Exhibit_A-E.xls
XLS spreadsheet 147 KB Posted
- Attached to
- Non-Skid Removal and Application Support Federal contract opportunity
- Solicitation number
- N50054-15-R-0004
About this file
Exhibit A-E
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bidder's_Questions_and_Answers_(1-3).xlsx | XLSX spreadsheet | |
| N50054-15-R-0004-0002.doc | DOC document | |
| Bidder's_Questions.xlsx | XLSX spreadsheet | |
| N50054-15-R-0004-0001.doc | DOC document | |
| J17 _Request_for_Specification_Clarification.doc | DOC document | |
| J7 _042-011.pdf | ||
| J6 _042-008.pdf | ||
| J11 _SWT-077-001.pdf | ||
| J5 _042-007.pdf | ||
| J12 _LWT-992-310.pdf | ||
| J2 _042-002.pdf | ||
| J10 _042-037.pdf | ||
| J14 _Capacity_Evaluation_Form.xlsx | XLSX spreadsheet | |
| J15 _Past_Performance_Information_Form.docx | DOCX document | |
| J4 _042-006.pdf | ||
| J16 _Past_Performance_Assessment_Questionnaire.doc | DOC document | |
| J13_-_Wheel_Stops.pdf | ||
| J1 _CDRLs.pdf | ||
| J3 _042-005.pdf | ||
| J8 _042-022.pdf | ||
| J9 _042-026.pdf | ||
| N50054-15-R-0004.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| Contractor Name | |||||||
| Supplies/Services | Est Qty | Unit | Unit | ||||
| Price | Amount | ||||||
| A | 101 | Labor and Material to Abrasive Blast - Remove up to 25,000 SF of existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. | 25,000 | SF | $0.00 | $0.00 | |
| A | 102 | Labor and Material to Abrasive Blast - Remove existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. | 26,000 | SF | $0.00 | $0.00 | |
| A | 103 | Labor and Material to accomplish Ultra High Pressure Water Jetting - Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas up to 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. | 75,000 | SF | $0.00 | $0.00 | |
| A | 104 | Labor and Material to accomplish Ultra High Pressure Water Jetting - Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. | 38,000 | SF | $0.00 | $0.00 | |
| A | 105 | Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing abrasive blast method. Prime the prepared deck with a proprietary paint system and stripe coat. | 1,000 | SF | $0.00 | $0.00 | |
| A | 106 | Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing ultra high pressure water jetting method. Prime the prepared deck with a proprietary paint system and stripe coat. | 1,000 | SF | $0.00 | $0.00 | |
| A | 107 | Labor and material to remove any high solid non-skid system utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. | 15,000 | SF | $0.00 | $0.00 | |
| A | 108 | Labor and material to remove any high solid non-skid system utilizing ultra high pressure water jetting method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. | 1,000 | SF | $0.00 | $0.00 | |
| A | 109 | Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. | 70,000 | SF | $0.00 | $0.00 | |
| A | 110 | Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. | 26,000 | SF | $0.00 | $0.00 | |
| A | 111 | Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. | 43,000 | SF | $0.00 | $0.00 | |
| A | 112 | Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. | 26,000 | SF | $0.00 | $0.00 | |
| A | 113 | Labor and material to apply non-high solid non-skid up to 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| A | 114 | Labor and material to apply non-high solid non-skid above 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. | 26,000 | SF | $0.00 | $0.00 | |
| A | 115 | Labor and material to apply non-high solid non-skid up to 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| A | 116 | Labor and material to apply non-high solid non-skid above 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. | 26,000 | SF | $0.00 | $0.00 | |
| A | 117 | Labor and material to apply epoxy non-skid with rubber membrane conforming to QPL as listed Type III (Flex). Apply new danger, warning, and VLA markings. | 1,000 | SF | $0.00 | $0.00 | |
| A | 118 | Labor and material to remove Type III non-skid, resurface membrane, patch a total of 15% of surface area, apply new MIL-PRF-24667 Type III non-skid. Apply new danger, warning, and VLA markings. | 1,000 | SF | $0.00 | $0.00 | |
| A | 119 | Labor and material to patch Type III membrane greater than 15% | 1,000 | SF | $0.00 | $0.00 | |
| A | 120 | Labor and material to Skim Coat Type III membrane | 1,000 | SF | $0.00 | $0.00 | |
| A | 121 | Labor and material to apply epoxy non-skid conforming to QPL as listed Type IV (Spray). Apply new danger, warning, and VLA markings. | 1,000 | SF | $0.00 | $0.00 | |
| A | 122 | Labor and material to apply non-high solid non-skid up to 25,000 SF with Type V MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| A | 123 | Labor and material to apply non-high solid non-skid above 25,000 SF with Type V MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| A | 124 | Labor and material to apply non-high solid non-skid up to 25,000 SF with Type V MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| A | 125 | Labor and material to apply non-high solid non-skid above 25,000 SF with Type V MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| A | 126 | Labor and material to apply up to 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition G non-skid. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| A | 127 | Labor and material to apply above 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition G non-skid. Apply new danger, warning, and VLA markings. | 26,000 | SF | $0.00 | $0.00 | |
| A | 128 | Labor and material to apply up to 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition L non-skid. Apply new danger, warning, and VLA markings. | 25,000 | $0.00 | $0.00 | ||
| A | 129 | Labor and material to apply above 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition L non-skid. Apply new danger, warning, and VLA markings. | 25,000 | $0.00 | $0.00 | ||
| A | 130 | Labor and material to apply Type I MIL-PRF-24667, Composition L, MS-400L, High Solid. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| A | 131 | Labor and material to apply Type I MIL-PRF-24667, Composition G, UV/LSA non-skid. Apply new danger, warning, and VLA markings. | 10,000 | SF | $0.00 | $0.00 | |
| A | 132 | Labor and material to apply Type II MIL-PRF-24667, Composition G, UV/LSA non-skid. Apply new danger, warning, and VLA markings. | 1,000 | SF | $0.00 | $0.00 | |
| A | 133 | Labor and material to accomplish Stripe Coating on Edging and Weld Seams in accordance with NSTM 634. | 1,000 | LF | $0.00 | $0.00 | |
| A | 134 | Labor and material to accomplish Barrier Coat on Previously Primed Decking. | 21,000 | SF | $0.00 | $0.00 | |
| A | 135 | Labor and material for Surface Protection for Areas Without Non-Skid. Provide deck gray (top coat) in areas without non-skid. Apply new danger, warning, and VLA markings. | 42,000 | SF | $0.00 | $0.00 | |
| A | 136 | Labor and Material for Abrasive Blast - Remove existing deck covering (non-high non-skid or paint). Prime to cleaned deck with a proprietary paint system. Primer shall be MIL-PRF-23236 Type VII, Class 17 applied at 6-8 mils followed by a coat of MIL-PRF-32171 Type I Class 1 or 2 applied at 10-12 mils in preparation for installation of Peel and Stick. | 15,000 | SF | $0.00 | $0.00 | |
| A | 137 | Labor and Material for Ultra High Pressure Water Jetting - Remove existing deck covering (non-high non-skid or paint). Prime to cleaned deck with a proprietary paint system. Primer shall be MIL-PRF-24667 Type I, V, and VI COMP G applied at 4-6 mils followed by ONE coat of DECK GRAY NO. 26008 (FED STD 595) MIL-PREF-24635 TYPE III, 2-3 mils or TYPE V 5-8 mils in preparation for installation of Peel and Stick. | 21,000 | SF | $0.00 | $0.00 | |
| A | 138 | Labor and Material for Removal of Worn/Torn Product (Peel and Stick) - Product removal shall be accomplished in accordance with the manufacturer's instructions. | 10,000 | SF | $0.00 | $0.00 | |
| A | 139 | Labor and Material for Topcoat - MIL-PRF-32171 Type I Class 1 or 2 applied at 10-12 mils. | 38,000 | SF | $0.00 | $0.00 | |
| A | 140 | Labor and material for self-adhesive installation of Peel and Stick non-skid sections - Installation of Peel and Stick non-skid shall conform to MIL-PRF-24667 Type XI or other material as approved by NAVSEA. Spaces between adjacent pieces may be up to 1-1/2 inches. This spacing should align with weld seams to the maximum extent practicable to avoid the material from bridging these seams. Seal all free edges of Peel and Stick non-skid with the manufacturer's approved sealer. | 10,000 | SF | $0.00 | $0.00 | |
| A | 141 | Labor and material to accomplish one additional cleaning and surface prep to achieve in-tolerance conductivity readings in accordance with NSI 009-32. | 10,000 | SF | $0.00 | $0.00 | |
| A | 142 | Labor and Material for Containment Enclosure - Enclosure setup/removal, transportation and maintained operating with electrical lights and climate control equipment to support flight deck non-skid replacement. | 120 | DAY | $0.00 | $0.00 | |
| A | 143 | Labor and Material for Containment Enclosure - Enclosure setup/removal, transportation and maintained operating with electrical lights and climate control equipment to support flight deck non-skid replacement. | 120 | DAY | $0.00 | $0.00 | |
| A | 144 | Labor and material for surface preparation of wheel stops/gutters | 3,000 | LF | $0.00 | $0.00 | |
| A | 145 | Labor and Material for Gas Free Certification | 5 | EA | $0.00 | $0.00 | |
| A | 146 | Undisclosed Work - Straight Time | 2,000 | HR | $0.00 | $0.00 | |
| The Undisclosed Work ELINS are intended to be used to accomplish tasks that are required, but which are not covered by ELINS A101 through A138. Undisclosed Work will not be used to reimburse overtime used in accomplishing tasks under ELINS A101 through A138. Undisclosed work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in Clause RMC C-2-0050, entitled "Ordering Work." | |||||||
| A | 147 | Undisclosed Work - Overtime | 700 | HR | $0.00 | $0.00 | |
| A | 148 | Undisclosed Work - Material (Covers only material required for Undisclosed Work) | 44,000 | U.S. DOLLARS | $0.00 | $0.00 | |
| A | 149 | Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.) | 44,000 | X | 0.00% | $0.00 | |
| In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN. | |||||||
| A | 150 | Travel/Per Diem (for bidding purposes only) | 36,900 | U.S. DOLLARS | $0.00 | $0.00 | |
| A | 151 | Travel/Per Diem G&A (Contractor to submit a percentage.) Actual travel will be reimbursed in accordance with RMC H-2-0052. | 36,900 | X | 0.00% | $0.00 | |
| A | 152 | Adjustment/Percentage for ELINS A101 through A141 to accomplish tasks on submarines versus surface vessels. ELIN A151 represents the amount of adjustment to be received for doing work on submarines. (Contractor to submit a percentage.) | 3,000 | X | $0.00 | $0.00 | |
| A | 153 | Contract Data Requirements (DD Form 1423) | NSP | ||||
| Total Estimate for Base Year | $0.00 | ||||||
| NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, labor, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices. | |||||||
| NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools. | |||||||
| NOTE 3: Overtime is not authorized under the terms and conditions of this contract (with the exception of Undisclosed Work - Overtime) and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost orr expense. | |||||||
| NOTE 4: ELINS are to be fully burdened to include any required rental equipment. |
&C&"Arial,Bold"SOLICITATION N50054-15-R-0000 EXHIBIT A &"Arial,Regular"
&"Arial,Bold"SUPPLIES OR SERVICES AND PRICES
BASE YEAR EFFORT
Second Yr ( Option 1)
| Contractor Name | |||||||
| Supplies/Services | Est Qty | Unit | Unit | ||||
| Price | Amount | ||||||
| B | 101 | Labor and Material to Abrasive Blast - Remove up to 25,000 SF of existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. | 25,000 | SF | $0.00 | $0.00 | |
| B | 102 | Labor and Material to Abrasive Blast - Remove existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. | 26,000 | SF | $0.00 | $0.00 | |
| B | 103 | Labor and Material to accomplish Ultra High Pressure Water Jetting - Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas up to 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. | 75,000 | SF | $0.00 | $0.00 | |
| B | 104 | Labor and Material to accomplish Ultra High Pressure Water Jetting - Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. | 38,000 | SF | $0.00 | $0.00 | |
| B | 105 | Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing abrasive blast method. Prime the prepared deck with a proprietary paint system and stripe coat. | 1,000 | SF | $0.00 | $0.00 | |
| B | 106 | Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing ultra high pressure water jetting method. Prime the prepared deck with a proprietary paint system and stripe coat. | 1,000 | SF | $0.00 | $0.00 | |
| B | 107 | Labor and material to remove any high solid non-skid system utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. | 15,000 | SF | $0.00 | $0.00 | |
| B | 108 | Labor and material to remove any high solid non-skid system utilizing ultra high pressure water jetting method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. | 1,000 | SF | $0.00 | $0.00 | |
| B | 109 | Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. | 70,000 | SF | $0.00 | $0.00 | |
| B | 110 | Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. | 26,000 | SF | $0.00 | $0.00 | |
| B | 111 | Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. | 43,000 | SF | $0.00 | $0.00 | |
| B | 112 | Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. | 26,000 | SF | $0.00 | $0.00 | |
| B | 113 | Labor and material to apply non-high solid non-skid up to 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| B | 114 | Labor and material to apply non-high solid non-skid above 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. | 26,000 | SF | $0.00 | $0.00 | |
| B | 115 | Labor and material to apply non-high solid non-skid up to 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| B | 116 | Labor and material to apply non-high solid non-skid above 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. | 26,000 | SF | $0.00 | $0.00 | |
| B | 117 | Labor and material to apply epoxy non-skid with rubber membrane conforming to QPL as listed Type III (Flex). Apply new danger, warning, and VLA markings. | 1,000 | SF | $0.00 | $0.00 | |
| B | 118 | Labor and material to remove Type III non-skid, resurface membrane, patch a total of 15% of surface area, apply new MIL-PRF-24667 Type III non-skid. Apply new danger, warning, and VLA markings. | 1,000 | SF | $0.00 | $0.00 | |
| B | 119 | Labor and material to patch Type III membrane greater than 15% | 1,000 | SF | $0.00 | $0.00 | |
| B | 120 | Labor and material to Skim Coat Type III membrane | 1,000 | SF | $0.00 | $0.00 | |
| B | 121 | Labor and material to apply epoxy non-skid conforming to QPL as listed Type IV (Spray). Apply new danger, warning, and VLA markings. | 1,000 | SF | $0.00 | $0.00 | |
| B | 122 | Labor and material to apply non-high solid non-skid up to 25,000 SF with Type V MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| B | 123 | Labor and material to apply non-high solid non-skid above 25,000 SF with Type V MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| B | 124 | Labor and material to apply non-high solid non-skid up to 25,000 SF with Type V MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| B | 125 | Labor and material to apply non-high solid non-skid above 25,000 SF with Type V MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| B | 126 | Labor and material to apply up to 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition G non-skid. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| B | 127 | Labor and material to apply above 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition G non-skid. Apply new danger, warning, and VLA markings. | 26,000 | SF | $0.00 | $0.00 | |
| 128 | Labor and material to apply up to 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition L non-skid. Apply new danger, warning, and VLA markings. | 25,000 | $0.00 | $0.00 | |||
| 129 | Labor and material to apply above 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition L non-skid. Apply new danger, warning, and VLA markings. | 25,000 | $0.00 | $0.00 | |||
| B | 130 | Labor and material to apply Type I MIL-PRF-24667, Composition L, MS-400L, High Solid. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| B | 131 | Labor and material to apply Type I MIL-PRF-24667, Composition G, UV/LSA non-skid. Apply new danger, warning, and VLA markings. | 10,000 | SF | $0.00 | $0.00 | |
| B | 132 | Labor and material to apply Type II MIL-PRF-24667, Composition G, UV/LSA non-skid. Apply new danger, warning, and VLA markings. | 1,000 | SF | $0.00 | $0.00 | |
| B | 133 | Labor and material to accomplish Stripe Coating on Edging and Weld Seams in accordance with NSTM 634. | 1,000 | LF | $0.00 | $0.00 | |
| B | 134 | Labor and material to accomplish Barrier Coat on Previously Primed Decking. | 21,000 | SF | $0.00 | $0.00 | |
| B | 135 | Labor and material for Surface Protection for Areas Without Non-Skid. Provide deck gray (top coat) in areas without non-skid. Apply new danger, warning, and VLA markings. | 42,000 | SF | $0.00 | $0.00 | |
| B | 136 | Labor and Material for Abrasive Blast - Remove existing deck covering (non-high non-skid or paint). Prime to cleaned deck with a proprietary paint system. Primer shall be MIL-PRF-23236 Type VII, Class 17 applied at 6-8 mils followed by a coat of MIL-PRF-32171 Type I Class 1 or 2 applied at 10-12 mils in preparation for installation of Peel and Stick. | 15,000 | SF | $0.00 | $0.00 | |
| B | 137 | Labor and Material for Ultra High Pressure Water Jetting - Remove existing deck covering (non-high non-skid or paint). Prime to cleaned deck with a proprietary paint system. Primer shall be MIL-PRF-24667 Type I, V, and VI COMP G applied at 4-6 mils followed by ONE coat of DECK GRAY NO. 26008 (FED STD 595) MIL-PREF-24635 TYPE III, 2-3 mils or TYPE V 5-8 mils in preparation for installation of Peel and Stick. | 21,000 | SF | $0.00 | $0.00 | |
| B | 138 | Labor and Material for Removal of Worn/Torn Product (Peel and Stick) - Product removal shall be accomplished in accordance with the manufacturer's instructions. | 10,000 | SF | $0.00 | $0.00 | |
| B | 139 | Labor and Material for Topcoat - MIL-PRF-32171 Type I Class 1 or 2 applied at 10-12 mils. | 38,000 | SF | $0.00 | $0.00 | |
| B | 140 | Labor and material for self-adhesive installation of Peel and Stick non-skid sections - Installation of Peel and Stick non-skid shall conform to MIL-PRF-24667 Type XI or other material as approved by NAVSEA. Spaces between adjacent pieces may be up to 1-1/2 inches. This spacing should align with weld seams to the maximum extent practicable to avoid the material from bridging these seams. Seal all free edges of Peel and Stick non-skid with the manufacturer's approved sealer. | 10,000 | SF | $0.00 | $0.00 | |
| B | 141 | Labor and material to accomplish one additional cleaning and surface prep to achieve in-tolerance conductivity readings in accordance with NSI 009-32. | 10,000 | SF | $0.00 | $0.00 | |
| B | 142 | Labor and Material for Containment Enclosure - Enclosure setup/removal, transportation and maintained operating with electrical lights and climate control equipment to support flight deck non-skid replacement. | 120 | DAY | $0.00 | $0.00 | |
| B | 143 | Labor and Material for Containment Enclosure - Enclosure setup/removal, transportation and maintained operating with electrical lights and climate control equipment to support flight deck non-skid replacement. | 120 | DAY | $0.00 | $0.00 | |
| B | 144 | Labor and material for surface preparation of wheel stops/gutters | 3,000 | LF | $0.00 | $0.00 | |
| B | 145 | Labor and Material for Gas Free Certification | 5 | EA | $0.00 | $0.00 | |
| B | 146 | Undisclosed Work - Straight Time | 2,000 | HR | $0.00 | $0.00 | |
| The Undisclosed Work ELINS are intended to be used to accomplish tasks that are required, but which are not covered by ELINS B101 through B138. Undisclosed Work will not be used to reimburse overtime used in accomplishing tasks under ELINS B101 through B138. Undisclosed work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in Clause RMC C-2-0050, entitled "Ordering Work." | |||||||
| B | 147 | Undisclosed Work - Overtime | 700 | HR | $0.00 | $0.00 | |
| B | 148 | Undisclosed Work - Material (Covers only material required for Undisclosed Work) | 44,000 | U.S. DOLLARS | $0.00 | $0.00 | |
| B | 149 | Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.) | 44,000 | X | 0.00% | $0.00 | |
| In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN. | |||||||
| B | 150 | Travel/Per Diem (for bidding purposes only) | 36,900 | U.S. DOLLARS | $0.00 | $0.00 | |
| B | 151 | Travel/Per Diem G&A (Contractor to submit a percentage.) Actual travel will be reimbursed in accordance with RMC H-2-0052. | 36,900 | X | 0.00% | $0.00 | |
| B | 152 | Adjustment/Percentage for ELINS A101 through A135 to accomplish tasks on submarines versus surface vessels. ELIN A145 represents the amount of adjustment to be received for doing work on submarines. (Contractor to submit a percentage.) | 3,000 | X | 0.00% | $0.00 | |
| B | 153 | Contract Data Requirements (DD Form 1423) | NSP | ||||
| Total Estimate for Base Year | $0.00 | ||||||
| NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, labor, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices. | |||||||
| NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools. | |||||||
| NOTE 3: Overtime is not authorized under the terms and conditions of this contract (with the exception of Undisclosed Work - Overtime) and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense. | |||||||
| NOTE 4: ELINS are to be fully burdened to include any required rental equipment. |
&C&"Arial,Bold"SOLICITATION N50054-15-R-0004 EXHIBIT B &"Arial,Regular" &"Arial,Bold"
SUPPLIES OR SERVICES AND PRICES
SECOND YEAR EFFORT (OPTION I)
Third Yr (Option 2)
| Contractor Name | |||||||
| Supplies/Services | Est Qty | Unit | Unit | ||||
| Price | Amount | ||||||
| C | 101 | Labor and Material to Abrasive Blast - Remove up to 25,000 SF of existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. | 25,000 | SF | $0.00 | $0.00 | |
| C | 102 | Labor and Material to Abrasive Blast - Remove existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. | 26,000 | SF | $0.00 | $0.00 | |
| C | 103 | Labor and Material to accomplish Ultra High Pressure Water Jetting - Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas up to 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. | 75,000 | SF | $0.00 | $0.00 | |
| C | 104 | Labor and Material to accomplish Ultra High Pressure Water Jetting - Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. | 38,000 | SF | $0.00 | $0.00 | |
| C | 105 | Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing abrasive blast method. Prime the prepared deck with a proprietary paint system and stripe coat. | 1,000 | SF | $0.00 | $0.00 | |
| C | 106 | Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing ultra high pressure water jetting method. Prime the prepared deck with a proprietary paint system and stripe coat. | 1,000 | SF | $0.00 | $0.00 | |
| C | 107 | Labor and material to remove any high solid non-skid system utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. | 15,000 | SF | $0.00 | $0.00 | |
| C | 108 | Labor and material to remove any high solid non-skid system utilizing ultra high pressure water jetting method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. | 1,000 | SF | $0.00 | $0.00 | |
| C | 109 | Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. | 70,000 | SF | $0.00 | $0.00 | |
| C | 110 | Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. | 26,000 | SF | $0.00 | $0.00 | |
| C | 111 | Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. | 43,000 | SF | $0.00 | $0.00 | |
| C | 112 | Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. | 26,000 | SF | $0.00 | $0.00 | |
| C | 113 | Labor and material to apply non-high solid non-skid up to 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| C | 114 | Labor and material to apply non-high solid non-skid above 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. | 26,000 | SF | $0.00 | $0.00 | |
| C | 115 | Labor and material to apply non-high solid non-skid up to 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| C | 116 | Labor and material to apply non-high solid non-skid above 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. | 26,000 | SF | $0.00 | $0.00 | |
| C | 117 | Labor and material to apply epoxy non-skid with rubber membrane conforming to QPL as listed Type III (Flex). Apply new danger, warning, and VLA markings. | 1,000 | SF | $0.00 | $0.00 | |
| C | 118 | Labor and material to remove Type III non-skid, resurface membrane, patch a total of 15% of surface area, apply new MIL-PRF-24667 Type III non-skid. Apply new danger, warning, and VLA markings. | 1,000 | SF | $0.00 | $0.00 | |
| C | 119 | Labor and material to patch Type III membrane greater than 15% | 1,000 | SF | $0.00 | $0.00 | |
| C | 120 | Labor and material to Skim Coat Type III membrane | 1,000 | SF | $0.00 | $0.00 | |
| C | 121 | Labor and material to apply epoxy non-skid conforming to QPL as listed Type IV (Spray). Apply new danger, warning, and VLA markings. | 1,000 | SF | $0.00 | $0.00 | |
| C | 122 | Labor and material to apply non-high solid non-skid up to 25,000 SF with Type V MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| C | 123 | Labor and material to apply non-high solid non-skid above 25,000 SF with Type V MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| C | 124 | Labor and material to apply non-high solid non-skid up to 25,000 SF with Type V MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| C | 125 | Labor and material to apply non-high solid non-skid above 25,000 SF with Type V MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| C | 126 | Labor and material to apply up to 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition G non-skid. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| C | 127 | Labor and material to apply above 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition G non-skid. Apply new danger, warning, and VLA markings. | 26,000 | SF | $0.00 | $0.00 | |
| C | 128 | Labor and material to apply up to 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition L non-skid. Apply new danger, warning, and VLA markings. | 25,000 | $0.00 | $0.00 | ||
| C | 129 | Labor and material to apply above 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition L non-skid. Apply new danger, warning, and VLA markings. | 25,000 | $0.00 | $0.00 | ||
| C | 130 | Labor and material to apply Type I MIL-PRF-24667, Composition L, MS-400L, High Solid. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| C | 131 | Labor and material to apply Type I MIL-PRF-24667, Composition G, UV/LSA non-skid. Apply new danger, warning, and VLA markings. | 10,000 | SF | $0.00 | $0.00 | |
| C | 132 | Labor and material to apply Type II MIL-PRF-24667, Composition G, UV/LSA non-skid. Apply new danger, warning, and VLA markings. | 1,000 | SF | $0.00 | $0.00 | |
| C | 133 | Labor and material to accomplish Stripe Coating on Edging and Weld Seams in accordance with NSTM 634. | 1,000 | LF | $0.00 | $0.00 | |
| C | 134 | Labor and material to accomplish Barrier Coat on Previously Primed Decking. | 21,000 | SF | $0.00 | $0.00 | |
| C | 135 | Labor and material for Surface Protection for Areas Without Non-Skid. Provide deck gray (top coat) in areas without non-skid. Apply new danger, warning, and VLA markings. | 42,000 | SF | $0.00 | $0.00 | |
| C | 136 | Labor and Material for Abrasive Blast - Remove existing deck covering (non-high non-skid or paint). Prime to cleaned deck with a proprietary paint system. Primer shall be MIL-PRF-23236 Type VII, Class 17 applied at 6-8 mils followed by a coat of MIL-PRF-32171 Type I Class 1 or 2 applied at 10-12 mils in preparation for installation of Peel and Stick. | 15,000 | SF | $0.00 | $0.00 | |
| C | 137 | Labor and Material for Ultra High Pressure Water Jetting - Remove existing deck covering (non-high non-skid or paint). Prime to cleaned deck with a proprietary paint system. Primer shall be MIL-PRF-24667 Type I, V, and VI COMP G applied at 4-6 mils followed by ONE coat of DECK GRAY NO. 26008 (FED STD 595) MIL-PREF-24635 TYPE III, 2-3 mils or TYPE V 5-8 mils in preparation for installation of Peel and Stick. | 21,000 | SF | $0.00 | $0.00 | |
| C | 138 | Labor and Material for Removal of Worn/Torn Product (Peel and Stick) - Product removal shall be accomplished in accordance with the manufacturer's instructions. | 10,000 | SF | $0.00 | $0.00 | |
| C | 139 | Labor and Material for Topcoat - MIL-PRF-32171 Type I Class 1 or 2 applied at 10-12 mils. | 38,000 | SF | $0.00 | $0.00 | |
| C | 140 | Labor and material for self-adhesive installation of Peel and Stick non-skid sections - Installation of Peel and Stick non-skid shall conform to MIL-PRF-24667 Type XI or other material as approved by NAVSEA. Spaces between adjacent pieces may be up to 1-1/2 inches. This spacing should align with weld seams to the maximum extent practicable to avoid the material from bridging these seams. Seal all free edges of Peel and Stick non-skid with the manufacturer's approved sealer. | 10,000 | SF | $0.00 | $0.00 | |
| C | 141 | Labor and material to accomplish one additional cleaning and surface prep to achieve in-tolerance conductivity readings in accordance with NSI 009-32. | 10,000 | SF | $0.00 | $0.00 | |
| C | 142 | Labor and Material for Containment Enclosure - Enclosure setup/removal, transportation and maintained operating with electrical lights and climate control equipment to support flight deck non-skid replacement. | 120 | DAY | $0.00 | $0.00 | |
| C | 143 | Labor and Material for Containment Enclosure - Enclosure setup/removal, transportation and maintained operating with electrical lights and climate control equipment to support flight deck non-skid replacement. | 120 | DAY | $0.00 | $0.00 | |
| C | 144 | Labor and material for surface preparation of wheel stops/gutters | 3,000 | LF | $0.00 | $0.00 | |
| C | 145 | Labor and Material for Gas Free Certification | 5 | EA | $0.00 | $0.00 | |
| C | 146 | Undisclosed Work - Straight Time | 2,000 | HR | $0.00 | $0.00 | |
| The Undisclosed Work ELINS are intended to be used to accomplish tasks that are required, but which are not covered by ELINS B101 through B138. Undisclosed Work will not be used to reimburse overtime used in accomplishing tasks under ELINS B101 through B138. Undisclosed work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in Clause RMC C-2-0050, entitled "Ordering Work." | |||||||
| C | 147 | Undisclosed Work - Overtime | 700 | HR | $0.00 | $0.00 | |
| C | 148 | Undisclosed Work - Material (Covers only material required for Undisclosed Work) | 44,000 | U.S. DOLLARS | $0.00 | $0.00 | |
| C | 149 | Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.) | 44,000 | X | 0.00% | $0.00 | |
| In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN. | |||||||
| C | 150 | Travel/Per Diem (for bidding purposes only) | 36,900 | U.S. DOLLARS | $0.00 | $0.00 | |
| C | 151 | Travel/Per Diem G&A (Contractor to submit a percentage.) Actual travel will be reimbursed in accordance with RMC H-2-0052. | 36,900 | X | 0.00% | $0.00 | |
| C | 152 | Adjustment/Percentage for ELINS A101 through A135 to accomplish tasks on submarines versus surface vessels. ELIN A145 represents the amount of adjustment to be received for doing work on submarines. (Contractor to submit a percentage.) | 3,000 | X | 0.00% | $0.00 | |
| C | 153 | Contract Data Requirements (DD Form 1423) | NSP | ||||
| Total Estimate for Base Year | $0.00 | ||||||
| NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, labor, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices. | |||||||
| NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools. | |||||||
| NOTE 3: Overtime is not authorized under the terms and conditions of this contract (with the exception of Undisclosed Work - Overtime) and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense. | |||||||
| NOTE 4: ELINS are to be fully burdened to include any required rental equipment. |
&C&"Arial,Bold"SOLICITATION N50054-15-R-0004 EXHIBIT C &"Arial,Regular"
&"Arial,Bold"SUPPLIES OR SERVICES AND PRICES
THIRD YEAR EFFORT (OPTION II)
Fourth Yr (Option 3)
| Contractor Name | |||||||
| Supplies/Services | Est Qty | Unit | Unit | ||||
| Price | Amount | ||||||
| D | 101 | Labor and Material to Abrasive Blast - Remove up to 25,000 SF of existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. | 25,000 | SF | $0.00 | $0.00 | |
| D | 102 | Labor and Material to Abrasive Blast - Remove existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. | 26,000 | SF | $0.00 | $0.00 | |
| D | 103 | Labor and Material to accomplish Ultra High Pressure Water Jetting - Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas up to 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. | 75,000 | SF | $0.00 | $0.00 | |
| D | 104 | Labor and Material to accomplish Ultra High Pressure Water Jetting - Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. | 38,000 | SF | $0.00 | $0.00 | |
| D | 105 | Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing abrasive blast method. Prime the prepared deck with a proprietary paint system and stripe coat. | 1,000 | SF | $0.00 | $0.00 | |
| D | 106 | Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing ultra high pressure water jetting method. Prime the prepared deck with a proprietary paint system and stripe coat. | 1,000 | SF | $0.00 | $0.00 | |
| D | 107 | Labor and material to remove any high solid non-skid system utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. | 15,000 | SF | $0.00 | $0.00 | |
| D | 108 | Labor and material to remove any high solid non-skid system utilizing ultra high pressure water jetting method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat. | 1,000 | SF | $0.00 | $0.00 | |
| D | 109 | Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. | 70,000 | SF | $0.00 | $0.00 | |
| D | 110 | Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. | 26,000 | SF | $0.00 | $0.00 | |
| D | 111 | Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. | 43,000 | SF | $0.00 | $0.00 | |
| D | 112 | Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. | 26,000 | SF | $0.00 | $0.00 | |
| D | 113 | Labor and material to apply non-high solid non-skid up to 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| D | 114 | Labor and material to apply non-high solid non-skid above 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. | 26,000 | SF | $0.00 | $0.00 | |
| D | 115 | Labor and material to apply non-high solid non-skid up to 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| D | 116 | Labor and material to apply non-high solid non-skid above 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. | 26,000 | SF | $0.00 | $0.00 | |
| D | 117 | Labor and material to apply epoxy non-skid with rubber membrane conforming to QPL as listed Type III (Flex). Apply new danger, warning, and VLA markings. | 1,000 | SF | $0.00 | $0.00 | |
| D | 118 | Labor and material to remove Type III non-skid, resurface membrane, patch a total of 15% of surface area, apply new MIL-PRF-24667 Type III non-skid. Apply new danger, warning, and VLA markings. | 1,000 | SF | $0.00 | $0.00 | |
| D | 119 | Labor and material to patch Type III membrane greater than 15% | 1,000 | SF | $0.00 | $0.00 | |
| D | 120 | Labor and material to Skim Coat Type III membrane | 1,000 | SF | $0.00 | $0.00 | |
| D | 121 | Labor and material to apply epoxy non-skid conforming to QPL as listed Type IV (Spray). Apply new danger, warning, and VLA markings. | 1,000 | SF | $0.00 | $0.00 | |
| D | 122 | Labor and material to apply non-high solid non-skid up to 25,000 SF with Type V MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| D | 123 | Labor and material to apply non-high solid non-skid above 25,000 SF with Type V MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| D | 124 | Labor and material to apply non-high solid non-skid up to 25,000 SF with Type V MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| D | 125 | Labor and material to apply non-high solid non-skid above 25,000 SF with Type V MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| D | 126 | Labor and material to apply up to 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition G non-skid. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| D | 127 | Labor and material to apply above 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition G non-skid. Apply new danger, warning, and VLA markings. | 26,000 | SF | $0.00 | $0.00 | |
| D | 128 | Labor and material to apply up to 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition L non-skid. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| D | 129 | Labor and material to apply above 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition L non-skid. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| D | 130 | Labor and material to apply Type I MIL-PRF-24667, Composition L, MS-400L, High Solid. Apply new danger, warning, and VLA markings. | 25,000 | SF | $0.00 | $0.00 | |
| D | 131 | Labor and material to apply Type I MIL-PRF-24667, Composition G, UV/LSA non-skid. Apply new danger, warning, and VLA markings. | 10,000 | SF | $0.00 | $0.00 | |
| D | 132 | Labor and material to apply Type II MIL-PRF-24667, Composition G, UV/LSA non-skid. Apply new danger, warning, and VLA markings. | 1,000 | SF | $0.00 | $0.00 | |
| D | 133 | Labor and material to accomplish Stripe Coating on Edging and Weld Seams in accordance with NSTM 634. | 1,000 | LF | $0.00 | $0.00 | |
| D | 134 | Labor and material to accomplish Barrier Coat on Previously Primed Decking. | 21,000 | SF | $0.00 | $0.00 | |
| D | 135 | Labor and material for Surface Protection for Areas Without Non-Skid. Provide deck gray (top coat) in areas without non-skid. Apply new danger, warning, and VLA markings. | 42,000 | SF | $0.00 | $0.00 | |
| D | 136 | Labor and Material for Abrasive Blast - Remove existing deck covering (non-high non-skid or paint). Prime to cleaned deck with a proprietary paint system. Primer shall be MIL-PRF-23236 Type VII, Class 17 applied at 6-8 mils followed by a coat of MIL-PRF-32171 Type I Class 1 or 2 applied at 10-12 mils in preparation for installation of Peel and Stick. | 15,000 | SF | $0.00 | $0.00 | |
| D | 137 | Labor and Material for Ultra High Pressure Water Jetting - Remove existing deck covering (non-high non-skid or paint). Prime to cleaned deck with a proprietary paint system. Primer shall be MIL-PRF-24667 Type I, V, and VI COMP G applied at 4-6 mils followed by ONE coat of DECK GRAY NO. 26008 (FED STD 595) MIL-PREF-24635 TYPE III, 2-3 mils or TYPE V 5-8 mils in preparation for installation of Peel and Stick. | 21,000 | SF | $0.00 | $0.00 | |
| D | 138 | Labor and Material for Removal of Worn/Torn Product (Peel and Stick) - Product removal shall be accomplished in accordance with the manufacturer's instructions. | 10,000 | SF | $0.00 | $0.00 | |
| D | 139 | Labor and Material for Topcoat - MIL-PRF-32171 Type I Class 1 or 2 applied at 10-12 mils. | 38,000 | SF | $0.00 | $0.00 | |
| D | 140 | Labor and material for self-adhesive installation of Peel and Stick non-skid sections - Installation of Peel and Stick non-skid shall conform to MIL-PRF-24667 Type XI or other material as approved by NAVSEA. Spaces between adjacent pieces may be up to 1-1/2 inches. This spacing should align with weld seams to the maximum extent practicable to avoid the material from bridging these seams. Seal all free edges of Peel and Stick non-skid with the manufacturer's approved sealer. | 10,000 | SF | $0.00 | $0.00 | |
| D | 141 | Labor and material to accomplish one additional cleaning and surface prep to achieve in-tolerance conductivity readings in accordance with NSI 009-32. | 10,000 | SF | $0.00 | $0.00 | |
| D | 142 | Labor and Material for Containment Enclosure - Enclosure setup/removal, transportation and maintained operating with electrical lights and climate control equipment to support flight deck non-skid replacement. | 120 | DAY | $0.00 | $0.00 | |
| D | 143 | Labor and Material for Containment Enclosure - Enclosure setup/removal, transportation and maintained operating with electrical lights and climate control equipment to support flight deck non-skid replacement. | 120 | DAY | $0.00 | $0.00 | |
| D | 144 | Labor and material for surface preparation of wheel stops/gutters | 3,000 | LF | $0.00 | $0.00 | |
| D | 145 | Labor and Material for Gas Free Certification | 5 | EA | $0.00 | $0.00 | |
| D | 146 | Undisclosed Work - Straight Time | 2,000 | HR | $0.00 | $0.00 | |
| D | 147 | Undisclosed Work - Overtime | 700 | HR | $0.00 | $0.00 | |
| D | 148 | Undisclosed Work - Material (Covers only material required for Undisclosed Work) | 44,000 | U.S. DOLLARS | $0.00 | $0.00 | |
| D | 149 | Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.) | 44,000 | X | 0.00% | $0.00 | |
| In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN. | |||||||
| D | 150 | Travel/Per Diem (for bidding purposes only) | 36,900 | U.S. DOLLARS | $0.00 | $0.00 | |
| D | 151 | Travel/Per Diem G&A (Contractor to submit a percentage.) Actual travel will be reimbursed in accordance with RMC H-2-0052. | 36,900 | X | 0.00% | $0.00 | |
| D | 152 | Adjustment/Percentage for ELINS A101 through A135 to accomplish tasks on submarines versus surface vessels. ELIN A145 represents the amount of adjustment to be received for doing work on submarines. (Contractor to submit a percentage.) | 3,000 | X | 0.00% | $0.00 | |
| D | 153 | Contract Data Requirements (DD Form 1423) | NSP | ||||
| Total Estimate for Base Year | $0.00 | ||||||
| NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, labor, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices. | |||||||
| NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools. |