N55236-16-R-0020_Amendment_2.pdf

PDF 287 KB Posted

Attached to
Non-complex, Emergent & Continuous Maintenance on Surface Combatant & Amphibious Ships
Solicitation number
N55236-16-R-0020
Issued by

About this file

N55236-16-R-0020 Amendment 2

View the file

Other files

File Type Posted
AMEND_03.pdf PDF
S2_-_Management_&_Technical_Experience.docx DOCX document
S3_-_Past_Perf_Questionnaire.docx DOCX document
Amen_1_Non-Complex_Solicitation.pdf PDF
J1-_Labor_and_Material_Price_Sheet_KTR_non-Complex.xlsx XLSX spreadsheet
Section_J_-_Exhibits_A B _ _C.zip ZIP file
N55236-16-R-0020_SOLICITATION.docx DOCX document
Section_J_-_Attachements_S2 _S3_and_S4.zip ZIP file
A002.pdf PDF
A014.pdf PDF
A006.pdf PDF
CDRLB8.pdf PDF
S2_-_Management_&_Technical_Experience.docx DOCX document
CDRLB9.pdf PDF
CDRLB3.pdf PDF
A005.pdf PDF
J1-_Labor_and_Material_Price_Sheet_KTR_non-Complex.xlsx XLSX spreadsheet
CDRLC2.pdf PDF
CDRLB7.pdf PDF
A011.pdf PDF
CDRLB4.pdf PDF
A007.pdf PDF
CDRLB6.pdf PDF
CDRLB5.pdf PDF
CDRLC1.pdf PDF
A001.pdf PDF
CDRLB2.pdf PDF
A009.pdf PDF
A012_.pdf PDF
S-4_Pre-Proposal_Information_Form.docx DOCX document
A003.pdf PDF
A008.pdf PDF
CDRLB1.pdf PDF
S3_-_Past_Perf_Questionnaire.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N5523616R0020

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to anser questions from the bidders received through 8 December 2016

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Dec-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N55236-16-R-0020

X 9B. DATED (SEE ITEM 11)

22-Nov-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Dec-2016

CODE

SOUTHWEST REGIONAL MAINTENANCE CENTER

CODE 410 3755 BRINSER STREET, STE 1

SAN DIEGO CA 92136-5205

N55236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N55236-16-R-0020

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESITONS AND ANSWERS 02

1. Q: (Reference Section C 8.0, page 18) Defines “minor delay” as eight (8) hours or less in duration. 8 hours represents loss of a shift – while a one day delay for an individual may have minimal impact – an 8 hour delay for a crew may cause significant impact particularly in the case of critical path work and should not be considered “normal”.

Will the government consider the four (4) hour vice eight (8) hours as the criteria for a minor delay? Will the government provide compensation for delays of this nature or is the expectation that this be considered in development of fully burdened rate? If part of the fully burdened rate, will the government provide a percentage of hours delays considered “normal” for a typical CMAV?

A: 8 hours is the standard on all MACs and Coast Wide competitive contracts and will be used in this requirement.

2. Q: (Paragraph 1.5, Page 15 Section C) – SWLIN table breakdown includes previously identified critical systems – which the government does not anticipate tasking work on.

Is it the government’s intention that a successful offeror possess in-house capabilities for work on these systems and/or have established subcontractors in place to perform this work? Or will an established purchasing process with the ability to subcontract specialty contractors in place satisfy this requirement?

A: Any work on the critical systems list most likely would not fall under the contract resulting from this solicitation and will likely be a part of the previously awarded Complex MAC contract.

3. Q: Note B on page 7 list Welding Machinist (Inside and Outside) as one (1) labor function.

Should these labor functions be separated to Welding and Machinist (Inside and

Outside) since they are two labor functions?

A: The Government acknowledges the bidder may have these work functions broke into two separate functions. If the bidder has these broken into two different labor functions propose the associated hours as such.

4. Q: Page 23 HQ C-2 0010 states the contractor is responsible for providing the ship’s crew with berthing.

We do not think that there will be a need to provide the crew berthing. Please confirm.

A: Providing crew berthing may vary for each delivery order depending on the requirements of the availability.

5. Clause 5252.24-9110 requires the contractor to provide Tug and Pilot services to and from the pier or dock to the fairway of the plant.

Can you please confirm this will be required under this contract?

A: Tug and Pilot services may vary for each delivery order depending on the requirements of the availability.

6. (Reference paragraph 2 page 8) In process testing of production work is normally conducted by skilled trade personnel in the course of production – Is it the government’s intention that these hours not be considered production man-hours?

Similarly, end of shift cleaning IAW standard items is completed by production personnel as a normal part of the production efforts –

Is it the government’s intention that these hours not be considered in the production effort?

A: Correct, those are considered support functions and not part of the production effort.

7. Q: Reference Page 8, paragraph 3 – Indicates fixed hourly rate that includes all wages

(e.g. straight time, overtime, shift differential, holiday time, standby time, etc.)

Will the government provide an expected OT percentage?

A: No, the Government will not be providing an expected OT percentage.

8. Q: Section L page 88 1.0 states basis of award will be “Best Value”, while Section M page 98 2.0 states basis of award will be “ Lowest Price Technically Acceptable

(LPTA)”

Please confirm if basis of award will be “Best Value” or “LPTA?”

A: The government will achieve “best value” through a LPTA process. There will be no trade-off process involved.

9. Q: Offeror requests an extension of due date to January 13, 2017, for the following reasons:

Current due date indicated in Section L (December 22, 2016) conflicts with due date stated on SF-33 (December 23, 2016).

Timeframe from the date that questions are due (December 15, 2016) to the proposal due date (December 22 or December 23, 2016), is insufficient to allow for answering, release, and processing of impact of answers or possible amendment, and to properly revise our proposal response to reflect changes or clarifications that result from the answers.

With the release of the Solicitation the day prior to Thanksgiving, and the current due date immediately prior to the Christmas period, the Holiday period impacts offerors’ ability to prepare our Proposals. With previous RFPs released during this period, we are typically allowed a 45-day response period.

For planning purposes, we request that the Government issue an Amendment with the extension, or notification of an extension with Amendment to follow now, rather than waiting until response to the current Question/Answer timeframe.

Amendment 1 was issued to reflect the correct date of 23 Dec 2016 in Section L.

Request for extension denied.

10. Section L 5.0 under Volume II Factor 2 and Factor 3 the following requirements are provided for the format of each section.

a) The first page of the Proposal, which shall consist of a single title page containing only the following basic information: volume number and Factor name; the solicitation number; the name of the contract; Offeror’s name; the full name and address designation of the soliciting Regional Maintenance

Center; and the Offeror’s position regarding disclosure of proposal data. No pages placed before this title page will be evaluated.

b) The table of contents for the Factor, which shall immediately follow the title page described in item (a) above.

Does the government intend for one title page and table of contents for Volume II or for title pages and table of contents just for Factor 2 and Factor 3?

The Government only intends for one title page and table of contents for Volume

II.

(End of Summary of Changes)