AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

REF: ACB-1 CRAFTS CMAV

SEE CONTINUATION PAGES

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Jul-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N55236-15-R-0034

X 9B. DATED (SEE ITEM 11)

02-Jul-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Jul-2015

CODE

SOUTHWEST REGIONAL MAINTENANCE CENTER

CODE 410 3755 BRINSER STREET, STE 1

SAN DIEGO CA 92136

N55236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N55236-15-R-0034

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0003 CONTINUED

REQUEST FOR SPECIFICATION CLARIFICATION:

QUESTION # 4 – WORK ITEM 581-10-002, Para No. 3.2 and 3.2.1 - Work Item has (V) (G) "DFT READINGS" called out between weld repair and weld requirements of 009-12. Contractor requests clarification of requirement "DFT READINGS" should belong with painting para.

ANSWER # 4: Checkpoint for Paragraph 3.2.1 shall be changed to read as follows: "(I)(G) NONDESTRUCTIVE

TESTING"

QUESTION # 5 – WORK ITEM 233-11-001, Para No. 3.3 - Request clarification which to use; the PREFERRED Coolant (Cat ELC) or a commercial extended life coolant that meets the Caterpillar EC-1 specification OR the ACCEPTABLE - A Cat DEAC (Diesel Engine Antifreeze/Coolant) or a commercial heavy-duty coolant/antifreeze that meets "ASTM D4985" or "ASTM D5345" Specification?

ANSWER # 5: Navy PMS, MIP 2331/020 MRC F2FH directs the use of jacket water anti-freeze treatment A-A- 52624, permanent type inhibited ethylene glycol, protection to -60 deg F.. PMS over-rides the technical manual.

QUESTION # 6 – WORK ITEM 512-11-002, Para No. 2.3 - Para 2.2 references SAR, within SAR reference 1 is SOW which is not provided in References CD. Please provide reference or clarify what to utilize for Ref.

ANSWER # 6: Contact Staff Sergeant Daniel Calleja, for a copy of missing references, via email.

daniel.calleja@navy.mil

QUESTION # 7 – WORK ITEM 631-41-001, Para No. 2.3 - Para 2.3 references 1600263 Hull Designation, label plates and Draft markings? Not present on CD provided. Please provide Reference.

ANSWER # 7: Contact Staff Sergeant Daniel Calleja, for a copy of missing references, via email.

daniel.calleja@navy.mil

(End of Summary of Changes)