This document is a Contract Data Requirements List (CDRL) for a corporate operations support services contract. The CDRL outlines eleven required data items to be delivered by the contractor in support of various tasks under the contract. These include technical reports, documentation, analyses, studies, presentation materials, graphics, photographs, and videos related to facilities management, security programs, property management, program analysis, and travel. The data items must be delivered in Microsoft Office or PDF format via email to recipients specified by the contracting agency. The contractor must submit initial drafts within five days of receiving guidance from the government and incorporate any feedback, submitting final versions within two days of receiving comments. All data is subject to government review and approval and must be properly marked and safeguarded in accordance with the contract terms.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NSWC PCD Corporate Operations Support
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001 Technical Report – Study/Services Facilities Management Documentation and Reports
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80508B PWS Para 3.1 and subparagraphs NSWC PCD Code 10 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED ASREQ SEE BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft Final
A SEE BLK 16 SEE BLK 16 Reg Rep
16. REMARKS SEE BLK 16 1 1 0
Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.
Blks 8,10,12,13: Provide initial submittal within 5 days after receipt of GFI requiring generation of the data or identification of need to submit the data unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.
Government comments shall be incorporated and the data resubmitted as final within 2 days after receipt of comments.
Blk 9: Data shall be marked in accordance with PWS paragraph 8.0
Blk 14: MEDIA requirement: Copy shall be provided via e-mail in MS Office™ 2016 compatible files. E-mail addresses for recipients will be provided with the funding for each position.
(LT ONLY)
NSWC PCD Code 022
NSWC PCD COR
15. TOTAL 1 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
NSWC PCD Code 1063
01/21/2020
W.T. Sawyer, NSWC PC Code 0213
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 1 of 11 Pages 1161/183
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.
A TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NSWC PCD Corporate Operations Support
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A002 Commercial Engineering Design Data and Associated Lists Furniture Layout Drawings and Sketches
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-81003F PWS Para 3.2(b) NSWC PCD Code 10 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED ASREQ SEE BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft Final
A SEE BLK 16 SEE BLK 16 Reg Rep
16. REMARKS SEE BLK 16 1 1 0
Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.
Blks 8,10,12,13: Provide initial submittal within 5 days after receipt of GFI requiring generation of the data or identification of need to submit the data unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.
Government comments shall be incorporated and the data resubmitted as final within 2 days after receipt of comments.
Blk 9: Same as A002
Blk 14: MEDIA requirement: Copy shall be provided via e-mail in Autocad or Adobe .pdf compatible files. E-mail addresses for recipients will be provided with the funding for each position.
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 2 of 11 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.
A TDP TM OTHER ADMN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NSWC PCD Corporate Operations Support
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A003 Presentation Materials
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-ADMN-81373 PWS Para 3.2 and subparagraphs NSWC PCD Code 10 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED ASREQ SEE BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft Final
A SEE BLK 16 SEE BLK 16 Reg Rep
16. REMARKS SEE BLK 16 1 1 0
Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.
Blks 8,10,12,13: Provide initial submittal within 5 days after receipt of GFI requiring generation of the data or identification of need to submit the data unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.
Government comments shall be incorporated and the data resubmitted as final within 2 days after receipt of comments.
Blks 9, 14: Same as A002.
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 3 of 11 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NSWC PCD Corporate Operations Support
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A004 Technical Report – Study/Services Multi-Media Graphics Scheduling, Documentation, and Products
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80508B PWS Para 3.2 and subparagraphs NSWC PCD Code 10 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED ASREQ SEE BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft Final
A SEE BLK 16 SEE BLK 16 Reg Rep
16. REMARKS SEE BLK 16 1 1 0
Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.
Blks 8,10,12,13: Provide initial submittal within 5 days after receipt of GFI requiring generation of the data or identification of need to submit the data unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.
Government comments shall be incorporated and the data resubmitted as final within 2
Blks 9, 14: Same as A002
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 4 of 11 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.
A TDP TM OTHER ADMN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NSWC PCD Corporate Operations Support
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A005 Presentation Material Still Photo Coverage and Photographic Products
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-ADMN-81373 PWS Para 3.2 and subparagraphs NSWC PCD Code 10 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED ASREQ SEE BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft Final
A SEE BLK 16 SEE BLK 16 Reg Rep
16. REMARKS SEE BLK 16 1 1 0
Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.
Blks 8,10,12,13: Provide initial submittal within 5 days after receipt of GFI requiring generation of the data or identification of need to submit the data unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.
Government comments shall be incorporated and the data resubmitted as final within 2 days after receipt of comments.
Blk 9: Same as A002
Blk 14: Copy shall be provided via e-mail in .pdf or .jpg files. E-mail addresses for recipients will be provided with the funding for each position.
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 5 of 11 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NSWC PCD Corporate Operations Support
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A006 Technical Videotape Presentation Multi-Media Graphics Video Products
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-81275 PWS Para 3.2 and subparagraphs NSWC PCD Code 10 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED ASREQ SEE BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft Final
A SEE BLK 16 SEE BLK 16 Reg Rep
16. REMARKS SEE BLK 16 1 1 0
Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.
Blks 8,10,12,13: Provide initial submittal within 5 days after receipt of GFI requiring generation of the data or identification of need to submit the data unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.
Government comments shall be incorporated and the data resubmitted as final within 2 days after receipt of comments.
Blk 9: Same as A002.
Blk 14: Copy shall be provided via e-mail in a format agreed upon by the Contractor and the Government. E-mail addresses for recipients will be provided with the funding for each position.
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 6 of 11 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NSWC PCD Corporate Operations Support
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A007 Technical Report – Study/Services Security Special Programs Support Documentation and Reports
DI-MISC-80508B PWS Para 3.3 and subparagraphs NSWC PCD Code 10 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED ASREQ SEE BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft Final
A SEE BLK 16 SEE BLK 16 Reg Rep
16. REMARKS SEE BLK 16 1 1 0
Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.
Blks 8,10,12,13: Provide initial submittal within 5 days after receipt of GFI requiring generation of the data or identification of need to submit the data unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.
Government comments shall be incorporated and the data resubmitted as final within 2
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 7 of 11 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NSWC PCD Corporate Operations Support
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A008 Technical Report – Study/Services Management Internal Control and Records Management Analyses, White Papers, Studies, and Support Documentation
DI-MISC-80508B PWS Para 3.4 and subparagraphs NSWC PCD Code 10 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED ASREQ SEE BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft Final
A SEE BLK 16 SEE BLK 16 Reg Rep
16. REMARKS SEE BLK 16 1 1 0
Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.
Blks 8,10,12,13: Provide initial submittal within 5 days after receipt of GFI requiring generation of the data or identification of need to submit the data unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.
Government comments shall be incorporated and the data resubmitted as final within 2
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 8 of 11 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NSWC PCD Corporate Operations Support
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A009 Technical Report – Study/Services Input to Property Management (Materials and Equipment) Documentation, Analyses, Studies, and Reports
DI-MISC-80508B PWS Para 3.5 and subparagraphs NSWC PCD Code 10 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED ASREQ SEE BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft Final
A SEE BLK 16 SEE BLK 16 Reg Rep
16. REMARKS SEE BLK 16 1 1 0
Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.
Blks 8,10,12,13: Provide initial submittal within 5 days after receipt of GFI requiring generation of the data or identification of need to submit the data unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.
Government comments shall be incorporated and the data resubmitted as final within 2
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 9 of 11 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NSWC PCD Corporate Operations Support
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A010 Technical Report – Study/Services Management and Program Analysis Documentation, Analyses, Studies, and Reports
DI-MISC-80508B PWS Para 3.6 and subparagraphs NSWC PCD Code 10 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED ASREQ SEE BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft Final
A SEE BLK 16 SEE BLK 16 Reg Rep
16. REMARKS SEE BLK 16 1 1 0
Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.
Blks 8,10,12,13: Provide initial submittal within 5 days after receipt of GFI requiring generation of the data or identification of need to submit the data unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.
Government comments shall be incorporated and the data resubmitted as final within 2
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 10 of 11 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NSWC PCD Corporate Operations Support
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A011 Technical Report – Study/Services Travel Documentation and Reports
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80508B PWS Para 3.8 and subparagraphs NSWC PCD Code 10 18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED ASREQ SEE BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft Final
A SEE BLK 16 SEE BLK 16 Reg Rep
16. REMARKS SEE BLK 16 1 1 0
Blk 4: Contractor format is acceptable unless otherwise specified by the Government – DID is cited for guidance only as to content.
Blks 8,10,12,13: Provide initial submittal within 5 days after receipt of GFI requiring generation of the data or identification of need to submit the data unless otherwise specified by the Government. The Government will review for approval of technical content and will provide review comments if required within 3 days after receipt.
Government comments shall be incorporated and the data resubmitted as final within 2
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 11 of 11 Pages