A8 CDRL A001 A002 A003.pdf
PDF 379 KB Posted
- Solicitation number
- N61331-25-T-TB03
About this file
This is a Contract Data Requirements List (CDRL) Form DD 1423-1 containing three data items (A001-A003) for a tower inspection contract at Beach Site 4 with International Towers LLC (contract number 1301201864).
The CDRL requires three deliverables: 1) A High Hazard Operations Form due 5 business days after contract award, with government review within 5 days and contractor resubmittal within 3 days if needed; 2) ECATTS Training Certificates and Personnel Training Roster due 5 business days after award with updates required upon completion of training by personnel working at NSWC PCD; and 3) An Inspection Report due 14 calendar days after completion of inspection. All deliverables must be submitted in Microsoft Office 365 compatible format via email to NSWC PCD Code 1022, with distribution limited per Statement of Work requirements. The contractor format is acceptable for all items but must follow the general guidance of the referenced Data Item Descriptions (DIDs).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C12 Service Clauses.pdf | ||
| A5 SOW Signed Final.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 1 of 3 Pages
1161/183
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Tower Inspection at Beach Site 4 1301201864 International Towers LLC
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001 Scientific and Technical Reports Summary High Hazard Operations Form
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80048 SOW para. 4.8.1 NSWC PCD Code 1022 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT
REQUIRED
ONE/R SEE BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft Final
A SEE BLK 16 N/A SEE BLK 16 Reg Repro
16. REMARKS
NSWC PCD Code 1022 0 1 0
Blk 4: The DID is cited for guidance as to content only. Contractor format is acceptable.
Blk 8, 10, 12, 13: Submittal due 5 business days after award of contract. The
Government will approve or provide written comments within 5 business days of initial submittal. If re-submittal is required, the Contractor shall re-submit within 3 business days of receipt of comments from the Government.
Blk 9: Technical Documents generated under this contract shall carry the Distribution
Limitation Statement in the Statement of Work. Word- processing/electronic files shall have the statement included in the file such that the first page of any resultant hard copy shall display the statement.
Blks 14: MEDIA Requirements: Microsoft Office 365 compatible files via e-mail. E-mail addresses will be provided at award.
LT ONLY
NSWC PCD Code 024
15. TOTAL 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
NSWC PCD Code 1022 See Section G. Jason Zimmerman, NSWC PCD Code 02T See Section I.
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 2 of 3 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Tower Inspection at Beach Site 4 1301201864 International Towers LLC
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A002 Engineering and Technical Services Accomplishment Report ECATTS Training Certificates and Personnel
Training Roster
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80048 SOW Para. 4.8.2 NSWC PCD Code 1022 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT
REQUIRED
ONE/P SEE BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft Final
N/A SEE BLK 16 N/A SEE BLK 16 Reg Repro
16. REMARKS
NSWC PCD Code 1022 0 1 0
Blk 4: The DID is cited for guidance as to content only. Contractor format is acceptable, but shall conform to the general requirements of DI-MGMT-80061A. Adherence to
Section 7.2 is not required.
Blk 8, 10, 12, 13: Initial Submittal due 5 business days after award of contract.
Updates are due upon completion of training by all individuals who will work at NSWC
PCD.
Blk 9: Technical Documents generated under this contract shall carry the Distribution
Limitation Statement in the Statement of Work. Word- processing/electronic files shall have the statement included in the file such that the first page of any resultant hard copy shall display the statement.
Blks 14: MEDIA Requirements: Microsoft Office 365 compatible files via e-mail. E-mail addresses will be provided at award.
LT ONLY
NSWC PCD Code 024
15. TOTAL 0 1 0
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 3 of 3 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Tower Inspection at Beach Site 4 1301201864 International Towers LLC
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A003 Scientific and Technical Reports Summary Inspection Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80048 SOW Para. 5.1 NSWC PCD Code 1022 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT
REQUIRED
ONE/P SEE BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft Final
N/A SEE BLK 16 N/A SEE BLK 16 Reg Repro
16. REMARKS
NSWC PCD Code 1022 0 1 0
Blk 4: The DID is cited for guidance as to content only. Contractor format is acceptable.
Blk 8, 10, 12, 13: Submittal due 14 calendar days after completion of inspection.
Blk 9: Technical Documents generated under this contract shall carry the Distribution
Limitation Statement in the Statement of Work. Word- processing/electronic files shall have the statement included in the file such that the first page of any resultant hard copy shall display the statement.
Blks 14: MEDIA Requirements: Microsoft Office 365 compatible files via e-mail. E-mail addresses will be provided at award.
LT ONLY
NSWC PCD Code 024
15. TOTAL 0 1 0
| 2024-10-29T10:10:28-0500 | |
| ZIMMERMAN.JASON.T.1285268890 |
| 2024-10-29T10:10:39-0500 | |
| ZIMMERMAN.JASON.T.1285268890 |
| 2024-10-29T10:10:50-0500 | |
| ZIMMERMAN.JASON.T.1285268890 |
| 2024-10-29T10:47:30-0500 | |
| LEE.RANDALL.KIRK.1501045973 |
| 2024-10-29T10:47:51-0500 | |
| LEE.RANDALL.KIRK.1501045973 |
| 2024-10-29T10:48:19-0500 | |
| LEE.RANDALL.KIRK.1501045973 |