Attachment_J.7_Personnel_Certification_Requirements.docx
DOCX document 17 KB Posted
- Solicitation number
- N61331-16-R-0006
About this file
Attachment J.7 - Personnel Certification Requirements
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N61331-16-R-0006_Amendment_4.pdf | ||
| Attachment_J.4_Revised_Desired_Qualifications-6-8-16.pdf | ||
| N61331-16-R-0006_Amendment_3.pdf | ||
| N61331-16-R-0006_Amendment_2.pdf | ||
| Attachment_J.4_Revised_Desired_Qualifications-6-3-16.pdf | ||
| N61331-16-R-0006_Amend_1.pdf | ||
| N61331-16-R-0006_LCAC-SSC_Maint_Final_RFP.pdf | ||
| Attachment_J.6_Staffing_Plan_With_Cost.xls | XLS spreadsheet | |
| Attachment_J.5_Staffing_Plan_Without_Cost.xls | XLS spreadsheet | |
| Attachment_J.2_Cost_Summary_Format.xls | XLS spreadsheet | |
| Attachment_J.4_Desired_Qualifications.docx | DOCX document | |
| Attachment_J.1_DD_Form_254.pdf | ||
| Exhibit_A_CDRL.doc | DOC document | |
| Attachment_J.3_Supporting_Cost_Data.xls | XLS spreadsheet |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment J.7 N61331-16-R-0006
PERSONNEL CERTIFICATION REQUIREMENTS
All LCAC maintenance personnel shall obtain certification in Cardiopulmonary Resuscitation (CPR) within 30 days after date of award and shall subsequently maintain the certification throughout the period of performance of the Task Order.
LCAC maintenance personnel required to handle and maintain LCAC Halon fire extinguisher cartridges shall obtain certification within 30 days after award as Non-Nuclear Ordnance and Explosives handlers per PWS Section 2.3(b) and 2.3(c) prior to performing Ammunition & Explosives (A&E) tasks under this contract.
Contractor personnel performing as welders shall have NAVSEA S9074-AQ-GIB-010/248 (PWS Section 2.3(h)) certifications in welding techniques for Aluminum, Stainless Steel, and Inconel. The Contractor shall maintain training records associated with weld and solder qualifications for the following types of welding and materials:
Gas Metal Arc Welding (GMAW) (MIG Welding) Type Metal: Aluminum 5456-H116 Thickness: 3/8" Plate Welding Wire: 5556 Positions: Horizontal (2G), Uphill (3G), and Overhead (4G)
Gas Tungsten Arc Welding (GTAW) (TIG Welding) Type Metal: Aluminum 5456-H116 Thickness: 1/8" Plate Welding Wire: 5556 Positions: 2G, 3G, and 4G
Gas Tungsten Arc Welding (GTAW) (TIG Welding) Type Metal: Stainless Steel 316L Thickness: 1/8" Plate Welding Wire: 316L Positions: 2G, 3G, and 4G
Gas Tungsten Arc Welding (GTAW) (TIG Welding) Type Metal: A286 Thickness: .050" Plate Welding Wire: ER NiCrFe-6 Position: 2G, 3G, and 4G
Gas Tungsten Arc Welding (GTAW) (TIG Welding) Type Metal: 625 INCONEL Thickness: .049" TUBE Welding Wire: ER NiCrFe-6 Position: 45 degree fixed (6G)
LCAC maintenance personnel operating a forklift shall be certified in accordance with Occupational Safety and Health Administration (OSHA) regulations (1910.178) and meet the licensing and training requirements of Sections 6 through 9 of NAVFAC P-307 (as applicable) and medical requirements of NAVSUP P-538. Certified overhead crane operators will be required to take a training course titled CAT 3 (non-cab) crane safety NCC-C3CS-1.0 after contract award. Contractor personnel who have current overhead bridge crane and fork lift truck operator permits must be approved by Naval Support Activity Panama City (NSA PC) prior to the operation of said equipment anywhere onboard NSA PC or NSWC PCD.
Ramp Marshalls and safety personnel for LCAC operations shall be certified in accordance with Safe Engineering and Operation (SEAOPS) Manual for LCAC, Volume 1.
Deck mechanics are required to pass a written test and a check ride conducted by an active duty Assault Craft Unit training crew. Certification will then be issued by NSWC PCD.
File details come from the government source that posted it. Updated .