The file's text, extracted by GovTribe without its formatting.
N6134018R0027
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
BLOCK 14 CONTINUATION PAGE
The following amended document attachments are included as part of Amendment 0002.
1) Atch (1)_APPENDIX F Conference Schedule_Amendement02_26Oct2018
2) Atch (1)_APPENDIX N Instructional Design Requirements_Amendment02_26Oct2018
3) Atch (1)_APPENDIX T Business Rules_Amendement02_26Oct2018
4) Atch (L-3)_TBOE_09 11 18_Amendment02_26Oct2018
5) Atch (L-6)_Relevancy_Information_of_the_PP_Contract_Amendment 02_26Oct2018
6) Atch (L-7)_GovtEst_LaborRates_Amendment 02_26Oct2018
7) CDRL F003 Embedded File_Amendment02_dated 21Nov01 The remainder of the government’s answers, along with any additional updated document attachments for RFP Industry Submitted Questions will be provided via Amendment 0003 the week of October 29, 2018.
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 1027
The CLIN extended description has changed from:
Delivery Technical Data Not Separately Priced (NSP) IAW DD 1423 (CDRLS) for each applicable CLIN. Technical Data is to be delivered in accordance with Exhibits (A), (B) and (F) in support of CLINs 0001 throught 1026.
To:
Delivery Technical Data Not Separately Priced (NSP) IAW DD 1423 (CDRLS) for each applicable CLIN. Technical Data is to be delivered in accordance with Exhibits (A), (B) and (F) in support of CLINs 0001 thru 1026. Refer to Section F.1 for details.
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule item for CLIN 0006 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
ERIC PFEFFERKORN
12211 SCIENCE DRIVE
ORLANDO FL 32826-3224
407-380-4565 FOB: Destination N61340
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
ERIC PFEFFERKORN
12211 SCIENCE DRIVE
ORLANDO FL 32826-3224
407-380-4565
N61340
The following Delivery Schedule item for CLIN 0011 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
ERIC PFEFFERKORN
12211 SCIENCE DRIVE
ORLANDO FL 32826-3224
407-380-4565
N61340
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
ERIC PFEFFERKORN
12211 SCIENCE DRIVE
ORLANDO FL 32826-3224
407-380-4565
N61340
The following Delivery Schedule item for CLIN 0014 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
ERIC PFEFFERKORN
12211 SCIENCE DRIVE
ORLANDO FL 32826-3224
407-380-4565
N61340
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
ERIC PFEFFERKORN
12211 SCIENCE DRIVE
ORLANDO FL 32826-3224
407-380-4565
N61340
The following Delivery Schedule item for CLIN 0017 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
ERIC PFEFFERKORN
12211 SCIENCE DRIVE
ORLANDO FL 32826-3224
407-380-4565
N61340
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
ERIC PFEFFERKORN
12211 SCIENCE DRIVE
ORLANDO FL 32826-3224
407-380-4565
N61340
The following Delivery Schedule item for CLIN 0018 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
ERIC PFEFFERKORN
12211 SCIENCE DRIVE
ORLANDO FL 32826-3224
407-380-4565
N61340
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
ERIC PFEFFERKORN
12211 SCIENCE DRIVE
ORLANDO FL 32826-3224
407-380-4565
N61340
The following Delivery Schedule item for CLIN 0019 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
ERIC PFEFFERKORN
12211 SCIENCE DRIVE
ORLANDO FL 32826-3224
407-380-4565
N61340
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
ERIC PFEFFERKORN
12211 SCIENCE DRIVE
ORLANDO FL 32826-3224
407-380-4565
N61340
The following Delivery Schedule item for CLIN 0020 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
ERIC PFEFFERKORN
12211 SCIENCE DRIVE
ORLANDO FL 32826-3224
407-380-4565
N61340
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
ERIC PFEFFERKORN
12211 SCIENCE DRIVE
ORLANDO FL 32826-3224
407-380-4565
N61340
The following Delivery Schedule item for CLIN 0025 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
ERIC PFEFFERKORN
12211 SCIENCE DRIVE
ORLANDO FL 32826-3224
407-380-4565
N61340
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
ERIC PFEFFERKORN
12211 SCIENCE DRIVE
ORLANDO FL 32826-3224
407-380-4565
N61340
The following have been modified:
SECTION F ADDITIONAL TERMS
F.1 TECHNICAL DATA AND INFORMATION
Technical Data and Information shall be delivered IAW the SOW, Section J, Attachment # 1, at the frequency specified in the CDRL Exhibits (A), (B) and (F) for the specified CLINs as per the the below table, and the terms and conditions set forth in this contract. The Data Item Transmittal (DIT) form , Section J, Attachment # 4, shall be utilized to transmit to the Government all CDRL requirements.
CLIN
CLIN
| A001 |
| DoD Risk Management Framework (RMF) Package |
| X |
| X |
| X |
| A002 |
| Requirements Traceability Verification Matrix (RTVM) |
| X |
| X |
| X |
| A003 |
| Test Procedures (TP) |
| X |
| X |
| X |
| A004 |
| Test / Inspection Report (T/IR) |
| X |
| X |
| X |
| A005 |
| Computer Software Product End Item (CSPEI) |
| X |
| X |
| X |
| B001 |
| Technical and Management Work Plan |
| X |
| X |
| X |
| B002 |
| Integrated Program Management Report (IPMR) |
| X |
| X |
| X |
| B003 |
| Contract Work Breakdown Structure (CWBS) |
| X |
| X |
| X |
| B004 |
| Contractor’s Progress, Status and Management Report |
| B005 |
| Conference Agenda |
| X |
| X |
| X |
| B006 |
| Conference Minutes |
| X |
| X |
| X |
| B007 |
| Site Visit Plan |
| X |
| X |
| X |
| B008 |
| Operations Security (OPSEC) Plan |
| X |
| X |
| X |
| B009 |
| Vendor Integrity Statements for Software (Scientific and Technical Reports) |
| X |
| X |
| X |
| F001 |
| Appendix to Rating Domain Analysis (RDA) (Instructional Performance Requirements Document) |
| X |
| F002 |
| Appendix to Functional Requirements Document (FRD) (Scientific and Technical Report) |
| X |
| F003 |
| Training Systems Functional Description (TSFD) (Scientific and Technical Report) |
| X |
| F004 |
| Style Guide (Instructional Media Design Package) |
| X |
| F005 |
| Model Products (Instructional Media Design Package) |
| X |
| F006 |
| Lesson Design Strategy (SDIT, IFIT, PS) (Instructional Media Design Package) |
| X |
| F007 |
| On-Screen Lessons (Instructional Media Package) |
| X |
| F008 |
| Photo/Graphic Traceability Cross Reference Matrix (Scientific and Technical Reports) |
| X |
| F009* |
| CD-ROM/DVD Delivery (Instructional Media Package) |
| X |
| X |
| X |
| F00A |
| Script/Storyboard (SDIT, IFIT, PS) (Instructional Media Package) |
| X |
| F00B |
| Test Package (Test Package) |
| X |
| X |
| X |
| F00C |
| Instructor Facilitated Interactive Training Curriculum Package (IFIT, PS) (Training Conduct Support Document) |
| X |
| X |
| X |
| F00D |
| Structured On-the-Job Training (Training Conduct Support Document) |
| X |
| X |
| X |
| F00E |
| Training Course Control Document (Training Program Structure Document) |
| X |
| X |
| X |
| F00F |
| Training Systems Support Procedures (Training System Support Document) |
| X |
| X |
| X |
| F00G |
| Train the Trainer (Course Conduct Information Package) |
X
| F00H |
| Pilot (Training Evaluation Document) |
X
| F00J |
| Instructional Media Source Files (Instructional Media Package) |
| X |
| X |
| X |
* CDRL F009 is associated with the CLIN end-item deliverable.
CLIN
CLIN
| A001 |
| DoD Risk Management Framework (RMF) Package |
| X |
| X |
| X |
| A002 |
| Requirements Traceability Verification Matrix (RTVM) |
| X |
| X |
| X |
| A003 |
| Test Procedures (TP) |
| X |
| X |
| X |
| A004 |
| Test / Inspection Report (T/IR) |
| X |
| X |
| X |
| A005 |
| Computer Software Product End Item (CSPEI) |
| X |
| X |
| X |
| B001 |
| Technical and Management Work Plan |
| X |
| X |
| X |
| B002 |
| Integrated Program Management Report (IPMR) |
| X |
| X |
| X |
| B003 |
| Contract Work Breakdown Structure (CWBS) |
| X |
| X |
| X |
| B004 |
| Contractor’s Progress, Status and Management Report |
| B005 |
| Conference Agenda |
| X |
| X |
| X |
| B006 |
| Conference Minutes |
| X |
| X |
| X |
| B007 |
| Site Visit Plan |
| X |
| X |
| X |
| B008 |
| Operations Security (OPSEC) Plan |
| X |
| X |
| X |
| B009 |
| Vendor Integrity Statements for Software (Scientific and Technical Reports) |
| X |
| X |
| X |
| F001 |
| Appendix to Rating Domain Analysis (RDA) (Instructional Performance Requirements Document) |
| X |
| F002 |
| Appendix to Functional Requirements Document (FRD) (Scientific and Technical Report) |
| X |
| F003 |
| Training Systems Functional Description (TSFD) (Scientific and Technical Report) |
| X |
| F004 |
| Style Guide (Instructional Media Design Package) |
| X |
| F005 |
| Model Products (Instructional Media Design Package) |
| X |
| F006 |
| Lesson Design Strategy (SDIT, IFIT, PS) (Instructional Media Design Package) |
| X |
| F007 |
| On-Screen Lessons (Instructional Media Package) |
| X |
| F008 |
| Photo/Graphic Traceability Cross Reference Matrix (Scientific and Technical Reports) |
| X |
| F009* |
| CD-ROM/DVD Delivery (Instructional Media Package) |
| X |
| X |
| X |
| F00A |
| Script/Storyboard (SDIT, IFIT, PS) (Instructional Media Package) |
| X |
| F00B |
| Test Package (Test Package) |
| X |
| X |
| X |
| F00C |
| Instructor Facilitated Interactive Training Curriculum Package (IFIT, PS) (Training Conduct Support Document) |
| X |
| X |
| X |
| F00D |
| Structured On-the-Job Training (Training Conduct Support Document) |
| X |
| X |
| X |
| F00E |
| Training Course Control Document (Training Program Structure Document) |
| X |
| X |
| X |
| F00F |
| Training Systems Support Procedures (Training System Support Document) |
| X |
| X |
| X |
| F00G |
| Train the Trainer (Course Conduct Information Package) |
X
| F00H |
| Pilot (Training Evaluation Document) |
X
| F00J |
| Instructional Media Source Files (Instructional Media Package) |
| X |
| X |
| X |
CLIN
CLIN
| A001 |
| DoD Risk Management Framework (RMF) Package |
| X |
| X |
| X |
| A002 |
| Requirements Traceability Verification Matrix (RTVM) |
| X |
| X |
| X |
| A003 |
| Test Procedures (TP) |
| X |
| X |
| X |
| A004 |
| Test / Inspection Report (T/IR) |
| X |
| X |
| X |
| A005 |
| Computer Software Product End Item (CSPEI) |
| X |
| X |
| X |
| B001 |
| Technical and Management Work Plan |
| X |
| X |
| X |
| B002 |
| Integrated Program Management Report (IPMR) |
| X |
| X |
| X |
| B003 |
| Contract Work Breakdown Structure (CWBS) |
| X |
| X |
| X |
| B004 |
| Contractor’s Progress, Status and Management Report |
| B005 |
| Conference Agenda |
| X |
| X |
| X |
| B006 |
| Conference Minutes |
| X |
| X |
| X |
| B007 |
| Site Visit Plan |
| X |
| X |
| X |
| B008 |
| Operations Security (OPSEC) Plan |
| X |
| X |
| X |
| B009 |
| Vendor Integrity Statements for Software (Scientific and Technical Reports) |
| X |
| X |
| X |
| F001 |
| Appendix to Rating Domain Analysis (RDA) (Instructional Performance Requirements Document) |
| X |
| F002 |
| Appendix to Functional Requirements Document (FRD) (Scientific and Technical Report) |
| X |
| F003 |
| Training Systems Functional Description (TSFD) (Scientific and Technical Report) |
| X |
| F004 |
| Style Guide (Instructional Media Design Package) |
| X |
| F005 |
| Model Products (Instructional Media Design Package) |
| X |
| F006 |
| Lesson Design Strategy (SDIT, IFIT, PS) (Instructional Media Design Package) |
| X |
| F007 |
| On-Screen Lessons (Instructional Media Package) |
| X |
| F008 |
| Photo/Graphic Traceability Cross Reference Matrix (Scientific and Technical Reports) |
| X |
| F009* |
| CD-ROM/DVD Delivery (Instructional Media Package) |
| X |
| X |
| X |
| F00A |
| Script/Storyboard (SDIT, IFIT, PS) (Instructional Media Package) |
| X |
| F00B |
| Test Package (Test Package) |
| X |
| X |
| X |
| F00C |
| Instructor Facilitated Interactive Training Curriculum Package (IFIT, PS) (Training Conduct Support Document) |
| X |
| X |
| X |
| F00D |
| Structured On-the-Job Training (Training Conduct Support Document) |
| X |
| X |
| X |
| F00E |
| Training Course Control Document (Training Program Structure Document) |
| X |
| X |
| X |
| F00F |
| Training Systems Support Procedures (Training System Support Document) |
| X |
| X |
| X |
| F00G |
| Train the Trainer (Course Conduct Information Package) |
X
| F00H |
| Pilot (Training Evaluation Document) |
X
| F00J |
| Instructional Media Source Files (Instructional Media Package) |
| X |
| X |
| X |
| CDRL TITLE |
| CLIN 0011 |
| CLIN |
CLIN
CLIN
| A001 |
| DoD Risk Management Framework (RMF) Package |
| X |
| X |
| X |
| X |
| A002 |
| Requirements Traceability Verification Matrix (RTVM) |
| X |
| X |
| X |
| X |
| A003 |
| Test Procedures (TP) |
| X |
| X |
| X |
| X |
| A004 |
| Test / Inspection Report (T/IR) |
| X |
| X |
| X |
| X |
| A005 |
| Computer Software Product End Item (CSPEI) |
| X |
| X |
| X |
| X |
| B001 |
| Technical and Management Work Plan |
| X |
| X |
| X |
| X |
| B002 |
| Integrated Program Management Report (IPMR) |
| X |
| X |
| X |
| X |
| B003 |
| Contract Work Breakdown Structure (CWBS) |
| X |
| X |
| X |
| X |
| B004 |
| Contractor’s Progress, Status and Management Report |
| B005 |
| Conference Agenda |
| X |
| X |
| X |
| X |
| B006 |
| Conference Minutes |
| X |
| X |
| X |
| X |
| B007 |
| Site Visit Plan |
| X |
| X |
| X |
| X |
| B008 |
| Operations Security (OPSEC) Plan |
| X |
| X |
| X |
| X |
| B009 |
| Vendor Integrity Statements for Software (Scientific and Technical Reports) |
| X |
| X |
| X |
| X |
| F001 |
| Appendix to Rating Domain Analysis (RDA) (Instructional Performance Requirements Document) |
| X |
| X |
| F002 |
| Appendix to Functional Requirements Document (FRD) (Scientific and Technical Report) |
| X |
| X |
| F003 |
| Training Systems Functional Description (TSFD) (Scientific and Technical Report) |
| X |
| X |
| F004 |
| Style Guide (Instructional Media Design Package) |
| X |
| X |
| F005 |
| Model Products (Instructional Media Design Package) |
| X |
| X |
| F006 |
| Lesson Design Strategy (SDIT, IFIT, PS) (Instructional Media Design Package) |
| X |
| X |
| F007 |
| On-Screen Lessons (Instructional Media Package) |
| X |
| X |
| F008 |
| Photo/Graphic Traceability Cross Reference Matrix (Scientific and Technical Reports) |
| X |
| X |
| F009* |
| CD-ROM/DVD Delivery (Instructional Media Package) |
| X |
| X |
| X |
| X |
| F00A |
| Script/Storyboard (SDIT, IFIT, PS) (Instructional Media Package) |
| X |
| X |
| F00B |
| Test Package (Test Package) |
| X |
| X |
| X |
| X |
| F00C |
| Instructor Facilitated Interactive Training Curriculum Package (IFIT, PS) (Training Conduct Support Document) |
| X |
| X |
| X |
| X |
| F00D |
| Structured On-the-Job Training (Training Conduct Support Document) |
| X |
| X |
| X |
| X |
| F00E |
| Training Course Control Document (Training Program Structure Document) |
| X |
| X |
| X |
| X |
| F00F |
| Training Systems Support Procedures (Training System Support Document) |
| X |
| X |
| X |
| X |
| F00G |
| Train the Trainer (Course Conduct Information Package) |
X
| F00H |
| Pilot (Training Evaluation Document) |
X
| F00J |
| Instructional Media Source Files (Instructional Media Package) |
| X |
| X |
| X |
| X |
| CDRL TITLE |
| CLIN 0014 |
| CLIN |
CLIN
CLIN
| A001 |
| DoD Risk Management Framework (RMF) Package |
| X |
| X |
| X |
| X |
| A002 |
| Requirements Traceability Verification Matrix (RTVM) |
| X |
| X |
| X |
| X |
| A003 |
| Test Procedures (TP) |
| X |
| X |
| X |
| X |
| A004 |
| Test / Inspection Report (T/IR) |
| X |
| X |
| X |
| X |
| A005 |
| Computer Software Product End Item (CSPEI) |
| X |
| X |
| X |
| X |
| B001 |
| Technical and Management Work Plan |
| X |
| X |
| X |
| X |
| B002 |
| Integrated Program Management Report (IPMR) |
| X |
| X |
| X |
| X |
| B003 |
| Contract Work Breakdown Structure (CWBS) |
| X |
| X |
| X |
| X |
| B004 |
| Contractor’s Progress, Status and Management Report |
| B005 |
| Conference Agenda |
| X |
| X |
| X |
| X |
| B006 |
| Conference Minutes |
| X |
| X |
| X |
| X |
| B007 |
| Site Visit Plan |
| X |
| X |
| X |
| X |
| B008 |
| Operations Security (OPSEC) Plan |
| X |
| X |
| X |
| X |
| B009 |
| Vendor Integrity Statements for Software (Scientific and Technical Reports) |
| X |
| X |
| X |
| X |
| F001 |
| Appendix to Rating Domain Analysis (RDA) (Instructional Performance Requirements Document) |
| X |
| X |
| F002 |
| Appendix to Functional Requirements Document (FRD) (Scientific and Technical Report) |
| X |
| X |
| F003 |
| Training Systems Functional Description (TSFD) (Scientific and Technical Report) |
| X |
| X |
| F004 |
| Style Guide (Instructional Media Design Package) |
| X |
| X |
| F005 |
| Model Products (Instructional Media Design Package) |
| X |
| X |
| F006 |
| Lesson Design Strategy (SDIT, IFIT, PS) (Instructional Media Design Package) |
| X |
| X |
| F007 |
| On-Screen Lessons (Instructional Media Package) |
| X |
| X |
| F008 |
| Photo/Graphic Traceability Cross Reference Matrix (Scientific and Technical Reports) |
| X |
| X |
| F009* |
| CD-ROM/DVD Delivery (Instructional Media Package) |
| X |
| X |
| X |
| X |
| F00A |
| Script/Storyboard (SDIT, IFIT, PS) (Instructional Media Package) |
| X |
| X |
| F00B |
| Test Package (Test Package) |
| X |
| X |
| X |
| X |
| F00C |
| Instructor Facilitated Interactive Training Curriculum Package (IFIT, PS) (Training Conduct Support Document) |
| X |
| X |
| X |
| X |
| F00D |
| Structured On-the-Job Training (Training Conduct Support Document) |
| X |
| X |
| X |
| X |
| F00E |
| Training Course Control Document (Training Program Structure Document) |
| X |
| X |
| X |
| X |
| F00F |
| Training Systems Support Procedures (Training System Support Document) |
| X |
| X |
| X |
| X |
| F00G |
| Train the Trainer (Course Conduct Information Package) |
X
| F00H |
| Pilot (Training Evaluation Document) |
X
| F00J |
| Instructional Media Source Files (Instructional Media Package) |
| X |
| X |
| X |
| X |
| CDRL TITLE |
| CLIN 0017 |
| CLIN |
CLIN
CLIN
| A001 |
| DoD Risk Management Framework (RMF) Package |
| X |
| X |
| X |
| X |
| A002 |
| Requirements Traceability Verification Matrix (RTVM) |
| X |
| X |
| X |
| X |
| A003 |
| Test Procedures (TP) |
| X |
| X |
| X |
| X |
| A004 |
| Test / Inspection Report (T/IR) |
| X |
| X |
| X |
| X |
| A005 |
| Computer Software Product End Item (CSPEI) |
| X |
| X |
| X |
| X |
| B001 |
| Technical and Management Work Plan |
| X |
| X |
| X |
| X |
| B002 |
| Integrated Program Management Report (IPMR) |
| X |
| X |
| X |
| X |
| B003 |
| Contract Work Breakdown Structure (CWBS) |
| X |
| X |
| X |
| X |
| B004 |
| Contractor’s Progress, Status and Management Report |
| B005 |
| Conference Agenda |
| X |
| X |
| X |
| X |
| B006 |
| Conference Minutes |
| X |
| X |
| X |
| X |
| B007 |
| Site Visit Plan |
| X |
| X |
| X |
| X |
| B008 |
| Operations Security (OPSEC) Plan |
| X |
| X |
| X |
| X |
| B009 |
| Vendor Integrity Statements for Software (Scientific and Technical Reports) |
| X |
| X |
| X |
| X |
| F001 |
| Appendix to Rating Domain Analysis (RDA) (Instructional Performance Requirements Document) |
| X |
| X |
| F002 |
| Appendix to Functional Requirements Document (FRD) (Scientific and Technical Report) |
| X |
| X |
| F003 |
| Training Systems Functional Description (TSFD) (Scientific and Technical Report) |
| X |
| X |
| F004 |
| Style Guide (Instructional Media Design Package) |
| X |
| X |
| F005 |
| Model Products (Instructional Media Design Package) |
| X |
| X |
| F006 |
| Lesson Design Strategy (SDIT, IFIT, PS) (Instructional Media Design Package) |
| X |
| X |
| F007 |
| On-Screen Lessons (Instructional Media Package) |
| X |
| X |
| F008 |
| Photo/Graphic Traceability Cross Reference Matrix (Scientific and Technical Reports) |
| X |
| X |
| F009* |
| CD-ROM/DVD Delivery (Instructional Media Package) |
| X |
| X |
| X |
| X |
| F00A |
| Script/Storyboard (SDIT, IFIT, PS) (Instructional Media Package) |
| X |
| X |
| F00B |
| Test Package (Test Package) |
| X |
| X |
| X |
| X |
| F00C |
| Instructor Facilitated Interactive Training Curriculum Package (IFIT, PS) (Training Conduct Support Document) |
| X |
| X |
| X |
| X |
| F00D |
| Structured On-the-Job Training (Training Conduct Support Document) |
| X |
| X |
| X |
| X |
| F00E |
| Training Course Control Document (Training Program Structure Document) |
| X |
| X |
| X |
| X |
| F00F |
| Training Systems Support Procedures (Training System Support Document) |
| X |
| X |
| X |
| X |
| F00G |
| Train the Trainer (Course Conduct Information Package) |
X
| F00H |
| Pilot (Training Evaluation Document) |
X
| F00J |
| Instructional Media Source Files (Instructional Media Package) |
| X |
| X |
| X |
| X |
| CDRL TITLE |
| CLIN 0020 |
| CLIN |
CLIN
CLIN
| A001 |
| DoD Risk Management Framework (RMF) Package |
| X |
| X |
| X |
| X |
| A002 |
| Requirements Traceability Verification Matrix (RTVM) |
| X |
| X |
| X |
| X |
| A003 |
| Test Procedures (TP) |
| X |
| X |
| X |
| X |
| A004 |
| Test / Inspection Report (T/IR) |
| X |
| X |
| X |
| X |
| A005 |
| Computer Software Product End Item (CSPEI) |
| X |
| X |
| X |
| X |
| B001 |
| Technical and Management Work Plan |
| X |
| X |
| X |
| X |
| B002 |
| Integrated Program Management Report (IPMR) |
| X |
| X |
| X |
| X |
| B003 |
| Contract Work Breakdown Structure (CWBS) |
| X |
| X |
| X |
| X |
| B004 |
| Contractor’s Progress, Status and Management Report |
| B005 |
| Conference Agenda |
| X |
| X |
| X |
| X |
| B006 |
| Conference Minutes |
| X |
| X |
| X |
| X |
| B007 |
| Site Visit Plan |
| X |
| X |
| X |
| X |
| B008 |
| Operations Security (OPSEC) Plan |
| X |
| X |
| X |
| X |
| B009 |
| Vendor Integrity Statements for Software (Scientific and Technical Reports) |
| X |
| X |
| X |
| X |
| F001 |
| Appendix to Rating Domain Analysis (RDA) (Instructional Performance Requirements Document) |
| X |
| X |
| F002 |
| Appendix to Functional Requirements Document (FRD) (Scientific and Technical Report) |
| X |
| X |
| F003 |
| Training Systems Functional Description (TSFD) (Scientific and Technical Report) |
| X |
| X |
| F004 |
| Style Guide (Instructional Media Design Package) |
| X |
| X |
| F005 |
| Model Products (Instructional Media Design Package) |
| X |
| X |
| F006 |
| Lesson Design Strategy (SDIT, IFIT, PS) (Instructional Media Design Package) |
| X |
| X |
| F007 |
| On-Screen Lessons (Instructional Media Package) |
| X |
| X |
| F008 |
| Photo/Graphic Traceability Cross Reference Matrix (Scientific and Technical Reports) |
| X |
| X |
| F009* |
| CD-ROM/DVD Delivery (Instructional Media Package) |
| X |
| X |
| X |
| X |
| F00A |
| Script/Storyboard (SDIT, IFIT, PS) (Instructional Media Package) |
| X |
| X |
| F00B |
| Test Package (Test Package) |
| X |
| X |
| X |
| X |
| F00C |
| Instructor Facilitated Interactive Training Curriculum Package (IFIT, PS) (Training Conduct Support Document) |
| X |
| X |
| X |
| X |
| F00D |
| Structured On-the-Job Training (Training Conduct Support Document) |
| X |
| X |
| X |
| X |
| F00E |
| Training Course Control Document (Training Program Structure Document) |
| X |
| X |
| X |
| X |
| F00F |
| Training Systems Support Procedures (Training System Support Document) |
| X |
| X |
| X |
| X |
| F00G |
| Train the Trainer (Course Conduct Information Package) |
X
| F00H |
| Pilot (Training Evaluation Document) |
X
| F00J |
| Instructional Media Source Files (Instructional Media Package) |
| X |
| X |
| X |
| X |
| CDRL TITLE |
| CLIN 0023 |
| CLIN |
CLIN
CLIN
| A001 |
| DoD Risk Management Framework (RMF) Package |
| X |
| X |
| X |
| X |
| A002 |
| Requirements Traceability Verification Matrix (RTVM) |
| X |
| X |
| X |
| X |
| A003 |
| Test Procedures (TP) |
| X |
| X |
| X |
| X |
| A004 |
| Test / Inspection Report (T/IR) |
| X |
| X |
| X |
| X |
| A005 |
| Computer Software Product End Item (CSPEI) |
| X |
| X |
| X |
| X |
| B001 |
| Technical and Management Work Plan |
| X |
| X |
| X |
| X |
| B002 |
| Integrated Program Management Report (IPMR) |
| X |
| X |
| X |
| X |
| B003 |
| Contract Work Breakdown Structure (CWBS) |
| X |
| X |
| X |
| X |
| B004 |
| Contractor’s Progress, Status and Management Report |
| B005 |
| Conference Agenda |
| X |
| X |
| X |
| X |
| B006 |
| Conference Minutes |
| X |
| X |
| X |
| X |
| B007 |
| Site Visit Plan |
| X |
| X |
| X |
| X |
| B008 |
| Operations Security (OPSEC) Plan |
| X |
| X |
| X |
| X |
| B009 |
| Vendor Integrity Statements for Software (Scientific and Technical Reports) |
| X |
| X |
| X |
| X |
| F001 |
| Appendix to Rating Domain Analysis (RDA) (Instructional Performance Requirements Document) |
| X |
| X |
| F002 |
| Appendix to Functional Requirements Document (FRD) (Scientific and Technical Report) |
| X |
| X |
| F003 |
| Training Systems Functional Description (TSFD) (Scientific and Technical Report) |
| X |
| X |
| F004 |
| Style Guide (Instructional Media Design Package) |
| X |
| X |
| F005 |
| Model Products (Instructional Media Design Package) |
| X |
| X |
| F006 |
| Lesson Design Strategy (SDIT, IFIT, PS) (Instructional Media Design Package) |
| X |
| X |
| F007 |
| On-Screen Lessons (Instructional Media Package) |
| X |
| X |
| F008 |
| Photo/Graphic Traceability Cross Reference Matrix (Scientific and Technical Reports) |
| X |
| X |
| F009* |
| CD-ROM/DVD Delivery (Instructional Media Package) |
| X |
| X |
| X |
| X |
| F00A |
| Script/Storyboard (SDIT, IFIT, PS) (Instructional Media Package) |
| X |
| X |
| F00B |
| Test Package (Test Package) |
| X |
| X |
| X |
| X |
| F00C |
| Instructor Facilitated Interactive Training Curriculum Package (IFIT, PS) (Training Conduct Support Document) |
| X |
| X |
| X |
| X |
| F00D |
| Structured On-the-Job Training (Training Conduct Support Document) |
| X |
| X |
| X |
| X |
| F00E |
| Training Course Control Document (Training Program Structure Document) |
| X |
| X |
| X |
| X |
| F00F |
| Training Systems Support Procedures (Training System Support Document) |
| X |
| X |
| X |
| X |
| F00G |
| Train the Trainer (Course Conduct Information Package) |
X
| F00H |
| Pilot (Training Evaluation Document) |
X
| F00J |
| Instructional Media Source Files (Instructional Media Package) |
| X |
| X |
| X |
| X |
| CDRL TITLE |
| CLIN 0026 |
| CLIN |
CLIN
CLIN
| A001 |
| DoD Risk Management Framework (RMF) Package |
| X |
| X |
| X |
| X |
| A002 |
| Requirements Traceability Verification Matrix (RTVM) |
| X |
| X |
| X |
| X |
| A003 |
| Test Procedures (TP) |
| X |
| X |
| X |
| X |
| A004 |
| Test / Inspection Report (T/IR) |
| X |
| X |
| X |
| X |
| A005 |
| Computer Software Product End Item (CSPEI) |
| X |
| X |
| X |
| X |
| B001 |
| Technical and Management Work Plan |
| X |
| X |
| X |
| X |
| B002 |
| Integrated Program Management Report (IPMR) |
| X |
| X |
| X |
| X |
| B003 |
| Contract Work Breakdown Structure (CWBS) |
| X |
| X |
| X |
| X |
| B004 |
| Contractor’s Progress, Status and Management Report |
| B005 |
| Conference Agenda |
| X |
| X |
| X |
| X |
| B006 |
| Conference Minutes |
| X |
| X |
| X |
| X |
| B007 |
| Site Visit Plan |
| X |
| X |
| X |
| X |
| B008 |
| Operations Security (OPSEC) Plan |
| X |
| X |
| X |
| X |
| B009 |
| Vendor Integrity Statements for Software (Scientific and Technical Reports) |
| X |
| X |
| X |
| X |
| F001 |
| Appendix to Rating Domain Analysis (RDA) (Instructional Performance Requirements Document) |
| X |
| X |
| F002 |
| Appendix to Functional Requirements Document (FRD) (Scientific and Technical Report) |
| X |
| X |
| F003 |
| Training Systems Functional Description (TSFD) (Scientific and Technical Report) |
| X |
| X |
| F004 |
| Style Guide (Instructional Media Design Package) |
| X |
| X |
| F005 |
| Model Products (Instructional Media Design Package) |
| X |
| X |
| F006 |
| Lesson Design Strategy (SDIT, IFIT, PS) (Instructional Media Design Package) |
| X |
| X |
| F007 |
| On-Screen Lessons (Instructional Media Package) |
| X |
| X |
| F008 |
| Photo/Graphic Traceability Cross Reference Matrix (Scientific and Technical Reports) |
| X |
| X |
| F009* |
| CD-ROM/DVD Delivery (Instructional Media Package) |
| X |
| X |
| X |
| X |
| F00A |
| Script/Storyboard (SDIT, IFIT, PS) (Instructional Media Package) |
| X |
| X |
| F00B |
| Test Package (Test Package) |
| X |
| X |
| X |
| X |
| F00C |
| Instructor Facilitated Interactive Training Curriculum Package (IFIT, PS) (Training Conduct Support Document) |
| X |
| X |
| X |
| X |
| F00D |
| Structured On-the-Job Training (Training Conduct Support Document) |
| X |
| X |
| X |
| X |
| F00E |
| Training Course Control Document (Training Program Structure Document) |
| X |
| X |
| X |
| X |
| F00F |
| Training Systems Support Procedures (Training System Support Document) |
| X |
| X |
| X |
| X |
| F00G |
| Train the Trainer (Course Conduct Information Package) |
X
| F00H |
| Pilot (Training Evaluation Document) |
X
| F00J |
| Instructional Media Source Files (Instructional Media Package) |
| X |
| X |
| X |
| X |
F.2 OTHER DELIVERY INFORMATION
The original of all transmittal letters, forms and documentation shall be delivered to the Procuring Contracting Officer (PCO) or designee at the following addresses:
NAWCTSD
ATTN:
Ms. Ayana Graham, Procuring Contracting Officer (PCO) Code: AIR 2.5.3.1 12211 Science Drive Orlando, FL 32826
PCO Designee:
ATTN:
Ms. Lileana Davila, Sr. Contract Specialist Code: AIR 2.5.3.1.1 12211 Science Drive Orlando, FL 32826
F.3 OPTION EXERCISE TIMEFRAMES
The Government may unilaterally exercise any or all of the Option CLINs in accordance with FAR clause 52.217-7 and within the time frames specified in the below F.3 Table, Option CLINs Exercise Timeframe Periods. After the Option CLINs are exercised, the following delivery schedule will apply and the “DELIVERY INFORMATION” will be updated accordingly:
For Content Conversion & CC Virtual Sim Software Option CLINs 0011, 1011, 0014, 1014, 0017, 1017, 0020, and 1020 delivery date is 12 months after option exercise date.
For Content Conversion & CC Virtual Sim Software Option CLINs 0023 and 1023 delivery date is 18 months after option exercise date.
For Content Conversion & CC Virtual Sim Software Option CLIN 1026 delivery date is 24 months after option exercise date.
For all Train-the-Trainer & Updates and Pilot & Updates Option CLINs 0003, 0004, 0006, 0007, 0009, 0010, 0012, 0013, 0015, 0016, 0018, 0019, 0021, 0022, 0024, 0025, 0027, and 0028, delivery date is 4 months after option exercise date.
F.3 TABLE_Option CLINs Exercise Timeframe Periods
| Option CLIN |
| Exercise Time Frame Start* |
| Exercise Time Frame End** |
| 0003 |
| 01 May 2020 |
| 01 May 2021 |
| 0004 |
| 01 September 2020 |
| 01 September 2021 |
| 0006 |
| 01 September 2020 |
| 01 September 2021 |
| 0007 |
| 01 January 2021 |
| 01 January 2022 |
| 0009 |
| 01 May 2021 |
| 01 May 2022 |
| 0010 |
| 01 September 2021 |
| 01 September 2022 |
| 0011 |
| 01 January 2020 |
| 01 January 2021 |
| 0012 |
| 01 January 2021 |
| 01 January 2022 |
| 0013 |
| 01 May 2021 |
| 01 May 2022 |
| 0014 |
| 01 January 2020 |
| 01 January 2021 |
| 0015 |
| 01 January 2021 |
| 01 January 2022 |
| 0016 |
| 01 May 2021 |
| 01 May 2022 |
| 0017 |
| 01 January 2020 |
| 01 January 2021 |
| 0018 |
| 01 January 2021 |
| 01 January 2022 |
| 0019 |
| 01 May 2021 |
| 01 May 2022 |
| 0020 |
| 01 January 2020 |
| 01 January 2021 |
| 0021 |
| 01 January 2021 |
| 01 January 2022 |
| 0022 |
| 01 May 2021 |
| 01 May 2022 |
| 0023 |
| 01 January 2020 |
| 01 January 2021 |
| 0024 |
| 01 July 2021 |
| 01 July 2022 |
| 0025 |
| 01 November 2021 |
| 01 November 2022 |
| 0027 |
| 01 May 2021 |
| 01 May 2022 |
| 0028 |
| 01 April 2022 |
| 01 April 2023 |
| 1011 |
| 01 January 2020 |
| 01 January 2021 |
| 1014 |
| 01 January 2020 |
| 01 January 2021 |
| 1017 |
| 01 January 2020 |
| 01 January 2021 |
| 1020 |
| 01 January 2020 |
| 01 January 2021 |
| 1023 |
| 01 January 2020 |
| 01 January 2021 |
| 1026 |
| 01 January 2020 |
| 01 January 2021 |
*The START date means that the Government may commence to exercise the Option CLIN on this date.
**The END date means that this is the last date in which the Government may exercise this Option CLIN.
Note that for ALL Option CLINs, the delivery date on the below “DELIVERY INFORMATION” table reflects the last date in which the Option CLIN product would be delivered after it is exercised. It does not mean it is the actual delivery date. As stated in F.3 above, these delivery dates will be updated once the Option CLIN is exercised.
SECTION H - SPECIAL CONTRACT REQUIREMENTS
SECTION H CLAUSES
H.4 - TDPC Section H.4 PRIME CONTRACTOR SUBCONTRACTING Contractors shall adhere to the TDPC H.4 clause concerning teaming arrangements. A teaming arrangement plan is required for Prime contractors in Lot 1 teaming with another Lot 1 awardee, whether the teaming is done on an exclusive basis or on a non-exclusive basis.
H.12 - TDPC Section H.12 SMALL BUSINESS SUBCONTRACTING PLAN (APPLICABLE TO LARGE BUSINESSES ONLY) Contractor shall submit its subcontracting plan according to Section H.12 of the Basic TDPC MAC and in accordance with FAR clause 52.219-9 at the time of award. (This is not a requirement for Section L and M proposal submission.)
H.13 – TDPC Section H.13 PROGRESS AND PERFORMANCE-BASED PAYMENTS AUTHORIZATION
Progress Payments are authorized for this Delivery Order.
H.14 – TDPC Section H.14 MAXIMUM PROFIT / FEE RATE
The Contracting Officer has waived the maximum profit rate for this Firm-Fixed-Priced delivery order.
Delivery Order Specific Additional Section H Information (new)
H.16 USE AND DISCLOSURE RIGHTS IN SPECIAL WORKS
(a) This delivery order contains DFARS clause 252.227-7020, “Rights in Special Works.” In accordance with DFARS clause 252.227-7020, all works produced, created, or generated under this delivery order remain the property of the Government and shall be delivered with the required Government copyright notice legend. Pursuant to DFARS sections 227.7106(b) and 227.7205(b), the Government needs to restrict the contractor’s rights to use or disclose works produced, created, or generated in the performance of this contract. Accordingly, the contractor shall not use or disclose works produced, created, or generated in the performance of this delivery order without first obtaining written approval from the contracting officer.
(b) Requests for approval shall identify the specific work to be used or disclosed, the medium to be used, and the purpose for the use or disclosure. The Contractor shall submit its request to the Contracting Officer at least thirty (30) days before the proposed date for use or disclosure.
(c) The Contractor agrees to include a similar requirement in each subcontract under this delivery order. Subcontractors shall submit requests for authorization to use or disclose works through the prime contractor to the Contracting Officer.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
LIST OF ATTACHMENTS
| Document Type |
| Description |
| Pages |
| Date |
| Attachment 1 |
| Sailor 2025 (S2025) Ready Relevant Learning (RRL) FY19 Content Conversion (CC) Statement of Work (SOW) |
| 68 |
| 13 Sep 2018 |
Attachment 1 - Appendix A
| Rating Requirements |
| 3 |
| 25 October 2018 |
| Attachment 1 - B |
| Acronym List |
| 6 |
| 29 Aug 2018 |
| Attachment 1 - C |
| Terms and Definitions |
| 15 |
| 06 Sep 2018 |
| Attachment 1 - D |
| CDRL Listing |
| 3 |
| 06 Sep 2018 |
| Attachment 1 - E |
| RRL Risk Assessment Example Format |
| 6 |
| 06 Sep 2018 |
| Attachment 1 - F |
| Conference Schedule |
| 2 |
06 Sep 2018
Amendment 02 26 Oct 2018
| Attachment 1 - G |
| Sailor 2025 RRL Performance and Training Strategies |
| 1 |
| 29 Aug 2018 |
| Attachment 1 - H |
| Sailor 2025 RRL Operational Engaging Instructional Strategies |
| 1 |
| 29 Aug 2018 |
| Attachment 1 - I |
| RRL Use of Bloom’s Taxonomy Action Verbs |
| 1 |
| 29 Aug 2018 |
| Attachment 1 - J |
| RRL content conversion Media Type Characteristics |
| 1 |
| 29 Aug 2018 |
| Attachment 1 - K |
| RRL Media Definitions |
| 4 |
| 08 Aug 2018 |
| Attachment 1 - L |
| Mobile Learning Roadmap |
| 24 |
| 29 Aug 2018 |
| Attachment 1 - M |
| xAPI Requirements |
| 56 |
| 29 Aug 2018 |
| Attachment 1 – N |
| Instructional Design Requirements |
| 3 |
06 Sep 2018
Amendment 02 26 Oct 2018
| Attachment 1 – O |
| Potential Gaps for Options |
| 7 |
| 06 Sep 2018 |
| Attachment 1 – P |
| Data Consolidation Instructions |
| 3 |
| 29 Aug 2018 |
| Attachment 1 – Q |
| RRL Single User Gaming and Simulation Guidance |
| 7 |
| 10 Sep 2018 |
| Attachment 1 – R |
| RRL Video Streaming Guidance |
| 20 |
| 24 Oct 2017 |
| Attachmetn 1 – T |
| APPENDIX T Business Rules |
| 5 |
| 26 Oct 2018 |
| Attachment 2a |
| DD 254 (Plan)_STG and STS (Secret) |
| 5 |
| 30 Aug 2018 |
| Attachment 2b |
| DD 254 (Plan)_LS, LSS, STS, ABE, ABF, ABH, A-PACT, PR, and STG |
| 5 |
| 30 Aug 2018 |
| Attachment 3 |
| Sailor 2025 RRL GFI Listing |
| 2 |
| 06 Sep 2018 |
| Attachment 4 |
| Data Item Transmission (DIT) Form |
| 1 |
| Jan 2013 |
| Attachment 5* |
| GFP List (empty) |
| See file |
| 24 Sep 2018 |
*Note that even though this attachment is included, the Government will not be providing GFP. This attachment is included for possible Contractor Acquired Property during the performance of the contract.
LIST OF EXHIBITS
| Document Type |
| Description |
| Pages |
| Date |
| Exhibit A |
| Engineering (A) CDRLs |
| 6 |
| 24 Sep 2018 |
| Exhibit B |
| Administrative (B) CDRLs |
| 12 |
| 24 Sep 2018 |
| Exhibit F |
| Training (F) CDRLs |
| 19 |
| 24 Sep 2018 |
| CDRL F003 Embedded File_Amendment02_dated 21Nov01 |
| NAVAIRWARCENTRASYSDIV INSTRUCTION 3910.4D-(Embeded file for CDRL F003) |
| 44 |
| 21 Nov 2001 |
LIST OF SECTION L ATTACHMENTS
| Document Type |
| Description |
| Pages |
| Date |
| Attachment L-1 |
| Question and Answers Form |
| 1 |
| 08 Aug 2018 |
| Attachment L-2 |
| Contractor Work Breakdown Structure (CWBS), |
| 32 |
| 30 Aug 2018 |
| Attachment L-3 |
| Technical Basis of Estimate (TBOE) (Blank) |
30 Aug 2018
Amendment 02 26 Oct 2018
| Attachment L-4 |
| Past Performance Contract Reference Worksheet |
| 3 |
| 29 Aug 2018 |
| Attachment L-5 |
| Past Performance Questionnaire (PPQ) |
| 2 |
| No Date |
| Attachment L-6 |
| Relevancy Information of the Past Performance Contract Worksheet |
| 5 |
30 Aug 2018
Amendment 02 26 Oct 2018
| Attachment L-7 |
| Government Estimate Labor Rates |
| 1 |
30 Aug 2018
Amendment 02 26 Oct 2018
| Attachment L-8 |
| TBOE Government Estimated Labor Hours |
| 51 |
| 30 Aug 2018 |
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
SECTION L
INSTRUCTIONS TO OFFERORS
| PART A: | GENERAL INSTRUCTIONS |
| 1.0 | GENERAL |
| 1.1 | Section L contains instructions on how to prepare and submit proposals in response to this solicitation. Nonconformance with these instructions may result in an unfavorable proposal evaluation and elimination from consideration for award. |
| 1.2 | The government will base its evaluation on the information presented in the offeror's proposal. The offeror has the burden to submit a proposal that convincingly demonstrates that the offeror has an accurate understanding of the requirements and the associated risks; that the offeror has viable solutions for the requirements and potential risk areas; and that the offeror is able, willing and competent to devote the resources necessary to meet the requirements. |
| 1.3 | It is the offeror’s responsibility to submit a proposal that enables government evaluators to effectively evaluate and substantiate the validity of any assertions set forth in the offeror’s proposal. Assume the government has no prior knowledge of an offeror’s facilities and experience. Accordingly, do not simply rephrase or restate the government's requirements. Statements that the offeror will provide a particular feature or objective without explaining how the offeror proposes to meet that feature or objective are generally inadequate and may adversely impact the government’s evaluation assessment of the offeror. Regurgitating the Statement of Work, any Government Instruction, guideline documents or standards are inadequate and will adversely impact the government’s evaluation assessment of the offeror. Also inadequate are the following types of statements: |
· unsupported statements that the offeror allegedly understands the requirements and risks;
· unsupported statements that the offeror allegedly can or will comply with requirements;
· unsupported statements that merely paraphrase the requirements;
· undefined or explained statements such as “best commercial practices will be used”;
· undefined or explained statements such as “standard procedures will be used”; and
· undefined or explained statements such as “well-known techniques will be employed.”
| 1.4 | Alternate proposals are not acceptable. In addition, taking exception or deviating from any term or condition of the RFP may make an offer unacceptable, and the proposal unawardable, unless the RFP expressly authorizes such an exception or deviation with regard to that specific term or condition. |
| 1.5 | There is no need to repeat information in the same volume or in more than one volume. If an overlap exists, the detailed information should be included in the most logical place and summarized and referenced in other areas. With the exception of the Price or Past Performance Volumes, no cost or pricing information should appear in any volume. |
| 2.0 | PROPOSAL FORMAT |
Written proposals must be formatted using a Times New Roman 12-point normal font, no reduction permitted, single-spaced, 1-inch margins all around, and formatted for standard 8.5 x 11 inch paper. All pages should be numbered. When foldout pages are used, they must not exceed 11 x 17 inches and will be counted as 1 page. Drawings may be provided separately and may be any size, with font of any size, but should be folded to approximately 8.5 x 11 inch standard size and will count as 1 page. Graphs, drawings, graphics, tables and figures shall be presented in no smaller than a 10-point font. The Technical Volume’s CWBS and TBOE may not be smaller than 10-point font and it is preferred in a 11 x 17 inches paper.
| 3.0 | PROPOSAL VOLUMES |
| 3.1 | All proposals must be UNCLASSIFIED. Each volume of the proposal shall be submitted as one paper original with additional paper and separate Compact Disk Read-Only Memory (CD-ROM) copies as specified in the table below. |
| 3.2 | The separate CD-ROM copy of the Technical Volume and the separate CD-ROM copy of the Past Performance Volume must be fully compatible with Microsoft Office 2016. Do not submit in .pdf format. For information not supported by Microsoft Office products (e.g., drawings), the offeror must provide the information in portable document format (.pdf) using the latest Adobe Acrobat reader on each CD-ROM. The separate CD-ROM copy of the Price Volume must be provided in or be fully compatible with Microsoft Office 2016 Word and Excel format, with spreadsheets unprotected and showing all computations and formulas. Each separate CD-ROM is to be labeled for content and the offeror’s name. If a discrepancy exists between the original paper version of the proposal and a CD-ROM “copy,” the paper original will take precedence. |
| 3.3 | Page limitations for each volume are specified in the table below. Proposal pages beyond the specified limit will not be evaluated. Title/cover pages, table of contents, lists of figures/tables, divider tabs, and worksheets do not count towards the page limit. In addition, the CWBS and TBOE Attachments to be completed by the offeror do not count towards the page limit. |
| Volume Number |
| Volume Title |
| Page Limit |
| Copies Required |
| 1 |
| TECHNICAL |
| 25 pages |
| 1 Paper Original |
4 Paper Copies 1 CD-ROM Copy
| 2 |
| PAST PERFORMANCE |
| As needed |
(no page limit) 1 Paper Original 4 Paper Copies/ 1 CD-ROM Copy
(no page limit) 1 Paper Original 4 Paper Copies 1 CD-ROM Copy
4.0 SOLICITATION QUESTIONS
Questions regarding this solicitation shall be submitted in writing with the use of Attachment L-1. Each question or comment should reference the applicable document, page number, and paragraph number. Do not include any proprietary information in your question, because the government will provide the question and answer to all potential offerors. All questions must be submitted for the solicitation no later than 12:00 pm EDT on 04 October 2018 to Lileana Davila, Contract Specialist, at (407) 380-4023, lileana.davila@navy.mil and carbon copy Mr. Mike Weaver at (407) 380-8122, michael.e.weaver@navy.mil. The government is under no obligation to try to answer questions received after that date, but may answer the question if time permits.
| 5.0 | PROPOSAL SUBMISSION |
| 5.1 | Clearly mark all packages with the solicitation number. The submission date for the proposal shall be no later than the date and time specified in Block 9 of Standard Form 33 of the RFP. Offerors shall not submit proposals by facsimile or via email. |
| 5.2 | Proposals Submitted by Commercial Carrier: Offerors shall submit proposals via United States Postal Service or through a commercial carrier using the following address: |
Naval Air Warfare Center Training Systems Division Code: AIR-2.5.3.1.1 Lileana Davila Tel. (407)380-4023 12211 Science Drive Orlando, FL 32826 Solicitation Number: N6134018R0027
| 5.3 | Hand Carried Proposals: Hand carried proposals must be delivered to the address above, attention Lileana Davila, 407-380-4023. If a proposal or amendment is hand carried, the offeror must submit a written visit request no later than three business days prior to the proposal due date. Without the visit request, the offeror may not get beyond the installation security gate to deliver its proposal. Guards are not authorized to accept proposals. A visit request may be obtained by contacting Lileana Davila, Contract Specialist, at (407) 380-4023, lileana.davila@navy.mil. Upon arrival to NAWCTSD, please contact Lileana Davila from the lobby phone. In the event that Ms. Davila is not available, please contact the alternate point of contact, Mr. Mike Weaver, at (407) 380-8122 or Mr. Reuel Dunn at 407-380-4843. |
| 5.4 | Late Proposals: |
(a) Definitions. As used in this provision— “Proposal modification” is a change made to a proposal before the solicitation’s closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.
“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer.
“Time,” if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
(c) Submission, modification, revision, and withdrawal of proposals. Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the government office designated in the solicitation by the time specified in the solicitation.
(1) Any proposal, modification, or revision received at the government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition, and—
(i) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or
(ii) There is acceptable evidence to establish that it was received at the government installation designated for receipt of offers and was under the government’s control prior to the time set for receipt of offers; or
(iii) It is the only proposal received.
| (2) | However, a late modification of an otherwise successful proposal that makes its terms more favorable to the government will be considered at any time it is received and may be accepted. |
| (3) | Acceptable evidence to establish the time of receipt at the government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of government personnel. |
| (4) | If an emergency or unanticipated event interrupts normal government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal government processes resume. |
| (5) | Proposals may be withdrawn by written notice received at any time before award. |
| (6) | Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award. |
| (7) | Offerors may submit revised proposals only if requested or allowed by the Contracting Officer. |
| (8) | Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer. |
(9) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding delivery order without further action by either party.
5.5 Restriction on Disclosure and Use of Data: Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the government except for evaluation purposes, shall—
(a) Mark the title page with the following legend:
This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed—in whole or in part—for any purpose other than to evaluate this proposal. If, however, a delivery order is awarded to this offeror as a result of — or in connection with — the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting delivery order. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and
(b) Mark each sheet of data it wishes to restrict with the following legend:
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
6.0 PROPOSAL PACKAGING
The offeror shall package the proposal volumes in cartons or equivalent packaging containers in the most efficient manner possible, grouping like-volumes to the maximum extent possible. Each container shall be single-person portable. One container shall include all original proposal volumes. Each box shall include a packing slip detailing the contents, to include the solicitation number, volume number, title, and copy number. Also, each box should be stamped or marked “For Official Use Only.”
| PART B: | SPECIFIC INSTRUCTIONS |
| 1.0 | VOLUME 1: TECHNICAL |
The offeror shall provide the information below. This volume shall not contain any reference to cost or price aspects of the offer.
| 1.1 | As set forth in Section M of the solicitation, the government is only evaluating each offeror’s technical approach to delivering the products under CLINs 0005, 0006, 0007, 0026, 0027, 0028, and 1026. The government is evaluating the offeror’s Contractor Work Breakdown Structure (CWBS) and Technical Basis of Estimate (TBOE) for each of the CLINs identified above using, as a baseline, the government’s Work Breakdown Structure (WBS) and the government’s TBOE for each CLIN. The government’s WBS for each CLIN is found at Attachment L-2. The government’s TBOE for each CLIN is found at Attachment L-8. The offeror is required to submit its own CWBS and to complete the offeror’s TBOE found at Attachment L-3. |
| 1.2 | The government’s baselines at WBS, Attachment L-2, and TBOE, Attachment L-8, are nothing more than starting points so that an offeror can explain its approach and how and why the offeror’s proposed approach, labor hours, and labor categories differ from the government’s baselines. The offeror’s discussions and rationales as to why the offeror’s proposed approach for each rating CLIN differs from the government’s WBS and TBOE baseline for each rating CLIN gives the government evaluators something more tangible to evaluate. The government’s use of its WBS and TBOE as a starting point for evaluation is in no way a direct or indirect inference that the government’s WBS and TBOE is a preferred approach. |
| 1.3 | As a result, offerors are required to provide separate CWBS and TBOE worksheets for each of the following CLINs pertaining to the Logistics Specialist Submarine rating and the Sonar Technician Surface rating: 0005, 0006, 0007, 0026, 0027, 0028, 1026. Offerors shall describe the instructional systems and systems engineering technical approaches, labor categories, and number of labor hours the offerors plan to use to deliver the multiple products that are deliverable, for each rating, under each CLIN and planned travel to accomplish the effort. Offerors shall describe the processes, steps, and activities the offeror plans to use to complete requirements, for each rating, under each CLIN. Offerors need to discuss any assumptions, estimating methods, and historical analogous data the offeror uses to determine the offeror’s technical approach. “Historical experience” or “subject matter expert estimate” do not provide the level of detail sought by this RFP. Ensure the offeror’s CWBSs and TBOEs are unprotected. | |
| 1.4 | The offeror shall provide a CWBS for the LSS rating (CLINs 0005, 0006, 0007), the STG rating (CLINs 0026, 0027, 0028), and the STG Virtual Simulation Software (CLIN 1026). | |
| a. | Use the Government provided WBS, Attachment L-2, as a baseline. |
| b. | Complete the CWBS in Microsoft Excel format with font no smaller than 10-point font |
| c. | Complete the CWBS to Level III |
· Level I – requirements in SOW 170012 Section 3
· Level II – corresponding subsections to Level I requirements
· Level III – processes/steps proposed to meet Level II requirements
| 1.5. | The offeror shall provide a separate TBOE, Attachment L-3, worksheet for each of the following CLINs: 0005, 0006, 0007, 0026, 0027, 0028, and 1026. |
| a. | Complete the Government provided TBOE, Attachment L-3, for each of the CLINs for the LSS and STG ratings |
| b. | Complete in Microsoft Excel format with font no smaller than 10-pont font |
| c. | Follow the directions on the “Instructions” tab of the Attachment L-3 TBOE |
| d. | Complete Summary, the CLIN TBOEs, Travel, Labor Categories Rationale, and Labor Categories Roles and Responsibilities tabs |
| e. | Include TBOE information for the prime and subcontractors |
| f. | For all products identified: |
· Provide activities planned to complete requirements (Column B)
· Identify CWBS level (Column C)
· Trace to CLIN (Column D)
· Identify Quantity of Courseware (in hours) (Column E)
· Identify Quantity of Non-Courseware (in hours (Column F)
· Trace to Tech Approach Para in proposal paragraph (Column G)
· Trace to SOW Para (Column H)
· Trace to CDRLs (Column I)
· Provide labor categories required to complete requirements for analysis, design, development, implementation, and testing
· For the Prime provide labor categories in Columns J-Y
· For subcontractor provide labor categories in Columns AA-AP
· Copy and paste Columns AA-AP, as needed for additional subcontractors
· Identify associated fiscal year for labor categories (Column Z)
· Identify the fiscal year calendar if different from government fiscal year calendar
· Add/Edit/Delete labor categories (Columns J-Y and AA-AP) as needed
· Provide rationale for adding/editing/deleting labor categories (Columns J-Y and AA-AP) identified in Government provided TBOE, Attachment L-3 on the Labor Categories Rationale tab
· Identify applicable rating tab that the labor category change occurs on (Column A)
· Identify the applicable rating tab column that the labor category change occurs on (Column B)
· Identify the original labor category (Column C)
· Identify the Action taken to the labor category (Column D)
· Identify the new labor category, if applicable (Column E)
· Provide rationale for labor category change (Column F)
· Provide roles and responsibilities for each labor category (Columns J-Y and AA-AP) on the Labor Categories R&R tab
· Identify the Labor Category (Column A)
· Identify the Role and Responsibility of the Labor Category (Column B)
· Sum up labor categories by hours, instructional strategy, and product
· Provide proposed travel on the Travel tab for each rating, identifying
· The corresponding Process/Product (Column A)
· If the trip is an Instructional Design or Systems Engineering trip (Column B)
· The applicable School (Column C)
· The Type of Trip (Column D)
· The Number of Trips (Column E)
· The Number of People per Trip (Column F)
· The Number of Days per Trip (Column G)
· The Total Number of Days (Column H)
· The Destination (Column I)
· The airport the team will fly into (Column J)
| 1.6 | Summary Labor Totals - Using the offeror’s CWBS’s and TBOE’s, separately provide the total number of labor hours as requested below: |
This is the start of the file's text. The full file is on GovTribe.