SF30_18-2003_Amend_0004.pdf
PDF 102 KB Posted
- Solicitation number
- N6247018R2003
About this file
SF30_18-2003_Amend_0004.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30_18-2003_Amend_0007.pdf | ||
| Attach_P.pdf | ||
| SF30_18-2003_Amend_0006.pdf | ||
| Attach_O.pdf | ||
| Attach_M.pdf | ||
| Amend_0005.pdf | ||
| Attach_N.pdf | ||
| Attach_L.doc | DOC document | |
| SF30_Amend_0003.pdf | ||
| N62470-18-R-2003_SpecRev1.pdf | ||
| 0001_Revise_Site_Visit.pdf | ||
| SF30_18-2003_0002.pdf | ||
| Attach_C.pdf | ||
| Attach_B.pdf | ||
| Solicitation_18-2003.pdf | ||
| Attach_A.pdf | ||
| N6247018R2003_Pre-Sol_Synopsis_Final.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
140 TON PORTAL CRANE, PORTSMOUTH NAVAL SHIPYARD
See Summary of Changes
1. CONTRACT ID CODE PAGE OF PAGES
J 1 17
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Apr-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247018R2003
X 9B. DATED (SEE ITEM 11)
27-Feb-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Apr-2018
CODE
COMMANDER NAVFAC ATLANTIC
NAVY CRANE CENTER
NORFOLK NAVAL SHIPYARD
BLDG 491
PORTSMOUTH VA 23709-5000
N62470 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247018R2003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0004
Amendment 0004 is issued for the following reasons:
1) To clarify attachments in Section J;
2) To revise Section H of the Solicitation;
3) To revise Section I of the Solicitation
3) To revise Section J of the Solicitation;
4) To revise Section L of the Solicitation;
5) To revise Section M (Price) of the Solicitation; and
6) To revise Section M (Factor 2 Small Business Utilization) of the Solicitation
Clarification for Section J – List of Documents, Exhibits and Other Attachments
The following are provided as clarifications for Section J:
1) Attachment A, NAVFAC 140 Ton Portal Specifications, has no label within the document. Offerors shall consider as Attachment A in accordance with Section J.
2) Attachment B, Wage Determination, has no label within the document. Offerors shall consider as Attachment B in accordance with Section J.
3) Attachment C, Standard Form 24, Bid Bond, has no label within the document. Offerors shall consider as Attachment C in accordance with Section J.
4) Attachment D, Pre-Proposal Inquiry Form, has no label within the document. Offerors shall consider as Attachment D in accordance with Section J.
5) Attachment F, Small Business Subcontracting Record, is mislabeled as Attachment D within the document.
Offerors shall disregard the label on the document and consider as Attachment F in accordance with Section J.
6) Attachment G, Small Business Participation and Commitment Strategy, is mislabeled as Attachment E within the document. Offerors shall disregard the label on the document and consider as Attachment G in accordance with Section J.
7) Attachment I, Exhibit A, Contract Data Requirements List DD Forms 1423, has no label within the document . Offerors shall consider as Attachment I in accordance with Section J.
8) Attachment J, Exhibit B, Data Items Descriptions, has no label within the document. Offerors shall consider as Attachment J in accordance with Section J.
9) Attachment K, N62470-18-R-2003 SpecRev1 (incorporated via Amendment 0003), is added to the list of Section J attachments.
10) Attachment L, Small Business Subcontracting Plan (incorporated via this amendment), is added to the list of Section J attachments.
SECTION H - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
H1 PORTSMOUTH NAVAL SHIPYARD
l. Facility Information N/A.
2. Operations Affecting Existing Work Operations affecting existing facilities at the construction sites shall be conducted with care not to damage facilities that are to remain in place. All existing facilities damaged by such operations shall be rectified promptly without additional cost to the Government. Where existing facilities must be changed, or where new facilities adjoin, connect to, or abut existing facilities, the existing facilities shall be altered only as necessary and approved, in a substantial, neat and workmanlike manner.
3. Work Outside Regular Hours If the Contractor decides that it will be necessary to conduct work outside regular hours or on Saturdays, Sundays, or holidays, at any of the Government sites identified in the delivery orders issued, the contractor shall submit a written request to the naval activity authorities, as well as a copy to the Contracting Officer. Such requests, if authorized, shall allow ample time to enable satisfactory arrangements to be made by the Government to authorize such work and for inspecting the work in progress. At night, the contractor shall light the different parts of the work in an approved manner. All utility cut-overs shall be made after normal working hours or on weekends. No additional costs shall be authorized for such work. Normal work hours are considered to be 0700 to 1530, Monday through Friday, with no work on government holidays, and no work between Christmas and New Year’s Day.
4. Security Requirements
4.1 Foreign nationals: Approval of access by foreign nationals requires a significant amount of time. The following information may need to be provided to the delivery site representative a minimum of thirty (30) calendar days before a visit:
1. Name
2. Country of Origin
3. Firm/Contract Number
4. Area to be visited
5. Reason for visit
6. Exact dates when visit will occur.
7. Passport
8. Birth Certificate
9. Work Visa
10. Driver’s license When approval is received, the individual(s) must be escorted at all times by a Portsmouth Naval Shipyard designated individual.
4.2 New contractor security requirements have taken affect at the shipyard. From CNIC, contractors, suppliers, and vendors who need access to a Navy installation must have a DBIDS credential for base access. "Defense Biometric Identification System (DBIDS) increases installation security and communications by receiving frequent database updates on changes to personnel/credential status, law enforcement warrants, lost/stolen cards, and force protection conditions. The system provides a continuous vetting anytime the DBIDS card is scanned at an installation entry point.” If you (contractors, et al)* currently have a Navy Commercial Access Control System (NCACS) card, the following is required to get a DBIDS credential: Present your NCACS Card and a completed copy of the SECNAV FORM 5512/1 to the base Visitor Control Center (VCC) representative.
The VCC will pull up your information in the computer, ensuring all information is current and correct. Once your information is validated, a temporary DBIDS credential is provided.
For each additional U.S. Navy installation to which you need access, the first time you visit you only need to bring your DBIDS credential and statement of purpose for base access when arriving at the VCC. The representative will enter base access authorization and then you may proceed to work.
Additional information is available at https://www.cnic.navy.mil/om/dbids.html.
Failure to obtain entry approval will not affect the contract price or time of completion.
4.2.1 Badge Requirements: NAVSEA Standard Access Control Badges (SACB’s) are required for access to naval activities, NAVSEA Controlled areas, Security Islands (SI), Controlled Nuclear Information Areas (CNIA) Nuclear Work Areas (NWA), and Controlled Industrial Area (CIA). The badges can be obtained at the Visitor Control Center Office located at the naval activity. SACB badges shall be worn at all times while on the activity and shall be in plain view in a conspicuous place above the waist. Wearers of NAVSEA SACB shall maintain a picture I.D. on their person for access into the Controlled Industrial Area, or other NAVSEA Areas. All contracting personnel will be required to have a pre-job brief on security awareness. Materials delivered by other than the Contractor’s personnel who have identification and a NAVSEA SACB, will require a bill-of-lading and an escort for the vehicle and its driver into and out of the Controlled Industrial Area (CIA)
4.3 Vehicle Permits: All vehicles entering any naval activity are required to obtain a permit in accordance with facility regulations. The vehicle permits can be obtained from the VCC. Vehicles will be required to have a company logo or identification visible on both sides. All contractor vehicles and equipment, when not in use, shall be locked or removed from the facility or otherwise disabled so that operation by unauthorized personnel will be prohibited.
4.4 Cameras: No cameras, including cell phone cameras, are allowed inside NAVSEA Controlled Areas.
Photography by the Contractor is prohibited. Construction progress photos, and all other necessary photo documentation, will be provided by authorized Government personnel.
4.5 Portable Computer Equipment: Authority to operate computer systems on Portsmouth Naval Shipyard (PNS) must be granted by Code 109 ISSM. Portable computer equipment is only allowed if contracted work can not be completed without it. Camera equipped laptops are not allowed. The lens must be removed, void filled with epoxy and application disabled. The PNS VISITORS PORTABLE COMPUTER EQUIPMENT REGISTRATION form can be obtained from the VCC or provided in advance by the shipyard sponsor. The original signed form must be kept by the contractor with the computer as proof of registration.
4.6 Be advised that prohibited items such as alcohol, drugs, and firearms are not permitted on the Shipyard and that entry onto the Shipyard constitutes consent to search of their person and all property under their control.
5. Naval Activity Regulations The contractor, employees and subcontractors shall become familiar with and obey all facility regulations including fire, traffic and security regulations. All personnel employed on the work site shall keep within the limits of the work (and avenues of ingress and egress), and shall not enter any restricted areas unless required to do so and are cleared for such entry. The contractor’s equipment shall be conspicuously marked for identification.
6. Work Schedule The Contractor shall submit a work schedule as required by the contract for each delivery order issued to the Contracting Officer and the appropriate naval activity personnel prior to commencing work since circumstances at any particular site may dictate the need to modify the contractor’s work schedule. Attention is invited to the fact that other Contractors may be engaged in work at each site and there may be the need for close cooperation in order to avoid conflicts. The Contractor shall cooperate and schedule work to avoid conflicts with and interruption of the work of others insofar as practicable. In the case of conflicts with other Contractors that cannot be resolved satisfactorily, the matter shall be referred to the Contracting Officer for resolution. The Contractor shall provide written notice to the Contracting Officer of at least thirty days prior to intended mobilization date.
7. Government Activities The Government will continue its normal activities during the contractor’s work at each site, and the contractor shall carry on work with the least possible interference to Government activities. The contractor shall schedule work as to cause the least amount of interference with naval facility operations. Work schedules shall be discussed with naval activity personnel as required. Permission to connect or interrupt any roads, railroads and/or utility service shall be requested in writing a minimum of fifteen (15) calendar days prior to the desired date of interruption. The contractor shall make reasonable efforts to provide secure boundaries and sign postings around the designated work site to prevent entry of unauthorized personnel and vehicles.
8. Government Work and Material The Contractor will perform the final acceptance tests of the crane as described in the contract. The Government will provide the test weights, rigging gear, and power, to perform the tests.
9. Safety Requirements See Appendix H (Safety) contained in this contract. Also, see safety related CDRLs provided in Exhibit A.
10. Crane Mobilization, Assembly, Installation and Testing Plan The contractor shall submit a plan to the Contracting Officer detailing the logistics involved in crane mobilization to the assembly site, installation and testing of the crane. The plan shall include the type of equipment necessary for crane mobilization to the assembly site, required storage and protection of crane components, coordination of crane installation and testing. The plan shall contain enough detail so that all topics are covered including maximum loading and maximum wheel loading for mobilization equipment.
11. Storm Protection Should warnings of wind of gale force or stronger be issued, the Contractor shall take every practicable precaution to minimize danger to persons, the crane and to adjacent property. These precautions shall include closing all openings as appropriate, removing all loose materials, tools and equipment from exposed locations and removing or securing scaffolding and other temporary work.
12. Sanitation If adequate sanitary conveniences are not available at the site, the contractor shall be responsible for such conveniences of any approved type for the use of persons employed on the work and properly secluded from public observation and shall be constructed and maintained by the contractor in such a manner and at such points as shall be required or approved by the appropriate authority at the Government facility. These conveniences shall be maintained at all times without nuisance and their use shall be strictly enforced. Upon completion of the work, they shall be removed from the premises, leaving the premises clean and free from nuisance.
13. Environmental Protection The contractor shall comply with all applicable federal, state and local environmental protection laws regulations and standards. The Contractor shall coordinate all environmental protection and hazardous waste disposal matters with the Contracting Officer. The Activity Environmental Protection Coordinator or authorized officials may inspect any of the facilities operated or maintained by the Contractor at any time and without prior notice. In the event that a regulatory agency assesses a monetary fine against the Government for violations caused by the Contractor, the Contractor shall reimburse the Government for all associated costs, including the amount of the fine. The contractor shall also clean up any oil or chemical spills that result from the Contractor’s operations at his own expense. The Contractor shall comply with the instructions of the cognizant Navy Medical Department with respect to avoidance of conditions which create a nuisance or which may be hazardous to the health of military or civilian personnel.
14. Public Release of Information There shall be no public release of information or photographs concerning any aspect of the materials or services relating to this contract or other documents resulting therefore without the prior written approval of the Contracting Officer. The Contractor shall insert the substance of this paragraph in each subcontract and purchase order.
15. Services of a Manufacturer’s Representative at Site of Delivery The prime contractor shall provide a representative at the site specified in the contract who shall coordinate all work during the entire period of delivery, erection, field testing and Government inspection. This representative shall have the technical expertise and authority to resolve problems in a timely manner, and shall be an employee of the prime contractor whether the site work is performed by the prime or by subcontractor(s).
16. Pre-Installation Conference A pre-installation conference shall be scheduled for prior to site mobilization. This conference shall be held at the naval facility for which work is to be accomplished under the contract. The purpose of this conference is for the Government to provide clearance information required by the contractor for access to the facility for personnel and vehicles, security on the facility and to discuss the contractor’s preliminary mobilization, erection and testing plan as will be formally provided under DD Form 1423, Contract Data Requirements List, Delivery and Mobilization Plan.
17. Radio Transmitter Restrictions To preclude accidental actuation of sensitive electronic equipment, the Contractor shall conform to the restrictions and procedures for the use of radio transmitting equipment as delineated by the activity. Under no circumstances shall transmitters be used without prior approval of the appropriate naval facility authorities.
18. Utilities Services The contractor shall make arrangements for any and all utility services required. The contractor shall be responsible for providing utility services for installation until the crane is checked out and testing begins. Once checkout and testing begin, electricity for crane operation will be supplied through normal crane power supply circuits.
18.1. Telephone Service: The contractor shall make arrangements for telephone services, as available.
18.2. Water: The location of temporary tie-ins will be as approved by the Contracting Officer. All temporary tie-ins to the facility water system require meters, low-pressure back-flow preventers and shut off valves. Fire hydrants shall not be used for water supply. The present charge for potable water is $1.00 for 1000 gallons, unless otherwise indicated by the activity.
18.3. Solid Waste: Dumpster: If a dumpster is needed, the contractor must make all provisions for installation, dumping, removal, and clean-up.
19. Government Representatives ONLY the Contracting Officer, Naval Facilities Engineering Command, Navy Crane Center may direct the contractor to make any changes under this contract in accordance with the "CHANGES - FIXED PRICE CLAUSE, 52.243-1" contained in Section I herein. The Contracting Officer may authorize other government representatives to monitor the progress of work at each site and to perform various administration functions under each delivery order issued under the resultant ID/IQ Contract. The Contracting Officer will identify in writing to the contractor such representatives.
20. The contractor shall procure and maintain during the entire period of performance under this contract the following minimum insurance:
COVERAGE
Type of Insurance: Per Person Per Accident Property General Liability $ 500,000.00 Automobile $200,000.00 $ 500,000.00 $ 20,000.00 Liability Workmen’s As Required Under FAR 28.307-2 Compensation (Other as required by State Law)
A Certificate of Insurance shall be submitted to the Contracting Officer for review and approval. No work shall commence until this notice has been presented to the Contracting Officer.
The only wording that is acceptable to the Government in the Cancellation section of the Certificate of Insurance is the endorsement stating:
"ANY CANCELLATION OR MATERIAL CHANGE IN THE COVERAGE
ADVERSELY AFFECTING THE GOVERNMENT'S INTEREST SHALL
NOT BE EFFECTIVE UNTIL 30 DAYS AFTER THE INSURER GIVES
WRITTEN NOTICE TO THE CERTIFICATE HOLDER."
The Certificate Holder will be Commander, NAVFAC Atlantic, Navy Crane Center, Norfolk Naval Shipyard, Building 491, Portsmouth, VA 23709-5000.
SECTION I - CONTRACT CLAUSES
The following have been added by reference:
52.219-9 Alt II 252.219-7003
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
Attachments
a) NAVFAC 140 Ton Portal Specification
b) Wage Determination
c) Standard Form 24, Bid Bond
d) Pre-Proposal Inquiry Form
e) Corporate Experience Questionnaire
f) Small Business Subcontracting Record
g) Small Business Participation and Commitment Strategy
h) Past Performance Questionnaire
i) Exhibit A, Contract Data Requirements List DD Forms 1423
j) Exhibit B, Data Item Descriptions, DD Forms 1664
k) N62470-18-R-2003 SpecRev1
l) Small Business Subcontracting Plan
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
L1 INQUIRIES OR QUESTIONS
Inquiries and questions on this Request for Proposals shall be submitted in writing electronically to the Contract
Specialist, Lisa Sumpter at lisa.sumpter@navy.mil (with a copy to Luke Clay at luke.clay@navy.mil). See solicitation Section J Attachment D for the pre-proposal inquiry form.
All inquiries or questions must state the solicitation number and clearly state the question and solicitation/spec reference.
The deadline for submitting pre-proposal inquiries is 2:00 PM EST, 9 April 2018.
All pre-proposal inquiries and responses will be posted as an additional document under Solicitation N62470- 18-R-2003. Revisions to the request for proposal will be issued via amendment to the solicitation.
L2 PROPOSAL SUBMISSION INSTRUCTIONS
1. Time and Date for Receipt of Proposals A. Technical and price proposals shall be submitted no later than the date and time provided in Block 9 of the Standard Form 33 “Solicitation, Offer, and Award.” Proposals not received on or before the hour and date set forth will be handled in accordance with FAR provision 52.215-1 “Instructions to Offerors – Competitive Acquisition.”
B. Proposals shall be submitted to the following address:
If sent by mail or private courier:
Director, Navy Crane Center Attention: Lisa Sumpter or Luke Clay Naval Facilities Engineering Command Building 491 Portsmouth, Virginia 23709-1044
2. Proposal Format Offerors must submit required information for non-price (technical and past performance) and price proposals as follows:
The Non-Price (technical and past performance) and Price Proposals shall be submitted in separate binders, tabbed appropriately, and must include a cover page with the name of the prime contractor, addresses, phone and fax numbers, e-mail addresses, solicitation number, DUNS number, and point of contact. Should there be a discrepancy between paper and electronic information provided, the paper copies shall govern. Offerors are requested to number the pages consecutively for each factor.
Each volume of the proposal shall be submitted in accordance with the solicitation submittal requirements presented under Price and Non-Price Factors. Proposals are to be neat, legible and orderly. Content is more important than quantity. A concise and comprehensive proposal is desired. Organization, clarity, accuracy of information, relevance, and completeness are of prime importance. Statements such as “will comply”, or “noted and understood”, without supporting narrative to define compliance are not acceptable. Cursory responses or responses which merely reiterate or reformulate solicitation language will not be considered as satisfying the requirement of the RFP or as demonstrating the ability to perform. Elaborate brochures or other presentations beyond that sufficient to present a complete and effective proposal are not desired. Elaborate artwork and expensive visual or other presentation aids are not necessary.
Details concerning how the proposal will be evaluated are covered in Section M of the RFP.
3. Joint Venture and Team Arrangements—FAR Subpart 9.6 defines contractor team arrangements. Contractor team arrangements mean (1) two or more companies form a partnership or joint venture to act as a potential prime contractor; or (2) a potential prime contractor agrees with one or more other companies to have them act as its subcontractor under a specified Government contract or acquisition program.
All offerors proposing team members, a joint venture, key “team” subcontractor(s) (a key “team” subcontractor is defined as a subcontractor who in a “team” approach will perform significant/critical aspects of work under the proposed contract on a consistent basis, or on a consistent overflow basis), other subcontractors, and/or other entities (subsidiary/affiliate/parent/LLC/LTD member companies whose names are not exactly as stated on the SF33) upon whose resources the offeror relies on in response to a factor or subfactor requirement of this proposal, e.g. experience provided under Factor 1 (Management Experience), shall submit the following information in the front of both the technical and price proposals:
1. Provide a listing of the team members’ corporate name (no abbreviations), address, point of contact, phone number, DUNS Number, and CAGE Code. Provide this information in technical and price proposal.
2. Submit a copy of the joint venture agreement, other teaming arrangement agreement, or signed binding letter of commitment from each team member. For subcontractors, the offeror shall also provide an explanation of the meaningful involvement that the subcontractor will have in performance of this contract.
All joint ventures, teaming agreements, and letters of commitment shall: (1) clearly identify the expected relationship, role and responsibility between the firms or of the subcontractor or other entity (type and proportion of work to be performed); and (2) shall be signed by the appropriate individual(s) of each firm.
Copies of joint venture agreements, teaming agreements, and letters of commitment shall not be applied against the overall 75 page limit under the technical proposal.
4. Determination of Responsibility In accordance with Federal Acquisition Regulation (FAR) Part 9.1, the Contracting Officer shall award contracts only to responsible vendors. No purchase or award shall be made unless the contracting officer makes an affirmative determination of responsibility.
To be determined responsible, a prospective contractor must have adequate financial resources to perform the contract, or the ability to obtain them. The contracting officer shall require acceptable evidence of the prospective contractor's current sound financial status, as well as the ability to obtain required resources if the need arises.
The offeror shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or at least by an authorized officer of the organization.
Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements submit the latest three complete fiscal year financial statements for each Joint Venture company and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the offeror.
In addition, the offeror should provide the following:
i. One (1) Signed Bank Reference demonstrating adequate financial resources. If your firm has a line of credit – provide information on how much money your firm is able to borrow against the line of credit (i.e.
approximate or estimate is sufficient – an exact line of credit is not required).
ii. Three (3) signed credit references. Credit references must verify that your firm pays its creditors timely and in accordance with the terms negotiated with the creditor.
Although required to be submitted with your firm’s price proposal, this information will not be evaluated as part of the price proposal. This information forms the basis of your firm’s responsibility determination should your firm be considered for award.
5. Small Business Subcontracting Plan If applicable and proposing as other than a small business, Offeror shall provide Attachment L Small Business Subcontracting Plan. If you are other than a small business, submit a “Draft” Small Business Subcontracting Plan for this contract. Identify in terms of dollar value and percentage of the total acquisition, the extent of work you will perform as the prime contractor.
SMALL BUSINESS SUBCONTRACTING PLAN (Reference FAR 52.219-9 Alt II and DFARS 252.219-7003)
NAVFAC's command-wide small business subcontracting targets are shown below. These may be higher or lower than percentages that would represent realistic, challenging small business subcontracting goals for this acquisition.
Offerors representing as other than small businesses shall establish small business subcontracting plan goals that are consistent with their small business participation and commitment strategies submitted for evaluation under the small business utilization source selection factor in this solicitation and shall document in their subcontracting plans the basis for all proposed goals.
SB 65%
SDB 15%
HUBZone SB 6%
WOSB 15%
SDVOSB 5%
VOSB 5%
Small businesses identified by name in offerors’ proposals/participation and commitment strategies and considered in the evaluation shall be listed in small business subcontracting plans submitted pursuant to FAR 52.219-9 in order to facilitate compliance with 252.219-7003(e).
SECTION M - EVALUATION FACTORS FOR AWARD
M1 BASIS FOR AWARD
The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the proposal determined to represent the best value—the proposal most advantageous to the Government, price and other factors considered.
Tthe Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.
M2 EVALUATION FACTORS
The solicitation requires the evaluation of price and the following non-cost/price factors:
Factor 1 – Recent, Relevant Experience of the Firm Factor 2 – Small Business Utilization Factor 3 – Safety Factor 4 – Past Performance on Recent, Relevant Projects
The distinction between experience and past performance is that experience pertains to the volume of work completed by a contractor that are comparable to the types of work described under the definition of recent, relevant projects, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
The relative order of importance of the non-price evaluation factors is the technical factors (Factors, 1, 2, 3) are of equal importance to each other and, when combined are equal in importance to the past performance evaluation/performance confidence assessment factor (Factor 4). When the proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor combined (i.e., the non-price evaluation factors) are approximately equal to price.
The importance of price will increase if the Offerors’ non-price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-price proposal’s superiority to the Government. Award will be made to the responsible Offeror(s) whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered.
(a) PRICE: Submit one (1) original price proposal with one (1) CD in Adobe Acrobat (.pdf) format. The price proposal must be separate from the non-price proposal and clearly labeled as price.
(1) Solicitation Submittal Requirements:
1. Completed SF33, Solicitation, Offer and Award (Blocks 12-18)
2. Completed Price Schedule (Section B)
3. VETS-4212 Annual Report
4. Standard Form 24, Bid Bond
5. Copy of Contractor Representations and Certifications from the System for Award
Management (SAM) website at www.sam.gov.
6. The latest three year complete fiscal year financial statements, certified by an independent accounting firm, if available, or at least by an authorized officer of the organization. Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements discuss the financial responsibilities among the companies.
7. Small Business Subcontracting Plan (for other than small businesses)
(2) Basis of Evaluation: The Government will evaluate price based on the total price. Total price consists of the basic requirement (see Section B of the solicitation). Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
(i) Comparison of proposed prices received in response to the RFP.
(ii) Comparison of proposed prices with the Independent Government Estimate.
(iii) Comparison of proposed prices with available historical information.
(iv) Comparison of market survey results.
(b) NON-PRICE FACTORS: Submit one (1) original non-price proposal with two (2) hard copies and one (1) CD in Adobe Acrobat (.pdf) format addressing the following:
(1) Factor 1 Recent and Relevant Experience of the Firm:
(i) Solicitation Submittal Requirements: The Offeror shall provide a maximum of five (5) examples of recent and relevant projects. The Offeror shall clearly demonstrate recent and relevant experience of the firm on projects similar in size, scope and complexity to the requirements described in the Request for Proposals (RFP) completed within the last five (5) years preceding the release date of the solicitation. For purposes of this evaluation, a relevant project is further defined as a project involving a crane with a sixty (60) ton or greater main hoist, luffing boom hoist and rotating upper works. The projects presented must also demonstrate the ability to perform all of the following (NOTE: all abilities are not anticipated to be demonstrated in every project, but each project must demonstrate experience in at least one of these abilities to be considered relevant): use of an on-board diesel, site survey/investigation, design, fabrication, assembly, crane installation, crane testing, and operational training. It is the Offeror’s responsibility to choose which projects best demonstrate experience with the above noted abilities and reflect the Offeror’s ability to successfully accomplish the RFP requirements.
Given the nature of the work required by this solicitation, it is anticipated that the Offeror may be a Joint Venture, Partnership, LLC or other entity consisting of more than one entity. The Offeror may utilize recent, relevant experience of a subcontractor, partner, or, team member that will perform major or critical aspects of the requirement to demonstrate recent, relevant experience required under this evaluation factor.
Major aspects mean 10% or more of the dollar value of the work required by the solicitation.
If the Offeror is a Joint Venture, recent and relevant experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have such experience, relevant experience shall be submitted for each Joint Venture partner. JV Offerors are still limited to a total of five (5) recent and relevant projects. Projects submitted by Joint Ventures, where the Joint Venture firms performed together (either as partners or in a prime-sub relationship) may be viewed more favorably than contracts submitted in which the Joint Venture firms did not perform together. Any supporting agreements, including Joint Venture agreements, evidencing the relationship between two or more business entities (e.g. letters of intent, teaming agreements, etc.) shall be submitted with the proposal.
If the offeror uses a proposed subcontractor(s) to demonstrate corporate experience, the offeror must do the following: provide a letter of commitment from the subcontractor and the subcontractor’s DUNS number if available; submit at least one (1) contract for the proposed subcontractor(s); and demonstrate how the proposed subcontractor will use that corporate experience in the performance of the contract.
If the offeror uses affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF33) to demonstrate recent, relevant experience the offeror shall clearly demonstrate that the affiliates/subsidiaries/parent/LLC/LTD member companies will have meaningful involvement in the performance of this contract. Meaningful involvement is demonstrated when the proposal: 1) clearly states the affiliate/subsidiary/parent/LLC/LTD member company's specific commitment of technical resources (e.g. personnel, equipment) that will be provided or relied upon for contract performance; and 2) describes specific aspects of the project that the affiliate/subsidiary/parent/LLC/LTD member company will self-perform or manage on behalf of the Offeror in performance of the contract.
Failure to submit letters of intent, teaming agreements (including Joint Venture agreements), meaningful involvement, or other evidence of commitment may result in the Government not evaluating the recent, relevant experience of the subcontractor, partner, team, or JV member.
For each project the offeror shall complete the Corporate Experience Questionnaire included as Attachment E.
All information shall be provided as requested on the form.
IMPORTANT: It is the offeror’s responsibility to clearly explain and demonstrate to the Government how its work experience, and the experience of each teaming partner (if applicable) in each submitted contract is relevant to the contract requirements in thissolicitation. If the offeror does not clearly explain how its experience(s) is/are relevant to the contract requirements in this specification, the Government may determine that the submitted contract experience is not relevant.
The Recent, Relevant Experience submittal (Corporate Experience Questionnaires) shall be limited to no more than fifteen (15) single-sided pages (or three (3) single-sided pages per project) total.
(ii) Basis of Evaluation: The Government will evaluate the offeror’s demonstrated experience and depth of experience in performing relevant projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s recent and relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will review only five (5) projects. Any projects submitted in excess of the five (5) project limit will not be considered.
(2) Factor 2 Small Business Utilization:
This Factor assesses both the historical achievements in utilizing small business concerns as subcontractors and proposed small business participation and commitment strategies (see Basis of Evaluation).
(i) Solicitation Submittal Requirements:
1. Achievements: All offerors shall provide a narrative (limited to two pages) to describe their achievements in supporting the Government’s policy to provide maximum practicable opportunities for small business (SB), veteran-owned small business (VOSB), service-disabled veteran-owned small business (SDVOSB), historically underutilized business zone (HUBZone) small business, small disadvantaged business (SDB), and women-owned small business (WOSB) concerns to participate as subcontractors consistent with efficient contract performance. In support of narrative submissions:
a. All offerors (SBs and other than SBs) shall submit small business subcontracting information associated with each project cited under the Corporate Experience Factor whether performed as a prime or subcontractor. This information is required regardless of whether a subcontracting plan was incorporated into the contract award. This information shall be provided in the format provided in Attachment F, Small Business Participation Record. If projects submitted under Corporate Experience were task orders, the small business participation achievements should be specific to the task order, not the contract. If a project cited under the Corporate Experience Factor was not performed by the offeror as a prime or subcontractor (i.e. the offeror is utilizing experience of subcontractor to fulfill Corporate Experience), Attachment F is not required. The proposal shall include an explanation for any project that does not require Attachment F. Offerors shall provide explanations for contracts or task orders that were performed exclusively overseas or did not include opportunities for subcontracting (100% self-performed).
b. Offerors representing as other than small businesses shall also provide copies of the most current individual subcontracting reports (ISRs) associated with each project cited under the Corporate Experience Factor if a small business subcontracting plan was required by the contract. If such projects were completed under specific task orders, provide ISRs for the overall contract. For cited projects with state and local government agencies, provide similar subcontracting performance reports if required by the contracts. When not specifically addressed in the ISR or similar report, offerors shall provide explanations for all instances of failures to meet dollar or percentage goals in individual subcontracting plans. Acknowledging a missed goal is not the same as providing an explanation for why a goal was missed.
Notes: The Government reserves the right to consider achievements information on other recent, relevant projects from all available sources.
Offerors utilizing achievements information of key subcontractors shall clearly demonstrate how these companies will have meaningful involvement in the management of the subcontracting program for this acquisition. If not, such achievement information will not be considered under this factor. If the offeror is a new joint venture, partnership or other entity consisting of more than one company, provide achievements information for each individual business entity(ies) that will be responsible for managing the subcontracting program and clearly describe those responsibilities.
Failure to provide ISRs or any other requested information must be fully explained and may negatively impact your evaluation.
2. Small Business Participation and Commitment: All offerors shall submit a small business participation and commitment strategy including all data elements shown in Attachment G, Small Business Participation and Commitment Strategy.
a. Identify in terms of dollar value and percentage of the total acquisition the extent of work the offeror will self-perform as the prime contractor. If submitting an offer as a joint venture, identify the percentage of work each member will be responsible for and indicate the size status of each member (e.g. small business, woman-owned small business, other than small business).
b. Include supplemental narratives (limited to five pages) to address other elements of the offeror’s strategy such as binding agreements covering post award roles for execution of the contract and specific initiatives and tools that will be employed under the contract to enhance small businesses opportunities to both participate in this acquisition and build capabilities to support future NAVFAC acquisitions.
c. The anticipated prime and first tier overall small business participation rate for this acquisition (i.e.
work to be performed by small businesses as the prime and/or subcontractors) is 20% of the contract value. Offerors are encouraged to exceed this percentage and seek meaningful levels of participation in each of the small business socioeconomic programs listed in Attachment E consistent with efficient contract performance. Offerors shall explain in their participation and commitment strategies how proposed participation rates were established. The small business participation and commitment strategy must be in agreement with any required small business subcontracting plan and will be made a part of the contract upon award.
Note: The small business participation and commitment strategies evaluated under this factor do not replace small business subcontracting plans. Offerors representing as other than small businesses must submit acceptable small business subcontracting plans using the Attachment L as a template in order to be eligible for award (FAR 19.702(a)(1)). See the SMALL BUSINESS SUBCONTRACTING PLAN section of INSTRUCTIONS TO OFFERORS for subcontracting plan submission requirements.
(ii) Basis of Evaluation: Offerors will be evaluated on the following:
a. The extent to which their proposals and other performance information available to the Government demonstrate a history of successfully supporting Government policies concerning utilization of small business concerns as subcontractors including, when applicable, achievements against established small business subcontracting plan goals.
b. The extent to which small business concerns are specifically identified by name and socio-economic category in the proposal.
c. The levels of small business participation proposed and the degree of commitment to use named sources (formal agreements/letters of intent).
d. Complexity and variety of the work small businesses are to perform.
e. The anticipated benefits of proposed initiatives and tools to enhance small business participation and capabilities.
f. Realism and the likelihood of success in achieving the small business objectives of this acquisition.
g. Quantitative degree to which small business (including small business in all socio-economic categories) will participate in the acquisition relative to the total contract value.
Attachment F – Small Business Subcontracting Record
Attachment G – Small Business Participation and Commitment Strategy
(3) Factor 3 Safety:
(i) Solicitation Submittal Requirements:
The Offeror shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each contractor who is part of the partnership or joint venture; however, only one safety narrative is required. EMR, DART and TRC Rates shall not be submitted for subcontractors.)
(1) Experience Modification Rate (EMR): Submit the three most recent complete calendar years’ worth of data. This rate compares company’s annual losses in insurance claims against its policy premiums. The offeror may submit an insurance company-provided equivalent rate if no EMR exists. If the offeror has no EMR or premium, for any year, affirmatively state so and explain why. Any extenuating circumstances that affect the EMR and negative trends should be addressed as part of the factor submission.
(2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate: Submit the three most recent complete calendar years’ worth of data. If an offeror cannot submit an OSHA DART and TRC rates, for any year, affirmatively state so and an explanation must be provided. Any extenuating circumstances that affected the OSHA, DART, and TRC rate data negatively must be addressed as part of this factor submission.
(3) OSHA Total Recordable Case (TRC) Rate: Submit the three most recent complete calendar years’ worth of data. If an offeror cannot submit an OSHA TRC rate, for any year, affirmatively state so and an explanation must be provided. Any extenuating circumstances that affected the OSHA TRC rate data negatively must be addressed as part of this factor submission
(4) Technical Approach for Safety: Describe the plan for safety that will be implemented to evaluate safety performance of potential subcontractors as part of the selection process for all levels of subcontractors.
This is the start of the file's text. The full file is on GovTribe.