AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

REF: CIS SHEETMETAL SERVICES

The purpose of the Amendment is to address 3 requests for specif ication clarif ications, see enclosed.

See continuation pages.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Sep-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N5523620R0004

X 9B. DATED (SEE ITEM 11)

04-Aug-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Sep-2020

CODE

SOUTHWEST REGIONAL MAINTENANCE CENTER

CODE 410B 3755 BRINSER STREET, STE 1

SAN DIEGO CA 92136-5205

N55236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL: (619) 556-4706 laura.k.lindsay@navy.mil Laura K. Lindsay, Contracting Officer

N5523620R0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

REFERENCE: N55236-20-R-0004, CIS SHEETMETAL SERVICES

In response to the Requests for Specification Clarifications:

Question #27: As per Item E010- Please provide drawings referenced within supplies and services for pricing purposes.

Response: ELINs 010 and Sub-ELINs: Fabrication shall be based on existing/installed system and/or equipment. Ship’s installed systems are specific to the ship and will be discussed during the shipcheck between the Contractor and the Government.

Applicable drawings will be provided during the shipcheck to allow the Contractor sufficient information required for pricing when proposals are requested per Section G – Contract Administration Data, Fair Opportunity Process of the Contract.

Question #28: As per Item E011 lines E011AA thru A011AH drawings or MIL specs not included within solicitation package. Please provide copy of the following drawings:

E011AA

INCLINED LADDERS: Material: Stainless Steel Ladders, NAVSHIPS S1604-860039 and

S1604-860040

E011AB INCLINED LADDERS: Material: Aluminum Ladders, NAVSEA 804-1749113

E011AC

INCLINED LADDERS: Material: Glass reinforced Plastic (GRP) Ladder. NAVSEA 804-

5184099

E011AD INCLINED LADDERS - TREADS: Material: Aluminum Treads, MIL-DTL-24634

E011AE INCLINED LADDERS - TREADS: Material: Glass Reinforced Plastic (GRP) Ladder Treads

E011AF

INCLINED LADDERS - SAFETY RAILS AND SOCKET: Material: Stainless Steel Ladder, NAVSHIPS S1604-860039 and S1604-860040

E011AG

INCLINED LADDERS - SAFETY RAILS AND SOCKET: Material: Aluminum Ladders, NAVSEA 804-1749113

E011AH

INCLINED LADDERS- SAFETY RAILS AND SOCKET: Material: Glass reinforced Plastic

(GRP) Ladder. NAVSEA 804-5184099

N5523620R0004

Response: ELINs 011 and Sub-ELINs shall refer to the Statement of Work reference (s) S9086-UF-STM-030, NSTM Chapter

600 – Volume 3; Hull Outfitting Equipment provides general guidelines on inclined ladders. NAVSEA Drawing and Military

Specifications are included in the ELIN description.

Question #29: “As per Section C- paragraph C.2.4 The Contractor shall provide all cranes necessary to accomplish the work specified in this contract and the awarded Delivery Order(s), including floating cranes when required and cranes with a boom capacity great enough to reach ships berthed second ship out IAW references C.1.1.(a) through

C.1.1.(ar).” KTR requests a range of size crane to be utilizing for pricing purposes.

Response: The quantity of crane hours shall be discussed during the shipcheck between the Contractor and the Government when proposals are requested per Section G – Contract Administration Data, Fair Opportunity Process of the Contract, the

Contractor shall make the decision on what size or type of crane to use to perform the requirement of the ELIN and the scope of work outlined in the contract.