LOT VII ENG_ADMIN CDRLS_Exhibit A_B 8-11-2022.docx

DOCX document 524 KB Posted

Attached to
RFP Amendment 0006 for H-1 Training Device Modernization Program Procurement, Upgrades to AH-1Z and UH-1Y Flight Training Devices
Solicitation number
N6134022R00300001
Issued by

View the file

Other files

File Type Posted
Att 6 GFI_GFS List H-1 Lot 7_8 Amend 6.xlsx XLSX spreadsheet
H1 Lot VII_VIII RFP Amendment 06 Conform Doc.pdf PDF
H1 Lot VII_VIII RFP Amendment 06 Mod Doc.pdf PDF
L-1 H1 Lot VII_VIII QAForm Amend 6.xlsx XLSX spreadsheet
Att 6 GFI_GFS List H-1 Lot 7_8 Amend5.xlsx XLSX spreadsheet
Att 1 H-1 TDMP Lot 7 and 8 SOW 210044C.pdf PDF
H1 Lot VII_VIII RFP Amendment 05 Conform Doc.pdf PDF
Att 2 H-1 TDMP Lot 7_8 PRF 20037C.pdf PDF
L-1 H1 Lot VII_VIII QAForm Amend 5.xlsx XLSX spreadsheet
H1 Lot VII_VIII RFP Amendment 05 Mod Doc.pdf PDF
H1 Lot VII_VIII RFP Amendment 04 Conform.pdf PDF
L-1 H1 Lot VII_VIII QAForm Amend 4.xlsx XLSX spreadsheet
H1 Lot VII_VIII RFP Amendment 04 Mod Doc.pdf PDF
Att 4 DIT Form.pdf PDF
L-1 H1 Lot VII_VIII QAForm Amend 3.xlsx XLSX spreadsheet
LOT VIII_ ENG_ADMIN CDRLS_Exhibit A_B Final 8-11-22.docx DOCX document
Att 1 H-1 TDMP Lot 7 and 8 SOW 210044B.pdf PDF
LOT VIII Tech Pubs_CDRLs Exhibit E Final 8-29-22.docx DOCX document
LOT VII Logistic CDRLs Exhibit C_D_E FINAL 9-01-22.docx DOCX document
LOT VIII Logistics CDRLs Exhibit C_D Final 8-29-22.docx DOCX document
H1 Lot VII_VIII RFP Amendment 03 Mod Doc.pdf PDF
H1 Lot VII_VIII RFP Amendment 03 Conform.pdf PDF
Att 2 H-1 TDMP Lot 7 and 8 PRF 20037B.pdf PDF
L-1 H1 Lot VII_VIII QAForm.xlsx XLSX spreadsheet
Attachment L-4 - NPSI_Distribution_Agreement for Sample Dataset. (082322).pdf PDF
H1 Lot VII_VIII RFP Amendment 02 Conform.pdf PDF
H1 Lot VII_VIII RFP Amendment 02 Mod Doc.pdf PDF
H1 Lot VII_VIII RFP Amendment 01 Mod Doc.pdf PDF
H1 Lot VII_VIII RFP Amendment 01 Conform.pdf PDF
L-2 H1 Lot VII_VIII Industry Day QA_Final.xlsx XLSX spreadsheet
L-1 H1 Lot VII_VIII QAForm.xlsx XLSX spreadsheet
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H-1 Lot 7 Engineering & Admin CDRL Data Items Summary List

CDRL #
H-1 Lot 7 DELIVERABLES
ABBREVIATION
AUTHORITY
A001, AA01, AG01, AN01, G001, N001, U001
DOD RISK MANAGEMENT FRAMEWORK PACKAGE
RMF
DI-MGMT-82001A
A002
SOFTWARE PRODUCT DESIGN
SPD
DI-SESS-82036
A003, G003
SOFTWARE PRODUCT PACKAGE
SPP
DI-IPSC-82090C
A004, AA04, AG04. AN04, G004, N004, U004
TEST PROCEDURES
TP
DI-NDTI-80603A
A005, G005
REQUIREMENTS TRACEABILITY VERIFICATION MATRIX
RTVM
DI-MGMT-82133
A006
SYSTEM/SUBSYSTEM DESIGN DESCRIPTION
SSDD
DI-IPSC-81432A
A007, G007
TRAINER CRITERIA REPORT
TCR
DI-MISC-81281
A008, G008
TRAINER MATH MODEL REPORT
TMMR
DI-ILSS-81185
A009 (Lot 7 & 8)
REQUEST FOR VARIANCE (RFV)
RFV
DI-SESS-80640E
A00A (Lot 7 & 8)
ENGINEERING CHANGE PROPOSAL (ECP)
ECP
DI-SESS-80639E
A00B, G00B
VISUAL SYSTEM ENGINEERING REPORT (VSER)
VSER
OT-22-20033
A00C (Lot 7 & 8)
SYNTHETIC ENVIRONMENT DATABASE DESIGN DOCUMENT
SEDDD
DI-MSSM-82158
A00D (Lot 7 & 8)
NAVAIR PORTABLE SOURCE INITIATIVE (NPSI) DATASET DELIVERY
NPSI
DI- MGMT -82125
B001 (Lot 7 & 8)
INTEGRATED PROGRAM MANAGEMENT DATA AND ANALYSIS REPORT(IPMDAR)
IPMDAR
DI-MGMT-81861C
B002 (Lot 7 & 8)
QUANTITY DATA REPORT
QDR
DI-MGMT-82164
B003 (Lot 7 & 8)
CONFERENCE AGENDA
CNF AG
DI-ADMN-81249C
B004 (Lot 7 & 8)
CONFERENCE MINUTES
CNF MIN
DI-ADMN-81250C
B005 (Lot 7 & 8)
PRESENTATION MATERIAL
PM
DI-ADMN-81373
B006 (Lot 7 & 8)
COST AND HOUR REPORT (FLEXFILE)
FLEXFILE
DI-FNCL-82162

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 2 of 39

C O N T R A C T D A T A R E Q U I R E M E N T S L I S T (1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOT I
TDP _____ TM _____ OTHER MGMT

D. SYSTEM/ITEM

2F197B-2 (AH-1Z)

E. CONTRACT/PR NO.
F. CONTRACTOR
N61340XXC00XX
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A001
DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-MGMT-82001A
SOW 210044 PARA 3.1.3.2
PEO (CS) PMA-205
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
XX
REQUIRED
4TIMES
SEE BLK 16
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBM.
a. ADDRESSEE
b. COPIES

Final

A

N/A
SEE BLK 16
draft
reg
repr

16. REMARKS

1. BLK 4: TAILOR THE DI-MGMT-82001A TO MEET THE APPLICABLE RMF REQUIREMENTS

2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE rfp: “ATTACHMENT XX_RMF_Package_Format.xlsx”.

3. BLK 8: THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 15 DAYS TO CORRECT AND RESUBMIT REJECTED MATERIALS.

4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:

DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY (ADMINISTRATIVE OR OPERATIONAL USE) DETERMINED ON 14 FEB 2022. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDER, NAVAL AIR SYSTEMS COMMAND (PMA205), 47123 BUSE ROAD, PATUXENT RIVER, MD 20670.

5. BLK 12: SEE TABLE BELOW

DMRT RMF PACKAGE ELEMENTS
DATE DUE

· SYSTEM REGISTRATION TAB

EXCLUDE PROTOCAL AND PORTS IN THE DATA FLOW WORKSHEET

EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET

· REQUIREMENTS SELECTION TAB

· INVENTORY & SYSTEM INFORMATION TAB

CONFIGURATION MANAGEMENT PLAN

· MFR TAB

FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR

6. BLK 13 – SEE TABLE BELOW

RMF PACKAGE ELEMENTS
DATE DUE

· INVENTORY AND SYSTEM INFORMATION TAB

· COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

· COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

SECOND SUBMISSION DUE 10 DAYS AFTER CDR

· SELF ASSESSMENT TAB

· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS

· DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

· VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS)

THIRD SUBMISSION DUE 10 DAYS PRIOR TO COMMENCEMENT OF TRR FOR 2F197B-2

· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS

· FINAL CSAG

FOURTH SUBMISSION DUE AT FINAL PCA (FPCA) 2F197B-2

7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT. CLASSIFIED ACAS AND STIG SCAN RESULTS SHALL BE DELIVERED TO THE MC ATS ISSM USING THE CLASSIFIED CHERRY POINT ORION SERVER OR VIA SIPR E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.

8. DELIVERY TO THE NAWCTSD ENGR AND PCO SHALL BE LETTER NOTIFICATION ONLY.

NAWCTSD PCO
0
SEE

BLK 16

NAWCTSD ENGR
0
SEE
NAWCTSD ISSM
1
SEE
NAWCTSD ISEO-CP
0
SEE
15. TOTAL
1
0
2
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

CATTIEN NGUYEN, NAWCTSD SW ENGR

S. COLN, PMA-205 DAPMTS

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOT I
TDP _____ TM _____ OTHER MGMT

D. SYSTEM/ITEM

2F196B-3 (UH-1Y)

E. CONTRACT/PR NO.
F. CONTRACTOR
N61340XXC00XX
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

AA01
DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-MGMT-82001A
SOW 210044 PARA 3.1.3.2
PEO (CS) PMA-205
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
XX
REQUIRED
4TIMES
SEE BLK 16
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBM.
a. ADDRESSEE
b. COPIES

Final

A

N/A
SEE BLK 16
draft
reg
repr

16. REMARKS

2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE rfp: “ATTACHMENT XX_RMF_Package_Format.xlsx”.

3. .BLK 8: THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 15 DAYS TO CORRECT AND RESUBMIT REJECTED MATERIALS.

4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:

DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY (ADMINISTRATIVE OR OPERATIONAL USE) DETERMINED ON 14 FEB 2022. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDER, NAVAL AIR SYSTEMS COMMAND (PMA205), 47123 BUSE ROAD, PATUXENT RIVER, MD 20670.

5. BLK 12: SEE TABLE BELOW

DMRT RMF PACKAGE ELEMENTS
DATE DUE

· SYSTEM REGISTRATION TAB

EXCLUDE PROTOCAL AND PORTS IN THE DATA FLOW WORKSHEET

EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET

· REQUIREMENTS SELECTION TAB

· INVENTORY & SYSTEM INFORMATION TAB

CONFIGURATION MANAGEMENT PLAN

FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR

RMF PACKAGE ELEMENTS
DATE DUE

· INVENTORY AND SYSTEM INFORMATION TAB

· COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

· COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

SECOND SUBMISSION DUE 10 DAYS AFTER CDR

· SELF ASSESSMENT TAB

· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS

· DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

· VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS)

THIRD SUBMISSION DUE 10 DAYS PRIOR TO COMMENCEMENT OF TRR FOR 2F197B-2

· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS

FOURTH SUBMISSION DUE AT FINAL PCA (FPCA) 2F197B-2

7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT. CLASSIFIED ACAS AND STIG SCAN RESULTS SHALL BE DELIVERED TO THE MC ATS ISSM USING THE CLASSIFIED CHERRY POINT ORION SERVER OR VIA SIPR E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.

NAWCTSD PCO
0
SEE
NAWCTSD ENGR
0
SEE
NAWCTSD ISSM
1
SEE
NAWCTSD ISEO-CP
0
SEE
15. TOTAL
1
0
2
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

CATTIEN NGUYEN, NAWCTSD SW ENGR

S. COLN, PMA-205 DAPMTS

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOT I
TDP _____ TM _____ OTHER MGMT

D. SYSTEM/ITEM

2F226-2 (UH-1Y)

E. CONTRACT/PR NO.
F. CONTRACTOR
N61340XXC00XX
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

AG01
DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-MGMT-82001A
SOW 210044 PARA 3.1.3.2
PEO (CS) PMA-205
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
XX
REQUIRED
4TIMES
SEE BLK 16
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBM.
a. ADDRESSEE
b. COPIES

Final

A

N/A
SEE BLK 16
draft
reg
repr

16. REMARKS

2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE rfp: “ATTACHMENT XX_RMF_Package_Format.xlsx”.

3. BLK 8: THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 15 DAYS TO CORRECT AND RESUBMIT REJECTED MATERIALS.

4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:

DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY (ADMINISTRATIVE OR OPERATIONAL USE) DETERMINED ON 14 FEB 2022. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDER, NAVAL AIR SYSTEMS COMMAND (PMA205), 47123 BUSE ROAD, PATUXENT RIVER, MD 20670.

5. BLK 12: SEE TABLE BELOW

DMRT RMF PACKAGE ELEMENTS
DATE DUE

· SYSTEM REGISTRATION TAB

EXCLUDE PROTOCAL AND PORTS IN THE DATA FLOW WORKSHEET

EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET

· REQUIREMENTS SELECTION TAB

· INVENTORY & SYSTEM INFORMATION TAB

CONFIGURATION MANAGEMENT PLAN

FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR

RMF PACKAGE ELEMENTS
DATE DUE

· INVENTORY AND SYSTEM INFORMATION TAB

· COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

· COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

SECOND SUBMISSION DUE 10 DAYS AFTER CDR TIM

· SELF ASSESSMENT TAB

· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS

· DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

· VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS)

THIRD SUBMISSION DUE 10 DAYS PRIOR TO COMMENCEMENT OF TRR FOR 2F197B-2

· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS

FOURTH SUBMISSION DUE AT FINAL PCA (FPCA) 2F197B-2

7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT. CLASSIFIED ACAS AND STIG SCAN RESULTS SHALL BE DELIVERED TO THE MC ATS ISSM USING THE CLASSIFIED CHERRY POINT ORION SERVER OR VIA SIPR E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.

NAWCTSD PCO
0
SEE
NAWCTSD ENGR
0
SEE
NAWCTSD ISSM
1
SEE
NAWCTSD ISEO-CP
0
SEE
15. TOTAL
1
0
2
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

CATTIEN NGUYEN, NAWCTSD SW ENGR

S. COLN, PMA-205 DAPMTS

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOT I
TDP _____ TM _____ OTHER MGMT

D. SYSTEM/ITEM

2F196B-4 (UH-1Y)

E. CONTRACT/PR NO.
F. CONTRACTOR
N61340XXC00XX
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

AN01
DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-MGMT-82001A
SOW 210044 PARA 3.1.3.2
PEO (CS) PMA-205
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
XX
REQUIRED
4TIMES
SEE BLK 16
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBM.
a. ADDRESSEE
b. COPIES

Final

A

N/A
SEE BLK 16
draft
reg
repr

16. REMARKS

2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE rfp: “ATTACHMENT XX_RMF_Package_Format.xlsx”.

3. BLK 8: THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 15 DAYS TO CORRECT AND RESUBMIT REJECTED MATERIALS.

4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:

DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY (ADMINISTRATIVE OR OPERATIONAL USE) DETERMINED ON 14 FEB 2022. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDER, NAVAL AIR SYSTEMS COMMAND (PMA205), 47123 BUSE ROAD, PATUXENT RIVER, MD 20670.

5. BLK 12: SEE TABLE BELOW

DMRT RMF PACKAGE ELEMENTS
DATE DUE

· SYSTEM REGISTRATION TAB

EXCLUDE PROTOCAL AND PORTS IN THE DATA FLOW WORKSHEET

EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET

· REQUIREMENTS SELECTION TAB

· INVENTORY & SYSTEM INFORMATION TAB

CONFIGURATION MANAGEMENT PLAN

FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR

RMF PACKAGE ELEMENTS
DATE DUE

· INVENTORY AND SYSTEM INFORMATION TAB

· COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

· COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

SECOND SUBMISSION DUE 10 DAYS AFTER CDR TIM

· SELF ASSESSMENT TAB

· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS

· DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

· VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS)

THIRD SUBMISSION DUE 10 DAYS PRIOR TO COMMENCEMENT OF TRR FOR 2F197B-2

· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS

FOURTH SUBMISSION DUE AT FINAL PCA (FPCA) 2F197B-2

7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT. CLASSIFIED ACAS AND STIG SCAN RESULTS SHALL BE DELIVERED TO THE MC ATS ISSM USING THE CLASSIFIED CHERRY POINT ORION SERVER OR VIA SIPR E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.

NAWCTSD PCO
0
SEE
NAWCTSD ENGR
0
SEE
NAWCTSD ISSM
1
SEE
NAWCTSD ISEO-CP
0
SEE
15. TOTAL
1
0
2
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

CATTIEN NGUYEN, NAWCTSD SW ENGR

S. COLN, PMA-205 DAPMTS

C O N T R A C T D A T A R E Q U I R E M E N T S L I S T

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOT I
TDP _____ TM _____ OTHER MGMT

D. SYSTEM/ITEM

2F196-1 (UH-1Y)

E. CONTRACT/PR NO.
F. CONTRACTOR
N61340XXC00XX
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

G001
DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-MGMT-82001A
SOW 210044 PARA 3.1.3.2
PEO (CS) PMA-205
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
XX
REQUIRED
4TIMES
SEE BLK 16
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBM.
a. ADDRESSEE
b. COPIES

Final

A

N/A
SEE BLK 16
draft
reg
repr

16. REMARKS

2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE rfp: “ATTACHMENT XX_RMF_Package_Format.xlsx”.

3. BLK 8: THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 15 DAYS TO CORRECT AND RESUBMIT REJECTED MATERIALS.

4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:

DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY (ADMINISTRATIVE OR OPERATIONAL USE) DETERMINED ON 14 FEB 2022. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDER, NAVAL AIR SYSTEMS COMMAND (PMA205), 47123 BUSE ROAD, PATUXENT RIVER, MD 20670.

5. BLK 12: SEE TABLE BELOW

DMRT RMF PACKAGE ELEMENTS
DATE DUE

· SYSTEM REGISTRATION TAB

EXCLUDE PROTOCAL AND PORTS IN THE DATA FLOW WORKSHEET

EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET

· REQUIREMENTS SELECTION TAB

· INVENTORY & SYSTEM INFORMATION TAB

CONFIGURATION MANAGEMENT PLAN

FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR

RMF PACKAGE ELEMENTS
DATE DUE

· INVENTORY AND SYSTEM INFORMATION TAB

· COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

· COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

SECOND SUBMISSION DUE 10 DAYS AFTER CDR TIM

· SELF ASSESSMENT TAB

· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS

· DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

· VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS)

THIRD SUBMISSION DUE 10 DAYS PRIOR TO COMMENCEMENT OF TRR FOR 2F197B-2

· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS

FOURTH SUBMISSION DUE AT FINAL PCA (FPCA) 2F197B-2

7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT. CLASSIFIED ACAS AND STIG SCAN RESULTS SHALL BE DELIVERED TO THE MC ATS ISSM USING THE CLASSIFIED CHERRY POINT ORION SERVER OR VIA SIPR E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.

NAWCTSD PCO
0
SEE
NAWCTSD ENGR
0
SEE
NAWCTSD ISSM
1
SEE
NAWCTSD ISEO-CP
0
SEE
15. TOTAL
1
0
2
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

CATTIEN NGUYEN, NAWCTSD SW ENGR

S. COLN, PMA-205 DAPMTS

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOT I
TDP _____ TM _____ OTHER MGMT

D. SYSTEM/ITEM

2F226-1 (UH-1Y)

E. CONTRACT/PR NO.
F. CONTRACTOR
N61340XXC00XX
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

N001
DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-MGMT-82001A
SOW 210044 PARA 3.1.3.2
PEO (CS) PMA-205
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
XX
REQUIRED
4TIMES
SEE BLK 16
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBM.
a. ADDRESSEE
b. COPIES

Final

A

N/A
SEE BLK 16
draft
reg
repr

16. REMARKS

2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE rfp: “ATTACHMENT XX_RMF_Package_Format.xlsx”.

3. BLK 8: THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 15 DAYS TO CORRECT AND RESUBMIT REJECTED MATERIALS.

4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:

DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY (ADMINISTRATIVE OR OPERATIONAL USE) DETERMINED ON 14 FEB 2022. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDER, NAVAL AIR SYSTEMS COMMAND (PMA205), 47123 BUSE ROAD, PATUXENT RIVER, MD 20670.

5. BLK 12: SEE TABLE BELOW

DMRT RMF PACKAGE ELEMENTS
DATE DUE

· SYSTEM REGISTRATION TAB

EXCLUDE PROTOCAL AND PORTS IN THE DATA FLOW WORKSHEET

EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET

· REQUIREMENTS SELECTION TAB

· INVENTORY & SYSTEM INFORMATION TAB

CONFIGURATION MANAGEMENT PLAN

FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR

RMF PACKAGE ELEMENTS
DATE DUE

· INVENTORY AND SYSTEM INFORMATION TAB

· COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

· COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

SECOND SUBMISSION DUE 10 DAYS AFTER CDR

· SELF ASSESSMENT TAB

· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS

· DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

· VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS)

THIRD SUBMISSION DUE 10 DAYS PRIOR TO COMMENCEMENT OF TRR FOR 2F197B-2

· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS

FOURTH SUBMISSION DUE AT FINAL PCA (FPCA) 2F197B-2

7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT. CLASSIFIED ACAS AND STIG SCAN RESULTS SHALL BE DELIVERED TO THE MC ATS ISSM USING THE CLASSIFIED CHERRY POINT ORION SERVER OR VIA SIPR E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.

NAWCTSD PCO
0
SEE
NAWCTSD ENGR
0
SEE
NAWCTSD ISSM
1
SEE
NAWCTSD ISEO-CP
0
SEE
15. TOTAL
1
0
2
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

CATTIEN NGUYEN, NAWCTSD SW ENGR

S. COLN, PMA-205 DAPMTS

C O N T R A C T D A T A R E Q U I R E M E N T S L I S T

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOT I
TDP _____ TM _____ OTHER MGMT

D. SYSTEM/ITEM

2F227-1 (AH-1Z)

E. CONTRACT/PR NO.
F. CONTRACTOR
N61340XXC00XX
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

U001
DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-MGMT-82001A
SOW 210044 PARA 3.1.3.2
PEO (CS) PMA-205
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
XX
REQUIRED
4TIMES
SEE BLK 16
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBM.
a. ADDRESSEE
b. COPIES

Final

A

N/A
SEE BLK 16
draft
reg
repr

16. REMARKS

2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE rfp: “ATTACHMENT XX_RMF_Package_Format.xlsx”.

3. BLK 8: THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 15 DAYS TO CORRECT AND RESUBMIT REJECTED MATERIALS.

4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:

DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY (ADMINISTRATIVE OR OPERATIONAL USE) DETERMINED ON 14 FEB 2022. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDER, NAVAL AIR SYSTEMS COMMAND (PMA205), 47123 BUSE ROAD, PATUXENT RIVER, MD 20670.

5. BLK 12: SEE TABLE BELOW

DMRT RMF PACKAGE ELEMENTS
DATE DUE

· SYSTEM REGISTRATION TAB

EXCLUDE PROTOCAL AND PORTS IN THE DATA FLOW WORKSHEET

EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET

· REQUIREMENTS SELECTION TAB

· INVENTORY & SYSTEM INFORMATION TAB

CONFIGURATION MANAGEMENT PLAN

FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR

RMF PACKAGE ELEMENTS
DATE DUE

· INVENTORY AND SYSTEM INFORMATION TAB

· COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

· COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

SECOND SUBMISSION DUE 10 DAYS AFTER CDR

· SELF ASSESSMENT TAB

· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS

· DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

· VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS)

THIRD SUBMISSION DUE 10 DAYS PRIOR TO COMMENCEMENT OF TRR FOR 2F197B-2

· PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS AND LEGITIMATE JUSTIFICATION FOR ANY OPEN FINDINGS

FOURTH SUBMISSION DUE AT FINAL PCA (FPCA) 2F197B-2

7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT. CLASSIFIED ACAS AND STIG SCAN RESULTS SHALL BE DELIVERED TO THE MC ATS ISSM USING THE CLASSIFIED CHERRY POINT ORION SERVER OR VIA SIPR E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.

NAWCTSD PCO
0
SEE
NAWCTSD ENGR
0
SEE
NAWCTSD ISSM
1
SEE
NAWCTSD ISEO-CP
0
SEE
15. TOTAL
1
0
2
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

CATTIEN NGUYEN, NAWCTSD SW ENGR

S. COLN, PMA-205 DAPMTS

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOT I
TDP _____ TM _____ OTHER SESS

D. SYSTEM/ITEM

ALL LOT 7 TRAINING DEVICES (SEE BLK 16)

E. CONTRACT/PR NO.
F. CONTRACTOR
N61340XXC00XX
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A002
SOFTWARE PRODUCT DESIGN (SPD)
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-SESS-82036
SOW 210044 PARA 3.2.2.7
PEO (CS) PMA-205
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
XX
REQUIRED
2 TIMES/R
SEE BLK 16
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBM.
a. ADDRESSEE
b. COPIES

Final

A

N/A
SEE BLK 16
draft
reg
repr

16. REMARKS

1. CONTRACTOR AND SUBCONTRACTOR SPD INFORMATION SHALL BE COMBINED INTO A SINGLE DOCUMENT.

2. BLK D: THE DEVICES INCLUDE 2F196-1, 2F196B-3, 2F196B-4, 2F197B-2, 2F226-1, 2F226-2, AND 2F227-1 DEVICES.

3. BLK 8: THE GOVERNMENT WILL HAVE 15 BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.

4. BLK 8: REVIEWING ACTIVITY IS NAWCTSD.

5. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 26 January 2022. Other requests shall be referred to Department of Navy, PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547.

6. BLK 10: REVISIONS SHALL BE DUE 30 DAYS AFTER EITHER DESIGN CHANGES (RELATIVE TO THE CDR TIM BASELINE) ARE IDENTIFIED, OR ADDITIONAL REQUIREMENT(S) AND/OR REQUIREMENT CHANGES ARE INCORPORATED INTO THE CONTRACT OR AFTER DEVICE(S) AWARD.

7. BLK 12: FIRST SUBMISSION SHALL BE DUE 20 BUSINESS DAYS PRIOR TO PDR.

8. BLK 13: SECOND (FINAL) SUBMISSION SHALL BE DUE 20 BUSINESS DAYS PRIOR TO THE CDR TIM.

9. BLK 14: ALL REPRODUCIBLE SUBMISSIONS SHALL BE POSTED IAW THE SOW. ALL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN AN EDITABLE ELECTRONIC FORMAT IN MICROSOFT WORD 2016 COMPATIBLE FORMAT. ADDITIONALLY, FINAL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN ELECTRONIC FORMAT ON CD-ROM TO FOLLOWING ADDRESSEES: NAWCTSD SW ENGR, NAWCTSD ENGR AND NAWCTSD ISEO-CP.

10. BLK14: DELIVERY TO THE NAWCTSD PCO SHALL RECEIVE LETTER OF NOTIFICATION. EMAIL ADDRESS IS PROVIDED IN SECTION F OF THE CONTRACT.

NAWCTSD SW ENGR
1
SEE
NAWCTSD ENGR
1
SEE
NAWCTSD ISEO-CP
0
SEE
NAWCTSD PCO
0
SEE
15. TOTAL
2
0
3
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

CATTIEN NGUYEN, NAWCTSD SW ENGR

S. COLN, PMA-205 DAPMTS

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOT I
TDP _____ TM _____ OTHER IPSC

D. SYSTEM/ITEM

2F197B-2, 2F227-1 (AH-1Z)

E. CONTRACT/PR NO.
F. CONTRACTOR
N61340XXC00XX
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A003
SOFTWARE PRODUCT PACKAGE (SPP)
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-IPSC-82090C
SOW 210044 PARAS 3.2.2.10.1

& 3.2.8.13.5.2.1

PEO (CS) PMA-205

7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
XX
REQUIRED
6 TIMES/R
SEE BLK 16
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBM.
a. ADDRESSEE
b. COPIES

Final

A

N/A
SEE BLK 16
draft
reg
repr

16. REMARKS

1. THE CONTRACTOR AND SUBCONTRACTOR SPP INFORMATION SHALL BE COMBINED INTO A SINGLE DOCUMENT.

2. BLK 4: EACH SUBMISSION SHALL CONTAIN THE DELIVERABLE SOURCE CODE AND THE DOCUMENTATION.

3. BLK 8: THE GOVERNMENT WILL HAVE 25 BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.

4. BLK 8: REVIEWING ACTIVITY IS NAWCTSD.

5. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 26 January 2022. Other requests shall be referred to Department of Navy, PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547.

6. BLK 12: FIRST SUBMISSION FOR EACH DEVICE (2F197B-2 AND 2F227-1) SHALL BE DUE 10 BUSINESS DAYS PRIOR TO DT-C1 (CPI) AND SHALL INCLUDE THE COLD START AND INSTALLATION PROCEDURES.

7. BLK 13: SECOND SUBMISSION FOR EACH DEVICE (2F197B-2 AND 2F227-1) SHALL BE DUE 10 BUSINESS DAYS PRIOR TO IT-C1 (IPI) AND SHALL INCLUDE ALL MEDIA FOR NON-COMMERCIAL ITEM SOFTWARE. CONTRACTOR SHALL MAKE THE COMMERCIAL ITEM SOFTWARE MEDIA AVAILABLE FOR GOVERNMENT USE WHILE PERFORMING THE COLD START AND INSTALLATION PROCEDURES.

8. BLK 13: THIRD (FINAL) SUBMISSION FOR EACH DEVICE (2F197B-2 AND 2F227-1) SHALL BE DUE 10 BUSINESS DAYS PRIOR TO FINAL PCA AND SHALL INCLUDE THE DELIVERY OF ALL SOFTWARE CONFIGURATION ITEMS (INCLUDING DATABASES AND COMMERCIAL ITEM MEDIA) REQUIRED TO ACCOMPLISH THE TRAINER SYSTEM COLD START AND INSTALLATION PROCEDURES.

9. BLK 13: REVISIONS SHALL BE DUE AS REQUIRED THROUGH THE END OF THE CONTRACT.

10. BLK 14: ALL REPRODUCIBLE SUBMISSIONS SHALL BE POSTED IAW THE SOW. ALL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN AN EDITABLE ELECTRONIC FORMAT IN MICROSOFT WORD 2016 COMPATIBLE FORMAT. ADDITIONALLY, FINAL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN ELECTRONIC FORMAT ON CD-ROM TO FOLLOWING ADDRESSEES: NAWCTSD SW ENGR, NAWCTSD ENGR, NAWCTSD ISEO-CP AND NAWCTSD ILSM.

11. BLK14: DELIVERY TO THE NAWCTSD PCO SHALL RECEIVE LETTER OF NOTIFICATION. EMAIL ADDRESS IS PROVIDED IN SECTION F OF THE CONTRACT.

12. THE DELIVERABLE SHALL BE FREE OF ALL PROPRIETARY MARKINGS, WITH THE EXCEPTION OF MARKINGS ON COMMERCIAL ITEM SOFTWARE.

NAWCTSD SW ENGR
1
SEE
NAWCTSD ENGR
1
SEE
NAWCTSD ISEO-CP
0
SEE
NAWCTSD ILSM
0
SEE
NAWCTSD PCO
0
SEE
15. TOTAL
2
0
4
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

CATTIEN NGUYEN, NAWCTSD SW ENGR

S. COLN, PMA-205 DAPMTS

C O N T R A C T D A T R E Q U I R E M E N T S L I S T

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOT V
TDP _____ TM _____ OTHER IPSC

D. SYSTEM/ITEM

2F196-1, 2F196B-3, 2F196B-4, 2F226-1, 2F226-2 (UH-1Y)

E. CONTRACT/PR NO.
F. CONTRACTOR
N61340XXC00XX
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

G003
SOFTWARE PRODUCT PACKAGE (SPP)
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-IPSC-82090C
SOW 210044 PARAS 3.2.2.10.1

& 3.2.8.13.5.2.1

PEO (CS) PMA-205

7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
XX
REQUIRED
15 TIMES/R
SEE BLK 16
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBM.
a. ADDRESSEE
b. COPIES

Final

A

N/A
SEE BLK 16
draft
reg
repr

16. REMARKS

1. CONTRACTOR AND SUBCONTRACTOR SPP INFORMATION SHALL BE COMBINED INTO A SINGLE DOCUMENT.

2. BLK 4: EACH SUBMISSION SHALL CONTAIN THE DELIVERABLE SOURCE CODE AND THE DOCUMENTATION.

3. BLK 8: THE GOVERNMENT WILL HAVE 25 BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.

4. BLK 8: REVIEWING ACTIVITY IS NAWCTSD.

5. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 26 January 2022. Other requests shall be referred to Department of Navy, PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547.

6. BLK 12: FIRST SUBMISSION FOR EACH DEVICE (2F196-1, 2F196B-3, 2F196B-4, 2F226-1, 2F226-2) SHALL BE DUE 10 BUSINESS DAYS PRIOR TO DT-C1 (CPI) AND SHALL INCLUDE THE COLD START AND INSTALLATION PROCEDURES.

7. BLK 13: SECOND SUBMISSION FOR EACH DEVICE (2F196-1, 2F196B-3, 2F196B-4, 2F226-1, 2F226-2) SHALL BE DUE 10 BUSINESS DAYS PRIOR TO IT-C1 (IPI) AND SHALL INCLUDE ALL MEDIA FOR NON-COMMERCIAL ITEM SOFTWARE. CONTRACTOR SHALL MAKE THE COMMERCIAL ITEM SOFTWARE MEDIA AVAILABLE FOR GOVERNMENT USE WHILE PERFORMING THE COLD START AND INSTALLATION PROCEDURES.

8. BLK 13: THIRD (FINAL) SUBMISSION FOR EACH DEVICE (2F196-1, 2F196B-3, 2F196B-4, 2F226-1, 2F226-2) SHALL BE DUE 10 BUSINESS DAYS PRIOR TO FINAL PCA AND SHALL INCLUDE THE DELIVERY OF ALL SOFTWARE CONFIGURATION ITEMS (INCLUDING DATABASES AND COMMERCIAL ITEM MEDIA) REQUIRED TO ACCOMPLISH THE TRAINER SYSTEM COLD START AND INSTALLATION PROCEDURES.

9. BLK 13: REVISIONS SHALL BE DUE AS REQUIRED THROUGH THE END OF THE CONTRACT.

10. BLK 14: ALL REPRODUCIBLE SUBMISSIONS SHALL BE POSTED IAW THE SOW. ALL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN AN EDITABLE ELECTRONIC FORMAT IN MICROSOFT WORD 2016 COMPATIBLE FORMAT. ADDITIONALLY, FINAL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN ELECTRONIC FORMAT ON CD-ROM TO FOLLOWING ADDRESSEES: NAWCTSD SW ENGR, NAWCTSD ENGR, NAWCTSD ISEO-CP AND NAWCTSD ILSM.

11. BLK14: DELIVERY TO THE NAWCTSD PCO SHALL RECEIVE LETTER OF NOTIFICATION. EMAIL ADDRESS IS PROVIDED IN SECTION F OF THE CONTRACT.

12. THE DELIVERABLE SHALL BE FREE OF ALL PROPRIETARY MARKINGS, WITH THE EXCEPTION OF MARKINGS ON COMMERCIAL ITEM SOFTWARE.

NAWCTSD SW ENGR
1
SEE
NAWCTSD ENGR
1
SEE
NAWCTSD ISEO-CP
0
SEE
NAWCTSD ILSM
0
SEE
NAWCTSD PCO
0
SEE
15. TOTAL
2
0
4
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

CATTIEN NGUYEN, NAWCTSD SW ENGR

S. COLN, PMA-205 DAPMTS

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOT II
TDP ____
TM ____
OTHER NDTI
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
2F197B-2 (AH-1Z)
N61340XXC00XX
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A004
TEST PROCEDURE (TP)
REVISION TO EXISTING GOVERNMENT DOCUMENTS
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-NDTI-80603A
SOW 210044 PARA 3.2.8.5
PEO (CS) PMA-205
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
XX
REQUIRED
3 TIMES/R
SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBM.
Draft
Final

A

N/A
SEE BLK 16
Reg
Repro

16. REMARKS

1. BLK 8: GOVERNMENT WILL HAVE 20 BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD SHALL START ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LATER.

2. BLK 8: REVIEWING ACTIVITY IS NAWCTSD.

3. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLES:

DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 26 January 2022. Other requests shall be referred to Department of Navy, PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547.

4. BLK 10: REVISIONS SHALL BE DUE 30 DAYS AFTER EITHER DESIGN CHANGES (RELATIVE TO THE CDR BASELINE) ARE IDENTIFIED, OR ADDITIONAL REQUIREMENT(S) AND/OR REQUIREMENT CHANGES ARE INCORPORATED INTO THE CONTRACT.

5. BLK 12: FIRST SUBMISSION SHALL BE A REPRO COPY OF THE TP. FIRST SUBMISSION SHALL BE DUE ON THE 20TH BUSINESS DAY PRIOR TO DT-C1 (CPI TESTING).

6. BLK 13: SECOND SUBMISSION SHALL BE DUE ON THE 20TH BUSINESS DAY PRIOR TO EACH TEST AND READINESS REVIEW (TRR). SECOND SUBMISSION SHALL INCORPORATE REVISIONS TO ADDRESS THE GOVERNMENT REVIEW COMMENTS FROM THE FIRST SUBMISSION AND REDLINES RESULTING FROM DT-C1. A CLEAN HARD COPY OF THE SECOND SUBMISSION SHALL BE MADE AVAILABLE TO THE GOVERNMENT AT THE TRAINER SITE AT THE START OF IT-C1 WHICH SHALL BE USED TO CAPTURE REDLINES AND RESULTS FROM IT-C1 TESTING

7. BLK 13: FINAL (THIRD) SUBMISSION SHALL BE DUE ON THE 15TH BUSINESS DAY AFTER COMPLETION OF IT-C1. FINAL SUBMISSION SHALL INCORPORATE REVISIONS TO ADDRESS THE GOVERNMENT REVIEW COMMENTS FROM THE SECOND SUBMISSION AND REDLINES RESULTING FROM IT-C1.

8. BLK 13: REVISIONS SHALL BE DUE AS REQUIRED THROUGH THE END OF THE CONTRACT.

9. BLK 14: ALL SUBMISSIONS SHALL BE DELIVERED IN EDITABLE MICROSOFT WORD 2016 FORMAT.

10. BLK 14: DELIVERY TO THE NAWCTSD PCO SHALL RECEIVE LETTER OF NOTIFICATION.

11. BLK 14: EMAIL ADDRESS IS PROVIDED IN SECTION F OF THE CONTRACT.

NAWCTSD ENGR
1
SEE
NAWCTSD ISEO-CP
1
SEE
NAWCTSD PCO
0
SEE
15. TOTAL
2
0
2
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

JULIA ROSCHER, NAWCTSD T&E

S. COLN, PMA-205 DAPMTS

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOT II
TDP ____
TM ____
OTHER NDTI
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
2F196B-3 (UH-1Y)
N61340XXC00XX
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

AA04
TEST PROCEDURE (TP)
REVISION TO EXISTING GOVERNMENT DOCUMENTS
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

DI-NDTI-80603A
SOW 210044 PARA 3.2.8.5
PEO (CS) PMA-205
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
XX
REQUIRED
3 TIMES/R
SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBM.
Draft
Final

A

N/A
SEE BLK 16
Reg
Repro

16. REMARKS

1. BLK 8: GOVERNMENT WILL HAVE 20 BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD SHALL START ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LATER.

2. BLK 8: REVIEWING ACTIVITY IS NAWCTSD.

3. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLES:

DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 26 January 2022. Other requests shall be referred to Department of Navy, PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547.

4. BLK 10: REVISIONS SHALL BE DUE 30 DAYS AFTER EITHER DESIGN CHANGES (RELATIVE TO THE CDR BASELINE) ARE IDENTIFIED, OR ADDITIONAL REQUIREMENT(S) AND/OR REQUIREMENT CHANGES ARE INCORPORATED INTO THE CONTRACT.

5. BLK 12: FIRST SUBMISSION SHALL BE A REPRO COPY OF THE TP. FIRST SUBMISSION SHALL BE DUE ON THE 20TH BUSINESS DAY PRIOR TO DT-C1 (CPI TESTING).

6. BLK 13: SECOND SUBMISSION SHALL BE DUE ON THE 20TH BUSINESS DAY PRIOR TO EACH TEST AND READINESS REVIEW (TRR). SECOND SUBMISSION SHALL INCORPORATE REVISIONS TO ADDRESS THE GOVERNMENT REVIEW COMMENTS FROM THE FIRST SUBMISSION AND REDLINES RESULTING FROM DT-C1. A CLEAN HARD COPY OF THE SECOND SUBMISSION SHALL BE MADE AVAILABLE TO THE GOVERNMENT AT THE TRAINER SITE AT THE START OF IT-C1 WHICH SHALL BE USED TO CAPTURE REDLINES AND RESULTS FROM IT-C1 TESTING.

7. BLK 13: FINAL (THIRD) SUBMISSION SHALL BE DUE ON THE 15TH BUSINESS DAY AFTER COMPLETION OF IT-C1. FINAL SUBMISSION SHALL INCORPORATE REVISIONS TO ADDRESS THE GOVERNMENT REVIEW COMMENTS FROM THE SECOND SUBMISSION AND REDLINES RESULTING FROM IT-C1.

8. BLK 13: REVISIONS SHALL BE DUE AS REQUIRED THROUGH THE END OF THE CONTRACT.

9. BLK 14: ALL SUBMISSIONS SHALL BE DELIVERED IN EDITABLE MICROSOFT WORD 2016 FORMAT.

NAWCTSD ENGR
1
SEE
NAWCTSD ISEO-CP
1
SEE
NAWCTSD PCO
0
SEE
15. TOTAL
2
0
2
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

JULIA ROSCHER, NAWCTSD T&E

S. COLN, PMA-205 DAPMTS

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .