Atch (L-1) QAs_Amendment 01_26Feb25.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
MH-60R Saudi Upgrade/Tech Refresh RFP Notice Rev 05
Solicitation number
N6134025R0006
Issued by

About this file

This is a Questions and Answers (Q&A) document related to solicitation N6134025R0006 for a technology refresh and system configuration upgrade to the Royal Saudi Naval Forces (RSNF) MH-60R Tactical Operational Flight Trainer (TOFT) located in Al Jubail Naval Air Base, Kingdom of Saudi Arabia. The Q&A addresses clarifications requested by potential offerors under this Foreign Military Sales (FMS) opportunity, which is limited to Training Systems Contract IV (TSC IV) awardees.

Key clarifications include: confirmation that three years of CPARS are sufficient for past performance evaluation, updates to DD-254 security requirements, clarification on CDRL formats and DIDs, and confirmation that OCONUS past performance can be from any location outside the continental U.S. Several technical questions remain pending response (TBD) regarding RMF controls, ATO package requirements, dipping sonar simulation capabilities, and ACME Motion Seat upgrades. The document also confirms that the Video Distribution System upgrade includes cameras used to capture video of the OFT and WTT student stations.

View the file

Other files

File Type Posted
Mod 05_N61340-25-R-0006.pdf PDF
Mod 05_Atch (L-1) QA_ Amendment 05_N6134025R0006_19 May 2025.xlsx XLSX spreadsheet
Mod 05_N61340-25-R-000605 Conformed Copy.pdf PDF
Mod 04_N6134025R0006 Conformed Copy.pdf PDF
Mod 04_N6134025R0006.pdf PDF
Mod 04_Atch_01_SOW RSNF MH60 TOFT Upgrade 12May2025.docx DOCX document
Mod 04_Atch (L-1) QA_ Amendment 04_N6134025R0006_15 May 2025.xlsx XLSX spreadsheet
Mod 03_RFP_N61340-25-R-0006.pdf PDF
Mod 03_Atch_05_RSNF GFI list_04 April 2025.docx DOCX document
Mod 03_N61340-25-R-000603_Conformed Copy.pdf PDF
Mod 03_Atch_01_SOW RSNF MH60 TOFT Upgrade 21Apr2025.pdf PDF
Mod 03_Atch_02_RTM RSNF MH60 TOFT upgrade_04 April 2025.xlsx XLSX spreadsheet
Mod 03_B005 Technical and Management Work Plan (CPI).pdf PDF
Mod 03_Atch (L-1) QA_REV 3_N6134025R0006_21 Apr 25.xlsx XLSX spreadsheet
Mod 02_Conformed Copy_RFP_N6134025R000602.pdf PDF
Mod 02_Atch_02_RTM RSNF MH60 TOFT Upgrade_12 Mar 2025.xlsx XLSX spreadsheet
Mod 02_Atch (L-1) QA_REV 2_N6134025R0006_18 Mar 25.xlsx XLSX spreadsheet
Mod 02_Atch_05_RSNF GFI list_20 Mar 2025.pdf PDF
Mod 02_A00Q RMF -RSNFH60_Rev02.pdf PDF
Mod 02_RFP_N6134025R0006.pdf PDF
Mod 02_Atch_03_DD 254 PLAN N61340-25-R-0006 - Saudi MH-60R TOFT.pdf PDF
Mod 02_Atch_01_SOW RSNF MH60 TOFT Upgrade R2_13 Mar 2025.pdf PDF
Atch_01_SOW RSNF MH60 TOFT Upgrade R1 26Feb25.pdf PDF
RFP_N6134025R0006_Amendment 01.pdf PDF
N61340-25-R-000601_Conformed Copy Rev 01.pdf PDF
Atch (L-3) Relevancy Information Rev 01_26Feb25.xlsx XLSX spreadsheet
FINAL_RFP_N6134025R006 MH60R Saudi Upgrade_Tech Refresh.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&As

Question #SubjectReference (i.e. RFP, SOW, Specs, Attachment, etc.)Specific QuestionDate SubmittedGovernment Response
1GFIAttachment 5 RSNF GFI ListPlease provide all GFI line items marked in Date Provided column with RFP2/11/25GFI Line Items provided by USG via DoD Safe on 12 Feb 24
2OCONUS TravelSOW 3.2.4SOW 3.2.4 is incomplete/truncated. Please provide all SOW requirements from this paragraph to the end of the SOW document.2/11/25The final line of SOW Para 3.2.4 Should read "…..prior to OCONUS travel."the SOW has been revised accordingly
3DD254DD254Block 13 refers to FTSS V Addendum A - RSNF COMS PWS and Addendum B CIS PWS. Please clarify if applicable to this RFP.2/11/25"-Contractors shall perform work in accordance with FTSS V Addendum A– RSNF COMS, Performance Work Statement (PWS) # 6643-A-XXXX, Contractor Operation and Maintenance Services (COMS) and Addendum B – RSNF, CIS Performance Work Statement (PWS) # 6643-B-XXXX, Contractor Instructional Services (CIS)." Should read: -Contractors shall perform work in accordance with TSC IV and Attachment 1 Statement of Work (SOW) 240042. DD-254 has been revised accordingly.
4CPARSRFP, Section L.2.4, page 41 of 53The third paragraph states "The offeror shall provide all available CPAR's for each past performance reference within fourteen (14) calendar days from the Final RFP release date." Please confirm that three (3) years of CPARs is sufficient.2/20/25Three (3) years of CPARS are sufficient. RFP Section L.2.4 has been updated accordingly.
5CDRLSSOW 3.1.1.6.hB002 references different DID than CDRL B002 DD-1423. Please confirm correct DID reference.2/20/25Revised the SOW to match the DD-1423 to read DI-ADMN-81250B
6CDRLSSOW 3.1.1.6.hB006 CPSMR is referenced but there is no associated B006 DD-1423. Please confirm if this is a CDRL deliverable.2/20/25SOW updated to remove reference to B006
7CDRLSPEDDAL, O&M, COTS Manual, PMS and TSSD CDRLs (E001-E005)Is it the Intent of the USG to have the contractor keep the deliverable CDRLs in the legacy format (as provided in the RFP GFI), OR transition the GFI documents into the new format (this contract's DIDs), even for drawings that will not be impacted by the scope of work?2/20/25Yes, the contractor shall retain the format of the source data (GFI), and only provide any updates resulting from the modifications under this task. Manuals were authored in MS Word. The DID for the drawings is the same (DI-SESS-81000), the name changed from PDAL to PEDDAL between Rev. E & F. The changes to the DID do not present a change on the format the drawings are delivered. Source files on .dwg and exported to .pdf for printing (11"x17") and tech manual use.
8RMFSOW 3.1.3.2.3SOWS 3.1.3.2.3 appears to have references to controls from DODI 8500.2, which was effectively superseded by RMF. Can the Government confirm DCBP-1 and ECVP-1 are referring to 8500.2 controls? If not, can the Government provide the control verbiage or confirm the requirement is not reference any documents2/20/25TBD
9ATOCDRL A00QCan USG confirm that the only elements of the ATO package required to be delivered by the Contractor are the ones listed in the "Annex to CDRL A00Q"?2/20/25TBD
10Tech RefreshRFPDoes the Technology Refresh of the Video Distribution System include upgrading the cameras used to capture video of the OFT and WTT student stations?2/20/25Yes, the cameras are part of the Video distribution systen and are needed to provide instructors with images of the students and Aircraft Operating Equipment
11DeviceRFPDoes the RSNF TOFT require the device to perform Dipping Sonar mechanical simulation (dip to dip) in OFT Mode (not to be confused with WTT mode or TOFT mode)?2/20/25TBD
12UpgradeSOW 3.2.2.gIs the intent that the contractor should propose upgrade to the RSNF ACME Motion Seat as part of follow-on ECP?2/20/25TBD
13ClarificactionSOW 3.2.3.11.What does the USG mean by "data structure format"?2/20/25TBD
14ClarificactionSOW 3.2.3.10.3Is USG requesting for the contractor and USG to conduct a joint Cold Start test using the Cold Start Procedures of the SPP prior to VRTA?2/20/25TBD
15ClarificactionSOW 3.2.3.10.3If USG is requesting for the contractor and USG to conduct a joint Cold Start test, then is the assumption that VRTA is only intended to address readiness for Performance and functional testing ONLY (not including Cold Start)?2/20/25TBD
16Past Performance ClarificationRFP and SOWSection M.2.2 Relevancy on page 49 of 53, bottom of 5th paragraph states that for evaluation purposes "OCONUS work performance (SOW 1.1)" must be supported in the Past Performance Volume. SOW 1.1 is simply called "Scope" on page 1 of the SOW. The SOW states nothing about OCONUS other than stating "The RSNF MH-60R TOFT is located at Al Jubail Naval Air Base, in KSA." Please confirm that past performance is valid anywhere outside the Continental U.S., not just KSA.2/20/25Confirmed. For the purposes of past performance any location outside the continental U.S. will be a relevant submission. Removed Reference in RFP to SOW 1.1. and Attachment L-3
17GFIRFPThe GFI Specification for the RSNF MH-60R TOFT references to the NATOPS and NATIPs for implementation of physical panels, functional capabilities, performance thresholds,etc. These two manuals have not been provided as part of the RFP GFI. How is the contractor to understand the cockpit difference and functional/performance differences between SC18 and SC24 without these documents?2/20/25TBD
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93

Attachment L-1 &"-,Bold"Royal Saudi Naval Forces (RSNF) Tactical Operational Flight Trainer (TOFT) Upgrade - Question & Answer Form &K000000N61340-25-R-0006

File details come from the government source that posted it. Updated .