USS Tortuga Bidder Questions 1-32
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Responses_to_Bidder_Questions_USS_Tortuga_(LSD-46)_SSRA_1-51_3.pdf | ||
| USS_Tortuga_Amendment_4.pdf | ||
| N50054-16-R0005-0003.pdf | ||
| Responses_to_Bidder_Questions_USS_Tortuga_(LSD-46)_SSRA_1-51__2.pdf | ||
| Responses_to_Bidder_Questions_USS_Tortuga_(LSD-46)_SSRA_1_-_32_update.pdf | ||
| USS_Tortuga_Amendment_2.pdf | ||
| USS_Tortuga_Amendment_1.pdf | ||
| J-8_LABOR_ _MATERIAL_BURDEN_RATE_WORKSHEET.xlsx | XLSX spreadsheet | |
| Responses_to_Bidder_Questions_1-3.pdf | ||
| CDRLs.zip | ZIP file | |
| J-4_CAT_I_ _II_NAVSEA_STANDARD_ITEM_INDEX.pdf | ||
| N50054-16-R-0005.pdf | ||
| J-9_REQUEST_FOR_SPECIFICATION_CLARIFICATION.xlsx | XLSX spreadsheet | |
| J-10_Past_Performance_Information_(PPI)_Form.docx | DOCX document | |
| J-5_DD-254.pdf | ||
| J-7B_SHIP_ACCESS_FORM.xlsx | XLSX spreadsheet | |
| J-7A_SHIP_ACCESS_PROCEDURES.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM NO: 123-16-003
TITLE: Ballast Tank; repair
PARA. NO:
PAGE NO: 3 of 3
ITEM NO: 123-16-005
TITLE: Ballast Tank; repair
PARA. NO:
PAGE NO: 4-7 of 7
ITEM NO: J-1 Tortuga Work Spec Package
TITLE: Work Item index
PARA. NO:
PAGE NO:
ITEM NO: 123-21-004
TITLE: Accessible Void Repair
PARA. NO: 4.1
PAGE NO: 3 of 4
ITEM NO: 123-21-006
TITLE: Non-Floodable Void; repair
PARA. NO: 3.4, 4.1
PAGE NO 1 of 2
ITEM NO: 150-11-003
TITLE: Deck Repair; accomplish
PARA. NO: 3.7, 3.8, 3.9
PAGE NO: 2 of 3
ITEM NO: 262-90-001
TITLE: SCD 71079K, Main Propulsion Diesel
Engine (MPDE) Standby LO Pump (SLOP);
removal only
PARA. NO: 3.3, 3.3.1
PAGE NO: 2 of 2
CONTRACTOR QUESTION 7:
Paragraph 3.3.1 states to Ship the equipment to ensure arrival at the repair facility within 30 days after availability start date. For Bidding purposes where will the equipment be shipped?
GOVERNMENT RESPONSE: The equipment will be turned over to the on-site Government Property Administrator.
CONTRACTOR QUESTION 6:
Paragraphs 3.7 and 3.8 seem to be referencing different preservation methods for the same area. Also, paragraph 3.9 references preservation for new and disturbed, but there doesn't appear to be a direction on preservation of the underside of the new deck plates installed in 3.4.1 and 3.4.2. Please clarify.
GOVERNMENT RESPONSE: Preservation on the underside of the new deck plates are covered in Paragraph 3.9 via ERRATA
Package #1. To receive the ERRATA, please send an email request to Morgan Myrick and Trenel Armstrong at
MARMC_NRFK_411_PROCUREMENT@navy.mil.
REQUEST FOR SPECIFICATION CLARIFICATION
Attachment J-9
New Government Responses are indicated in BOLD.
DATE OF REQUEST: 11 April 2016 SOLICITATION NO: N50054-16-R-0005
TITLE: USS TORTUGA (LSD-46) Special Selected Restricted Availability (SSRA) MARMC POC: Trenel Armstrong
MARMC PHONE: 757-778-1720
CONTRACTOR QUESTION 5:
Paragraph 3.4 calls out 009-32, Table 4, Line 20 for the space listed in
1.2.1. Per Note 4.1, repairs in this work item are to be accomplished in conjunction with work item 123-21-002. Therefore, location 1.2.1 is also being preserved in 123-21-002 as location 1.2.7. Please clarify if the
Government is requesting two preservation cycles or if the preservation will be removed from one of the two work items.
GOVERNMENT RESPONSE: Paragraph 3.4 has been deleted from Work Item 123-21-006 via ERRATA Package #1. To receive the ERRATA, please send an email request to Morgan Myrick and
Trenel Armstrong at
MARMC_NRFK_411_PROCUREMENT@navy.mil.
CONTRACTOR QUESTION 1:
This work item spec shows that there should be a total of three pages, but only pages one and two were provided. Although it appears that the work item spec is complete please confirm if this is a page numbering issue or if another page needs to be provided.
GOVERNMENT RESPONSE: There are only 2 pages to the Work
Spec, what was provided in the solicitation package is a complete Work
Spec.
CONTRACTOR QUESTION 2:
This work item spec shows that there should be a total of seven pages, but only pages one through three were provided. Although it appears that the work item spec is complete please confirm if this is a page numbering issue or if other pages need to be provided.
GOVERNMENT RESPONSE: There are only 3 pages to the Work
Spec, what was provided in the solicitation package is a complete Work
Spec.
CONTRACTOR QUESTION 3:
In attachment J-1 Tortuga Work Spec Package, the list of work items that runs from pages 4 through 6 includes a total of 119 work items. This list includes 14 work items that are not in Section C, nor were provided in the
Work Spec Package. Please either confirm that these 14 work items are not part of the solicitation or make appropriate changes to Section C and make the additional work item specs available.
GOVERNMENT RESPONSE: The 14 Work Specs are not part of the
Work Spec package. These items are Cancelled and are NOT part of the solicitation package.
GOVERNMENT RESPONSE: Work Item 123-21-007 was cancelled and removed from the Package prior to solicitation and will not be added at a later date. Yes, Note 4.1 was removed from the Work Item via ERRATA Package #1. To receive the ERRATA, please send an email request to Morgan Myrick and Trenel
Armstrong at MARMC_NRFK_411_PROCUREMENT@navy.mil.
CONTRACTOR QUESTION 4:
Note 4.1 states to work this item in conjunction with work item 123-21-
007. Work Item 123-21-007 is not in the package and the voids listed in 1.2 cannot be found in other work items. Will 123-21-007 be added at a later date or should Note 4.1 be removed?
ITEM NO: 612-11-003
TITLE: Lifeline Assembly; replace
PARA. NO: 3.4
PAGE NO: 2 of 4
ITEM NO: 612-11-003
TITLE: Lifeline Assembly; replace
PARA. NO: 3.3
PAGE NO: 2 of 4
ITEM NO: 612-11-004
TITLE: Lifeline Stanchion; repair
PARA. NO: 3.5
PAGE NO: 2 of 2
ITEM NO: 612-11-005
TITLE: Lifeline Assembly; replace
PARA. NO: 3.3
PAGE NO: 1 of 2
ITEM NO: 612-11-006
TITLE: Lifeline Assembly; replace
PARA. NO: 3.3
PAGE NO: 1 of 2
ITEM NO: 612-11-007
TITLE: Lifeline Assembly; replace
PARA. NO: 3.2
PAGE NO: 1 of 2
ITEM NO: 612-11-008
TITLE: Lifeline Assembly; replace
PARA. NO: 3.3
PAGE NO: 1 of 3
ITEM NO: 644-80-003
TITLE: Troop Sanitary Space Habitability
Removal Project (HTRP-R9668);
accomplish
PARA. NO: 3.1.7, 3.2
PAGE NO: 2 of 3
ITEM NO: Solicitations
TITLE: Sources Sought
PARA. NO:
PAGE NO:
ITEM NO: J-2
TITLE: Work Items
PARA. NO:
PAGE NO:
ITEM NO: J-8
TITLE: labor and material burden worksheet
PARA. NO:
PAGE NO:
CONTRACTOR QUESTION 18: We have not received a copy of the J-8 please provide.
GOVERNMENT RESPONSE: Attachment J-8 is posted on
FedBizOpps.
CONTRACTOR QUESTION 17: This contractor did not receive the work specification pacakge until till after 3:00 PM on 3/2 other contractors received these files 2 days earlier puttinh this contractorat a timing disadvantage to the other potential prime contracts. We request a 2 day extension to allo us the minimum 30 day period for bid proposal development.
GOVERNMENT RESPONSE: The proposal will not be extended.
CONTRACTOR QUESTION 10:
This paragraph states to accomplish the requirements of 009-32 Table 2, Line 8 & Table 2, Line 44, which are both non-skid lines. Will the
Government clarify if non-skid systems, or parts, are to be used on stanchions and eyehooks as written in the work items? Will the Government consider using SP-11 and the Freeboard system?
GOVERNMENT RESPONSE: Para 3.5 has been revised via
ERRATA Package #1 to reflect 009-32, Table 2, Line 4, Columns A, B, C and G. To receive the ERRATA, please send an email request to Morgan Myrick and Trenel Armstrong at
MARMC_NRFK_411_PROCUREMENT@navy.mil.
CONTRACTOR QUESTION 11:
This paragraph states to accomplish the requirements of 009-32 Table 2, Line 8 which is a non-Skid line. Will the government clarify if non-skid systems, or parts of it, are to be used on the stanchion and staple as written in the work item? Will the Government consider using SP-11 and the
Freeboard system?
GOVERNMENT RESPONSE: Para 3.3 has been revised via
ERRATA Package #1 to reflect 009-32, Table 2, Line 4, Columns A, B, C and G. To receive the ERRATA, please send an email request to Morgan Myrick and Trenel Armstrong at
MARMC_NRFK_411_PROCUREMENT@navy.mil.
GOVERNMENT RESPONSE: Para 3.3 has been revised via
ERRATA Package #1 to reflect 009-32, Table 2, Line 4, Columns A, B, C and G. To receive the ERRATA, please send an email request to Morgan Myrick and Trenel Armstrong at
MARMC_NRFK_411_PROCUREMENT@navy.mil.
CONTRACTOR QUESTION 12:
This paragraph states to accomplish the requirements of 009-32 Table 2, Line 8 which is a non-skid line. Will the government clarify if non-skid systems, or parts of it, are to be used on the stanchion and staple as written in the work item? Will the Government consider using SP-11 and the
Freeboard system?
CONTRACTOR QUESTION 13
This paragraph states to accomplish the requirements of 009-32 Table 2, Line 8 which is a non-skid line. Will the Government clarify if non-skid systems, or parts of it, are to be used on the stanchion and staple as written in the work item? Will the Government consider using SP-11 and the
Freeboard system?
GOVERNMENT RESPONSE: Para 3.2 has been revised via
ERRATA Package #1 to reflect 009-32, Table 2, Line 4, Columns A, B, C and G. To receive the ERRATA, please send an email request to Morgan Myrick and Trenel Armstrong at
MARMC_NRFK_411_PROCUREMENT@navy.mil.
GOVERNMENT RESPONSE: Para 3.3 has been revised via
ERRATA Package #1 to reflect 009-32, Table 2, Line 4, Columns A, B, C and G. To receive the ERRATA, please send an email request to Morgan Myrick and Trenel Armstrong at
MARMC_NRFK_411_PROCUREMENT@navy.mil.
CONTRACTOR QUESTION 15:
Paragraph 3.1.7 & 3.2 are duplicate paragraphs. Will the government remove 3.1.7 from the work item to avoid confusion?
GOVERNMENT RESPONSE: Paragraph 3.1.7 has been deleted from the Work Item via ERRATA Package #1. To receive the
ERRATA, please send an email request to Morgan Myrick and
Trenel Armstrong at
MARMC_NRFK_411_PROCUREMENT@navy.mil.
CONTRACTOR QUESTION 14:
This paragraph states to accomplish the requirements of 009-32 Table 2, Line 8, Columns B, C and G for each stanchion and staple. A surface preparation column is not called out, and the called out preservation Table and Line is a non-skid system. Will the Government clarify the surface prep and coating system to apply?
CONTRACTOR QUESTION 16: Why did the government not do a sources sought for this solicitation there wre multiple qualified small businesse with the capability to execute this work in the Norfolk Area
GOVERNMENT RESPONSE: Sources sought is not required;
however, market research was conducted in accordance with FAR
Part 10.
CONTRACTOR QUESTION 9:
This paragraph calls out to accomplish an SP-3 of stanchions, staples, and toggle pins. Will the Government consider replacing the toggle pins because any restriction in movement of a toggle pin usually is in the joint, an area that in inaccessible?
GOVERNMENT RESPONSE: The LMA shall submit a CFR
(Condition Found Report) report for any material or equipment that does not function or needs to be replaced. PM will consider repair or replacement on a case by case basis.
CONTRACTOR QUESTION 8:
Paragraph 3.4 calls out 009-32 Table 2, Line 8 for each stanchion and staple located in 1.2. This process is for non-skid. Is it the Government's intent to preserve the stanchions and staples with non-skid or will the Government change the coating system to a freeboard system keeping the SP-11 as the surface prep?
GOVERNMENT RESPONSE: Para 3.4 has been revised via
ERRATA Package #1 to reflect 009-32, Table 2, Line 4, Columns A, B, C and G. To receive the ERRATA, please send an email request to Morgan Myrick and Trenel Armstrong at
MARMC_NRFK_411_PROCUREMENT@navy.mil.
ITEM NO: 042-00-001
TITLE: Work Package Execution Review;
accomplish
PARA. NO:
PAGE NO:
ITEM NO: 123-16-005
TITLE: Ballast Tank
PARA. NO: 1.3.3
PAGE NO: 1 of 7
ITEM NO: 123-21-006
TITLE: Non-Floodable Void
PARA. NO: 3.4
PAGE NO: 1 of 2
ITEM NO: Solication
TITLE:
PARA. NO:
PAGE NO:
ITEM NO: 243-11-002
TITLE: Main Propulsion Shaft Locking Device
PARA. NO: 1.2
PAGE NO: 1 of 2
ITEM NO: 150-11-005
TITLE: 06 Level Bridge Wing; repair
PARA. NO: 2.5
PAGE NO: 1 of 2
ITEM NO: 167-11-001
TITLE: Manhole Cover Stud; replace
PARA. NO: 2.3
PAGE NO: 1 of 3
ITEM NO: 514-90-001
TITLE: S/A LSD41-75214.01K, Chilled Water
Distribution System; removal only
PARA. NO: 2.3
PAGE NO: 1 of 4
ITEM NO: 514-90-001
TITLE: S/A LSD41-75214.01K, Chilled Water
Distribution System; removal only
PARA. NO: 2.5
PAGE NO: 1 of 4
ITEM NO: 524-11-001
TITLE: Auxiliary Sea Water Cooling System
Piping; replace
PARA. NO: 2.2
PAGE NO: 1 of 2
ITEM NO: 526-11-001
TITLE: Deck Drain Assembly; replace
PARA. NO: 2.3
PAGE NO: 1 of 2
ITEM NO: 624-12-002
TITLE: Metal Joiner Door; repair
PARA. NO: 2.5
PAGE NO: 3 of 9
CONTRACTOR QUESTION 22: CLIN 0002, Contract Data Requirement
List, number A013.
This CDRL, Block 4. DI-FNCL-80912 (Blk 16)
This document is not applicable to Firm Fixed Price contracts.
Recommend deleting this CDRL from the solication.
GOVERNMENT RESPONSE: CDRL A0013 is no longer required.
CONTRACTOR QUESTION 23:
Under the Location of Work paragraph, there are two locations listed. 1.2.1 is for the Port Shaft Alley (6-98-2-E) and 1.2.2 is for the Starboard Shaft
Alley (6-98-2-E). Both locations show the same numerical designation, with the starboard side probably being incorrect. Most likely, the location should be (6-98-1-E) for the Starboard Shaft Alley. Please clarify.
GOVERNMENT RESPONSE: Government Response is
Forthcoming.
CONTRACTOR QUESTION 20: Looks like the length of the stiffener was left out, calls for 4 each, 5" x .025". Please provide stiffener length.
GOVERNMENT RESPONSE: Government Response is
Forthcoming.
GOVERNMENT RESPONSE: Para 1.3.3 and 3.2.2 have been corrected via ERRATA Package #2. To receive the ERRATA, please send an email request to Morgan Myrick and Trenel
Armstrong at MARMC_NRFK_411_PROCUREMENT@navy.mil.
CONTRACTOR QUESTION 21: Work in paragraph 3.4 is accomplished in item 123-21-002, paragraph 3.4, consider deleting para 3.4 from item 123-
21-006
GOVERNMENT RESPONSE: Please see GOVERNMENT
RESPONSE in Bidders Question number 5.
CONTRACTOR QUESTION 19: This work item requests the SOR be provided NLT A+25 this contradicts a Category 1 std item and requires the government to provide third part and AIT schedules which we have not received will the government provide those files in MS project?
CONTRACTOR QUESTION 27:
Ref. 2.5, 321-8474317, SCD-5214.01 Power System Modification Air
Conditioning Plants Chilled Water Pumps was not furnished to the contractor. Will this drawing be made available?
GOVERNMENT RESPONSE: Government Response is
Forthcoming.
CONTRACTOR QUESTION 26:
Ref 2.3, 302-758331, Standard Rise Installation Procedure Penetration
Install was not furnished to the contractor. Will this drawing be made available?
GOVERNMENT RESPONSE: Government Response is
Forthcoming.
CONTRACTOR QUESTION 25:
Ref 2.3 is 805-1626726 Rev F, Flush W.T. & O.T. Bolted Plate Manhole 15
Inch x 23 Inch & 15 Inch x 18 Inch. However, the drawing furnished to the contractor as 1626726 is a General Electric drawing for Tubing. ill the correct drawing be furnished to contractor?
CONTRACTOR QUESTION 24:
The copy of Ref. 2.5, S9AA0-AB-GOS-010, General Specifications for
Overhaul of Surface Ships provided to contractors is Revision 5 of this document. However, the current revision of the GSO is Rev 7.
Will the government be providing a copy of Revision 7?
GOVERNMENT RESPONSE: Government Response is
Forthcoming.
GOVERNMENT RESPONSE: Government Response is
Forthcoming.
CONTRACTOR QUESTION 28:
Ref. 2.2, 524-6101165 Rev D, Diagram Auxiliary Seawater Cooling System was not furnished to the contractor. Will the government be providing a copy of this drawing?
GOVERNMENT RESPONSE: Government Response is
Forthcoming.
CONTRACTOR QUESTION 29:
Ref 2.3, 803-1385789 Rev H, Fitting, Deck Drain is called out in the spec item. However, Rev "G" was furnished to the contractor.
Will the correct revision be furnished to contractor or will the spec be revised to reflect Rev "G"?
GOVERNMENT RESPONSE: Government Response is
Forthcoming.
GOVERNMENT RESPONSE: Government Response is
Forthcoming.
CONTRACTOR QUESTION 30:
Ref 2.5 805-4629248 Rev A, Door, Joiner Metal Honeycomb Core is called out in the spec item. However, it appears the copy provided is Rev "-". Will the Rev A drawing be made available or will the spec item be modified to reflect the Rev "-" provided.
ITEM NO: 711-11-001
TITLE: MK38 Mod 2 Gun Foundation Mod;
accomplish
PARA. NO: 2.4
PAGE NO: 1 of 2
ITEM NO: 992-11-004
TITLE: Temporary Service; provide
PARA. NO:
PAGE NO:
CONTRACTOR QUESTION 31:
Ref. 2.4 LAR_Repair/LSDCL/MA12576, 06 Level MK38 Gun Foundation
Drainage Issue was not furnished to the contractor.
Will this drawing be made available?
GOVERNMENT RESPONSE: Government Response is
Forthcoming.
CONTRACTOR QUESTION 32:
This work specification does not address ventilation requirements. To prevent delay and disruption which may be caused by extreme temperatures
(i.e., summer heat in unventilated ship), will the contractor be required to provide supply and exhaust ventilation and cooled air? If so, in order to provide this service, will the contractor be allowed to cut temporary access holes and/or tie into the existing ventilation system? Will a change to this work specification be forthcoming?
GOVERNMENT RESPONSE: Government Response is
Forthcoming.