Exhibit_A-E_Pricing_Worksheet.xlsx
XLSX spreadsheet 97 KB Posted
- Solicitation number
- N5523620R0001
About this file
This document package includes pricing templates and exhibits for a solicitation seeking hullboard lagging services. Key details include:
-
The solicitation seeks offers for removal, installation, repair, and testing services for hullboard and ventilation duct insulation and lagging materials onboard U.S. Navy vessels within 50 miles of San Diego, California over a potential five base-year ordering periods.
-
Required services include removal and disposal of existing materials, surface preparation and installation of new materials, patching and repair work, scaffolding and crane services, mold remediation, and marine chemist certification of compartments.
-
Pricing templates provide estimated quantities and unit prices for different material types and services across multiple line items and base years.
-
The solicitation is a total small business set-aside to be awarded as multiple indefinite delivery/indefinite quantity contracts with firm fixed pricing for ordering periods.
-
The applicable NAICS code is 2383100 and business size standard is $16.5 million. The agency is the Department of the Navy Naval Sea Systems Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N5523620R0001 Amendment 0003.pdf | ||
| MIL-PRF-24699A.pdf | ||
| Exhibit_A-E_Pricing_Worksheet_Rev_1.xlsx | XLSX spreadsheet | |
| 022718_IND-409-MinWool-1200-MarineBoard-A30A60.pdf | ||
| RFP N5523620R0001 Amendment 0002.pdf | ||
| RFP N5523620R0001 Amendment 0001.pdf | ||
| RFP N5523620R0001.pdf | ||
| Attachment S-2 Request for Specification Clarification Form.doc.docx | DOCX document | |
| Exhibit_F_CDRLs_(F001-F008).pdf | ||
| Attachment S-1 Past Performance Questionnaire.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ordering Period 1
| RFP: N5523620R0001 | |||||
| Offeror: | |||||
| SECTION B: CLIN 0001 | |||||
| EXHIBIT A: BASE YEAR ONE | |||||
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| A001 | REMOVAL OF EXISTING HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the removal of existing hullboard lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| A001AA | 1 inch thick Thermal | 30,000 | SF | $0.00 | $0.00 |
| A001AB | 2 inch thick Thermal | 20,000 | SF | $0.00 | $0.00 |
| A001AC | 3 inch thick Thermal | 10,000 | SF | $0.00 | $0.00 |
| A001AD | 1 inch thick Acoustical | 20,000 | SF | $0.00 | $0.00 |
| A001AE | 2 inch thich Acoustical | 10,000 | SF | $0.00 | $0.00 |
| A001AF | 3 inch thick Acoustical | 5,000 | SF | $0.00 | $0.00 |
| A001AG | 1 inch thick Polymide Foam Thermal | 10,000 | SF | $0.00 | $0.00 |
| A001AH | 2 inch thick Polymide Foam Thermal | 5,000 | SF | $0.00 | $0.00 |
| A001AJ | 1 inch thick Polymide Foam Acoustical | 10,000 | SF | $0.00 | $0.00 |
| A001AK | 2 inch thick Polymide Foam Acoustical | 5,000 | SF | $0.00 | $0.00 |
| A001AL | 1 inch thick Elastomeric Foam | 1,000 | SF | $0.00 | $0.00 |
| A001AM | LCS: 1 1/2 inch thick Neptune Thermal Insulation | 10,000 | SF | $0.00 | $0.00 |
| A001AN | LCS: 1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP) | 5,000 | SF | $0.00 | $0.00 |
| A001AP | LCS: 3 inch thick Polymide Foam Thermal | 2,000 | SF | $0.00 | $0.00 |
A001 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| A002 | INSTALLATION OF NEW HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the surface preparation, primer application and installation of new hullboard lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| A002AA | 1 inch thick Thermal | 30,000 | SF | $0.00 | $0.00 |
| A002AB | 2 inch thick Thermal | 20,000 | SF | $0.00 | $0.00 |
| A002AC | 3 inch thick Thermal | 10,000 | SF | $0.00 | $0.00 |
| A002AD | 1 inch thick Acoustical | 20,000 | SF | $0.00 | $0.00 |
| A002AE | 2 inch thick Acoustical | 10,000 | SF | $0.00 | $0.00 |
| A002AF | 3 inch thick Acoustical | 5,000 | SF | $0.00 | $0.00 |
| A002AG | 1 inch thick Polymide Foam Thermal | 10,000 | SF | $0.00 | $0.00 |
| A002AH | 2 inch thick Polymide Foam Thermal | 5,000 | SF | $0.00 | $0.00 |
| A002AJ | 1 inch thick Polymide Foam Acoustical | 10,000 | SF | $0.00 | $0.00 |
| A002AK | 2 inch thick Polymide Foam Acoustical | 5,000 | SF | $0.00 | $0.00 |
| A002AL | 1 inch thick Elastomeric Foam | 1,000 | SF | $0.00 | $0.00 |
| A002AM | LCS: 1 1/2 inch thick Neptune Thermal Insulation | 10,000 | SF | $0.00 | $0.00 |
| A002AN | LCS: 1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP) | 5,000 | SF | $0.00 | $0.00 |
| A002AP | LCS: 3 inch thick Polymide Foam Thermal | 2,000 | SF | $0.00 | $0.00 |
A002 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| A003 | PATCH AND REPAIR OF EXISTING HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the patch and repair of existing hullboard lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| A003AA | 1 inch thick Thermal | 2,000 | SF | $0.00 | $0.00 |
| A003AB | 2 inch thick Thermal | 1,000 | SF | $0.00 | $0.00 |
| A003AC | 3 inch thich Thermal | 500 | SF | $0.00 | $0.00 |
| A003AD | 1 inch thick Acoustical | 2,000 | SF | $0.00 | $0.00 |
| A003AE | 2 inch thick Acoustical | 1,000 | SF | $0.00 | $0.00 |
| A003AF | 3 inch thick Acoustical | 500 | SF | $0.00 | $0.00 |
| A003AG | 1 inch thich Polymide Foam Thermal | 1,000 | SF | $0.00 | $0.00 |
| A003AH | 2 inch thick Polymide Foam Thermal | 500 | SF | $0.00 | $0.00 |
| A003AJ | 1 inch thick Polymide Foam Acoustical | 1,000 | SF | $0.00 | $0.00 |
| A003AK | 2 inch thick Polymide Foam Acoustical | 500 | SF | $0.00 | $0.00 |
| A003AL | 1 inch thick Elastomeric Foam | 1,000 | SF | $0.00 | $0.00 |
| A003AM | LCS: 1 1/2 inch thick Neptune Thermal Insulation | 2,000 | SF | $0.00 | $0.00 |
| A003AN | LCS: 1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP) | 2,000 | SF | $0.00 | $0.00 |
| A003AP | LCS: 3 inch thick Polymide Foam Thermal | 1,000 | SF | $0.00 | $0.00 |
A003 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| A004 | VENTILATION DUCTING. REMOVAL OF EXISTING LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the removal of existing ventilation ducting lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| A004AA | 1 inch thick Thermal | 5,000 | SF | $0.00 | $0.00 |
| A004AB | 2 inch thick Thermal | 2,000 | SF | $0.00 | $0.00 |
| A004AC | 1 inch thich Polymide Foam Thermal | 5,000 | SF | $0.00 | $0.00 |
| A004AD | 2 inch thick Polymide Foam Therma | 2,000 | SF | $0.00 | $0.00 |
| A004AE | 1 inch thich Polymide Foam Acoustical | 1,000 | SF | $0.00 | $0.00 |
| A004AF | 2 inch thick Polymide Foam Acoustical | 500 | SF | $0.00 | $0.00 |
| A004AG | 1 inch thick Elastomeric Foam | 1,000 | SF | $0.00 | $0.00 |
| A004AH | Removable Lagging Pads on ventilation ducting flanges | 500 | SF | $0.00 | $0.00 |
A004 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| A005 | VENTILATION DUCTING. INSTALLATION OF NEW HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the surface preparation, primer application and installation of new ventilation ducting lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| A005AA | 1 inch thick Thermal | 5,000 | SF | $0.00 | $0.00 |
| A005AB | 2 inch thick Thermal | 2,000 | SF | $0.00 | $0.00 |
| A005AC | 1 inch thich Polymide Foam Thermal | 5,000 | SF | $0.00 | $0.00 |
| A005AD | 2 inch thick Polymide Foam Therma | 2,000 | SF | $0.00 | $0.00 |
| A005AE | 1 inch thich Polymide Foam Acoustical | 1,000 | SF | $0.00 | $0.00 |
| A005AF | 2 inch thick Polymide Foam Acoustical | 500 | SF | $0.00 | $0.00 |
| A005AG | 1 inch thick Elastomeric Foam | 1,000 | SF | $0.00 | $0.00 |
| A005AH | Removable Lagging Pads on ventilation ducting flanges | 500 | SF | $0.00 | $0.00 |
A005 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| A006 | PATCH AND REPAIR OF EXISTING VENTILATION DUCTING LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the patch and repair of existing ventilation ducting lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| A006AA | 1 inch thick Thermal | 2,000 | SF | $0.00 | $0.00 |
| A006AB | 2 inch thick Thermal | 1,000 | SF | $0.00 | $0.00 |
| A006AC | 1 inch thich Polymide Foam Thermal | 2,000 | SF | $0.00 | $0.00 |
| A006AD | 2 inch thick Polymide Foam Therma | 1,000 | SF | $0.00 | $0.00 |
| A006AE | 1 inch thich Polymide Foam Acoustical | 500 | SF | $0.00 | $0.00 |
| A006AF | 2 inch thick Polymide Foam Acoustical | 200 | SF | $0.00 | $0.00 |
| A006AG | 1 inch thick Elastomeric Foam | 200 | SF | $0.00 | $0.00 |
A006 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| A007 | Laboratory testing/analysis and disposal of insulation and lagging in accordance with the statement of work. | ||||
| A007AA | Laboratory testing/analysis of insulation and lagging. Applicable to the compartment(s) where the insulation and lagging were removed under ELINS A001AA, A001AB, A001AC, A001AD, A001AE, A001AF, A001AM, A001AN, A004AA, and A004AB. | 1,000 | EA | $0.00 | $0.00 |
| A007AB | Disposal of insulation and lagging removed. Applicable to the insulation and lagging that were removed under ELINS A001AA, A001AB, A001AC, A001AD, A001AE, A001AF, A001AM, A001AN, A004AA, and A004AB. | 100,000 | SF | $0.00 | $0.00 |
A007 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| A008 | CERTIFICATION OF COMPARTMENTS. Provide labor services, equipment and materials for a certified Marine Chemist to certify compartment(s) as "SAFE FOR WORKERS" for the duration of the Period of Performance in accordance with the statement of work. | ||||
| A008AA | One (1) compartment, Sunday through Saturday. | 100 | EA | $0.00 | $0.00 |
| A008AB | Each additional compartment(s), Sunday through Saturday.. | 100 | EA | $0.00 | $0.00 |
A008 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| A009 | MOLD REMEDIATION. Provide labor services, equipment and materials for the accomplishment of the Mold Remediation requirements in accordance with the statement of work. | ||||
| A009AA | Mold Remediation for different types of hullboard and ventilation lagging and insulation materials. Initial 10 SF. | 10 | EA | $0.00 | $0.00 |
| A009AB | Mold Remediation for different types of hullboard and ventilation lagging and insulation materials. Each additional 10 SF. | 10 | EA | $0.00 | $0.00 |
A009 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| A010 | Scaffolding and Crane Services. Provide labor, services, equipment, and materials for the erection, offload, certification, dismantle and offload of scaffolding in support of hullboard and ventilation ducting insulation and lagging services in accordance with the statement of work. | ||||
| A010AA | Rolling Scaffolding | 1,000 | HR | $0.00 | $0.00 |
| A010AB | Fixed Scaffolding | 1,000 | HR | $0.00 | $0.00 |
| A010AC | Hanging Scaffolding | 500 | HR | $0.00 | $0.00 |
| A010AD | Crane Services | 500 | HR | $0.00 | $0.00 |
A010 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT | |
| A011 | OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of the Delivery Order or the modification to an issued Delivery Order. | |||||
| A011AA | ADDITIONAL WORK - LABOR | |||||
| NOTE: The offeror’s proposed fully burdened labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control. | 200 | HR | $0.00 | $0.00 | ||
| A011AB | ADDITIONAL WORK - MATERIALS | |||||
| Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a contract and/or Delivery Order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. Offeror shall propose a material handling burdened rate:________% to be applied to SubELIN A011AB. | 100,000 | Dollars, | ||||
| U.S | 0.00% | $100,000 |
A011 ITEM NUMBER TOTAL $100,000.00
| ITEM NO | SUPPLIES/SERVICES | % PROPOSED | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| A012 | ACCELERATED DELIVERY: It is anticipated that 20 percent of the delivery orders will require accelerated delivery. When services are required in less than 4 hours of the receipt of the delivery order whether during or after normal working hours or less than the contract specified time of delivery. Line items A001 through A011AB may require accelerated delivery. Accelerated delivery will only be provided when authorized in advance by the Contracting Officer at a ______% percentage additional fee of the proposed ELIN price. (Zero % will be the additional charge if none is provided by the offeror). *** For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS A001 through A011 = $_____________ (multiplied by) 20 percent = ____________ (multiplied by percentage proposed for this ELIN) of ________% = ___________ (total amount in the Item Number Total space provided for ELIN A012). | ||||
| A001 - A011 | ELIN TOTAL FOR ACCELERATED DELIVERY CALCULATION | $100,000.00 | |||
| ANTICIPATED ACCELERATED DELIVERY TOTAL (20%): | $20,000.00 | ||||
| ADDITIONAL PERCENT FEE PROPOSED: | 0% | LOT | $0.00 | ||
| A012 | ITEM NUMBER TOTAL | 1 | LOT | $0.00 |
ELIN SUMMARY - BASE YEAR ONE
| A001TOTAL | $0.00 | ||
| A002 TOTAL | $0.00 | FINAL TOTAL | |
| BASE YEAR ONE | $100,000.00 | ||
| A003 TOTAL | $0.00 | ||
| A004 TOTAL | $0.00 | ||
| A005 TOTAL | $0.00 | ||
| A006 TOTAL | $0.00 | ||
| A007 TOTAL | $0.00 | ||
| A008 TOTAL | $0.00 | ||
| A009 TOTAL | $0.00 | ||
| A010 TOTAL | $0.00 | ||
| A011 TOTAL | $100,000.00 | ||
| A012 TOTAL | $0.00 |
&P of &N
Ordering Period 2
| RFP: N5523620R0001 | |||||
| Offeror: | |||||
| SECTION B: CLIN 0002 | |||||
| EXHIBIT B: BASE YEAR TWO | |||||
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| B001 | REMOVAL OF EXISTING HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the removal of existing hullboard lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| B001AA | 1 inch thick Thermal | 30,000 | SF | $0.00 | $0.00 |
| B001AB | 2 inch thick Thermal | 20,000 | SF | $0.00 | $0.00 |
| B001AC | 3 inch thick Thermal | 10,000 | SF | $0.00 | $0.00 |
| B001AD | 1 inch thick Acoustical | 20,000 | SF | $0.00 | $0.00 |
| B001AE | 2 inch thich Acoustical | 10,000 | SF | $0.00 | $0.00 |
| B001AF | 3 inch thick Acoustical | 5,000 | SF | $0.00 | $0.00 |
| B001AG | 1 inch thick Polymide Foam Thermal | 10,000 | SF | $0.00 | $0.00 |
| B001AH | 2 inch thick Polymide Foam Thermal | 5,000 | SF | $0.00 | $0.00 |
| B001AJ | 1 inch thick Polymide Foam Acoustical | 10,000 | SF | $0.00 | $0.00 |
| B001AK | 2 inch thick Polymide Foam Acoustical | 5,000 | SF | $0.00 | $0.00 |
| B001AL | 1 inch thick Elastomeric Foam | 1,000 | SF | $0.00 | $0.00 |
| B001AM | LCS: 1 1/2 inch thick Neptune Thermal Insulation | 10,000 | SF | $0.00 | $0.00 |
| B001AN | LCS: 1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP) | 5,000 | SF | $0.00 | $0.00 |
| B001AP | LCS: 3 inch thick Polymide Foam Thermal | 2,000 | SF | $0.00 | $0.00 |
B001 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| B002 | INSTALLATION OF NEW HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the surface preparation, primer application and installation of new hullboard lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| B002AA | 1 inch thick Thermal | 30,000 | SF | $0.00 | $0.00 |
| B002AB | 2 inch thick Thermal | 20,000 | SF | $0.00 | $0.00 |
| B002AC | 3 inch thick Thermal | 10,000 | SF | $0.00 | $0.00 |
| B002AD | 1 inch thick Acoustical | 20,000 | SF | $0.00 | $0.00 |
| B002AE | 2 inch thick Acoustical | 10,000 | SF | $0.00 | $0.00 |
| B002AF | 3 inch thick Acoustical | 5,000 | SF | $0.00 | $0.00 |
| B002AG | 1 inch thick Polymide Foam Thermal | 10,000 | SF | $0.00 | $0.00 |
| B002AH | 2 inch thick Polymide Foam Thermal | 5,000 | SF | $0.00 | $0.00 |
| B002AJ | 1 inch thick Polymide Foam Acoustical | 10,000 | SF | $0.00 | $0.00 |
| B002AK | 2 inch thick Polymide Foam Acoustical | 5,000 | SF | $0.00 | $0.00 |
| B002AL | 1 inch thick Elastomeric Foam | 1,000 | SF | $0.00 | $0.00 |
| B002AM | LCS: 1 1/2 inch thick Neptune Thermal Insulation | 10,000 | SF | $0.00 | $0.00 |
| B002AN | LCS: 1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP) | 5,000 | SF | $0.00 | $0.00 |
| B002AP | LCS: 3 inch thick Polymide Foam Thermal | 2,000 | SF | $0.00 | $0.00 |
B002 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| B003 | PATCH AND REPAIR OF EXISTING HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the patch and repair of existing hullboard lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| B003AA | 1 inch thick Thermal | 2,000 | SF | $0.00 | $0.00 |
| B003AB | 2 inch thick Thermal | 1,000 | SF | $0.00 | $0.00 |
| B003AC | 3 inch thich Thermal | 500 | SF | $0.00 | $0.00 |
| B003AD | 1 inch thick Acoustical | 2,000 | SF | $0.00 | $0.00 |
| B003AE | 2 inch thick Acoustical | 1,000 | SF | $0.00 | $0.00 |
| B003AF | 3 inch thick Acoustical | 500 | SF | $0.00 | $0.00 |
| B003AG | 1 inch thich Polymide Foam Thermal | 1,000 | SF | $0.00 | $0.00 |
| B003AH | 2 inch thick Polymide Foam Thermal | 500 | SF | $0.00 | $0.00 |
| B003AJ | 1 inch thick Polymide Foam Acoustical | 1,000 | SF | $0.00 | $0.00 |
| B003AK | 2 inch thick Polymide Foam Acoustical | 500 | SF | $0.00 | $0.00 |
| B003AL | 1 inch thick Elastomeric Foam | 1,000 | SF | $0.00 | $0.00 |
| B003AM | LCS: 1 1/2 inch thick Neptune Thermal Insulation | 2,000 | SF | $0.00 | $0.00 |
| B003AN | LCS: 1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP) | 2,000 | SF | $0.00 | $0.00 |
| B003AP | LCS: 3 inch thick Polymide Foam Thermal | 1,000 | SF | $0.00 | $0.00 |
B003 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| B004 | VENTILATION DUCTING. REMOVAL OF EXISTING LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the removal of existing ventilation ducting lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| B004AA | 1 inch thick Thermal | 5,000 | SF | $0.00 | $0.00 |
| B004AB | 2 inch thick Thermal | 2,000 | SF | $0.00 | $0.00 |
| B004AC | 1 inch thich Polymide Foam Thermal | 5,000 | SF | $0.00 | $0.00 |
| B004AD | 2 inch thick Polymide Foam Therma | 2,000 | SF | $0.00 | $0.00 |
| B004AE | 1 inch thich Polymide Foam Acoustical | 1,000 | SF | $0.00 | $0.00 |
| B004AF | 2 inch thick Polymide Foam Acoustical | 500 | SF | $0.00 | $0.00 |
| B004AG | 1 inch thick Elastomeric Foam | 1,000 | SF | $0.00 | $0.00 |
| B004AH | Removable Lagging Pads on ventilation ducting flanges | 500 | SF | $0.00 | $0.00 |
B004 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| B005 | VENTILATION DUCTING. INSTALLATION OF NEW HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the surface preparation, primer application and installation of new ventilation ducting lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| B005AA | 1 inch thick Thermal | 5,000 | SF | $0.00 | $0.00 |
| B005AB | 2 inch thick Thermal | 2,000 | SF | $0.00 | $0.00 |
| B005AC | 1 inch thich Polymide Foam Thermal | 5,000 | SF | $0.00 | $0.00 |
| B005AD | 2 inch thick Polymide Foam Therma | 2,000 | SF | $0.00 | $0.00 |
| B005AE | 1 inch thich Polymide Foam Acoustical | 1,000 | SF | $0.00 | $0.00 |
| B005AF | 2 inch thick Polymide Foam Acoustical | 500 | SF | $0.00 | $0.00 |
| B005AG | 1 inch thick Elastomeric Foam | 1,000 | SF | $0.00 | $0.00 |
| B005AH | Removable Lagging Pads on ventilation ducting flanges | 500 | SF | $0.00 | $0.00 |
B005 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| B006 | PATCH AND REPAIR OF EXISTING VENTILATION DUCTING LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the patch and repair of existing ventilation ducting lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| B006AA | 1 inch thick Thermal | 2,000 | SF | $0.00 | $0.00 |
| B006AB | 2 inch thick Thermal | 1,000 | SF | $0.00 | $0.00 |
| B006AC | 1 inch thich Polymide Foam Thermal | 2,000 | SF | $0.00 | $0.00 |
| B006AD | 2 inch thick Polymide Foam Therma | 1,000 | SF | $0.00 | $0.00 |
| B006AE | 1 inch thich Polymide Foam Acoustical | 500 | SF | $0.00 | $0.00 |
| B006AF | 2 inch thick Polymide Foam Acoustical | 200 | SF | $0.00 | $0.00 |
| B006AG | 1 inch thick Elastomeric Foam | 200 | SF | $0.00 | $0.00 |
B006 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| B007 | Laboratory testing/analysis and disposal of insulation and lagging in accordance with the statement of work. | ||||
| B007AA | Laboratory testing/analysis of insulation and lagging. Applicable to the compartment(s) where the insulation and lagging were removed under ELINS B001AA, B001AB, B001AC, B001AD, B001AE, B001AF, B001AM, B001AN, B004AA, and B004AB. | 1,000 | EA | $0.00 | $0.00 |
| B007AB | Disposal of insulation and lagging removed. Applicable to the insulation and lagging that were removed under ELINS B001AA, B001AB, B001AC, B001AD, B001AE, B001AF, B001AM, B001AN, B004AA, and B004AB. | 100,000 | SF | $0.00 | $0.00 |
B007 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| B008 | CERTIFICATION OF COMPARTMENTS. Provide labor services, equipment and materials for a certified Marine Chemist to certify compartment(s) as "SAFE FOR WORKERS" for the duration of the Period of Performance in accordance with the statement of work. | ||||
| B008AA | TWO (1) compartment, Sunday through Saturday. | 100 | EA | $0.00 | $0.00 |
| B008AB | Each additional compartment(s), Sunday through Saturday.. | 100 | EA | $0.00 | $0.00 |
B008 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| B009 | MOLD REMEDIATION. Provide labor services, equipment and materials for the accomplishment of the Mold Remediation requirements in accordance with the statement of work. | ||||
| B009AA | Mold Remediation for different types of hullboard and ventilation lagging and insulation materials. Initial 10 SF. | 10 | EA | $0.00 | $0.00 |
| B009AB | Mold Remediation for different types of hullboard and ventilation lagging and insulation materials. Each additional 10 SF. | 10 | EA | $0.00 | $0.00 |
B009 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| B010 | Scaffolding and Crane Services. Provide labor, services, equipment, and materials for the erection, offload, certification, dismantle and offload of scaffolding in support of hullboard and ventilation ducting insulation and lagging services in accordance with the statement of work. | ||||
| B010AA | Rolling Scaffolding | 1,000 | HR | $0.00 | $0.00 |
| B010AB | Fixed Scaffolding | 1,000 | HR | $0.00 | $0.00 |
| B010AC | Hanging Scaffolding | 500 | HR | $0.00 | $0.00 |
| B010AD | Crane Services | 500 | HR | $0.00 | $0.00 |
B010 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT | |
| B011 | OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of the Delivery Order or the modification to an issued Delivery Order. | |||||
| B011AA | ADDITIONAL WORK - LABOR | |||||
| NOTE: The offeror’s proposed fully burdened labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control. | 200 | HR | $0.00 | $0.00 | ||
| B011AB | ADDITIONAL WORK - MATERIALS | |||||
| Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a contract and/or Delivery Order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. Offeror shall propose a material handling burdened rate:________% to be applied to SubELIN B011AB. | 100,000 | Dollars, | ||||
| U.S | 0.00% | $100,000 |
B011 ITEM NUMBER TOTAL $100,000.00
| ITEM NO | SUPPLIES/SERVICES | % PROPOSED | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| B012 | ACCELERATED DELIVERY: It is anticipated that 20 percent of the delivery orders will require accelerated delivery. When services are required in less than 4 hours of the receipt of the delivery order whether during or after normal working hours or less than the contract specified time of delivery. Line items B001 through B011AB may require accelerated delivery. Accelerated delivery will only be provided when authorized in advance by the Contracting Officer at a ______% percentage additional fee of the proposed ELIN price. (Zero % will be the additional charge if nTWO is provided by the offeror). *** For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS B001 through B011 = $_____________ (multiplied by) 20 percent = ____________ (multiplied by percentage proposed for this ELIN) of ________% = ___________ (total amount in the Item Number Total space provided for ELIN B012). | ||||
| B001 - B011 | ELIN TOTAL FOR ACCELERATED DELIVERY CALCULATION | $100,000.00 | |||
| ANTICIPATED ACCELERATED DELIVERY TOTAL (20%): | $20,000.00 | ||||
| ADDITIONAL PERCENT FEE PROPOSED: | 0% | LOT | $0.00 | ||
| B012 | ITEM NUMBER TOTAL | 1 | LOT | $0.00 |
ELIN SUMMARY - BASE YEAR TWO
| B001TOTAL | $0.00 | ||
| B002 TOTAL | $0.00 | FINAL TOTAL | |
| BASE YEAR TWO | $100,000.00 | ||
| B003 TOTAL | $0.00 | ||
| B004 TOTAL | $0.00 | ||
| B005 TOTAL | $0.00 | ||
| B006 TOTAL | $0.00 | ||
| B007 TOTAL | $0.00 | ||
| B008 TOTAL | $0.00 | ||
| B009 TOTAL | $0.00 | ||
| B010 TOTAL | $0.00 | ||
| B011 TOTAL | $100,000.00 | ||
| B012 TOTAL | $0.00 |
Ordering Period 3
| RFP: N5523620R0001 | |||||
| Offeror: | |||||
| SECTION B: CLIN 0003 | |||||
| EXHIBIT C: BASE YEAR THREE | |||||
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| C001 | REMOVAL OF EXISTING HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the removal of existing hullboard lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| C001AA | 1 inch thick Thermal | 30,000 | SF | $0.00 | $0.00 |
| C001AB | 2 inch thick Thermal | 20,000 | SF | $0.00 | $0.00 |
| C001AC | 3 inch thick Thermal | 10,000 | SF | $0.00 | $0.00 |
| C001AD | 1 inch thick Acoustical | 20,000 | SF | $0.00 | $0.00 |
| C001AE | 2 inch thich Acoustical | 10,000 | SF | $0.00 | $0.00 |
| C001AF | 3 inch thick Acoustical | 5,000 | SF | $0.00 | $0.00 |
| C001AG | 1 inch thick Polymide Foam Thermal | 10,000 | SF | $0.00 | $0.00 |
| C001AH | 2 inch thick Polymide Foam Thermal | 5,000 | SF | $0.00 | $0.00 |
| C001AJ | 1 inch thick Polymide Foam Acoustical | 10,000 | SF | $0.00 | $0.00 |
| C001AK | 2 inch thick Polymide Foam Acoustical | 5,000 | SF | $0.00 | $0.00 |
| C001AL | 1 inch thick Elastomeric Foam | 1,000 | SF | $0.00 | $0.00 |
| C001AM | LCS: 1 1/2 inch thick Neptune Thermal Insulation | 10,000 | SF | $0.00 | $0.00 |
| C001AN | LCS: 1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP) | 5,000 | SF | $0.00 | $0.00 |
| C001AP | LCS: 3 inch thick Polymide Foam Thermal | 2,000 | SF | $0.00 | $0.00 |
C001 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| C002 | INSTALLATION OF NEW HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the surface preparation, primer application and installation of new hullboard lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| C002AA | 1 inch thick Thermal | 30,000 | SF | $0.00 | $0.00 |
| C002AB | 2 inch thick Thermal | 20,000 | SF | $0.00 | $0.00 |
| C002AC | 3 inch thick Thermal | 10,000 | SF | $0.00 | $0.00 |
| C002AD | 1 inch thick Acoustical | 20,000 | SF | $0.00 | $0.00 |
| C002AE | 2 inch thick Acoustical | 10,000 | SF | $0.00 | $0.00 |
| C002AF | 3 inch thick Acoustical | 5,000 | SF | $0.00 | $0.00 |
| C002AG | 1 inch thick Polymide Foam Thermal | 10,000 | SF | $0.00 | $0.00 |
| C002AH | 2 inch thick Polymide Foam Thermal | 5,000 | SF | $0.00 | $0.00 |
| C002AJ | 1 inch thick Polymide Foam Acoustical | 10,000 | SF | $0.00 | $0.00 |
| C002AK | 2 inch thick Polymide Foam Acoustical | 5,000 | SF | $0.00 | $0.00 |
| C002AL | 1 inch thick Elastomeric Foam | 1,000 | SF | $0.00 | $0.00 |
| C002AM | LCS: 1 1/2 inch thick Neptune Thermal Insulation | 10,000 | SF | $0.00 | $0.00 |
| C002AN | LCS: 1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP) | 5,000 | SF | $0.00 | $0.00 |
| C002AP | LCS: 3 inch thick Polymide Foam Thermal | 2,000 | SF | $0.00 | $0.00 |
C002 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| C003 | PATCH AND REPAIR OF EXISTING HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the patch and repair of existing hullboard lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| C003AA | 1 inch thick Thermal | 2,000 | SF | $0.00 | $0.00 |
| C003AB | 2 inch thick Thermal | 1,000 | SF | $0.00 | $0.00 |
| C003AC | 3 inch thich Thermal | 500 | SF | $0.00 | $0.00 |
| C003AD | 1 inch thick Acoustical | 2,000 | SF | $0.00 | $0.00 |
| C003AE | 2 inch thick Acoustical | 1,000 | SF | $0.00 | $0.00 |
| C003AF | 3 inch thick Acoustical | 500 | SF | $0.00 | $0.00 |
| C003AG | 1 inch thich Polymide Foam Thermal | 1,000 | SF | $0.00 | $0.00 |
| C003AH | 2 inch thick Polymide Foam Thermal | 500 | SF | $0.00 | $0.00 |
| C003AJ | 1 inch thick Polymide Foam Acoustical | 1,000 | SF | $0.00 | $0.00 |
| C003AK | 2 inch thick Polymide Foam Acoustical | 500 | SF | $0.00 | $0.00 |
| C003AL | 1 inch thick Elastomeric Foam | 1,000 | SF | $0.00 | $0.00 |
| C003AM | LCS: 1 1/2 inch thick Neptune Thermal Insulation | 2,000 | SF | $0.00 | $0.00 |
| C003AN | LCS: 1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP) | 2,000 | SF | $0.00 | $0.00 |
| C003AP | LCS: 3 inch thick Polymide Foam Thermal | 1,000 | SF | $0.00 | $0.00 |
C003 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| C004 | VENTILATION DUCTING. REMOVAL OF EXISTING LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the removal of existing ventilation ducting lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| C004AA | 1 inch thick Thermal | 5,000 | SF | $0.00 | $0.00 |
| C004AB | 2 inch thick Thermal | 2,000 | SF | $0.00 | $0.00 |
| C004AC | 1 inch thich Polymide Foam Thermal | 5,000 | SF | $0.00 | $0.00 |
| C004AD | 2 inch thick Polymide Foam Therma | 2,000 | SF | $0.00 | $0.00 |
| C004AE | 1 inch thich Polymide Foam Acoustical | 1,000 | SF | $0.00 | $0.00 |
| C004AF | 2 inch thick Polymide Foam Acoustical | 500 | SF | $0.00 | $0.00 |
| C004AG | 1 inch thick Elastomeric Foam | 1,000 | SF | $0.00 | $0.00 |
| C004AH | Removable Lagging Pads on ventilation ducting flanges | 500 | SF | $0.00 | $0.00 |
C004 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| C005 | VENTILATION DUCTING. INSTALLATION OF NEW HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the surface preparation, primer application and installation of new ventilation ducting lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| C005AA | 1 inch thick Thermal | 5,000 | SF | $0.00 | $0.00 |
| C005AB | 2 inch thick Thermal | 2,000 | SF | $0.00 | $0.00 |
| C005AC | 1 inch thich Polymide Foam Thermal | 5,000 | SF | $0.00 | $0.00 |
| C005AD | 2 inch thick Polymide Foam Therma | 2,000 | SF | $0.00 | $0.00 |
| C005AE | 1 inch thich Polymide Foam Acoustical | 1,000 | SF | $0.00 | $0.00 |
| C005AF | 2 inch thick Polymide Foam Acoustical | 500 | SF | $0.00 | $0.00 |
| C005AG | 1 inch thick Elastomeric Foam | 1,000 | SF | $0.00 | $0.00 |
| C005AH | Removable Lagging Pads on ventilation ducting flanges | 500 | SF | $0.00 | $0.00 |
C005 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| C006 | PATCH AND REPAIR OF EXISTING VENTILATION DUCTING LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the patch and repair of existing ventilation ducting lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| C006AA | 1 inch thick Thermal | 2,000 | SF | $0.00 | $0.00 |
| C006AB | 2 inch thick Thermal | 1,000 | SF | $0.00 | $0.00 |
| C006AC | 1 inch thich Polymide Foam Thermal | 2,000 | SF | $0.00 | $0.00 |
| C006AD | 2 inch thick Polymide Foam Therma | 1,000 | SF | $0.00 | $0.00 |
| C006AE | 1 inch thich Polymide Foam Acoustical | 500 | SF | $0.00 | $0.00 |
| C006AF | 2 inch thick Polymide Foam Acoustical | 200 | SF | $0.00 | $0.00 |
| C006AG | 1 inch thick Elastomeric Foam | 200 | SF | $0.00 | $0.00 |
C006 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| C007 | Laboratory testing/analysis and disposal of insulation and lagging in accordance with the statement of work. | ||||
| C007AA | Laboratory testing/analysis of insulation and lagging. Applicable to the compartment(s) where the insulation and lagging were removed under ELINS C001AA, C001AB, C001AC, C001AD, C001AE, C001AF, C001AM, C001AN, C004AA, and C004AB. | 1,000 | EA | $0.00 | $0.00 |
| C007AB | Disposal of insulation and lagging removed. Applicable to the insulation and lagging that were removed under ELINS C001AA, C001AB, C001AC, C001AD, C001AE, C001AF, C001AM, C001AN, C004AA, and C004AB. | 100,000 | SF | $0.00 | $0.00 |
C007 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| C008 | CERTIFICATION OF COMPARTMENTS. Provide labor services, equipment and materials for a certified Marine Chemist to certify compartment(s) as "SAFE FOR WORKERS" for the duration of the Period of Performance in accordance with the statement of work. | ||||
| C008AA | TWO (1) compartment, Sunday through Saturday. | 100 | EA | $0.00 | $0.00 |
| C008AB | Each additional compartment(s), Sunday through Saturday.. | 100 | EA | $0.00 | $0.00 |
C008 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| C009 | MOLD REMEDIATION. Provide labor services, equipment and materials for the accomplishment of the Mold Remediation requirements in accordance with the statement of work. | ||||
| C009AA | Mold Remediation for different types of hullboard and ventilation lagging and insulation materials. Initial 10 SF. | 10 | EA | $0.00 | $0.00 |
| C009AB | Mold Remediation for different types of hullboard and ventilation lagging and insulation materials. Each additional 10 SF. | 10 | EA | $0.00 | $0.00 |
C009 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| C010 | Scaffolding and Crane Services. Provide labor, services, equipment, and materials for the erection, offload, certification, dismantle and offload of scaffolding in support of hullboard and ventilation ducting insulation and lagging services in accordance with the statement of work. | ||||
| C010AA | Rolling Scaffolding | 1,000 | HR | $0.00 | $0.00 |
| C010AB | Fixed Scaffolding | 1,000 | HR | $0.00 | $0.00 |
| C010AC | Hanging Scaffolding | 500 | HR | $0.00 | $0.00 |
| C010AD | Crane Services | 500 | HR | $0.00 | $0.00 |
C010 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT | |
| C011 | OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of the Delivery Order or the modification to an issued Delivery Order. | |||||
| C011AA | ADDITIONAL WORK - LABOR | |||||
| NOTE: The offeror’s proposed fully burdened labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control. | 200 | HR | $0.00 | $0.00 | ||
| C011AB | ADDITIONAL WORK - MATERIALS | |||||
| Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a contract and/or Delivery Order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. Offeror shall propose a material handling burdened rate:________% to be applied to SubELIN C011AB. | 100,000 | Dollars, | ||||
| U.S | 0.00% | $100,000 |
C011 ITEM NUMBER TOTAL $100,000.00
| ITEM NO | SUPPLIES/SERVICES | % PROPOSED | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| C012 | ACCELERATED DELIVERY: It is anticipated that 20 percent of the delivery orders will require accelerated delivery. When services are required in less than 4 hours of the receipt of the delivery order whether during or after normal working hours or less than the contract specified time of delivery. Line items C001 through C011AB may require accelerated delivery. Accelerated delivery will only be provided when authorized in advance by the Contracting Officer at a ______% percentage additional fee of the proposed ELIN price. (Zero % will be the additional charge if nTWO is provided by the offeror). *** For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS C001 through C011 = $_____________ (multiplied by) 20 percent = ____________ (multiplied by percentage proposed for this ELIN) of ________% = ___________ (total amount in the Item Number Total space provided for ELIN C012). | ||||
| C001 - C011 | ELIN TOTAL FOR ACCELERATED DELIVERY CALCULATION | $100,000.00 | |||
| ANTICIPATED ACCELERATED DELIVERY TOTAL (20%): | $20,000.00 | ||||
| ADDITIONAL PERCENT FEE PROPOSED: | 0% | LOT | $0.00 | ||
| C012 | ITEM NUMBER TOTAL | 1 | LOT | $0.00 |
ELIN SUMMARY - BASE YEAR THREE
| C001TOTAL | $0.00 | ||
| C002 TOTAL | $0.00 | FINAL TOTAL | |
| BASE YEAR THREE | $100,000.00 | ||
| C003 TOTAL | $0.00 | ||
| C004 TOTAL | $0.00 | ||
| C005 TOTAL | $0.00 | ||
| C006 TOTAL | $0.00 | ||
| C007 TOTAL | $0.00 | ||
| C008 TOTAL | $0.00 | ||
| C009 TOTAL | $0.00 | ||
| C010 TOTAL | $0.00 | ||
| C011 TOTAL | $100,000.00 | ||
| C012 TOTAL | $0.00 |
Ordering Period 4
| RFP: N5523620R0001 | |||||
| Offeror: | |||||
| SECTION B: CLIN 0004 | |||||
| EXHIBIT D: BASE YEAR FOUR | |||||
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| D001 | REMOVAL OF EXISTING HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the removal of existing hullboard lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| D001AA | 1 inch thick Thermal | 30,000 | SF | $0.00 | $0.00 |
| D001AB | 2 inch thick Thermal | 20,000 | SF | $0.00 | $0.00 |
| D001AC | 3 inch thick Thermal | 10,000 | SF | $0.00 | $0.00 |
| D001AD | 1 inch thick Acoustical | 20,000 | SF | $0.00 | $0.00 |
| D001AE | 2 inch thich Acoustical | 10,000 | SF | $0.00 | $0.00 |
| D001AF | 3 inch thick Acoustical | 5,000 | SF | $0.00 | $0.00 |
| D001AG | 1 inch thick Polymide Foam Thermal | 10,000 | SF | $0.00 | $0.00 |
| D001AH | 2 inch thick Polymide Foam Thermal | 5,000 | SF | $0.00 | $0.00 |
| D001AJ | 1 inch thick Polymide Foam Acoustical | 10,000 | SF | $0.00 | $0.00 |
| D001AK | 2 inch thick Polymide Foam Acoustical | 5,000 | SF | $0.00 | $0.00 |
| D001AL | 1 inch thick Elastomeric Foam | 1,000 | SF | $0.00 | $0.00 |
| D001AM | LCS: 1 1/2 inch thick Neptune Thermal Insulation | 10,000 | SF | $0.00 | $0.00 |
| D001AN | LCS: 1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP) | 5,000 | SF | $0.00 | $0.00 |
| D001AP | LCS: 3 inch thick Polymide Foam Thermal | 2,000 | SF | $0.00 | $0.00 |
D001 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| D002 | INSTALLATION OF NEW HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the surface preparation, primer application and installation of new hullboard lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| D002AA | 1 inch thick Thermal | 30,000 | SF | $0.00 | $0.00 |
| D002AB | 2 inch thick Thermal | 20,000 | SF | $0.00 | $0.00 |
| D002AC | 3 inch thick Thermal | 10,000 | SF | $0.00 | $0.00 |
| D002AD | 1 inch thick Acoustical | 20,000 | SF | $0.00 | $0.00 |
| D002AE | 2 inch thick Acoustical | 10,000 | SF | $0.00 | $0.00 |
| D002AF | 3 inch thick Acoustical | 5,000 | SF | $0.00 | $0.00 |
| D002AG | 1 inch thick Polymide Foam Thermal | 10,000 | SF | $0.00 | $0.00 |
| D002AH | 2 inch thick Polymide Foam Thermal | 5,000 | SF | $0.00 | $0.00 |
| D002AJ | 1 inch thick Polymide Foam Acoustical | 10,000 | SF | $0.00 | $0.00 |
| D002AK | 2 inch thick Polymide Foam Acoustical | 5,000 | SF | $0.00 | $0.00 |
| D002AL | 1 inch thick Elastomeric Foam | 1,000 | SF | $0.00 | $0.00 |
| D002AM | LCS: 1 1/2 inch thick Neptune Thermal Insulation | 10,000 | SF | $0.00 | $0.00 |
| D002AN | LCS: 1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP) | 5,000 | SF | $0.00 | $0.00 |
| D002AP | LCS: 3 inch thick Polymide Foam Thermal | 2,000 | SF | $0.00 | $0.00 |
D002 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| D003 | PATCH AND REPAIR OF EXISTING HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the patch and repair of existing hullboard lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| D003AA | 1 inch thick Thermal | 2,000 | SF | $0.00 | $0.00 |
| D003AB | 2 inch thick Thermal | 1,000 | SF | $0.00 | $0.00 |
| D003AC | 3 inch thich Thermal | 500 | SF | $0.00 | $0.00 |
| D003AD | 1 inch thick Acoustical | 2,000 | SF | $0.00 | $0.00 |
| D003AE | 2 inch thick Acoustical | 1,000 | SF | $0.00 | $0.00 |
| D003AF | 3 inch thick Acoustical | 500 | SF | $0.00 | $0.00 |
| D003AG | 1 inch thich Polymide Foam Thermal | 1,000 | SF | $0.00 | $0.00 |
| D003AH | 2 inch thick Polymide Foam Thermal | 500 | SF | $0.00 | $0.00 |
| D003AJ | 1 inch thick Polymide Foam Acoustical | 1,000 | SF | $0.00 | $0.00 |
| D003AK | 2 inch thick Polymide Foam Acoustical | 500 | SF | $0.00 | $0.00 |
| D003AL | 1 inch thick Elastomeric Foam | 1,000 | SF | $0.00 | $0.00 |
| D003AM | LCS: 1 1/2 inch thick Neptune Thermal Insulation | 2,000 | SF | $0.00 | $0.00 |
| D003AN | LCS: 1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP) | 2,000 | SF | $0.00 | $0.00 |
| D003AP | LCS: 3 inch thick Polymide Foam Thermal | 1,000 | SF | $0.00 | $0.00 |
D003 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| D004 | VENTILATION DUCTING. REMOVAL OF EXISTING LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the removal of existing ventilation ducting lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| D004AA | 1 inch thick Thermal | 5,000 | SF | $0.00 | $0.00 |
| D004AB | 2 inch thick Thermal | 2,000 | SF | $0.00 | $0.00 |
| D004AC | 1 inch thich Polymide Foam Thermal | 5,000 | SF | $0.00 | $0.00 |
| D004AD | 2 inch thick Polymide Foam Therma | 2,000 | SF | $0.00 | $0.00 |
| D004AE | 1 inch thich Polymide Foam Acoustical | 1,000 | SF | $0.00 | $0.00 |
| D004AF | 2 inch thick Polymide Foam Acoustical | 500 | SF | $0.00 | $0.00 |
| D004AG | 1 inch thick Elastomeric Foam | 1,000 | SF | $0.00 | $0.00 |
| D004AH | Removable Lagging Pads on ventilation ducting flanges | 500 | SF | $0.00 | $0.00 |
D004 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| D005 | VENTILATION DUCTING. INSTALLATION OF NEW HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the surface preparation, primer application and installation of new ventilation ducting lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| D005AA | 1 inch thick Thermal | 5,000 | SF | $0.00 | $0.00 |
| D005AB | 2 inch thick Thermal | 2,000 | SF | $0.00 | $0.00 |
| D005AC | 1 inch thich Polymide Foam Thermal | 5,000 | SF | $0.00 | $0.00 |
| D005AD | 2 inch thick Polymide Foam Therma | 2,000 | SF | $0.00 | $0.00 |
| D005AE | 1 inch thich Polymide Foam Acoustical | 1,000 | SF | $0.00 | $0.00 |
| D005AF | 2 inch thick Polymide Foam Acoustical | 500 | SF | $0.00 | $0.00 |
| D005AG | 1 inch thick Elastomeric Foam | 1,000 | SF | $0.00 | $0.00 |
| D005AH | Removable Lagging Pads on ventilation ducting flanges | 500 | SF | $0.00 | $0.00 |
D005 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| D006 | PATCH AND REPAIR OF EXISTING VENTILATION DUCTING LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the patch and repair of existing ventilation ducting lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| D006AA | 1 inch thick Thermal | 2,000 | SF | $0.00 | $0.00 |
| D006AB | 2 inch thick Thermal | 1,000 | SF | $0.00 | $0.00 |
| D006AC | 1 inch thich Polymide Foam Thermal | 2,000 | SF | $0.00 | $0.00 |
| D006AD | 2 inch thick Polymide Foam Therma | 1,000 | SF | $0.00 | $0.00 |
| D006AE | 1 inch thich Polymide Foam Acoustical | 500 | SF | $0.00 | $0.00 |
| D006AF | 2 inch thick Polymide Foam Acoustical | 200 | SF | $0.00 | $0.00 |
| D006AG | 1 inch thick Elastomeric Foam | 200 | SF | $0.00 | $0.00 |
D006 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| D007 | Laboratory testing/analysis and disposal of insulation and lagging in accordance with the statement of work. | ||||
| D007AA | Laboratory testing/analysis of insulation and lagging. Applicable to the compartment(s) where the insulation and lagging were removed under ELINS D001AA, D001AB, D001AC, D001AD, D001AE, D001AF, D001AM, D001AN, D004AA, and D004AB. | 1,000 | EA | $0.00 | $0.00 |
| D007AB | Disposal of insulation and lagging removed. Applicable to the insulation and lagging that were removed under ELINS D001AA, D001AB, D001AC, D001AD, D001AE, D001AF, D001AM, D001AN, D004AA, and D004AB. | 100,000 | SF | $0.00 | $0.00 |
D007 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| D008 | CERTIFICATION OF COMPARTMENTS. Provide labor services, equipment and materials for a certified Marine Chemist to certify compartment(s) as "SAFE FOR WORKERS" for the duration of the Period of Performance in accordance with the statement of work. | ||||
| D008AA | TWO (1) compartment, Sunday through Saturday. | 100 | EA | $0.00 | $0.00 |
| D008AB | Each additional compartment(s), Sunday through Saturday.. | 100 | EA | $0.00 | $0.00 |
D008 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| D009 | MOLD REMEDIATION. Provide labor services, equipment and materials for the accomplishment of the Mold Remediation requirements in accordance with the statement of work. | ||||
| D009AA | Mold Remediation for different types of hullboard and ventilation lagging and insulation materials. Initial 10 SF. | 10 | EA | $0.00 | $0.00 |
| D009AB | Mold Remediation for different types of hullboard and ventilation lagging and insulation materials. Each additional 10 SF. | 10 | EA | $0.00 | $0.00 |
D009 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| D010 | Scaffolding and Crane Services. Provide labor, services, equipment, and materials for the erection, offload, certification, dismantle and offload of scaffolding in support of hullboard and ventilation ducting insulation and lagging services in accordance with the statement of work. | ||||
| D010AA | Rolling Scaffolding | 1,000 | HR | $0.00 | $0.00 |
| D010AB | Fixed Scaffolding | 1,000 | HR | $0.00 | $0.00 |
| D010AC | Hanging Scaffolding | 500 | HR | $0.00 | $0.00 |
| D010AD | Crane Services | 500 | HR | $0.00 | $0.00 |
D010 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT | |
| D011 | OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of the Delivery Order or the modification to an issued Delivery Order. | |||||
| D011AA | ADDITIONAL WORK - LABOR | |||||
| NOTE: The offeror’s proposed fully burdened labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control. | 200 | HR | $0.00 | $0.00 | ||
| D011AB | ADDITIONAL WORK - MATERIALS | |||||
| Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a contract and/or Delivery Order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. Offeror shall propose a material handling burdened rate:________% to be applied to SubELIN D011AB. | 100,000 | Dollars, | ||||
| U.S | 0.00% | $100,000 |
D011 ITEM NUMBER TOTAL $100,000.00
| ITEM NO | SUPPLIES/SERVICES | % PROPOSED | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| D012 | ACCELERATED DELIVERY: It is anticipated that 20 percent of the delivery orders will require accelerated delivery. When services are required in less than 4 hours of the receipt of the delivery order whether during or after normal working hours or less than the contract specified time of delivery. Line items D001 through D011AB may require accelerated delivery. Accelerated delivery will only be provided when authorized in advance by the Contracting Officer at a ______% percentage additional fee of the proposed ELIN price. (Zero % will be the additional charge if nTWO is provided by the offeror). *** For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS D001 through D011 = $_____________ (multiplied by) 20 percent = ____________ (multiplied by percentage proposed for this ELIN) of ________% = ___________ (total amount in the Item Number Total space provided for ELIN D012). | ||||
| D001 - D011 | ELIN TOTAL FOR ACCELERATED DELIVERY CALCULATION | $100,000.00 | |||
| ANTICIPATED ACCELERATED DELIVERY TOTAL (20%): | $20,000.00 | ||||
| ADDITIONAL PERCENT FEE PROPOSED: | 0% | LOT | $0.00 | ||
| D012 | ITEM NUMBER TOTAL | 1 | LOT | $0.00 |
ELIN SUMMARY - BASE YEAR FOUR
| D001TOTAL | $0.00 | ||
| D002 TOTAL | $0.00 | FINAL TOTAL | |
| BASE YEAR FOUR | $100,000.00 | ||
| D003 TOTAL | $0.00 | ||
| D004 TOTAL | $0.00 | ||
| D005 TOTAL | $0.00 | ||
| D006 TOTAL | $0.00 | ||
| D007 TOTAL | $0.00 | ||
| D008 TOTAL | $0.00 | ||
| D009 TOTAL | $0.00 | ||
| D010 TOTAL | $0.00 | ||
| D011 TOTAL | $100,000.00 | ||
| D012 TOTAL | $0.00 |
Ordering Period 5
| RFP: N5523620R0001 | |||||
| Offeror: | |||||
| SECTION B: CLIN 0005 | |||||
| EXHIBIT E: BASE YEAR FIVE | |||||
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| E001 | REMOVAL OF EXISTING HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the removal of existing hullboard lagging and insulation materials in accordance with the requirements of the statement of work. | ||||
| E001AA | 1 inch thick Thermal | 30,000 | SF | $0.00 | $0.00 |
| E001AB | 2 inch thick Thermal | 20,000 | SF | $0.00 | $0.00 |
| E001AC | 3 inch thick Thermal | 10,000 | SF | $0.00 | $0.00 |
| E001AD | 1 inch thick Acoustical | 20,000 | SF | $0.00 | $0.00 |
| E001AE | 2 inch thich Acoustical | 10,000 | SF | $0.00 | $0.00 |
| E001AF | 3 inch thick Acoustical | 5,000 | SF | $0.00 | $0.00 |
| E001AG | 1 inch thick Polymide Foam Thermal | 10,000 | SF | $0.00 | $0.00 |
| E001AH | 2 inch thick Polymide Foam Thermal | 5,000 | SF | $0.00 | $0.00 |
| E001AJ | 1 inch thick Polymide Foam Acoustical | 10,000 | SF | $0.00 | $0.00 |
| E001AK | 2 inch thick Polymide Foam Acoustical | 5,000 | SF | $0.00 | $0.00 |
| E001AL | 1 inch thick Elastomeric Foam | 1,000 | SF | $0.00 | $0.00 |
| E001AM | LCS: 1 1/2 inch thick Neptune Thermal Insulation | 10,000 | SF | $0.00 | $0.00 |
| E001AN | LCS: 1 1/2 inch thick Non-Wicking Structural Fire Protection (SFP) | 5,000 | SF | $0.00 | $0.00 |
| E001AP | LCS: 3 inch thick Polymide Foam Thermal | 2,000 | SF | $0.00 | $0.00 |
E001 ITEM NUMBER TOTAL $0.00
| ITEM NO | SUPPLIES/SERVICES | EST. QTY PER YEAR | UNIT | ESTIMATED PRICE PER UNIT | AMOUNT |
| E002 | INSTALLATION OF NEW HULLBOARD LAGGING AND INSULATION MATERIALS. Provide labor, services, equipment, and materials for the surface preparation, primer application and installation of new hullboard lagging and insulation materials in accordance with the requirements of the statement of work. |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .