LOT VII ENG_ADMIN CDRLS_Exhibit A_B 8-11-2022.docx
DOCX document 524 KB Posted
- Solicitation number
- N6134022R00300001
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
H-1 Lot 7 Engineering & Admin CDRL Data Items Summary List
| CDRL # |
| H-1 Lot 7 DELIVERABLES |
| ABBREVIATION |
| AUTHORITY |
| A001, AA01, AG01, AN01, G001, N001, U001 |
| DOD RISK MANAGEMENT FRAMEWORK PACKAGE |
| RMF |
| DI-MGMT-82001A |
| A002 |
| SOFTWARE PRODUCT DESIGN |
| SPD |
| DI-SESS-82036 |
| A003, G003 |
| SOFTWARE PRODUCT PACKAGE |
| SPP |
| DI-IPSC-82090C |
| A004, AA04, AG04. AN04, G004, N004, U004 |
| TEST PROCEDURES |
| TP |
| DI-NDTI-80603A |
| A005, G005 |
| REQUIREMENTS TRACEABILITY VERIFICATION MATRIX |
| RTVM |
| DI-MGMT-82133 |
| A006 |
| SYSTEM/SUBSYSTEM DESIGN DESCRIPTION |
| SSDD |
| DI-IPSC-81432A |
| A007, G007 |
| TRAINER CRITERIA REPORT |
| TCR |
| DI-MISC-81281 |
| A008, G008 |
| TRAINER MATH MODEL REPORT |
| TMMR |
| DI-ILSS-81185 |
| A009 (Lot 7 & 8) |
| REQUEST FOR VARIANCE (RFV) |
| RFV |
| DI-SESS-80640E |
| A00A (Lot 7 & 8) |
| ENGINEERING CHANGE PROPOSAL (ECP) |
| ECP |
| DI-SESS-80639E |
| A00B, G00B |
| VISUAL SYSTEM ENGINEERING REPORT (VSER) |
| VSER |
| OT-22-20033 |
| A00C (Lot 7 & 8) |
| SYNTHETIC ENVIRONMENT DATABASE DESIGN DOCUMENT |
| SEDDD |
| DI-MSSM-82158 |
| A00D (Lot 7 & 8) |
| NAVAIR PORTABLE SOURCE INITIATIVE (NPSI) DATASET DELIVERY |
| NPSI |
| DI- MGMT -82125 |
| B001 (Lot 7 & 8) |
| INTEGRATED PROGRAM MANAGEMENT DATA AND ANALYSIS REPORT(IPMDAR) |
| IPMDAR |
| DI-MGMT-81861C |
| B002 (Lot 7 & 8) |
| QUANTITY DATA REPORT |
| QDR |
| DI-MGMT-82164 |
| B003 (Lot 7 & 8) |
| CONFERENCE AGENDA |
| CNF AG |
| DI-ADMN-81249C |
| B004 (Lot 7 & 8) |
| CONFERENCE MINUTES |
| CNF MIN |
| DI-ADMN-81250C |
| B005 (Lot 7 & 8) |
| PRESENTATION MATERIAL |
| PM |
| DI-ADMN-81373 |
| B006 (Lot 7 & 8) |
| COST AND HOUR REPORT (FLEXFILE) |
| FLEXFILE |
| DI-FNCL-82162 |
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 2 of 39
C O N T R A C T D A T A R E Q U I R E M E N T S L I S T (1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT I |
| TDP _____ TM _____ OTHER MGMT |
D. SYSTEM/ITEM
2F197B-2 (AH-1Z)
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A001 |
| DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MGMT-82001A |
| SOW 210044 PARA 3.1.3.2 |
| PEO (CS) PMA-205 |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 4TIMES |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| a. ADDRESSEE |
| b. COPIES |
Final
A
| N/A |
| SEE BLK 16 |
| draft |
| reg |
| repr |
16. REMARKS
1. BLK 4: TAILOR THE DI-MGMT-82001A TO MEET THE APPLICABLE RMF REQUIREMENTS
2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE rfp: “ATTACHMENT XX_RMF_Package_Format.xlsx”.
3. BLK 8: THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 15 DAYS TO CORRECT AND RESUBMIT REJECTED MATERIALS.
4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY (ADMINISTRATIVE OR OPERATIONAL USE) DETERMINED ON 14 FEB 2022. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDER, NAVAL AIR SYSTEMS COMMAND (PMA205), 47123 BUSE ROAD, PATUXENT RIVER, MD 20670.
5. BLK 12: SEE TABLE BELOW
| DMRT RMF PACKAGE ELEMENTS |
| DATE DUE |
· SYSTEM REGISTRATION TAB
EXCLUDE PROTOCAL AND PORTS IN THE DATA FLOW WORKSHEET
EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET
· REQUIREMENTS SELECTION TAB
· INVENTORY & SYSTEM INFORMATION TAB
CONFIGURATION MANAGEMENT PLAN
· MFR TAB
FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR
6. BLK 13 – SEE TABLE BELOW
| RMF PACKAGE ELEMENTS |
| DATE DUE |
· INVENTORY AND SYSTEM INFORMATION TAB
· COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
· COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
SECOND SUBMISSION DUE 10 DAYS AFTER CDR
· SELF ASSESSMENT TAB
· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS
· DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)
· VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS)
THIRD SUBMISSION DUE 10 DAYS PRIOR TO COMMENCEMENT OF TRR FOR 2F197B-2
· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS
· FINAL CSAG
FOURTH SUBMISSION DUE AT FINAL PCA (FPCA) 2F197B-2
7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT. CLASSIFIED ACAS AND STIG SCAN RESULTS SHALL BE DELIVERED TO THE MC ATS ISSM USING THE CLASSIFIED CHERRY POINT ORION SERVER OR VIA SIPR E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.
8. DELIVERY TO THE NAWCTSD ENGR AND PCO SHALL BE LETTER NOTIFICATION ONLY.
| NAWCTSD PCO |
| 0 |
| SEE |
BLK 16
| NAWCTSD ENGR |
| 0 |
| SEE |
| NAWCTSD ISSM |
| 1 |
| SEE |
| NAWCTSD ISEO-CP |
| 0 |
| SEE |
| 15. TOTAL |
| 1 |
| 0 |
| 2 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CATTIEN NGUYEN, NAWCTSD SW ENGR
S. COLN, PMA-205 DAPMTS
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT I |
| TDP _____ TM _____ OTHER MGMT |
D. SYSTEM/ITEM
2F196B-3 (UH-1Y)
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| AA01 |
| DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MGMT-82001A |
| SOW 210044 PARA 3.1.3.2 |
| PEO (CS) PMA-205 |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 4TIMES |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| a. ADDRESSEE |
| b. COPIES |
Final
A
| N/A |
| SEE BLK 16 |
| draft |
| reg |
| repr |
16. REMARKS
2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE rfp: “ATTACHMENT XX_RMF_Package_Format.xlsx”.
3. .BLK 8: THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 15 DAYS TO CORRECT AND RESUBMIT REJECTED MATERIALS.
4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY (ADMINISTRATIVE OR OPERATIONAL USE) DETERMINED ON 14 FEB 2022. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDER, NAVAL AIR SYSTEMS COMMAND (PMA205), 47123 BUSE ROAD, PATUXENT RIVER, MD 20670.
5. BLK 12: SEE TABLE BELOW
| DMRT RMF PACKAGE ELEMENTS |
| DATE DUE |
· SYSTEM REGISTRATION TAB
EXCLUDE PROTOCAL AND PORTS IN THE DATA FLOW WORKSHEET
EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET
· REQUIREMENTS SELECTION TAB
· INVENTORY & SYSTEM INFORMATION TAB
CONFIGURATION MANAGEMENT PLAN
FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR
| RMF PACKAGE ELEMENTS |
| DATE DUE |
· INVENTORY AND SYSTEM INFORMATION TAB
· COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
· COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
SECOND SUBMISSION DUE 10 DAYS AFTER CDR
· SELF ASSESSMENT TAB
· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS
· DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)
· VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS)
THIRD SUBMISSION DUE 10 DAYS PRIOR TO COMMENCEMENT OF TRR FOR 2F197B-2
· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS
FOURTH SUBMISSION DUE AT FINAL PCA (FPCA) 2F197B-2
7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT. CLASSIFIED ACAS AND STIG SCAN RESULTS SHALL BE DELIVERED TO THE MC ATS ISSM USING THE CLASSIFIED CHERRY POINT ORION SERVER OR VIA SIPR E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.
| NAWCTSD PCO |
| 0 |
| SEE |
| NAWCTSD ENGR |
| 0 |
| SEE |
| NAWCTSD ISSM |
| 1 |
| SEE |
| NAWCTSD ISEO-CP |
| 0 |
| SEE |
| 15. TOTAL |
| 1 |
| 0 |
| 2 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CATTIEN NGUYEN, NAWCTSD SW ENGR
S. COLN, PMA-205 DAPMTS
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT I |
| TDP _____ TM _____ OTHER MGMT |
D. SYSTEM/ITEM
2F226-2 (UH-1Y)
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| AG01 |
| DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MGMT-82001A |
| SOW 210044 PARA 3.1.3.2 |
| PEO (CS) PMA-205 |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 4TIMES |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| a. ADDRESSEE |
| b. COPIES |
Final
A
| N/A |
| SEE BLK 16 |
| draft |
| reg |
| repr |
16. REMARKS
2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE rfp: “ATTACHMENT XX_RMF_Package_Format.xlsx”.
3. BLK 8: THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 15 DAYS TO CORRECT AND RESUBMIT REJECTED MATERIALS.
4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY (ADMINISTRATIVE OR OPERATIONAL USE) DETERMINED ON 14 FEB 2022. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDER, NAVAL AIR SYSTEMS COMMAND (PMA205), 47123 BUSE ROAD, PATUXENT RIVER, MD 20670.
5. BLK 12: SEE TABLE BELOW
| DMRT RMF PACKAGE ELEMENTS |
| DATE DUE |
· SYSTEM REGISTRATION TAB
EXCLUDE PROTOCAL AND PORTS IN THE DATA FLOW WORKSHEET
EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET
· REQUIREMENTS SELECTION TAB
· INVENTORY & SYSTEM INFORMATION TAB
CONFIGURATION MANAGEMENT PLAN
FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR
| RMF PACKAGE ELEMENTS |
| DATE DUE |
· INVENTORY AND SYSTEM INFORMATION TAB
· COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
· COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
SECOND SUBMISSION DUE 10 DAYS AFTER CDR TIM
· SELF ASSESSMENT TAB
· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS
· DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)
· VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS)
THIRD SUBMISSION DUE 10 DAYS PRIOR TO COMMENCEMENT OF TRR FOR 2F197B-2
· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS
FOURTH SUBMISSION DUE AT FINAL PCA (FPCA) 2F197B-2
7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT. CLASSIFIED ACAS AND STIG SCAN RESULTS SHALL BE DELIVERED TO THE MC ATS ISSM USING THE CLASSIFIED CHERRY POINT ORION SERVER OR VIA SIPR E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.
| NAWCTSD PCO |
| 0 |
| SEE |
| NAWCTSD ENGR |
| 0 |
| SEE |
| NAWCTSD ISSM |
| 1 |
| SEE |
| NAWCTSD ISEO-CP |
| 0 |
| SEE |
| 15. TOTAL |
| 1 |
| 0 |
| 2 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CATTIEN NGUYEN, NAWCTSD SW ENGR
S. COLN, PMA-205 DAPMTS
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT I |
| TDP _____ TM _____ OTHER MGMT |
D. SYSTEM/ITEM
2F196B-4 (UH-1Y)
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| AN01 |
| DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MGMT-82001A |
| SOW 210044 PARA 3.1.3.2 |
| PEO (CS) PMA-205 |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 4TIMES |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| a. ADDRESSEE |
| b. COPIES |
Final
A
| N/A |
| SEE BLK 16 |
| draft |
| reg |
| repr |
16. REMARKS
2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE rfp: “ATTACHMENT XX_RMF_Package_Format.xlsx”.
3. BLK 8: THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 15 DAYS TO CORRECT AND RESUBMIT REJECTED MATERIALS.
4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY (ADMINISTRATIVE OR OPERATIONAL USE) DETERMINED ON 14 FEB 2022. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDER, NAVAL AIR SYSTEMS COMMAND (PMA205), 47123 BUSE ROAD, PATUXENT RIVER, MD 20670.
5. BLK 12: SEE TABLE BELOW
| DMRT RMF PACKAGE ELEMENTS |
| DATE DUE |
· SYSTEM REGISTRATION TAB
EXCLUDE PROTOCAL AND PORTS IN THE DATA FLOW WORKSHEET
EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET
· REQUIREMENTS SELECTION TAB
· INVENTORY & SYSTEM INFORMATION TAB
CONFIGURATION MANAGEMENT PLAN
FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR
| RMF PACKAGE ELEMENTS |
| DATE DUE |
· INVENTORY AND SYSTEM INFORMATION TAB
· COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
· COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
SECOND SUBMISSION DUE 10 DAYS AFTER CDR TIM
· SELF ASSESSMENT TAB
· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS
· DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)
· VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS)
THIRD SUBMISSION DUE 10 DAYS PRIOR TO COMMENCEMENT OF TRR FOR 2F197B-2
· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS
FOURTH SUBMISSION DUE AT FINAL PCA (FPCA) 2F197B-2
7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT. CLASSIFIED ACAS AND STIG SCAN RESULTS SHALL BE DELIVERED TO THE MC ATS ISSM USING THE CLASSIFIED CHERRY POINT ORION SERVER OR VIA SIPR E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.
| NAWCTSD PCO |
| 0 |
| SEE |
| NAWCTSD ENGR |
| 0 |
| SEE |
| NAWCTSD ISSM |
| 1 |
| SEE |
| NAWCTSD ISEO-CP |
| 0 |
| SEE |
| 15. TOTAL |
| 1 |
| 0 |
| 2 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CATTIEN NGUYEN, NAWCTSD SW ENGR
S. COLN, PMA-205 DAPMTS
C O N T R A C T D A T A R E Q U I R E M E N T S L I S T
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT I |
| TDP _____ TM _____ OTHER MGMT |
D. SYSTEM/ITEM
2F196-1 (UH-1Y)
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| G001 |
| DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MGMT-82001A |
| SOW 210044 PARA 3.1.3.2 |
| PEO (CS) PMA-205 |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 4TIMES |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| a. ADDRESSEE |
| b. COPIES |
Final
A
| N/A |
| SEE BLK 16 |
| draft |
| reg |
| repr |
16. REMARKS
2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE rfp: “ATTACHMENT XX_RMF_Package_Format.xlsx”.
3. BLK 8: THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 15 DAYS TO CORRECT AND RESUBMIT REJECTED MATERIALS.
4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY (ADMINISTRATIVE OR OPERATIONAL USE) DETERMINED ON 14 FEB 2022. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDER, NAVAL AIR SYSTEMS COMMAND (PMA205), 47123 BUSE ROAD, PATUXENT RIVER, MD 20670.
5. BLK 12: SEE TABLE BELOW
| DMRT RMF PACKAGE ELEMENTS |
| DATE DUE |
· SYSTEM REGISTRATION TAB
EXCLUDE PROTOCAL AND PORTS IN THE DATA FLOW WORKSHEET
EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET
· REQUIREMENTS SELECTION TAB
· INVENTORY & SYSTEM INFORMATION TAB
CONFIGURATION MANAGEMENT PLAN
FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR
| RMF PACKAGE ELEMENTS |
| DATE DUE |
· INVENTORY AND SYSTEM INFORMATION TAB
· COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
· COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
SECOND SUBMISSION DUE 10 DAYS AFTER CDR TIM
· SELF ASSESSMENT TAB
· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS
· DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)
· VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS)
THIRD SUBMISSION DUE 10 DAYS PRIOR TO COMMENCEMENT OF TRR FOR 2F197B-2
· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS
FOURTH SUBMISSION DUE AT FINAL PCA (FPCA) 2F197B-2
7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT. CLASSIFIED ACAS AND STIG SCAN RESULTS SHALL BE DELIVERED TO THE MC ATS ISSM USING THE CLASSIFIED CHERRY POINT ORION SERVER OR VIA SIPR E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.
| NAWCTSD PCO |
| 0 |
| SEE |
| NAWCTSD ENGR |
| 0 |
| SEE |
| NAWCTSD ISSM |
| 1 |
| SEE |
| NAWCTSD ISEO-CP |
| 0 |
| SEE |
| 15. TOTAL |
| 1 |
| 0 |
| 2 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CATTIEN NGUYEN, NAWCTSD SW ENGR
S. COLN, PMA-205 DAPMTS
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT I |
| TDP _____ TM _____ OTHER MGMT |
D. SYSTEM/ITEM
2F226-1 (UH-1Y)
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| N001 |
| DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MGMT-82001A |
| SOW 210044 PARA 3.1.3.2 |
| PEO (CS) PMA-205 |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 4TIMES |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| a. ADDRESSEE |
| b. COPIES |
Final
A
| N/A |
| SEE BLK 16 |
| draft |
| reg |
| repr |
16. REMARKS
2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE rfp: “ATTACHMENT XX_RMF_Package_Format.xlsx”.
3. BLK 8: THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 15 DAYS TO CORRECT AND RESUBMIT REJECTED MATERIALS.
4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY (ADMINISTRATIVE OR OPERATIONAL USE) DETERMINED ON 14 FEB 2022. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDER, NAVAL AIR SYSTEMS COMMAND (PMA205), 47123 BUSE ROAD, PATUXENT RIVER, MD 20670.
5. BLK 12: SEE TABLE BELOW
| DMRT RMF PACKAGE ELEMENTS |
| DATE DUE |
· SYSTEM REGISTRATION TAB
EXCLUDE PROTOCAL AND PORTS IN THE DATA FLOW WORKSHEET
EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET
· REQUIREMENTS SELECTION TAB
· INVENTORY & SYSTEM INFORMATION TAB
CONFIGURATION MANAGEMENT PLAN
FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR
| RMF PACKAGE ELEMENTS |
| DATE DUE |
· INVENTORY AND SYSTEM INFORMATION TAB
· COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
· COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
SECOND SUBMISSION DUE 10 DAYS AFTER CDR
· SELF ASSESSMENT TAB
· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS
· DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)
· VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS)
THIRD SUBMISSION DUE 10 DAYS PRIOR TO COMMENCEMENT OF TRR FOR 2F197B-2
· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS
FOURTH SUBMISSION DUE AT FINAL PCA (FPCA) 2F197B-2
7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT. CLASSIFIED ACAS AND STIG SCAN RESULTS SHALL BE DELIVERED TO THE MC ATS ISSM USING THE CLASSIFIED CHERRY POINT ORION SERVER OR VIA SIPR E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.
| NAWCTSD PCO |
| 0 |
| SEE |
| NAWCTSD ENGR |
| 0 |
| SEE |
| NAWCTSD ISSM |
| 1 |
| SEE |
| NAWCTSD ISEO-CP |
| 0 |
| SEE |
| 15. TOTAL |
| 1 |
| 0 |
| 2 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CATTIEN NGUYEN, NAWCTSD SW ENGR
S. COLN, PMA-205 DAPMTS
C O N T R A C T D A T A R E Q U I R E M E N T S L I S T
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT I |
| TDP _____ TM _____ OTHER MGMT |
D. SYSTEM/ITEM
2F227-1 (AH-1Z)
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| U001 |
| DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MGMT-82001A |
| SOW 210044 PARA 3.1.3.2 |
| PEO (CS) PMA-205 |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 4TIMES |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| a. ADDRESSEE |
| b. COPIES |
Final
A
| N/A |
| SEE BLK 16 |
| draft |
| reg |
| repr |
16. REMARKS
2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE rfp: “ATTACHMENT XX_RMF_Package_Format.xlsx”.
3. BLK 8: THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 15 DAYS TO CORRECT AND RESUBMIT REJECTED MATERIALS.
4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY (ADMINISTRATIVE OR OPERATIONAL USE) DETERMINED ON 14 FEB 2022. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDER, NAVAL AIR SYSTEMS COMMAND (PMA205), 47123 BUSE ROAD, PATUXENT RIVER, MD 20670.
5. BLK 12: SEE TABLE BELOW
| DMRT RMF PACKAGE ELEMENTS |
| DATE DUE |
· SYSTEM REGISTRATION TAB
EXCLUDE PROTOCAL AND PORTS IN THE DATA FLOW WORKSHEET
EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET
· REQUIREMENTS SELECTION TAB
· INVENTORY & SYSTEM INFORMATION TAB
CONFIGURATION MANAGEMENT PLAN
FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR
| RMF PACKAGE ELEMENTS |
| DATE DUE |
· INVENTORY AND SYSTEM INFORMATION TAB
· COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
· COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
SECOND SUBMISSION DUE 10 DAYS AFTER CDR
· SELF ASSESSMENT TAB
· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS
· DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)
· VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS)
THIRD SUBMISSION DUE 10 DAYS PRIOR TO COMMENCEMENT OF TRR FOR 2F197B-2
· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS
FOURTH SUBMISSION DUE AT FINAL PCA (FPCA) 2F197B-2
7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT. CLASSIFIED ACAS AND STIG SCAN RESULTS SHALL BE DELIVERED TO THE MC ATS ISSM USING THE CLASSIFIED CHERRY POINT ORION SERVER OR VIA SIPR E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.
| NAWCTSD PCO |
| 0 |
| SEE |
| NAWCTSD ENGR |
| 0 |
| SEE |
| NAWCTSD ISSM |
| 1 |
| SEE |
| NAWCTSD ISEO-CP |
| 0 |
| SEE |
| 15. TOTAL |
| 1 |
| 0 |
| 2 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CATTIEN NGUYEN, NAWCTSD SW ENGR
S. COLN, PMA-205 DAPMTS
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT I |
| TDP _____ TM _____ OTHER SESS |
D. SYSTEM/ITEM
ALL LOT 7 TRAINING DEVICES (SEE BLK 16)
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A002 |
| SOFTWARE PRODUCT DESIGN (SPD) |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-SESS-82036 |
| SOW 210044 PARA 3.2.2.7 |
| PEO (CS) PMA-205 |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 2 TIMES/R |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| a. ADDRESSEE |
| b. COPIES |
Final
A
| N/A |
| SEE BLK 16 |
| draft |
| reg |
| repr |
16. REMARKS
1. CONTRACTOR AND SUBCONTRACTOR SPD INFORMATION SHALL BE COMBINED INTO A SINGLE DOCUMENT.
2. BLK D: THE DEVICES INCLUDE 2F196-1, 2F196B-3, 2F196B-4, 2F197B-2, 2F226-1, 2F226-2, AND 2F227-1 DEVICES.
3. BLK 8: THE GOVERNMENT WILL HAVE 15 BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.
4. BLK 8: REVIEWING ACTIVITY IS NAWCTSD.
5. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 26 January 2022. Other requests shall be referred to Department of Navy, PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547.
6. BLK 10: REVISIONS SHALL BE DUE 30 DAYS AFTER EITHER DESIGN CHANGES (RELATIVE TO THE CDR TIM BASELINE) ARE IDENTIFIED, OR ADDITIONAL REQUIREMENT(S) AND/OR REQUIREMENT CHANGES ARE INCORPORATED INTO THE CONTRACT OR AFTER DEVICE(S) AWARD.
7. BLK 12: FIRST SUBMISSION SHALL BE DUE 20 BUSINESS DAYS PRIOR TO PDR.
8. BLK 13: SECOND (FINAL) SUBMISSION SHALL BE DUE 20 BUSINESS DAYS PRIOR TO THE CDR TIM.
9. BLK 14: ALL REPRODUCIBLE SUBMISSIONS SHALL BE POSTED IAW THE SOW. ALL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN AN EDITABLE ELECTRONIC FORMAT IN MICROSOFT WORD 2016 COMPATIBLE FORMAT. ADDITIONALLY, FINAL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN ELECTRONIC FORMAT ON CD-ROM TO FOLLOWING ADDRESSEES: NAWCTSD SW ENGR, NAWCTSD ENGR AND NAWCTSD ISEO-CP.
10. BLK14: DELIVERY TO THE NAWCTSD PCO SHALL RECEIVE LETTER OF NOTIFICATION. EMAIL ADDRESS IS PROVIDED IN SECTION F OF THE CONTRACT.
| NAWCTSD SW ENGR |
| 1 |
| SEE |
| NAWCTSD ENGR |
| 1 |
| SEE |
| NAWCTSD ISEO-CP |
| 0 |
| SEE |
| NAWCTSD PCO |
| 0 |
| SEE |
| 15. TOTAL |
| 2 |
| 0 |
| 3 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CATTIEN NGUYEN, NAWCTSD SW ENGR
S. COLN, PMA-205 DAPMTS
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT I |
| TDP _____ TM _____ OTHER IPSC |
D. SYSTEM/ITEM
2F197B-2, 2F227-1 (AH-1Z)
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A003 |
| SOFTWARE PRODUCT PACKAGE (SPP) |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-IPSC-82090C |
| SOW 210044 PARAS 3.2.2.10.1 |
& 3.2.8.13.5.2.1
PEO (CS) PMA-205
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 6 TIMES/R |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| a. ADDRESSEE |
| b. COPIES |
Final
A
| N/A |
| SEE BLK 16 |
| draft |
| reg |
| repr |
16. REMARKS
1. THE CONTRACTOR AND SUBCONTRACTOR SPP INFORMATION SHALL BE COMBINED INTO A SINGLE DOCUMENT.
2. BLK 4: EACH SUBMISSION SHALL CONTAIN THE DELIVERABLE SOURCE CODE AND THE DOCUMENTATION.
3. BLK 8: THE GOVERNMENT WILL HAVE 25 BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.
4. BLK 8: REVIEWING ACTIVITY IS NAWCTSD.
5. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 26 January 2022. Other requests shall be referred to Department of Navy, PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547.
6. BLK 12: FIRST SUBMISSION FOR EACH DEVICE (2F197B-2 AND 2F227-1) SHALL BE DUE 10 BUSINESS DAYS PRIOR TO DT-C1 (CPI) AND SHALL INCLUDE THE COLD START AND INSTALLATION PROCEDURES.
7. BLK 13: SECOND SUBMISSION FOR EACH DEVICE (2F197B-2 AND 2F227-1) SHALL BE DUE 10 BUSINESS DAYS PRIOR TO IT-C1 (IPI) AND SHALL INCLUDE ALL MEDIA FOR NON-COMMERCIAL ITEM SOFTWARE. CONTRACTOR SHALL MAKE THE COMMERCIAL ITEM SOFTWARE MEDIA AVAILABLE FOR GOVERNMENT USE WHILE PERFORMING THE COLD START AND INSTALLATION PROCEDURES.
8. BLK 13: THIRD (FINAL) SUBMISSION FOR EACH DEVICE (2F197B-2 AND 2F227-1) SHALL BE DUE 10 BUSINESS DAYS PRIOR TO FINAL PCA AND SHALL INCLUDE THE DELIVERY OF ALL SOFTWARE CONFIGURATION ITEMS (INCLUDING DATABASES AND COMMERCIAL ITEM MEDIA) REQUIRED TO ACCOMPLISH THE TRAINER SYSTEM COLD START AND INSTALLATION PROCEDURES.
9. BLK 13: REVISIONS SHALL BE DUE AS REQUIRED THROUGH THE END OF THE CONTRACT.
10. BLK 14: ALL REPRODUCIBLE SUBMISSIONS SHALL BE POSTED IAW THE SOW. ALL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN AN EDITABLE ELECTRONIC FORMAT IN MICROSOFT WORD 2016 COMPATIBLE FORMAT. ADDITIONALLY, FINAL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN ELECTRONIC FORMAT ON CD-ROM TO FOLLOWING ADDRESSEES: NAWCTSD SW ENGR, NAWCTSD ENGR, NAWCTSD ISEO-CP AND NAWCTSD ILSM.
11. BLK14: DELIVERY TO THE NAWCTSD PCO SHALL RECEIVE LETTER OF NOTIFICATION. EMAIL ADDRESS IS PROVIDED IN SECTION F OF THE CONTRACT.
12. THE DELIVERABLE SHALL BE FREE OF ALL PROPRIETARY MARKINGS, WITH THE EXCEPTION OF MARKINGS ON COMMERCIAL ITEM SOFTWARE.
| NAWCTSD SW ENGR |
| 1 |
| SEE |
| NAWCTSD ENGR |
| 1 |
| SEE |
| NAWCTSD ISEO-CP |
| 0 |
| SEE |
| NAWCTSD ILSM |
| 0 |
| SEE |
| NAWCTSD PCO |
| 0 |
| SEE |
| 15. TOTAL |
| 2 |
| 0 |
| 4 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CATTIEN NGUYEN, NAWCTSD SW ENGR
S. COLN, PMA-205 DAPMTS
C O N T R A C T D A T R E Q U I R E M E N T S L I S T
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT V |
| TDP _____ TM _____ OTHER IPSC |
D. SYSTEM/ITEM
2F196-1, 2F196B-3, 2F196B-4, 2F226-1, 2F226-2 (UH-1Y)
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| G003 |
| SOFTWARE PRODUCT PACKAGE (SPP) |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-IPSC-82090C |
| SOW 210044 PARAS 3.2.2.10.1 |
& 3.2.8.13.5.2.1
PEO (CS) PMA-205
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 15 TIMES/R |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| a. ADDRESSEE |
| b. COPIES |
Final
A
| N/A |
| SEE BLK 16 |
| draft |
| reg |
| repr |
16. REMARKS
1. CONTRACTOR AND SUBCONTRACTOR SPP INFORMATION SHALL BE COMBINED INTO A SINGLE DOCUMENT.
2. BLK 4: EACH SUBMISSION SHALL CONTAIN THE DELIVERABLE SOURCE CODE AND THE DOCUMENTATION.
3. BLK 8: THE GOVERNMENT WILL HAVE 25 BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.
4. BLK 8: REVIEWING ACTIVITY IS NAWCTSD.
5. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 26 January 2022. Other requests shall be referred to Department of Navy, PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547.
6. BLK 12: FIRST SUBMISSION FOR EACH DEVICE (2F196-1, 2F196B-3, 2F196B-4, 2F226-1, 2F226-2) SHALL BE DUE 10 BUSINESS DAYS PRIOR TO DT-C1 (CPI) AND SHALL INCLUDE THE COLD START AND INSTALLATION PROCEDURES.
7. BLK 13: SECOND SUBMISSION FOR EACH DEVICE (2F196-1, 2F196B-3, 2F196B-4, 2F226-1, 2F226-2) SHALL BE DUE 10 BUSINESS DAYS PRIOR TO IT-C1 (IPI) AND SHALL INCLUDE ALL MEDIA FOR NON-COMMERCIAL ITEM SOFTWARE. CONTRACTOR SHALL MAKE THE COMMERCIAL ITEM SOFTWARE MEDIA AVAILABLE FOR GOVERNMENT USE WHILE PERFORMING THE COLD START AND INSTALLATION PROCEDURES.
8. BLK 13: THIRD (FINAL) SUBMISSION FOR EACH DEVICE (2F196-1, 2F196B-3, 2F196B-4, 2F226-1, 2F226-2) SHALL BE DUE 10 BUSINESS DAYS PRIOR TO FINAL PCA AND SHALL INCLUDE THE DELIVERY OF ALL SOFTWARE CONFIGURATION ITEMS (INCLUDING DATABASES AND COMMERCIAL ITEM MEDIA) REQUIRED TO ACCOMPLISH THE TRAINER SYSTEM COLD START AND INSTALLATION PROCEDURES.
9. BLK 13: REVISIONS SHALL BE DUE AS REQUIRED THROUGH THE END OF THE CONTRACT.
10. BLK 14: ALL REPRODUCIBLE SUBMISSIONS SHALL BE POSTED IAW THE SOW. ALL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN AN EDITABLE ELECTRONIC FORMAT IN MICROSOFT WORD 2016 COMPATIBLE FORMAT. ADDITIONALLY, FINAL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN ELECTRONIC FORMAT ON CD-ROM TO FOLLOWING ADDRESSEES: NAWCTSD SW ENGR, NAWCTSD ENGR, NAWCTSD ISEO-CP AND NAWCTSD ILSM.
11. BLK14: DELIVERY TO THE NAWCTSD PCO SHALL RECEIVE LETTER OF NOTIFICATION. EMAIL ADDRESS IS PROVIDED IN SECTION F OF THE CONTRACT.
12. THE DELIVERABLE SHALL BE FREE OF ALL PROPRIETARY MARKINGS, WITH THE EXCEPTION OF MARKINGS ON COMMERCIAL ITEM SOFTWARE.
| NAWCTSD SW ENGR |
| 1 |
| SEE |
| NAWCTSD ENGR |
| 1 |
| SEE |
| NAWCTSD ISEO-CP |
| 0 |
| SEE |
| NAWCTSD ILSM |
| 0 |
| SEE |
| NAWCTSD PCO |
| 0 |
| SEE |
| 15. TOTAL |
| 2 |
| 0 |
| 4 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
CATTIEN NGUYEN, NAWCTSD SW ENGR
S. COLN, PMA-205 DAPMTS
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT II |
| TDP ____ |
| TM ____ |
| OTHER NDTI |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 2F197B-2 (AH-1Z) |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A004 |
| TEST PROCEDURE (TP) |
| REVISION TO EXISTING GOVERNMENT DOCUMENTS |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-NDTI-80603A |
| SOW 210044 PARA 3.2.8.5 |
| PEO (CS) PMA-205 |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 3 TIMES/R |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| Draft |
| Final |
A
| N/A |
| SEE BLK 16 |
| Reg |
| Repro |
16. REMARKS
1. BLK 8: GOVERNMENT WILL HAVE 20 BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD SHALL START ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LATER.
2. BLK 8: REVIEWING ACTIVITY IS NAWCTSD.
3. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLES:
DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 26 January 2022. Other requests shall be referred to Department of Navy, PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547.
4. BLK 10: REVISIONS SHALL BE DUE 30 DAYS AFTER EITHER DESIGN CHANGES (RELATIVE TO THE CDR BASELINE) ARE IDENTIFIED, OR ADDITIONAL REQUIREMENT(S) AND/OR REQUIREMENT CHANGES ARE INCORPORATED INTO THE CONTRACT.
5. BLK 12: FIRST SUBMISSION SHALL BE A REPRO COPY OF THE TP. FIRST SUBMISSION SHALL BE DUE ON THE 20TH BUSINESS DAY PRIOR TO DT-C1 (CPI TESTING).
6. BLK 13: SECOND SUBMISSION SHALL BE DUE ON THE 20TH BUSINESS DAY PRIOR TO EACH TEST AND READINESS REVIEW (TRR). SECOND SUBMISSION SHALL INCORPORATE REVISIONS TO ADDRESS THE GOVERNMENT REVIEW COMMENTS FROM THE FIRST SUBMISSION AND REDLINES RESULTING FROM DT-C1. A CLEAN HARD COPY OF THE SECOND SUBMISSION SHALL BE MADE AVAILABLE TO THE GOVERNMENT AT THE TRAINER SITE AT THE START OF IT-C1 WHICH SHALL BE USED TO CAPTURE REDLINES AND RESULTS FROM IT-C1 TESTING
7. BLK 13: FINAL (THIRD) SUBMISSION SHALL BE DUE ON THE 15TH BUSINESS DAY AFTER COMPLETION OF IT-C1. FINAL SUBMISSION SHALL INCORPORATE REVISIONS TO ADDRESS THE GOVERNMENT REVIEW COMMENTS FROM THE SECOND SUBMISSION AND REDLINES RESULTING FROM IT-C1.
8. BLK 13: REVISIONS SHALL BE DUE AS REQUIRED THROUGH THE END OF THE CONTRACT.
9. BLK 14: ALL SUBMISSIONS SHALL BE DELIVERED IN EDITABLE MICROSOFT WORD 2016 FORMAT.
10. BLK 14: DELIVERY TO THE NAWCTSD PCO SHALL RECEIVE LETTER OF NOTIFICATION.
11. BLK 14: EMAIL ADDRESS IS PROVIDED IN SECTION F OF THE CONTRACT.
| NAWCTSD ENGR |
| 1 |
| SEE |
| NAWCTSD ISEO-CP |
| 1 |
| SEE |
| NAWCTSD PCO |
| 0 |
| SEE |
| 15. TOTAL |
| 2 |
| 0 |
| 2 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
JULIA ROSCHER, NAWCTSD T&E
S. COLN, PMA-205 DAPMTS
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A LOT II |
| TDP ____ |
| TM ____ |
| OTHER NDTI |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 2F196B-3 (UH-1Y) |
| N61340XXC00XX |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| AA04 |
| TEST PROCEDURE (TP) |
| REVISION TO EXISTING GOVERNMENT DOCUMENTS |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
| DI-NDTI-80603A |
| SOW 210044 PARA 3.2.8.5 |
| PEO (CS) PMA-205 |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 3 TIMES/R |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
| Draft |
| Final |
A
| N/A |
| SEE BLK 16 |
| Reg |
| Repro |
16. REMARKS
1. BLK 8: GOVERNMENT WILL HAVE 20 BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD SHALL START ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LATER.
2. BLK 8: REVIEWING ACTIVITY IS NAWCTSD.
3. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLES:
DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 26 January 2022. Other requests shall be referred to Department of Navy, PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547.
4. BLK 10: REVISIONS SHALL BE DUE 30 DAYS AFTER EITHER DESIGN CHANGES (RELATIVE TO THE CDR BASELINE) ARE IDENTIFIED, OR ADDITIONAL REQUIREMENT(S) AND/OR REQUIREMENT CHANGES ARE INCORPORATED INTO THE CONTRACT.
5. BLK 12: FIRST SUBMISSION SHALL BE A REPRO COPY OF THE TP. FIRST SUBMISSION SHALL BE DUE ON THE 20TH BUSINESS DAY PRIOR TO DT-C1 (CPI TESTING).
6. BLK 13: SECOND SUBMISSION SHALL BE DUE ON THE 20TH BUSINESS DAY PRIOR TO EACH TEST AND READINESS REVIEW (TRR). SECOND SUBMISSION SHALL INCORPORATE REVISIONS TO ADDRESS THE GOVERNMENT REVIEW COMMENTS FROM THE FIRST SUBMISSION AND REDLINES RESULTING FROM DT-C1. A CLEAN HARD COPY OF THE SECOND SUBMISSION SHALL BE MADE AVAILABLE TO THE GOVERNMENT AT THE TRAINER SITE AT THE START OF IT-C1 WHICH SHALL BE USED TO CAPTURE REDLINES AND RESULTS FROM IT-C1 TESTING.
7. BLK 13: FINAL (THIRD) SUBMISSION SHALL BE DUE ON THE 15TH BUSINESS DAY AFTER COMPLETION OF IT-C1. FINAL SUBMISSION SHALL INCORPORATE REVISIONS TO ADDRESS THE GOVERNMENT REVIEW COMMENTS FROM THE SECOND SUBMISSION AND REDLINES RESULTING FROM IT-C1.
8. BLK 13: REVISIONS SHALL BE DUE AS REQUIRED THROUGH THE END OF THE CONTRACT.
9. BLK 14: ALL SUBMISSIONS SHALL BE DELIVERED IN EDITABLE MICROSOFT WORD 2016 FORMAT.
| NAWCTSD ENGR |
| 1 |
| SEE |
| NAWCTSD ISEO-CP |
| 1 |
| SEE |
| NAWCTSD PCO |
| 0 |
| SEE |
| 15. TOTAL |
| 2 |
| 0 |
| 2 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
JULIA ROSCHER, NAWCTSD T&E
S. COLN, PMA-205 DAPMTS
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .