J-4_CAT_I_ _II_NAVSEA_STANDARD_ITEM_INDEX.pdf
PDF 35 KB Posted
- Attached to
- USS TORTUGA (LSD-46) SSRA
- Solicitation number
- N50054-16-R-0005
About this file
J-4 CAT I II NAVSEA STANDARD ITEM INDEX
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Responses_to_Bidder_Questions_USS_Tortuga_(LSD-46)_SSRA_1-51_3.pdf | ||
| USS_Tortuga_Amendment_4.pdf | ||
| N50054-16-R0005-0003.pdf | ||
| Responses_to_Bidder_Questions_USS_Tortuga_(LSD-46)_SSRA_1-51__2.pdf | ||
| Responses_to_Bidder_Questions_USS_Tortuga_(LSD-46)_SSRA_1_-_32_update.pdf | ||
| USS_Tortuga_Amendment_2.pdf | ||
| Responses_to_Bidder_Questions_USS_Tortuga_(LSD-46)_SSRA_1_-_32.pdf | ||
| USS_Tortuga_Amendment_1.pdf | ||
| J-8_LABOR_ _MATERIAL_BURDEN_RATE_WORKSHEET.xlsx | XLSX spreadsheet | |
| Responses_to_Bidder_Questions_1-3.pdf | ||
| CDRLs.zip | ZIP file | |
| N50054-16-R-0005.pdf | ||
| J-9_REQUEST_FOR_SPECIFICATION_CLARIFICATION.xlsx | XLSX spreadsheet | |
| J-10_Past_Performance_Information_(PPI)_Form.docx | DOCX document | |
| J-5_DD-254.pdf | ||
| J-7B_SHIP_ACCESS_FORM.xlsx | XLSX spreadsheet | |
| J-7A_SHIP_ACCESS_PROCEDURES.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX
SHIP: USS TORTUGA (LSD 46) TPPC-LSD46-NSSA16-CN01
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-16 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM_NO. TITLE DATE
009-01 General Criteria; accomplish 07/18/2014
009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide 07/18/2014
009-03 Toxic and Hazardous Substances; control 07/18/2014
009-04 Quality Management System; provide 07/18/2014
009-05 Temporary Accesses; provide 07/18/2014
009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;
accomplish
07/18/2014
009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish 07/18/2014
009-08 Fire Protection at Contractor's Facility; accomplish 07/18/2014
009-10 Shipboard Asbestos-Containing Material (ACM); control 07/18/2014
009-18 Magnetic Material; control 07/18/2014
009-19 Provisioning Technical Documentation (PTD); provide 07/18/2014
009-20 Government Property; control 07/18/2014
009-21 Logistics and Technical Data; provide 07/18/2014
009-23 Interferences; remove and install 07/18/2014
009-24 Shipboard Authorization, Control, Isolation, Blanking, and Tagging Requirements;
accomplish
07/10/2015
009-28 Fire Prevention Requirements; accomplish 06/10/2014
009-29 Asbestos-Free Pipe Hanger Liner Material; install 07/29/2004
009-34 Fire Protection of Unmanned Vessels at Contractor's Facility; provide 01/17/2013
009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish
07/18/2014
009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/ Component; provide
07/19/2007
009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish
07/18/2014
009-59 Organotin Antifouling Material; control 07/29/2011
009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;
provide and manage
09/01/2015
009-61 Shipboard Use of Fluorocarbons; control 07/18/2014
009-64 Synthetic Fire-Resistant Hydraulic Fluid; control 07/18/2014
009-65 Polychlorinated Biphenyls (PCBs); control 07/29/2011
009-67 Integrated Total Ship Testing; manage 07/18/2014
009-69 Heavy Weather/Mooring Plan; provide 07/18/2014
009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish
07/18/2014
009-72 Physical Security at Private Contractor's Facility; accomplish 07/18/2014
009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install 07/18/2014
009-74 Occupational, Safety and Health Requirements; accomplish 07/10/2015
009-77 Cofferdam Requirements; accomplish 07/18/2014
009-79 Government Owned Material (GOM); status reporting 07/18/2014
ITEM_NO. TITLE DATE
009-80 Ship's Facilities; provide 07/18/2014
009-81 Compartment Closeout; accomplish 07/18/2014
009-82 Data Requirements When Installing an Equal Component Vice Specified Component;
provide
07/29/2011
009-83 Wire Rope Fitting Verfication; provide 01/17/2013
009-84 Accountability of Temporary Fasteners; provide 07/18/2014
009-86 Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire Suppressant Halon (H) Materials; accomplish
08/01/2008
009-87 Chemical disinfection Procedures; accomplish 07/18/2014
009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify
07/18/2014
009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes;
accomplish
07/29/2011
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide
07/18/2014
009-94 General Environmental Requirements for Work at Contractor's Facility; accomplish 01/17/2013
009-95 Mechanically Attached Fittings (MAF's) for Piping Systems; install 07/18/2014
009-97 Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide
01/17/2013
009-99 Ship Departure Report; provide 07/18/2014
009-100 Ship's Stability Process Control Procedure (PCP); maintain 07/18/2014
009-101 Requirements for Entry to and Departure from Contractor's Facility; accomplish 07/18/2014
009-102 Alteration Verification; provide 07/29/2011
009-103 Weight and Moment Change Data; provide 07/18/2014
009-106 Work Authorization Form Coordinator (WAFCOR); provide 01/06/2014
009-108 Aircraft Carrier Requirements for Entry to, Movement within, and Departure from Contractor's Facility; accomplish
07/18/2014
009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels;
accomplish
07/18/2014
009-110 Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish 07/18/2014
009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration;
provide and manage
07/18/2014
009-112 Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish 07/18/2014
009-118 CG Deck Loading; accomplish 07/18/2014
009-120 Fact Finding and Critique of Unplanned Events; manage 07/18/2014
009-121 Ship Assessment/Inspection Requirements; provide 07/18/2014
DATETITLEITEM NO.
CATEGORY II. FY-16 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER
009-09 Process Control Procedure (PCP); provide and accomplish 07/18/2014
009-12 Welding, Fabrication, and Inspection Requirements;
accomplish
09/01/2015
009-12 Welding, Fabrication, and Inspection Requirements;
accomplish
07/30/2015
009-14 Gages, Switches, and Thermometers; repair and certify calibration
07/30/2015
009-22 Shipboard Electric Cable; test 07/18/2014
009-25 Structural Boundary Test; accomplish 07/18/2014
009-25 Structural Boundary Test; accomplish 07/30/2015
009-32 Cleaning and Painting Requirements; accomplish 07/10/2015
009-32 Cleaning and Painting Requirements; accomplish 07/10/2015
009-47 Gate Valve; repair 07/18/2014
009-71 Testing Requirements for Piping Systems; accomplish 07/10/2015
009-76 Waveguide and Transmission Line Temporary Lay-Up, Pressurization, and Purging; accomplish
07/29/2011
009-90 Technical Representative; provide 07/18/2014
009-107 Piping System Cleanliness (Non-Nuclear); accomplish 07/18/2014