26Q0045_Itemized_Pricing_Sheet_rev1.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
Commercial Industrial Services (CIS) Scaffolding - USS JOHN P. MURTHA (LPD-26) and USS PRINCETON (CG-59)
Solicitation number
N5523626Q0045
Issued by

About this file

This is an Itemized Pricing Sheet for a scaffolding services solicitation covering two U.S. Navy vessels: USS John P. Murtha (LPD-26) and USS Princeton (CG-53). The requirement involves providing labor, services, equipment, and materials for on-load, assembly, certification, modification, disassembly, and offload of fixed and hanging scaffolding with fall protection capabilities. For USS John P. Murtha, the contract period runs from February 23 to March 7, 2026, with 12 line items covering various scaffolding configurations ranging from 5 feet wide by 10 feet long by 6.5 to 26 feet in height, available for daily and weekly rental periods, plus crane services and manual labor for assembly and disassembly. For USS Princeton, the contract period runs from February 20 to March 8, 2026, with 16 additional line items including similar scaffolding specifications, shrink wrap containment services for antenna work, and six scaffolding setup changes to accommodate gas turbine inspector requirements, totaling 28 line items across both vessels.

The solicitation is issued as a Total Small Business Set-Aside under NAICS 238990 (All Other Specialty Trade Contractors), making large businesses ineligible for award. Evaluation will be conducted on a Lowest Price Technically Acceptable (LPTA) basis. All unit prices and extended prices in the current pricing sheet are listed as $0.00, indicating this is a template requiring offerors to complete pricing. Quotes must be submitted to Samantha Toles (primary) and Dayen Lagunas (secondary) at the Naval Sea Systems Command no later than February 19, 2026 at 1400 Pacific Time, along with completed technical documentation. Questions must be submitted via Request for Specification Clarification Form by February 18, 2026 at 0800 PST.

View the file

Other files

File Type Posted
26Q0045_SOW_JPM.pdf PDF
26Q0045_RFC_rev1.docx DOCX document
Amendment_0001.pdf PDF
26Q0045_SOW_PRN.pdf PDF
RFQ_26Q0045_rev1.pdf PDF
26Q0045_SF18.pdf PDF
26Q0045_SOW.pdf PDF
26Q0045_RFC.docx DOCX document
26Q0045_Itemized_Pricing_Sheet.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JOHN P. MURTHA

ITEMIZED PRICING SHEET
CONTRACTSCAFFOLDING
CONTRACT NO:TBD
CONTRACTOR:TBD
SHIP:USS JOHN P. MURTHA (LPD-26)
LOCATION:NAVY REGION SOUTHWEST
JSNLOCATIONEAUNIT PRICEEXT PRICE
CSE1-L03504-102-0-Q, AFT MAST AEMS AND UP TO CROWS NEST
(1 EACH FOR 6 DAYS)6

ITEMIZED PRICING 0001

PROVIDE LABOR, SERVICES AND MATERIALS TO ERECT:

FIXED SCAFFOLDING

DAILY RENTAL SIZE:

5 FEET WIDE X 10 FEET LENGTH X 6.5 FEET HEIGHT 6 $0.00 $0.00

JSNLOCATIONEAUNIT PRICEEXT PRICE
CSE2-L03004-102-0-Q, AFT MAST AEMS AND UP TO CROWS NEST
(2 EACH FOR 6 DAYS)12

ITEMIZED PRICING 0002

PROVIDE LABOR, SERVICES AND MATERIALS TO ERECT:

FIXED SCAFFOLDING

DAILY RENTAL SIZE:

5 Feet Wide X 10 Feet Length X 19.5 Feet Height 12 $0.00 $0.00

JSNLOCATIONEAUNIT PRICEEXT PRICE
CSE2-L03004-102-0-Q, AFT MAST AEMS AND UP TO CROWS NEST
(2 EACH FOR 6 DAYS)24

ITEMIZED PRICING 0003

PROVIDE LABOR, SERVICES AND MATERIALS TO ERECT:

FIXED SCAFFOLDING

DAILY RENTAL SIZE:

5 Feet Wide X 10 Feet Length X 26 Feet Height 24 $0.00 $0.00

JSNLOCATIONEAUNIT PRICEEXT PRICE
CSE2-L03004-102-0-Q, AFT MAST AEMS AND UP TO CROWS NEST
(1 EACH FOR 1 WEEK)1

ITEMIZED PRICING 0004

PROVIDE LABOR, SERVICES AND MATERIALS TO ERECT:

FIXED SCAFFOLDING

WEEKLY RENTAL SIZE:

5 Feet Wide X 10 Feet Length X 6.5 Feet Heigh 1 $0.00 $0.00

JSNLOCATIONEAUNIT PRICEEXT PRICE
CSE2-L03004-102-0-Q, AFT MAST AEMS AND UP TO CROWS NEST
(2 EACH FOR 1 WEEK)2

ITEMIZED PRICING 0005

PROVIDE LABOR, SERVICES AND MATERIALS TO ERECT:

FIXED SCAFFOLDING

WEEKLY RENTAL SIZE:

5 Feet Wide X 10 Feet Length X 19.5 Feet Height 2 $0.00 $0.00

JSNLOCATIONEAUNIT PRICEEXT PRICE
CSE2-L03004-102-0-Q, AFT MAST AEMS AND UP TO CROWS NEST
(2 EACH FOR 1 WEEK)4

ITEMIZED PRICING 0006

PROVIDE LABOR, SERVICES AND MATERIALS TO ERECT:

FIXED SCAFFOLDING

WEEKLY RENTAL SIZE:

5 Feet Wide X 10 Feet Length X 26 Feet Height 4 $0.00 $0.00

JSNLOCATIONEAUNIT PRICEEXT PRICE
CSE2-L03004-102-0-Q, AFT MAST AEMS AND UP TO CROWS NEST
(1 EACH FOR 6 DAYS)1

ITEMIZED PRICING 0007

PROVIDE LABOR, SERVICES AND MATERIALS TO ERECT:

HANGING SCAFFOLDING

DAILY RENTAL SIZE:

5 Feet Wide X 10 Feet Length X 6.5 Feet Height 1 $0.00 $0.00

JSNLOCATIONEAUNIT PRICEEXT PRICE
CSE2-L03004-102-0-Q, AFT MAST AEMS AND UP TO CROWS NEST

(1 EACH FOR 1 WEEK)

ITEMIZED PRICING 0008

PROVIDE LABOR, SERVICES AND MATERIALS TO ERECT:

HANGING SCAFFOLDING

WEEKLY RENTAL SIZE:

5 Feet Wide X 10 Feet Length X 6.5 Feet Height 1 $0.00 $0.00

JSNLOCATIONHRUNIT PRICEEXT PRICE
CSE2-L030CRANE SERVICES12

ITEMIZED PRICING 0009

PROVIDE CRANE SERVICES TO ONLOAD SCAFFOLDING 12 $0.00 $0.00

JSNLOCATIONHRUNIT PRICEEXT PRICE
CSE2-L030CRANE SERVICES12

ITEMIZED PRICING 0010

PROVIDE CRANE SERVICES TO DISASSEMBLE AND OFFLOAD SCAFFOLDING 12 $0.00 $0.00

JSNLOCATIONHRUNIT PRICEEXT PRICE
CSE2-L030MANUAL LABOR48

ITEMIZED PRICING 0011

PROVIDE LABOR TO ONLOAD AND ERECT SCAFFOLDING 48 $0.00 $0.00

JSNLOCATIONHRUNIT PRICEEXT PRICE
CSE2-L030MANUAL LABOR48

ITEMIZED PRICING 0012

PROVIDE LABOR TO DISASSEMBLE AND OFFLOAD SCAFFOLDING 48 $0.00 $0.00

TOTAL $0.00

MILESTONE EVENTDATE
1. Contract Start23-Feb-2026
2. On-load and completely assemble the scaffolding at the locations no later than (NLT)23-24-Feb-2026
3. Green Tagged NLT COB or sooner24-Feb-2026
4. In use dates24 Feb - 05 Mar 2026
5. Start to dismantle and offload scaffolding materials06-07-Mar-2026
6. Offload all scaffolding material7-Mar-2026
7. Contract End7-Mar-2026
NOTES:
1. Provide scaffolding services for in support of the repair. Ensure to the final process prior to green tagging that Ships Force is satisfied with the build.
2. No excess of scaffolding materials are allowed onboard the Ship and Pier after assembly.
3. All scaffolding materials SHALL be removed from the ship and on the pier NLT the Contract End Date.

PRINCETON

ITEMIZED PRICING SHEET
CONTRACT:SCAFFOLDING
CONTRACT NO:TBFD
CONTRACTOR:TBD
SHIP:USS PRINCETON (CG-53)
LOCATION:NAVY REGION SOUTHWEST
JSNLOCATIONEAUNIT PRICEEXT PRICE
EM02-L0195-300-0-E, GTM 1A
(3 EACH FOR 4 DAYS)12
ITEMIZED PRICING 0013

PROVIDE LABOR, SERVICES, AND MATERIALS TO ERECT FIXED SCAFFOLDING

DAILY RENTAL SIZE:

3 Feet Wide X 10 Feet Length X 6.5 Feet Height 12 $0.00 $0.00

JSNLOCATIONEAUNIT PRICEEXT PRICE
EM02-L0195-300-0-E, GTM 1A
(6 EACH FOR 4 DAYS)24
ITEMIZED PRICING 0014

PROVIDE LABOR, SERVICES, AND MATERIALS TO ERECT FIXED SCAFFOLDING

WEEKLY RENTAL SIZE:

3 Feet Wide X 10 Feet Length X 26 Feet Height 24 $0.00 $0.00

JSNLOCATIONEAUNIT PRICEEXT PRICE
EM02-L0195-300-0-E, GTM 1A
(4 EACH FOR 4 DAYS)16
EM02-L019STBD WHIP ANTENNA REMOVAL AND REINSTALLATION ON AFT STACK
(1 EACH FOR 4 DAYS)4
ITEMIZED PRICING 0015

PROVIDE LABOR, SERVICES, AND MATERIALS TO ERECT FIXED SCAFFOLDING

(FALLS PROTECTION)

DAILY RENTAL SIZE:

5 Feet Wide X 10 Feet Length X 6.5 Feet Height 20 $0.00 $0.00

JSNLOCATIONEAUNIT PRICEEXT PRICE
EM02-L0195-300-0-E, GTM 1A
(4 EACH FOR 4 DAYS)16
ITEMIZED PRICING 0016

PROVIDE LABOR, SERVICES, AND MATERIALS TO ERECT FIXED SCAFFOLDING

DAILY RENTAL SIZE:

5 Feet Wide X 10 Feet Length X 26 Feet Height 16 $0.00 $0.00

JSNLOCATIONEAUNIT PRICEEXT PRICE
EM02-L0195-300-0-E, GTM 1A
(12 EACH FOR 4 DAYS)48
EM02-L019STBD WHIP ANTENNA REMOVAL AND REINSTALLATION ON AFT STACK
(1 EACH FOR 4 DAYS)4
ITEMIZED PRICING 0017

PROVIDE LABOR, SERVICES, AND MATERIALS TO ERECT HANGING SCAFFOLDING

DAILY RENTAL SIZE:

5 Feet Wide X 10 Feet Length X 6.5 Feet Height 52 $0.00 $0.00

JSNLOCATIONEAUNIT PRICEEXT PRICE
EM02-L0195-300-0-E, GTM 1A
(3 EACH FOR 2 WEEKS)6
ITEMIZED PRICING 0018

PROVIDE LABOR, SERVICES, AND MATERIALS TO ERECT FIXED SCAFFOLDING

WEEKLY RENTAL SIZE:

3 Feet Wide X 10 Feet Length X 6.5 Feet Height 6 $0.00 $0.00

JSNLOCATIONEAUNIT PRICEEXT PRICE
EM02-L0195-300-0-E, GTM 1A
(6 EACH FOR 2 WEEKS)12
ITEMIZED PRICING 0019

PROVIDE LABOR, SERVICES, AND MATERIALS TO ERECT FIXED SCAFFOLDING

WEEKLY RENTAL SIZE:

3 Feet Wide X 10 Feet Length X 26 Feet Height 12 $0.00 $0.00

JSNLOCATIONEAUNIT PRICEEXT PRICE
EM02-L0195-300-0-E, GTM 1A
(4 EACH FOR 2 WEEKS)8
EM02-L019STBD WHIP ANTENNA REMOVAL AND REINSTALLATION ON AFT STACK
(1 EACH FOR 2 WEEKS)2
ITEMIZED PRICING 0020

PROVIDE LABOR, SERVICES, AND MATERIALS TO ERECT FIXED SCAFFOLDING

(FALLS PROTECTION)

WEEKLY RENTAL SIZE:

5 Feet Wide X 10 Feet Length X 6.5 Feet Height 10 $0.00 $0.00

JSNLOCATIONEAUNIT PRICEEXT PRICE
EM02-L0195-300-0-E, GTM 1A
(4 EACH FOR 2 WEEKS)8
ITEMIZED PRICING 0021

PROVIDE LABOR, SERVICES, AND MATERIALS TO ERECT FIXED SCAFFOLDING

WEEKLY RENTAL SIZE:

5 Feet Wide X 10 Feet Length X 26 Feet Height 8 $0.00 $0.00

JSNLOCATIONEAUNIT PRICEEXT PRICE
EM02-L0195-300-0-E, GTM 1A
(12 EACH FOR 2 WEEKS)24
EM02-L019STBD WHIP ANTENNA REMOVAL AND REINSTALLATION ON AFT STACK
(1 EACH FOR 2 WEEKS)2
ITEMIZED PRICING 0022

PROVIDE LABOR, SERVICES, AND MATERIALS TO ERECT FIXED SCAFFOLDING

WEEKLY RENTAL SIZE:

5 Feet Wide X 10 Feet Length X 6.5 Feet Height 26 $0.00 $0.00

JSNLOCATIONSFUNIT PRICEEXT PRICE
EM02-L019SHRINK WRAP CONTAINMENT2,000
ITEMIZED PRICING 0023

CONTAINMENT FOR THE DOME ANTENNA AND BERP 2,000 $0.00 $0.00

JSNLOCATIONHRUNIT PRICEEXT PRICE
EM02-L019CRANE SERVICES - ONLOAD8
ITEMIZED PRICING 0024

CRANE SERVICES - ONLOAD

PROVIDE LABOR, SERVICES, AND MATERIALS TO ONLOAD AND ERECT SCAFFOLDING 8 $0.00 $0.00

JSNLOCATIONHRUNIT PRICEEXT PRICE
EM02-L019CRANE SERVICES - OFFLOAD8
ITEMIZED PRICING 0025

CRANE SERVICES - OFFLOAD

PROVIDE LABOR, SERVICES, AND MATERIALS TO DISASSEMBLE AND OFFLOAD SCAFFOLDING 8 $0.00 $0.00

JSNLOCATIONHRUNIT PRICEEXT PRICE
EM02-L019MANUAL LABOR - ONLOAD72
ITEMIZED PRICING 0026

MANUAL LABOR - ONLOAD

PROVIDE LABOR, SERVICES, AND MATERIALS TO ONLOAD AND ERECT SCAFFOLDING 72 $0.00 $0.00

JSNLOCATIONHRUNIT PRICEEXT PRICE
EM02-L019MANUAL LABOR - OFFLOAD72
ITEMIZED PRICING 0027

MANUAL LABOR - OFFLOAD

PROVIDE LABOR, SERVICES, AND MATERIALS TO DISASSEMBLE AND OFFLOAD SCAFFOLDING 72 $0.00 $0.00

JSNLOCATIONHRUNIT PRICEEXT PRICE
EM02-L019FIRST SCAFFOLDING SETUP CHANGE: MANUAL LABOR TO DISMANTLE THE ASSEMBLE SCAFFOLDING AND REASSEMBLE TO A NEW SETUP TO MEET THE REQUiREMENTS OF THE GAS TURBINE INSPECTORS32
EM02-L019SECOND SCAFFOLDING SETUP CHANGE: MANUAL LABOR TO DISMANTLE THE ASSEMBLE SCAFFOLDING AND REASSEMBLE TO A NEW SETUP TO MEET THE REQUiREMENTS OF THE GAS TURBINE INSPECTORS32
EM02-L019THIRD SCAFFOLDING SETUP CHANGE: MANUAL LABOR TO DISMANTLE THE ASSEMBLE SCAFFOLDING AND REASSEMBLE TO A NEW SETUP TO MEET THE REQUiREMENTS OF THE GAS TURBINE INSPECTORS32
EM02-L019FOURTH SCAFFOLDING SETUP CHANGE: MANUAL LABOR TO DISMANTLE THE ASSEMBLE SCAFFOLDING AND REASSEMBLE TO A NEW SETUP TO MEET THE REQUiREMENTS OF THE GAS TURBINE INSPECTORS32
EM02-L019FIFTH SCAFFOLDING SETUP CHANGE: MANUAL LABOR TO DISMANTLE THE ASSEMBLE SCAFFOLDING AND REASSEMBLE TO A NEW SETUP TO MEET THE REQUiREMENTS OF THE GAS TURBINE INSPECTORS32
EM02-L019SIXTH SCAFFOLDING SETUP CHANGE: MANUAL LABOR TO DISMANTLE THE ASSEMBLE SCAFFOLDING AND REASSEMBLE TO A NEW SETUP TO MEET THE REQUiREMENTS OF THE GAS TURBINE INSPECTORS32
ITEMIZED PRICING 0028

SCAFFOLDING SETUP CHANGE: MANUAL LABOR TO DISMANTLE THE ASSEMBLE SCAFFOLDING AND REASSEMBLE TO A NEW SETUP TO MEET THE REQUIREMENTS OF THE GAS TURBINE INSPECTORS 192 $0.00 $0.00

TOTAL $0.00

MILESTONE EVENTDATE
1. Contract Start20-Feb-2026
2.On-load and completely assemble the scaffolding at the locations no later than (NLT)20-Feb to 21-Feb 2026
3. Green Tagged NLT 0700 or sooner21-Feb-2026
4. FIRST SCAFFOLDING SETUP CHANGE23-Feb-2026
5. SECOND SCAFFOLDING SETUP CHANGE:25-Feb-2026
6. THIRD SCAFFOLDING SETUP CHANGE27-Feb-2026
7. FOURTH SCAFFOLDING SETUP CHANGE1-Mar-2026
8. FIFTH SCAFFOLDING SETUP CHANGE3-Mar-2026
9. SIXTH SCAFFOLDING SETUP CHANGE5-Mar-2026
10. Start to dismantle and offload scaffolding materials7 - 8 Mar-2026
11. Contract End8-Mar-2026
NOTES:
1. Provide scaffolding services for in support of the repair. Ensure to the final process prior to green tagging that Ships Force is satisfied with the build. The green tag certification shall be updated prior to 0700 daily
2. No excess of scaffolding materials are allowed onboard the Ship and Pier after assembly.
3. All scaffolding materials SHALL be removed from the ship and on the pier NLT the Delivery Order End Date.

File details come from the government source that posted it. Updated .