J11_(Rev._1)_Appendix_A-2_Crane_124_4_AMEND_0003.pdf

PDF 245 KB Posted

Attached to
ID/IQ Contract for Small Capacity Weight Handling Equipment Multiple Award Contract (WHEMAC)
Solicitation number
N6247018R2007
Issued by

About this file

This document contains an appendix and solicitation for an Indefinite Delivery/Indefinite Quantity contract for small capacity weight handling equipment. The contract is a 100% small business set-aside to be used by the Department of the Navy Naval Facilities Engineering Command and other federal agencies for ordering new bridge, portal, jib, and gantry cranes up to 30 tons capacity and 60 foot span, as well as overhaul of existing equipment. Work will include site surveys, design, fabrication, demolition of old cranes, electrification, installation, testing, and training in accordance with Navy regulations. Cranes will handle general cargo as well as ordnance, hazardous materials, and fissionable components. The appendix provides specifications for crane 124-4 including dimensions, voltages, phases, and orientation of controls.

J11_(Rev._1)_Appendix_A-2_Crane_124_4_AMEND_0003.pdf

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A: 13' - 00" (Min)

B: 14' - 04"

C: 4'- 00" (Ref)

C

A (High Hook)

B

17' - 2 1/2"

Radius 4' - 00"

Radius 4' - 00"

7' - 04"

6' - 00"

4' - 06"

3' - 06"10' - 00"1' - 00"

Manual Switch

Manual Switch

Patented

Track

Hoist Trolly Path Denoted by:

Elevation View

Plan View

FWD

REV

FWD

REV

FWD

REV

F W

D

R E

V

F W

D

R E

V

Appendix A-2

Sheet 1/1 Rev. -

Hoist Trolley Information and Sketch

Crane 124-4

N

NOTES:

1. All dimensions are approximate and shall be verified by the Contractor.

2. 17.25" clear from monorail tread to electrical bus bar.

3. Current Electrification is vertical and attached to the patented track.

4. New end stops shall be installed in the same location as the existing end stops and shall mate with the bumper of the new trolley-hoist.

5. Orient the FWD and REV on the pendant controller as shown.

6. New crane electrification shall be provided by the crane contractor.

CRANE ELECTRIFICATION:

Voltage 220 VAC

Power: 15 AMP

Frequency: 60 Hz

3 Phase

Crane

Disconnect

Amendment 0003 Work Order 1562198

Sheets and Views
Appendix A Crane 124_4_AMEND_0003-Sheet 1

File details come from the government source that posted it. Updated .