Exhibit_A-E_Pricing_Worksheet_Rev_1.xlsx

XLSX spreadsheet 102 KB Posted

Attached to
Commercial Industrial Services (CIS) Hullboard Lagging Services
Solicitation number
N5523620R0001
Issued by

About this file

This is a solicitation for hullboard lagging services on U.S. Navy ships located within 50 miles of San Diego, California. The services include removal, installation, repair, and testing of various types of hullboard and ventilation duct insulation materials. The contract will have a one year base period and four one-year options to extend. The contractor must provide all labor, equipment, and materials in accordance with Navy specifications. This will be a multiple award IDIQ contract set aside for small businesses. The applicable NAICS code is 2383100 and the business size standard is $16.5 million. The Navy intends to award contracts to companies that can provide these insulation services to ships in the San Diego area.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ordering Period 1

RFP: N5523620R0001
Offeror:
SECTION B: CLIN 0001
EXHIBIT A: BASE YEAR ONE
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A001REMOVAL OF EXISTING HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the removal of existing hullboard lagging and insulation materials in accordance with the requirements of the statement of work.
A001AA1 inch thick Thermal30,000SF$0.00$0.00
A001AB2 inch thick Thermal20,000SF$0.00$0.00
A001AC3 inch thick Thermal10,000SF$0.00$0.00
A001AD1 inch thick Acoustical20,000SF$0.00$0.00
A001AE2 inch thich Acoustical10,000SF$0.00$0.00
A001AF3 inch thick Acoustical5,000SF$0.00$0.00
A001AG1 inch thick Polymide Foam Thermal10,000SF$0.00$0.00
A001AH2 inch thick Polymide Foam Thermal5,000SF$0.00$0.00
A001AJ1 inch thick Polymide Foam Acoustical10,000SF$0.00$0.00
A001AK2 inch thick Polymide Foam Acoustical5,000SF$0.00$0.00
A001AL1 inch thick Elastomeric Foam1,000SF$0.00$0.00
A001AM1 1/2 inch thick Neptune Thermal Insulation10,000SF$0.00$0.00
A001AN1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP)5,000SF$0.00$0.00
A001AP3 inch thick Polymide Foam Thermal2,000SF$0.00$0.00
A001AQ1 inch thick Mineral Wool A601,000SF$0.00$0.00
A001AR2 inch thick Mineral Wool A601,000SF$0.00$0.00
A001AS3 inch thick Mineral Wool A601,000SF$0.00$0.00
A001ATBarium Sulfate Mass Loaded Vinyl1,000SF$0.00$0.00

A001 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A002INSTALLATION OF NEW HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the surface preparation, primer application and installation of new hullboard lagging and insulation materials in accordance with the requirements of the statement of work.
A002AA1 inch thick Thermal30,000SF$0.00$0.00
A002AB2 inch thick Thermal20,000SF$0.00$0.00
A002AC3 inch thick Thermal10,000SF$0.00$0.00
A002AD1 inch thick Acoustical20,000SF$0.00$0.00
A002AE2 inch thick Acoustical10,000SF$0.00$0.00
A002AF3 inch thick Acoustical5,000SF$0.00$0.00
A002AG1 inch thick Polymide Foam Thermal10,000SF$0.00$0.00
A002AH2 inch thick Polymide Foam Thermal5,000SF$0.00$0.00
A002AJ1 inch thick Polymide Foam Acoustical10,000SF$0.00$0.00
A002AK2 inch thick Polymide Foam Acoustical5,000SF$0.00$0.00
A002AL1 inch thick Elastomeric Foam1,000SF$0.00$0.00
A002AM1 1/2 inch thick Neptune Thermal Insulation10,000SF$0.00$0.00
A002AN1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP)5,000SF$0.00$0.00
A002AP3 inch thick Polymide Foam Thermal2,000SF$0.00$0.00
A002AQ1 inch thick Mineral Wool A601,000SF$0.00$0.00
A002AR2 inch thick Mineral Wool A601,000SF$0.00$0.00
A002AS3 inch thick Mineral Wool A601,000SF$0.00$0.00
A002ATBarium Sulfate Mass Loaded Vinyl1,000SF$0.00$0.00

A002 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A003PATCH AND REPAIR OF EXISTING HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the patch and repair of existing hullboard lagging and insulation materials in accordance with the requirements of the statement of work.
A003AA1 inch thick Thermal2,000SF$0.00$0.00
A003AB2 inch thick Thermal1,000SF$0.00$0.00
A003AC3 inch thich Thermal500SF$0.00$0.00
A003AD1 inch thick Acoustical2,000SF$0.00$0.00
A003AE2 inch thick Acoustical1,000SF$0.00$0.00
A003AF3 inch thick Acoustical500SF$0.00$0.00
A003AG1 inch thich Polymide Foam Thermal1,000SF$0.00$0.00
A003AH2 inch thick Polymide Foam Thermal500SF$0.00$0.00
A003AJ1 inch thick Polymide Foam Acoustical1,000SF$0.00$0.00
A003AK2 inch thick Polymide Foam Acoustical500SF$0.00$0.00
A003AL1 inch thick Elastomeric Foam1,000SF$0.00$0.00
A003AM1 1/2 inch thick Neptune Thermal Insulation2,000SF$0.00$0.00
A003AN1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP)2,000SF$0.00$0.00
A003AP3 inch thick Polymide Foam Thermal1,000SF$0.00$0.00
A003AQ1 inch thick Mineral Wool A601,000SF$0.00$0.00
A003AR2 inch thick Mineral Wool A601,000SF$0.00$0.00
A003AS3 inch thick Mineral Wool A601,000SF$0.00$0.00
A003ATBarium Sulfate Mass Loaded Vinyl1,000SF$0.00$0.00

A003 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A004VENTILATION DUCTING. REMOVAL OF EXISTING LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the removal of existing ventilation ducting lagging and insulation materials in accordance with the requirements of the statement of work.
A004AA1 inch thick Thermal5,000SF$0.00$0.00
A004AB2 inch thick Thermal2,000SF$0.00$0.00
A004AC1 inch thich Polymide Foam Thermal5,000SF$0.00$0.00
A004AD2 inch thick Polymide Foam Therma2,000SF$0.00$0.00
A004AE1 inch thich Polymide Foam Acoustical1,000SF$0.00$0.00
A004AF2 inch thick Polymide Foam Acoustical500SF$0.00$0.00
A004AG1 inch thick Elastomeric Foam1,000SF$0.00$0.00
A004AHRemovable Lagging Pads on ventilation ducting flanges500SF$0.00$0.00

A004 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A005VENTILATION DUCTING. INSTALLATION OF NEW HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the surface preparation, primer application and installation of new ventilation ducting lagging and insulation materials in accordance with the requirements of the statement of work.
A005AA1 inch thick Thermal5,000SF$0.00$0.00
A005AB2 inch thick Thermal2,000SF$0.00$0.00
A005AC1 inch thich Polymide Foam Thermal5,000SF$0.00$0.00
A005AD2 inch thick Polymide Foam Therma2,000SF$0.00$0.00
A005AE1 inch thich Polymide Foam Acoustical1,000SF$0.00$0.00
A005AF2 inch thick Polymide Foam Acoustical500SF$0.00$0.00
A005AG1 inch thick Elastomeric Foam1,000SF$0.00$0.00
A005AHRemovable Lagging Pads on ventilation ducting flanges500SF$0.00$0.00

A005 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A006PATCH AND REPAIR OF EXISTING VENTILATION DUCTING LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the patch and repair of existing ventilation ducting lagging and insulation materials in accordance with the requirements of the statement of work.
A006AA1 inch thick Thermal2,000SF$0.00$0.00
A006AB2 inch thick Thermal1,000SF$0.00$0.00
A006AC1 inch thich Polymide Foam Thermal2,000SF$0.00$0.00
A006AD2 inch thick Polymide Foam Therma1,000SF$0.00$0.00
A006AE1 inch thich Polymide Foam Acoustical500SF$0.00$0.00
A006AF2 inch thick Polymide Foam Acoustical200SF$0.00$0.00
A006AG1 inch thick Elastomeric Foam200SF$0.00$0.00

A006 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A007Laboratory testing/analysis and disposal of insulation and lagging in accordance with the statement of work.
A007AALaboratory testing/analysis of insulation and lagging. Applicable to the compartment(s) where the insulation and lagging were removed under ELINS A001AA, A001AB, A001AC, A001AD, A001AE, A001AF, A001AM, A001AN, A004AA, and A004AB.1,000EA$0.00$0.00
A007ABDisposal of insulation and lagging removed. Applicable to the insulation and lagging that were removed under ELINS A001AA, A001AB, A001AC, A001AD, A001AE, A001AF, A001AM, A001AN, A004AA, and A004AB.100,000SF$0.00$0.00

A007 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A008CERTIFICATION OF COMPARTMENTS. Provide labor services, equipment and materials for a certified Marine Chemist to certify compartment(s) as "SAFE FOR WORKERS" for the duration of the Period of Performance in accordance with the statement of work.
A008AAOne (1) compartment, Sunday through Saturday.100EA$0.00$0.00
A008ABEach additional compartment(s), Sunday through Saturday..100EA$0.00$0.00

A008 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A009MOLD REMEDIATION. Provide labor services, equipment and materials for the accomplishment of the Mold Remediation requirements in accordance with the statement of work.
A009AAMold Remediation for different types of hullboard and ventilation lagging and insulation materials. Initial 10 SF.10EA$0.00$0.00
A009ABMold Remediation for different types of hullboard and ventilation lagging and insulation materials. Each additional 10 SF.10EA$0.00$0.00

A009 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A010Scaffolding and Crane Services. Provide labor, services, equipment, and materials for the erection, offload, certification, dismantle and offload of scaffolding in support of hullboard and ventilation ducting insulation and lagging services in accordance with the statement of work.
A010AARolling Scaffolding1,000HR$0.00$0.00
A010ABFixed Scaffolding1,000HR$0.00$0.00
A010ACHanging Scaffolding500HR$0.00$0.00
A010ADCrane Services500HR$0.00$0.00

A010 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A011OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of the Delivery Order or the modification to an issued Delivery Order.
A011AAADDITIONAL WORK - LABOR
NOTE: The offeror’s proposed fully burdened labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control.200HR$0.00$0.00
A011ABADDITIONAL WORK - MATERIALS
Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a contract and/or Delivery Order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. Offeror shall propose a material handling burdened rate:________% to be applied to SubELIN A011AB.100,000Dollars,
U.S0.00%$100,000

A011 ITEM NUMBER TOTAL $100,000.00

ITEM NOSUPPLIES/SERVICES% PROPOSEDUNITESTIMATED PRICE PER UNITAMOUNT
A012ACCELERATED DELIVERY: It is anticipated that 20 percent of the delivery orders will require accelerated delivery. When services are required in less than 4 hours of the receipt of the delivery order whether during or after normal working hours or less than the contract specified time of delivery. Line items A001 through A011AB may require accelerated delivery. Accelerated delivery will only be provided when authorized in advance by the Contracting Officer at a ______% percentage additional fee of the proposed ELIN price. (Zero % will be the additional charge if none is provided by the offeror). *** For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS A001 through A011 = $_____________ (multiplied by) 20 percent = ____________ (multiplied by percentage proposed for this ELIN) of ________% = ___________ (total amount in the Item Number Total space provided for ELIN A012).
A001 - A011ELIN TOTAL FOR ACCELERATED DELIVERY CALCULATION$100,000.00
ANTICIPATED ACCELERATED DELIVERY TOTAL (20%):$20,000.00
ADDITIONAL PERCENT FEE PROPOSED:0%LOT$0.00
A012ITEM NUMBER TOTAL1LOT$0.00

ELIN SUMMARY - BASE YEAR ONE

A001TOTAL$0.00
A002 TOTAL$0.00FINAL TOTAL
BASE YEAR ONE$100,000.00
A003 TOTAL$0.00
A004 TOTAL$0.00
A005 TOTAL$0.00
A006 TOTAL$0.00
A007 TOTAL$0.00
A008 TOTAL$0.00
A009 TOTAL$0.00
A010 TOTAL$0.00
A011 TOTAL$100,000.00
A012 TOTAL$0.00

&P of &N

Ordering Period 2

RFP: N5523620R0001
Offeror:
SECTION B: CLIN 0002
EXHIBIT B: BASE YEAR TWO
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B001REMOVAL OF EXISTING HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the removal of existing hullboard lagging and insulation materials in accordance with the requirements of the statement of work.
B001AA1 inch thick Thermal30,000SF$0.00$0.00
B001AB2 inch thick Thermal20,000SF$0.00$0.00
B001AC3 inch thick Thermal10,000SF$0.00$0.00
B001AD1 inch thick Acoustical20,000SF$0.00$0.00
B001AE2 inch thich Acoustical10,000SF$0.00$0.00
B001AF3 inch thick Acoustical5,000SF$0.00$0.00
B001AG1 inch thick Polymide Foam Thermal10,000SF$0.00$0.00
B001AH2 inch thick Polymide Foam Thermal5,000SF$0.00$0.00
B001AJ1 inch thick Polymide Foam Acoustical10,000SF$0.00$0.00
B001AK2 inch thick Polymide Foam Acoustical5,000SF$0.00$0.00
B001AL1 inch thick Elastomeric Foam1,000SF$0.00$0.00
B001AM1 1/2 inch thick Neptune Thermal Insulation10,000SF$0.00$0.00
B001AN1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP)5,000SF$0.00$0.00
B001AP3 inch thick Polymide Foam Thermal2,000SF$0.00$0.00
B001AQ1 inch thick Mineral Wool A601,000SF$0.00$0.00
B001AR2 inch thick Mineral Wool A601,000SF$0.00$0.00
B001AS3 inch thick Mineral Wool A601,000SF$0.00$0.00
B001ATBarium Sulfate Mass Loaded Vinyl1,000SF$0.00$0.00

B001 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B002INSTALLATION OF NEW HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the surface preparation, primer application and installation of new hullboard lagging and insulation materials in accordance with the requirements of the statement of work.
B002AA1 inch thick Thermal30,000SF$0.00$0.00
B002AB2 inch thick Thermal20,000SF$0.00$0.00
B002AC3 inch thick Thermal10,000SF$0.00$0.00
B002AD1 inch thick Acoustical20,000SF$0.00$0.00
B002AE2 inch thick Acoustical10,000SF$0.00$0.00
B002AF3 inch thick Acoustical5,000SF$0.00$0.00
B002AG1 inch thick Polymide Foam Thermal10,000SF$0.00$0.00
B002AH2 inch thick Polymide Foam Thermal5,000SF$0.00$0.00
B002AJ1 inch thick Polymide Foam Acoustical10,000SF$0.00$0.00
B002AK2 inch thick Polymide Foam Acoustical5,000SF$0.00$0.00
B002AL1 inch thick Elastomeric Foam1,000SF$0.00$0.00
B002AM1 1/2 inch thick Neptune Thermal Insulation10,000SF$0.00$0.00
B002AN1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP)5,000SF$0.00$0.00
B002AP3 inch thick Polymide Foam Thermal2,000SF$0.00$0.00
B002AQ1 inch thick Mineral Wool A601,000SF$0.00$0.00
B002AR2 inch thick Mineral Wool A601,000SF$0.00$0.00
B002AS3 inch thick Mineral Wool A601,000SF$0.00$0.00
B002ATBarium Sulfate Mass Loaded Vinyl1,000SF$0.00$0.00

B002 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B003PATCH AND REPAIR OF EXISTING HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the patch and repair of existing hullboard lagging and insulation materials in accordance with the requirements of the statement of work.
B003AA1 inch thick Thermal2,000SF$0.00$0.00
B003AB2 inch thick Thermal1,000SF$0.00$0.00
B003AC3 inch thich Thermal500SF$0.00$0.00
B003AD1 inch thick Acoustical2,000SF$0.00$0.00
B003AE2 inch thick Acoustical1,000SF$0.00$0.00
B003AF3 inch thick Acoustical500SF$0.00$0.00
B003AG1 inch thich Polymide Foam Thermal1,000SF$0.00$0.00
B003AH2 inch thick Polymide Foam Thermal500SF$0.00$0.00
B003AJ1 inch thick Polymide Foam Acoustical1,000SF$0.00$0.00
B003AK2 inch thick Polymide Foam Acoustical500SF$0.00$0.00
B003AL1 inch thick Elastomeric Foam1,000SF$0.00$0.00
B003AM1 1/2 inch thick Neptune Thermal Insulation2,000SF$0.00$0.00
B003AN1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP)2,000SF$0.00$0.00
B003AP3 inch thick Polymide Foam Thermal1,000SF$0.00$0.00
B003AQ1 inch thick Mineral Wool A601,000SF$0.00$0.00
B003AR2 inch thick Mineral Wool A601,000SF$0.00$0.00
B003AS3 inch thick Mineral Wool A601,000SF$0.00$0.00
B003ATBarium Sulfate Mass Loaded Vinyl1,000SF$0.00$0.00

B003 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B004VENTILATION DUCTING. REMOVAL OF EXISTING LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the removal of existing ventilation ducting lagging and insulation materials in accordance with the requirements of the statement of work.
B004AA1 inch thick Thermal5,000SF$0.00$0.00
B004AB2 inch thick Thermal2,000SF$0.00$0.00
B004AC1 inch thich Polymide Foam Thermal5,000SF$0.00$0.00
B004AD2 inch thick Polymide Foam Therma2,000SF$0.00$0.00
B004AE1 inch thich Polymide Foam Acoustical1,000SF$0.00$0.00
B004AF2 inch thick Polymide Foam Acoustical500SF$0.00$0.00
B004AG1 inch thick Elastomeric Foam1,000SF$0.00$0.00
B004AHRemovable Lagging Pads on ventilation ducting flanges500SF$0.00$0.00

B004 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B005VENTILATION DUCTING. INSTALLATION OF NEW HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the surface preparation, primer application and installation of new ventilation ducting lagging and insulation materials in accordance with the requirements of the statement of work.
B005AA1 inch thick Thermal5,000SF$0.00$0.00
B005AB2 inch thick Thermal2,000SF$0.00$0.00
B005AC1 inch thich Polymide Foam Thermal5,000SF$0.00$0.00
B005AD2 inch thick Polymide Foam Therma2,000SF$0.00$0.00
B005AE1 inch thich Polymide Foam Acoustical1,000SF$0.00$0.00
B005AF2 inch thick Polymide Foam Acoustical500SF$0.00$0.00
B005AG1 inch thick Elastomeric Foam1,000SF$0.00$0.00
B005AHRemovable Lagging Pads on ventilation ducting flanges500SF$0.00$0.00

B005 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B006PATCH AND REPAIR OF EXISTING VENTILATION DUCTING LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the patch and repair of existing ventilation ducting lagging and insulation materials in accordance with the requirements of the statement of work.
B006AA1 inch thick Thermal2,000SF$0.00$0.00
B006AB2 inch thick Thermal1,000SF$0.00$0.00
B006AC1 inch thich Polymide Foam Thermal2,000SF$0.00$0.00
B006AD2 inch thick Polymide Foam Therma1,000SF$0.00$0.00
B006AE1 inch thich Polymide Foam Acoustical500SF$0.00$0.00
B006AF2 inch thick Polymide Foam Acoustical200SF$0.00$0.00
B006AG1 inch thick Elastomeric Foam200SF$0.00$0.00

B006 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B007Laboratory testing/analysis and disposal of insulation and lagging in accordance with the statement of work.
B007AALaboratory testing/analysis of insulation and lagging. Applicable to the compartment(s) where the insulation and lagging were removed under ELINS B001AA, B001AB, B001AC, B001AD, B001AE, B001AF, B001AM, B001AN, B004AA, and B004AB.1,000EA$0.00$0.00
B007ABDisposal of insulation and lagging removed. Applicable to the insulation and lagging that were removed under ELINS B001AA, B001AB, B001AC, B001AD, B001AE, B001AF, B001AM, B001AN, B004AA, and B004AB.100,000SF$0.00$0.00

B007 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B008CERTIFICATION OF COMPARTMENTS. Provide labor services, equipment and materials for a certified Marine Chemist to certify compartment(s) as "SAFE FOR WORKERS" for the duration of the Period of Performance in accordance with the statement of work.
B008AATWO (1) compartment, Sunday through Saturday.100EA$0.00$0.00
B008ABEach additional compartment(s), Sunday through Saturday..100EA$0.00$0.00

B008 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B009MOLD REMEDIATION. Provide labor services, equipment and materials for the accomplishment of the Mold Remediation requirements in accordance with the statement of work.
B009AAMold Remediation for different types of hullboard and ventilation lagging and insulation materials. Initial 10 SF.10EA$0.00$0.00
B009ABMold Remediation for different types of hullboard and ventilation lagging and insulation materials. Each additional 10 SF.10EA$0.00$0.00

B009 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B010Scaffolding and Crane Services. Provide labor, services, equipment, and materials for the erection, offload, certification, dismantle and offload of scaffolding in support of hullboard and ventilation ducting insulation and lagging services in accordance with the statement of work.
B010AARolling Scaffolding1,000HR$0.00$0.00
B010ABFixed Scaffolding1,000HR$0.00$0.00
B010ACHanging Scaffolding500HR$0.00$0.00
B010ADCrane Services500HR$0.00$0.00

B010 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B011OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of the Delivery Order or the modification to an issued Delivery Order.
B011AAADDITIONAL WORK - LABOR
NOTE: The offeror’s proposed fully burdened labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control.200HR$0.00$0.00
B011ABADDITIONAL WORK - MATERIALS
Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a contract and/or Delivery Order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. Offeror shall propose a material handling burdened rate:________% to be applied to SubELIN B011AB.100,000Dollars,
U.S0.00%$100,000

B011 ITEM NUMBER TOTAL $100,000.00

ITEM NOSUPPLIES/SERVICES% PROPOSEDUNITESTIMATED PRICE PER UNITAMOUNT
B012ACCELERATED DELIVERY: It is anticipated that 20 percent of the delivery orders will require accelerated delivery. When services are required in less than 4 hours of the receipt of the delivery order whether during or after normal working hours or less than the contract specified time of delivery. Line items B001 through B011AB may require accelerated delivery. Accelerated delivery will only be provided when authorized in advance by the Contracting Officer at a ______% percentage additional fee of the proposed ELIN price. (Zero % will be the additional charge if nTWO is provided by the offeror). *** For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS B001 through B011 = $_____________ (multiplied by) 20 percent = ____________ (multiplied by percentage proposed for this ELIN) of ________% = ___________ (total amount in the Item Number Total space provided for ELIN B012).
B001 - B011ELIN TOTAL FOR ACCELERATED DELIVERY CALCULATION$100,000.00
ANTICIPATED ACCELERATED DELIVERY TOTAL (20%):$20,000.00
ADDITIONAL PERCENT FEE PROPOSED:0%LOT$0.00
B012ITEM NUMBER TOTAL1LOT$0.00

ELIN SUMMARY - BASE YEAR TWO

B001TOTAL$0.00
B002 TOTAL$0.00FINAL TOTAL
BASE YEAR TWO$100,000.00
B003 TOTAL$0.00
B004 TOTAL$0.00
B005 TOTAL$0.00
B006 TOTAL$0.00
B007 TOTAL$0.00
B008 TOTAL$0.00
B009 TOTAL$0.00
B010 TOTAL$0.00
B011 TOTAL$100,000.00
B012 TOTAL$0.00

Ordering Period 3

RFP: N5523620R0001
Offeror:
SECTION B: CLIN 0003
EXHIBIT C: BASE YEAR THREE
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C001REMOVAL OF EXISTING HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the removal of existing hullboard lagging and insulation materials in accordance with the requirements of the statement of work.
C001AA1 inch thick Thermal30,000SF$0.00$0.00
C001AB2 inch thick Thermal20,000SF$0.00$0.00
C001AC3 inch thick Thermal10,000SF$0.00$0.00
C001AD1 inch thick Acoustical20,000SF$0.00$0.00
C001AE2 inch thich Acoustical10,000SF$0.00$0.00
C001AF3 inch thick Acoustical5,000SF$0.00$0.00
C001AG1 inch thick Polymide Foam Thermal10,000SF$0.00$0.00
C001AH2 inch thick Polymide Foam Thermal5,000SF$0.00$0.00
C001AJ1 inch thick Polymide Foam Acoustical10,000SF$0.00$0.00
C001AK2 inch thick Polymide Foam Acoustical5,000SF$0.00$0.00
C001AL1 inch thick Elastomeric Foam1,000SF$0.00$0.00
C001AM1 1/2 inch thick Neptune Thermal Insulation10,000SF$0.00$0.00
C001AN1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP)5,000SF$0.00$0.00
C001AP3 inch thick Polymide Foam Thermal2,000SF$0.00$0.00
C001AQ1 inch thick Mineral Wool A601,000SF$0.00$0.00
C001AR2 inch thick Mineral Wool A601,000SF$0.00$0.00
C001AS3 inch thick Mineral Wool A601,000SF$0.00$0.00
C001ATBarium Sulfate Mass Loaded Vinyl1,000SF$0.00$0.00

C001 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C002INSTALLATION OF NEW HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the surface preparation, primer application and installation of new hullboard lagging and insulation materials in accordance with the requirements of the statement of work.
C002AA1 inch thick Thermal30,000SF$0.00$0.00
C002AB2 inch thick Thermal20,000SF$0.00$0.00
C002AC3 inch thick Thermal10,000SF$0.00$0.00
C002AD1 inch thick Acoustical20,000SF$0.00$0.00
C002AE2 inch thick Acoustical10,000SF$0.00$0.00
C002AF3 inch thick Acoustical5,000SF$0.00$0.00
C002AG1 inch thick Polymide Foam Thermal10,000SF$0.00$0.00
C002AH2 inch thick Polymide Foam Thermal5,000SF$0.00$0.00
C002AJ1 inch thick Polymide Foam Acoustical10,000SF$0.00$0.00
C002AK2 inch thick Polymide Foam Acoustical5,000SF$0.00$0.00
C002AL1 inch thick Elastomeric Foam1,000SF$0.00$0.00
C002AM1 1/2 inch thick Neptune Thermal Insulation10,000SF$0.00$0.00
C002AN1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP)5,000SF$0.00$0.00
C002AP3 inch thick Polymide Foam Thermal2,000SF$0.00$0.00
C002AQ1 inch thick Mineral Wool A601,000SF$0.00$0.00
C002AR2 inch thick Mineral Wool A601,000SF$0.00$0.00
C002AS3 inch thick Mineral Wool A601,000SF$0.00$0.00
C002ATBarium Sulfate Mass Loaded Vinyl1,000SF$0.00$0.00

C002 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C003PATCH AND REPAIR OF EXISTING HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the patch and repair of existing hullboard lagging and insulation materials in accordance with the requirements of the statement of work.
C003AA1 inch thick Thermal2,000SF$0.00$0.00
C003AB2 inch thick Thermal1,000SF$0.00$0.00
C003AC3 inch thich Thermal500SF$0.00$0.00
C003AD1 inch thick Acoustical2,000SF$0.00$0.00
C003AE2 inch thick Acoustical1,000SF$0.00$0.00
C003AF3 inch thick Acoustical500SF$0.00$0.00
C003AG1 inch thich Polymide Foam Thermal1,000SF$0.00$0.00
C003AH2 inch thick Polymide Foam Thermal500SF$0.00$0.00
C003AJ1 inch thick Polymide Foam Acoustical1,000SF$0.00$0.00
C003AK2 inch thick Polymide Foam Acoustical500SF$0.00$0.00
C003AL1 inch thick Elastomeric Foam1,000SF$0.00$0.00
C003AM1 1/2 inch thick Neptune Thermal Insulation2,000SF$0.00$0.00
C003AN1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP)2,000SF$0.00$0.00
C003AP3 inch thick Polymide Foam Thermal1,000SF$0.00$0.00
C003AQ1 inch thick Mineral Wool A601,000SF$0.00$0.00
C003AR2 inch thick Mineral Wool A601,000SF$0.00$0.00
C003AS3 inch thick Mineral Wool A601,000SF$0.00$0.00
C003ATBarium Sulfate Mass Loaded Vinyl1,000SF$0.00$0.00

C003 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C004VENTILATION DUCTING. REMOVAL OF EXISTING LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the removal of existing ventilation ducting lagging and insulation materials in accordance with the requirements of the statement of work.
C004AA1 inch thick Thermal5,000SF$0.00$0.00
C004AB2 inch thick Thermal2,000SF$0.00$0.00
C004AC1 inch thich Polymide Foam Thermal5,000SF$0.00$0.00
C004AD2 inch thick Polymide Foam Therma2,000SF$0.00$0.00
C004AE1 inch thich Polymide Foam Acoustical1,000SF$0.00$0.00
C004AF2 inch thick Polymide Foam Acoustical500SF$0.00$0.00
C004AG1 inch thick Elastomeric Foam1,000SF$0.00$0.00
C004AHRemovable Lagging Pads on ventilation ducting flanges500SF$0.00$0.00

C004 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C005VENTILATION DUCTING. INSTALLATION OF NEW HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the surface preparation, primer application and installation of new ventilation ducting lagging and insulation materials in accordance with the requirements of the statement of work.
C005AA1 inch thick Thermal5,000SF$0.00$0.00
C005AB2 inch thick Thermal2,000SF$0.00$0.00
C005AC1 inch thich Polymide Foam Thermal5,000SF$0.00$0.00
C005AD2 inch thick Polymide Foam Therma2,000SF$0.00$0.00
C005AE1 inch thich Polymide Foam Acoustical1,000SF$0.00$0.00
C005AF2 inch thick Polymide Foam Acoustical500SF$0.00$0.00
C005AG1 inch thick Elastomeric Foam1,000SF$0.00$0.00
C005AHRemovable Lagging Pads on ventilation ducting flanges500SF$0.00$0.00

C005 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C006PATCH AND REPAIR OF EXISTING VENTILATION DUCTING LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the patch and repair of existing ventilation ducting lagging and insulation materials in accordance with the requirements of the statement of work.
C006AA1 inch thick Thermal2,000SF$0.00$0.00
C006AB2 inch thick Thermal1,000SF$0.00$0.00
C006AC1 inch thich Polymide Foam Thermal2,000SF$0.00$0.00
C006AD2 inch thick Polymide Foam Therma1,000SF$0.00$0.00
C006AE1 inch thich Polymide Foam Acoustical500SF$0.00$0.00
C006AF2 inch thick Polymide Foam Acoustical200SF$0.00$0.00
C006AG1 inch thick Elastomeric Foam200SF$0.00$0.00

C006 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C007Laboratory testing/analysis and disposal of insulation and lagging in accordance with the statement of work.
C007AALaboratory testing/analysis of insulation and lagging. Applicable to the compartment(s) where the insulation and lagging were removed under ELINS C001AA, C001AB, C001AC, C001AD, C001AE, C001AF, C001AM, C001AN, C004AA, and C004AB.1,000EA$0.00$0.00
C007ABDisposal of insulation and lagging removed. Applicable to the insulation and lagging that were removed under ELINS C001AA, C001AB, C001AC, C001AD, C001AE, C001AF, C001AM, C001AN, C004AA, and C004AB.100,000SF$0.00$0.00

C007 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C008CERTIFICATION OF COMPARTMENTS. Provide labor services, equipment and materials for a certified Marine Chemist to certify compartment(s) as "SAFE FOR WORKERS" for the duration of the Period of Performance in accordance with the statement of work.
C008AATWO (1) compartment, Sunday through Saturday.100EA$0.00$0.00
C008ABEach additional compartment(s), Sunday through Saturday..100EA$0.00$0.00

C008 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C009MOLD REMEDIATION. Provide labor services, equipment and materials for the accomplishment of the Mold Remediation requirements in accordance with the statement of work.
C009AAMold Remediation for different types of hullboard and ventilation lagging and insulation materials. Initial 10 SF.10EA$0.00$0.00
C009ABMold Remediation for different types of hullboard and ventilation lagging and insulation materials. Each additional 10 SF.10EA$0.00$0.00

C009 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C010Scaffolding and Crane Services. Provide labor, services, equipment, and materials for the erection, offload, certification, dismantle and offload of scaffolding in support of hullboard and ventilation ducting insulation and lagging services in accordance with the statement of work.
C010AARolling Scaffolding1,000HR$0.00$0.00
C010ABFixed Scaffolding1,000HR$0.00$0.00
C010ACHanging Scaffolding500HR$0.00$0.00
C010ADCrane Services500HR$0.00$0.00

C010 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C011OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of the Delivery Order or the modification to an issued Delivery Order.
C011AAADDITIONAL WORK - LABOR
NOTE: The offeror’s proposed fully burdened labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control.200HR$0.00$0.00
C011ABADDITIONAL WORK - MATERIALS
Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a contract and/or Delivery Order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. Offeror shall propose a material handling burdened rate:________% to be applied to SubELIN C011AB.100,000Dollars,
U.S0.00%$100,000

C011 ITEM NUMBER TOTAL $100,000.00

ITEM NOSUPPLIES/SERVICES% PROPOSEDUNITESTIMATED PRICE PER UNITAMOUNT
C012ACCELERATED DELIVERY: It is anticipated that 20 percent of the delivery orders will require accelerated delivery. When services are required in less than 4 hours of the receipt of the delivery order whether during or after normal working hours or less than the contract specified time of delivery. Line items C001 through C011AB may require accelerated delivery. Accelerated delivery will only be provided when authorized in advance by the Contracting Officer at a ______% percentage additional fee of the proposed ELIN price. (Zero % will be the additional charge if nTWO is provided by the offeror). *** For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS C001 through C011 = $_____________ (multiplied by) 20 percent = ____________ (multiplied by percentage proposed for this ELIN) of ________% = ___________ (total amount in the Item Number Total space provided for ELIN C012).
C001 - C011ELIN TOTAL FOR ACCELERATED DELIVERY CALCULATION$100,000.00
ANTICIPATED ACCELERATED DELIVERY TOTAL (20%):$20,000.00
ADDITIONAL PERCENT FEE PROPOSED:0%LOT$0.00
C012ITEM NUMBER TOTAL1LOT$0.00

ELIN SUMMARY - BASE YEAR THREE

C001TOTAL$0.00
C002 TOTAL$0.00FINAL TOTAL
BASE YEAR THREE$100,000.00
C003 TOTAL$0.00
C004 TOTAL$0.00
C005 TOTAL$0.00
C006 TOTAL$0.00
C007 TOTAL$0.00
C008 TOTAL$0.00
C009 TOTAL$0.00
C010 TOTAL$0.00
C011 TOTAL$100,000.00
C012 TOTAL$0.00

Ordering Period 4

RFP: N5523620R0001
Offeror:
SECTION B: CLIN 0004
EXHIBIT D: BASE YEAR FOUR
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
D001REMOVAL OF EXISTING HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the removal of existing hullboard lagging and insulation materials in accordance with the requirements of the statement of work.
D001AA1 inch thick Thermal30,000SF$0.00$0.00
D001AB2 inch thick Thermal20,000SF$0.00$0.00
D001AC3 inch thick Thermal10,000SF$0.00$0.00
D001AD1 inch thick Acoustical20,000SF$0.00$0.00
D001AE2 inch thich Acoustical10,000SF$0.00$0.00
D001AF3 inch thick Acoustical5,000SF$0.00$0.00
D001AG1 inch thick Polymide Foam Thermal10,000SF$0.00$0.00
D001AH2 inch thick Polymide Foam Thermal5,000SF$0.00$0.00
D001AJ1 inch thick Polymide Foam Acoustical10,000SF$0.00$0.00
D001AK2 inch thick Polymide Foam Acoustical5,000SF$0.00$0.00
D001AL1 inch thick Elastomeric Foam1,000SF$0.00$0.00
D001AM1 1/2 inch thick Neptune Thermal Insulation10,000SF$0.00$0.00
D001AN1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP)5,000SF$0.00$0.00
D001AP3 inch thick Polymide Foam Thermal2,000SF$0.00$0.00
D001AQ1 inch thick Mineral Wool A601,000SF$0.00$0.00
D001AR2 inch thick Mineral Wool A601,000SF$0.00$0.00
D001AS3 inch thick Mineral Wool A601,000SF$0.00$0.00
D001ATBarium Sulfate Mass Loaded Vinyl1,000SF$0.00$0.00

D001 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
D002INSTALLATION OF NEW HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the surface preparation, primer application and installation of new hullboard lagging and insulation materials in accordance with the requirements of the statement of work.
D002AA1 inch thick Thermal30,000SF$0.00$0.00
D002AB2 inch thick Thermal20,000SF$0.00$0.00
D002AC3 inch thick Thermal10,000SF$0.00$0.00
D002AD1 inch thick Acoustical20,000SF$0.00$0.00
D002AE2 inch thick Acoustical10,000SF$0.00$0.00
D002AF3 inch thick Acoustical5,000SF$0.00$0.00
D002AG1 inch thick Polymide Foam Thermal10,000SF$0.00$0.00
D002AH2 inch thick Polymide Foam Thermal5,000SF$0.00$0.00
D002AJ1 inch thick Polymide Foam Acoustical10,000SF$0.00$0.00
D002AK2 inch thick Polymide Foam Acoustical5,000SF$0.00$0.00
D002AL1 inch thick Elastomeric Foam1,000SF$0.00$0.00
D002AM1 1/2 inch thick Neptune Thermal Insulation10,000SF$0.00$0.00
D002AN1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP)5,000SF$0.00$0.00
D002AP3 inch thick Polymide Foam Thermal2,000SF$0.00$0.00
D002AQ1 inch thick Mineral Wool A601,000SF$0.00$0.00
D002AR2 inch thick Mineral Wool A601,000SF$0.00$0.00
D002AS3 inch thick Mineral Wool A601,000SF$0.00$0.00
D002ATBarium Sulfate Mass Loaded Vinyl1,000SF$0.00$0.00

D002 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
D003PATCH AND REPAIR OF EXISTING HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the patch and repair of existing hullboard lagging and insulation materials in accordance with the requirements of the statement of work.
D003AA1 inch thick Thermal2,000SF$0.00$0.00
D003AB2 inch thick Thermal1,000SF$0.00$0.00
D003AC3 inch thich Thermal500SF$0.00$0.00
D003AD1 inch thick Acoustical2,000SF$0.00$0.00
D003AE2 inch thick Acoustical1,000SF$0.00$0.00
D003AF3 inch thick Acoustical500SF$0.00$0.00
D003AG1 inch thich Polymide Foam Thermal1,000SF$0.00$0.00
D003AH2 inch thick Polymide Foam Thermal500SF$0.00$0.00
D003AJ1 inch thick Polymide Foam Acoustical1,000SF$0.00$0.00
D003AK2 inch thick Polymide Foam Acoustical500SF$0.00$0.00
D003AL1 inch thick Elastomeric Foam1,000SF$0.00$0.00
D003AM1 1/2 inch thick Neptune Thermal Insulation2,000SF$0.00$0.00
D003AN1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP)2,000SF$0.00$0.00
D003AP3 inch thick Polymide Foam Thermal1,000SF$0.00$0.00
D003AQ1 inch thick Mineral Wool A601,000SF$0.00$0.00
D003AR2 inch thick Mineral Wool A601,000SF$0.00$0.00
D003AS3 inch thick Mineral Wool A601,000SF$0.00$0.00
D003ATBarium Sulfate Mass Loaded Vinyl1,000SF$0.00$0.00

D003 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
D004VENTILATION DUCTING. REMOVAL OF EXISTING LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the removal of existing ventilation ducting lagging and insulation materials in accordance with the requirements of the statement of work.
D004AA1 inch thick Thermal5,000SF$0.00$0.00
D004AB2 inch thick Thermal2,000SF$0.00$0.00
D004AC1 inch thich Polymide Foam Thermal5,000SF$0.00$0.00
D004AD2 inch thick Polymide Foam Therma2,000SF$0.00$0.00
D004AE1 inch thich Polymide Foam Acoustical1,000SF$0.00$0.00
D004AF2 inch thick Polymide Foam Acoustical500SF$0.00$0.00
D004AG1 inch thick Elastomeric Foam1,000SF$0.00$0.00
D004AHRemovable Lagging Pads on ventilation ducting flanges500SF$0.00$0.00

D004 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
D005VENTILATION DUCTING. INSTALLATION OF NEW HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the surface preparation, primer application and installation of new ventilation ducting lagging and insulation materials in accordance with the requirements of the statement of work.
D005AA1 inch thick Thermal5,000SF$0.00$0.00
D005AB2 inch thick Thermal2,000SF$0.00$0.00
D005AC1 inch thich Polymide Foam Thermal5,000SF$0.00$0.00
D005AD2 inch thick Polymide Foam Therma2,000SF$0.00$0.00
D005AE1 inch thich Polymide Foam Acoustical1,000SF$0.00$0.00
D005AF2 inch thick Polymide Foam Acoustical500SF$0.00$0.00
D005AG1 inch thick Elastomeric Foam1,000SF$0.00$0.00
D005AHRemovable Lagging Pads on ventilation ducting flanges500SF$0.00$0.00

D005 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
D006PATCH AND REPAIR OF EXISTING VENTILATION DUCTING LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the patch and repair of existing ventilation ducting lagging and insulation materials in accordance with the requirements of the statement of work.
D006AA1 inch thick Thermal2,000SF$0.00$0.00
D006AB2 inch thick Thermal1,000SF$0.00$0.00
D006AC1 inch thich Polymide Foam Thermal2,000SF$0.00$0.00
D006AD2 inch thick Polymide Foam Therma1,000SF$0.00$0.00
D006AE1 inch thich Polymide Foam Acoustical500SF$0.00$0.00
D006AF2 inch thick Polymide Foam Acoustical200SF$0.00$0.00
D006AG1 inch thick Elastomeric Foam200SF$0.00$0.00

D006 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
D007Laboratory testing/analysis and disposal of insulation and lagging in accordance with the statement of work.
D007AALaboratory testing/analysis of insulation and lagging. Applicable to the compartment(s) where the insulation and lagging were removed under ELINS D001AA, D001AB, D001AC, D001AD, D001AE, D001AF, D001AM, D001AN, D004AA, and D004AB.1,000EA$0.00$0.00
D007ABDisposal of insulation and lagging removed. Applicable to the insulation and lagging that were removed under ELINS D001AA, D001AB, D001AC, D001AD, D001AE, D001AF, D001AM, D001AN, D004AA, and D004AB.100,000SF$0.00$0.00

D007 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
D008CERTIFICATION OF COMPARTMENTS. Provide labor services, equipment and materials for a certified Marine Chemist to certify compartment(s) as "SAFE FOR WORKERS" for the duration of the Period of Performance in accordance with the statement of work.
D008AATWO (1) compartment, Sunday through Saturday.100EA$0.00$0.00
D008ABEach additional compartment(s), Sunday through Saturday..100EA$0.00$0.00

D008 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
D009MOLD REMEDIATION. Provide labor services, equipment and materials for the accomplishment of the Mold Remediation requirements in accordance with the statement of work.
D009AAMold Remediation for different types of hullboard and ventilation lagging and insulation materials. Initial 10 SF.10EA$0.00$0.00
D009ABMold Remediation for different types of hullboard and ventilation lagging and insulation materials. Each additional 10 SF.10EA$0.00$0.00

D009 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
D010Scaffolding and Crane Services. Provide labor, services, equipment, and materials for the erection, offload, certification, dismantle and offload of scaffolding in support of hullboard and ventilation ducting insulation and lagging services in accordance with the statement of work.
D010AARolling Scaffolding1,000HR$0.00$0.00
D010ABFixed Scaffolding1,000HR$0.00$0.00
D010ACHanging Scaffolding500HR$0.00$0.00
D010ADCrane Services500HR$0.00$0.00

D010 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
D011OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of the Delivery Order or the modification to an issued Delivery Order.
D011AAADDITIONAL WORK - LABOR
NOTE: The offeror’s proposed fully burdened labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control.200HR$0.00$0.00
D011ABADDITIONAL WORK - MATERIALS
Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a contract and/or Delivery Order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. Offeror shall propose a material handling burdened rate:________% to be applied to SubELIN D011AB.100,000Dollars,
U.S0.00%$100,000

D011 ITEM NUMBER TOTAL $100,000.00

ITEM NOSUPPLIES/SERVICES% PROPOSEDUNITESTIMATED PRICE PER UNITAMOUNT

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .