) APR 1984 52.252-1 Solicitation Provisions Incorporated By Reference FEB 1998 52.253-1 Computer Generated Forms JAN 1991
252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7003 Agency Office of the Inspector General DEC 2012 252.203-7004 Display of Hotline Posters OCT 2016 252.204-7000 Disclosure Of Information OCT 2016 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
OCT 2016
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of Terrorism
OCT 2015
252.215-7008 Only One Offer OCT 2013 252.219-7003 Small Business Subcontracting Plan (DOD Contracts) DEC 2018 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements DEC 2010 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or
Hazardous Materials
SEP 2014
252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials
SEP 2014
252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7001 Buy American And Balance Of Payments Program-- Basic DEC 2017 252.225-7002 Qualifying Country Sources As Subcontractors DEC 2017 252.225-7012 Preference For Certain Domestic Commodities DEC 2017 252.225-7016 Restriction On Acquisition Of Ball and Roller Bearings JUN 2011 252.225-7021 Trade Agreements--Basic DEC 2017 252.225-7036 Buy American--Free Trade Agreements--Balance of
Payments Program--Basic
DEC 2017
252.225-7048 Export-Controlled Items JUN 2013 252.226-7001 Utilization of Indian Organizations and Indian-Owned
Economic Enterprises, and Native Hawaiian Small Business Concerns
SEP 2004
252.227-7013 Rights in Technical Data--Noncommercial Items FEB 2014 252.227-7016 Rights in Bid or Proposal Information JAN 2011 252.227-7017 Identification and Assertion of Use, Release, or Disclosure
Restrictions
JAN 2011
252.227-7025 Limitations on the Use or Disclosure of Government- Furnished Information Marked with Restrictive Legends
MAY 2013
252.227-7030 Technical Data--Withholding Of Payment MAR 2000 252.227-7037 Validation of Restrictive Markings on Technical Data SEP 2016 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7001 Contract Drawings, and Specifications AUG 2000 252.236-7002 Obstruction of Navigable Waterways DEC 1991 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.246-7008 Sources of Electronic Parts MAY 2018
252.247-7023 Transportation of Supplies by Sea APR 2014
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 2,555 days of contract award. Options exercised up to 365 days from the base award will have a contract completion date of 1,080 calendar days from the time the option is exercised. Options exercised after 365 days from the base award will have a contract completion date of 720 calendar days from the time the option is exercised.
52.225-11 BUY AMERICAN--CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (OCT
2016)
(a) Definitions. As used in this clause--
Caribbean Basin country construction material means a construction material that--
(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is--
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4)such as agricultural products and petroleum products.
Component means an article, material, or supply incorporated directly into a construction material.
Construction material means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.
Materials purchased directly by the Government are supplies, not construction material.
Cost of components means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Designated country means any of the following countries:
(1) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Armenia, Aruba, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Moldova, Montenegro, Netherlands, New Zealand, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan, Ukraine, or United Kingdom);
(2) A Free Trade Agreement (FTA) country (Australia, Bahrain, Canada, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);
(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or
(4) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St.
Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).
Designated country construction material means a construction material that is a WTO GPA country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean Basin country construction material.
Domestic construction material means--
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if--
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
Foreign construction material means a construction material other than a domestic construction material.
Least developed country construction material means a construction material that--
(1) Is wholly the growth, product, or manufacture of a least developed country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.
“Free Trade Agreement country construction material” means a construction material that—
(1) Is wholly the growth, product, or manufacture of a Free Trade Agreement (FTA) country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a FTA country into a new and different construction material distinct from the materials from which it was transformed.
“Least developed country construction material” means a construction material that—
(1) Is wholly the growth, product, or manufacture of a least developed country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.
United States means the 50 States, the District of Columbia, and outlying areas.
WTO GPA country construction material means a construction material that--
(1) Is wholly the growth, product, or manufacture of a WTO GPA country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was transformed.
(b) Construction materials.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C.
This is the start of the file's text. The full file is on GovTribe.