This DD Form 1423-1 is a Contract Data Requirements List (CDRL) for a Technical and Management Work Plan (CPI Assessment) related to the RSNF MH-60R Tactical Operational Flight Trainer (TOFT) Block 3 Configuration. The document specifies detailed submission requirements for a Contractor Performance Improvement (CPI) assessment of the trainer's hardware and software breakdown structure, as defined in the Functional Baseline Technical Assessment (FBTA).

Key submission requirements include: a preliminary CPI analysis due 45 calendar days prior to the FBTA, government review period of 45 calendar days for each submission, and contractor resubmission window of 30 calendar days for documents accepted with comments. The document includes strict distribution and classification guidelines, with a Distribution Statement D authorizing use only by Department of Defense and DoD contractors for official purposes. The contract number is N61340-XX-D-XXXX, and the requiring office is NAWCTSD Engineering, with data submissions to be made as required through the end of the contract.

View the file

Other files

File Type Posted
Mod 05_N61340-25-R-0006.pdf PDF
Mod 05_Atch (L-1) QA_ Amendment 05_N6134025R0006_19 May 2025.xlsx XLSX spreadsheet
Mod 05_N61340-25-R-000605 Conformed Copy.pdf PDF
Mod 04_N6134025R0006 Conformed Copy.pdf PDF
Mod 04_N6134025R0006.pdf PDF
Mod 04_Atch_01_SOW RSNF MH60 TOFT Upgrade 12May2025.docx DOCX document
Mod 04_Atch (L-1) QA_ Amendment 04_N6134025R0006_15 May 2025.xlsx XLSX spreadsheet
Mod 03_RFP_N61340-25-R-0006.pdf PDF
Mod 03_Atch_05_RSNF GFI list_04 April 2025.docx DOCX document
Mod 03_N61340-25-R-000603_Conformed Copy.pdf PDF
Mod 03_Atch_01_SOW RSNF MH60 TOFT Upgrade 21Apr2025.pdf PDF
Mod 03_Atch_02_RTM RSNF MH60 TOFT upgrade_04 April 2025.xlsx XLSX spreadsheet
Mod 03_Atch (L-1) QA_REV 3_N6134025R0006_21 Apr 25.xlsx XLSX spreadsheet
Mod 02_Conformed Copy_RFP_N6134025R000602.pdf PDF
Mod 02_Atch_02_RTM RSNF MH60 TOFT Upgrade_12 Mar 2025.xlsx XLSX spreadsheet
Mod 02_Atch (L-1) QA_REV 2_N6134025R0006_18 Mar 25.xlsx XLSX spreadsheet
Mod 02_Atch_05_RSNF GFI list_20 Mar 2025.pdf PDF
Mod 02_A00Q RMF -RSNFH60_Rev02.pdf PDF
Mod 02_RFP_N6134025R0006.pdf PDF
Mod 02_Atch_03_DD 254 PLAN N61340-25-R-0006 - Saudi MH-60R TOFT.pdf PDF
Mod 02_Atch_01_SOW RSNF MH60 TOFT Upgrade R2_13 Mar 2025.pdf PDF
Atch_01_SOW RSNF MH60 TOFT Upgrade R1 26Feb25.pdf PDF
Atch (L-1) QAs_Amendment 01_26Feb25.xlsx XLSX spreadsheet
RFP_N6134025R0006_Amendment 01.pdf PDF
N61340-25-R-000601_Conformed Copy Rev 01.pdf PDF
Atch (L-3) Relevancy Information Rev 01_26Feb25.xlsx XLSX spreadsheet
FINAL_RFP_N6134025R006 MH60R Saudi Upgrade_Tech Refresh.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

18. ESTIMATED

TOTAL PRICE

17. PRICE GROUP

CONTRACT DATAREQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

RSNF MH-60R TOFT

E. CONTRACT/PR NO.

N61340-XX-D-XXXX

F. CONTRACTOR

1. DATA ITEM NO.

B005

2. TITLE OF DATA ITEM

TECHNICAL AND MANAGEMENT WORK PLAN

3. SUBTITLE

CPI ASSESSMENT

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81117A

5. CONTRACT REFERENCE

SOW 240042 PARA 3.1.3.8

6. REQUIRING OFFICE

NAWCTSD ENGR

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

Draft

Final

Reg Repro

16. REMARKS

1. THE CONTRACTOR SHALL PROVIDE THE RSNF TOFT MH-60R BLOCK 3

CONFIGURATION CPI ASSESSMENT FOR THE TRAINER HARDWARE AND

SOFTWARE BREAKDOWN STRUCTURE (SBS) DEFINED IN THE FUNCTIONAL

BASELINE TECHNICAL ASSESSMENT (FBTA).

2. BLK 12: PRELIMINARY CPI ANALYSIS SHALL BE DUE 45 CALENDAR DAYS PRIOR

TO THE FBTA.

3. BLK 7: THE GOVERNMENT SHALL HAVE 45 CALENDAR DAYS FOR REVIEW AND

ACCEPTANCE/REJECTION OF EACH SUBMISSION.

4. THE CONTRACTOR SHALL HAVE 30 CALENDAR DAYS FOR RESUBMISSION OF

ANY DOCUMENT ACCEPTED WITH COMMENTS.

5. BLK 9: THE APPROPRIATE LEVEL OF CLASSIFICATION SHALL BE

CONSPICUOUSLY MARKED AT THE TOP AND BOTTOM OF THE OUTSIDE COVER

(IF ANY), ON THE BOTTOM OF EACH PAGE, AND ON THE TOP AND BOTTOM OF

THE OUTSIDE BACK COVER (IF ANY). THE FRONT COVER (IF ANY) OR THE

FIRST PAGE OF THE DOCUMENT SHALL ALSO BE CONSPICUOUSLY MARKED

WITH THE FOLLOWING STATEMENT: "THIS DOCUMENT CONTAINS

INFORMATION EXEMPT FROM MANDATORY PUBLIC DISCLOSURE UNDER THE

FREEDOM OF INFORMATION ACT. EXEMPTION B(2) APPLIES.

THESE MARKINGS SHALL ALSO BE APPLIED IN AN APPROPRIATE MANNER TO

ANY DATA PROVIDED IN ELECTRONIC MEDIATHE FOLLOWING STATEMENT

SHALL BE INCLUDED ON THE DELIVERABLE:

DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and DoD contractors to protect publications required for official use of for administrative or operational purposes only, effective (see issue date). Other requests for the document WILL be referred to Commanding Officer, Naval Air Systems Command, PMA-299, RADM William A Moffett Building, 47123 Buse Road, Bldg 2272, Patuxent River, MD 20670-1547.

DISCLOSURE: This information is furnished upon the condition that it or knowledge of its possession will not be disclosed to another nation, and that it will not be used for other than the military purpose for which it is being provided without specific authority from the U.S. Department of the Navy; that individual or corporate proprietary rights contained within, whether patented or not, will be respected; that the information will be provided the same degree of security afforded it by the U.S. Department of Defense. Regardless of any declassification markings, this information may not be downgraded or declassified by a foreign recipient without the written approval of the originating U.S. agency.

DESTRUCTION NOTICE: For Unclassified/Limited Distribution documents destroy by any method that will prevent disclosure of contents or reconstruction of the document.

EXPORT WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50. U.S.C., App.

2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

6. BLKS 12/13: SUBMISSIONS SHALL BE DUE AS REQUIRED THROUGH THE END

OF THE CONTRACT.

NAWCTSD PCO X

NAWCTSD IPTL X

NAWCTSD LSE 1

NAWCTSD PJM 1

15. TOTAL 0 0 2

G. PREPARED BY

Daniel P. Loth, NAWCTSD PDI

H. DATE I. APPROVED BY

J. DATE

2025-04-08T10:37:49-0400
LOTH.DANIEL.PETER.1220987996