Att_(A)_Construction_Experience_Project_Data_Sheet.pdf
PDF 97 KB Posted
- Solicitation number
- N62470-14-R-3004
About this file
Construction Experience Project Data Sheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0003.pdf | ||
| Amendment_0002.pdf | ||
| Att_(D)_Drawings_and_Specifications.zip | ZIP file | |
| Att_(C)_Pre_Preposal_Inquiry_Form.xlsx | XLSX spreadsheet | |
| Att_(F)_Schedule_B_Price_Proposal_Form.pdf | ||
| Att_(B)_PPQ.pdf | ||
| Solicitation.pdf | ||
| Amendment_0001.pdf | ||
| Synopsis.pdf | ||
| Att_(A)_SmallBusSubPlan.doc | DOC document | |
| Attachment_(B)_PPQ.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT (A)
CONSTRUCTION EXPERIENCE PROJECT DATA SHEET
Project No. (check one) : CON #1 CON #2 CON #3 CON #4 CON #5
1. Experience for: Offeror Joint‐Venture Other (Explain)
Firm Name:
Address:
Phone Number:
DUNS Number:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)
Percent of project work performed:
If subcontractor, who was prime (Name/Phone #):
3. Contract Number: Delivery/Task Order Number:
Title:
Location:
4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):
5. Type of work:
New Construction Renovation Repair Alteration Other (explain):
6. Type of Contract/Task Order: (Check ALL that apply)
Firm‐Fixed Price Cost/Time and Material Other (explain):
Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.
7. Construction Project:
Award Amount: Final Price:
Type of Contract/Task Order: (Check ALL that apply)
Design‐Build Design‐Bid‐Build Delivery/Task Order (IDIQ) Other (explain):
If Design‐Build, identify the Lead Design Firm:______________________________________________
9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design‐ build, include a description of the design‐effort.
10. Provide a detailed description of what work your firm self‐performed on this project:
11. Other Information:
File details come from the government source that posted it. Updated .