Exhibit_A-E.xls

XLS spreadsheet 147 KB Posted

Attached to
Non-Skid Removal and Application Support Federal contract opportunity
Solicitation number
N50054-15-R-0004
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Exhibit A-E

View the file

Other files for this federal contract opportunity

Other files attached to Non-Skid Removal and Application Support, newest first.
File Type Posted
Bidder's_Questions_and_Answers_(1-3).xlsx XLSX spreadsheet
N50054-15-R-0004-0002.doc DOC document
Bidder's_Questions.xlsx XLSX spreadsheet
N50054-15-R-0004-0001.doc DOC document
J17 _Request_for_Specification_Clarification.doc DOC document
J7 _042-011.pdf PDF
J6 _042-008.pdf PDF
J11 _SWT-077-001.pdf PDF
J5 _042-007.pdf PDF
J12 _LWT-992-310.pdf PDF
J2 _042-002.pdf PDF
J10 _042-037.pdf PDF
J14 _Capacity_Evaluation_Form.xlsx XLSX spreadsheet
J15 _Past_Performance_Information_Form.docx DOCX document
J4 _042-006.pdf PDF
J16 _Past_Performance_Assessment_Questionnaire.doc DOC document
J13_-_Wheel_Stops.pdf PDF
J1 _CDRLs.pdf PDF
J3 _042-005.pdf PDF
J8 _042-022.pdf PDF
J9 _042-026.pdf PDF
N50054-15-R-0004.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

Contractor Name
Supplies/ServicesEst QtyUnitUnit
PriceAmount
A101Labor and Material to Abrasive Blast - Remove up to 25,000 SF of existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.25,000SF$0.00$0.00
A102Labor and Material to Abrasive Blast - Remove existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.26,000SF$0.00$0.00
A103Labor and Material to accomplish Ultra High Pressure Water Jetting - Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas up to 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.75,000SF$0.00$0.00
A104Labor and Material to accomplish Ultra High Pressure Water Jetting - Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.38,000SF$0.00$0.00
A105Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing abrasive blast method. Prime the prepared deck with a proprietary paint system and stripe coat.1,000SF$0.00$0.00
A106Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing ultra high pressure water jetting method. Prime the prepared deck with a proprietary paint system and stripe coat.1,000SF$0.00$0.00
A107Labor and material to remove any high solid non-skid system utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.15,000SF$0.00$0.00
A108Labor and material to remove any high solid non-skid system utilizing ultra high pressure water jetting method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.1,000SF$0.00$0.00
A109Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.70,000SF$0.00$0.00
A110Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.26,000SF$0.00$0.00
A111Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.43,000SF$0.00$0.00
A112Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.26,000SF$0.00$0.00
A113Labor and material to apply non-high solid non-skid up to 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
A114Labor and material to apply non-high solid non-skid above 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.26,000SF$0.00$0.00
A115Labor and material to apply non-high solid non-skid up to 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
A116Labor and material to apply non-high solid non-skid above 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.26,000SF$0.00$0.00
A117Labor and material to apply epoxy non-skid with rubber membrane conforming to QPL as listed Type III (Flex). Apply new danger, warning, and VLA markings.1,000SF$0.00$0.00
A118Labor and material to remove Type III non-skid, resurface membrane, patch a total of 15% of surface area, apply new MIL-PRF-24667 Type III non-skid. Apply new danger, warning, and VLA markings.1,000SF$0.00$0.00
A119Labor and material to patch Type III membrane greater than 15%1,000SF$0.00$0.00
A120Labor and material to Skim Coat Type III membrane1,000SF$0.00$0.00
A121Labor and material to apply epoxy non-skid conforming to QPL as listed Type IV (Spray). Apply new danger, warning, and VLA markings.1,000SF$0.00$0.00
A122Labor and material to apply non-high solid non-skid up to 25,000 SF with Type V MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
A123Labor and material to apply non-high solid non-skid above 25,000 SF with Type V MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
A124Labor and material to apply non-high solid non-skid up to 25,000 SF with Type V MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
A125Labor and material to apply non-high solid non-skid above 25,000 SF with Type V MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
A126Labor and material to apply up to 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition G non-skid. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
A127Labor and material to apply above 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition G non-skid. Apply new danger, warning, and VLA markings.26,000SF$0.00$0.00
A128Labor and material to apply up to 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition L non-skid. Apply new danger, warning, and VLA markings.25,000$0.00$0.00
A129Labor and material to apply above 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition L non-skid. Apply new danger, warning, and VLA markings.25,000$0.00$0.00
A130Labor and material to apply Type I MIL-PRF-24667, Composition L, MS-400L, High Solid. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
A131Labor and material to apply Type I MIL-PRF-24667, Composition G, UV/LSA non-skid. Apply new danger, warning, and VLA markings.10,000SF$0.00$0.00
A132Labor and material to apply Type II MIL-PRF-24667, Composition G, UV/LSA non-skid. Apply new danger, warning, and VLA markings.1,000SF$0.00$0.00
A133Labor and material to accomplish Stripe Coating on Edging and Weld Seams in accordance with NSTM 634.1,000LF$0.00$0.00
A134Labor and material to accomplish Barrier Coat on Previously Primed Decking.21,000SF$0.00$0.00
A135Labor and material for Surface Protection for Areas Without Non-Skid. Provide deck gray (top coat) in areas without non-skid. Apply new danger, warning, and VLA markings.42,000SF$0.00$0.00
A136Labor and Material for Abrasive Blast - Remove existing deck covering (non-high non-skid or paint). Prime to cleaned deck with a proprietary paint system. Primer shall be MIL-PRF-23236 Type VII, Class 17 applied at 6-8 mils followed by a coat of MIL-PRF-32171 Type I Class 1 or 2 applied at 10-12 mils in preparation for installation of Peel and Stick.15,000SF$0.00$0.00
A137Labor and Material for Ultra High Pressure Water Jetting - Remove existing deck covering (non-high non-skid or paint). Prime to cleaned deck with a proprietary paint system. Primer shall be MIL-PRF-24667 Type I, V, and VI COMP G applied at 4-6 mils followed by ONE coat of DECK GRAY NO. 26008 (FED STD 595) MIL-PREF-24635 TYPE III, 2-3 mils or TYPE V 5-8 mils in preparation for installation of Peel and Stick.21,000SF$0.00$0.00
A138Labor and Material for Removal of Worn/Torn Product (Peel and Stick) - Product removal shall be accomplished in accordance with the manufacturer's instructions.10,000SF$0.00$0.00
A139Labor and Material for Topcoat - MIL-PRF-32171 Type I Class 1 or 2 applied at 10-12 mils.38,000SF$0.00$0.00
A140Labor and material for self-adhesive installation of Peel and Stick non-skid sections - Installation of Peel and Stick non-skid shall conform to MIL-PRF-24667 Type XI or other material as approved by NAVSEA. Spaces between adjacent pieces may be up to 1-1/2 inches. This spacing should align with weld seams to the maximum extent practicable to avoid the material from bridging these seams. Seal all free edges of Peel and Stick non-skid with the manufacturer's approved sealer.10,000SF$0.00$0.00
A141Labor and material to accomplish one additional cleaning and surface prep to achieve in-tolerance conductivity readings in accordance with NSI 009-32.10,000SF$0.00$0.00
A142Labor and Material for Containment Enclosure - Enclosure setup/removal, transportation and maintained operating with electrical lights and climate control equipment to support flight deck non-skid replacement.120DAY$0.00$0.00
A143Labor and Material for Containment Enclosure - Enclosure setup/removal, transportation and maintained operating with electrical lights and climate control equipment to support flight deck non-skid replacement.120DAY$0.00$0.00
A144Labor and material for surface preparation of wheel stops/gutters3,000LF$0.00$0.00
A145Labor and Material for Gas Free Certification5EA$0.00$0.00
A146Undisclosed Work - Straight Time2,000HR$0.00$0.00
The Undisclosed Work ELINS are intended to be used to accomplish tasks that are required, but which are not covered by ELINS A101 through A138. Undisclosed Work will not be used to reimburse overtime used in accomplishing tasks under ELINS A101 through A138. Undisclosed work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in Clause RMC C-2-0050, entitled "Ordering Work."
A147Undisclosed Work - Overtime700HR$0.00$0.00
A148Undisclosed Work - Material (Covers only material required for Undisclosed Work)44,000U.S. DOLLARS$0.00$0.00
A149Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.)44,000X0.00%$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.
A150Travel/Per Diem (for bidding purposes only)36,900U.S. DOLLARS$0.00$0.00
A151Travel/Per Diem G&A (Contractor to submit a percentage.) Actual travel will be reimbursed in accordance with RMC H-2-0052.36,900X0.00%$0.00
A152Adjustment/Percentage for ELINS A101 through A141 to accomplish tasks on submarines versus surface vessels. ELIN A151 represents the amount of adjustment to be received for doing work on submarines. (Contractor to submit a percentage.)3,000X$0.00$0.00
A153Contract Data Requirements (DD Form 1423)NSP
Total Estimate for Base Year$0.00
NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, labor, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.
NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.
NOTE 3: Overtime is not authorized under the terms and conditions of this contract (with the exception of Undisclosed Work - Overtime) and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost orr expense.
NOTE 4: ELINS are to be fully burdened to include any required rental equipment.

&C&"Arial,Bold"SOLICITATION N50054-15-R-0000 EXHIBIT A &"Arial,Regular"

&"Arial,Bold"SUPPLIES OR SERVICES AND PRICES

BASE YEAR EFFORT

Second Yr ( Option 1)

Contractor Name
Supplies/ServicesEst QtyUnitUnit
PriceAmount
B101Labor and Material to Abrasive Blast - Remove up to 25,000 SF of existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.25,000SF$0.00$0.00
B102Labor and Material to Abrasive Blast - Remove existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.26,000SF$0.00$0.00
B103Labor and Material to accomplish Ultra High Pressure Water Jetting - Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas up to 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.75,000SF$0.00$0.00
B104Labor and Material to accomplish Ultra High Pressure Water Jetting - Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.38,000SF$0.00$0.00
B105Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing abrasive blast method. Prime the prepared deck with a proprietary paint system and stripe coat.1,000SF$0.00$0.00
B106Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing ultra high pressure water jetting method. Prime the prepared deck with a proprietary paint system and stripe coat.1,000SF$0.00$0.00
B107Labor and material to remove any high solid non-skid system utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.15,000SF$0.00$0.00
B108Labor and material to remove any high solid non-skid system utilizing ultra high pressure water jetting method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.1,000SF$0.00$0.00
B109Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.70,000SF$0.00$0.00
B110Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.26,000SF$0.00$0.00
B111Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.43,000SF$0.00$0.00
B112Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.26,000SF$0.00$0.00
B113Labor and material to apply non-high solid non-skid up to 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
B114Labor and material to apply non-high solid non-skid above 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.26,000SF$0.00$0.00
B115Labor and material to apply non-high solid non-skid up to 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
B116Labor and material to apply non-high solid non-skid above 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.26,000SF$0.00$0.00
B117Labor and material to apply epoxy non-skid with rubber membrane conforming to QPL as listed Type III (Flex). Apply new danger, warning, and VLA markings.1,000SF$0.00$0.00
B118Labor and material to remove Type III non-skid, resurface membrane, patch a total of 15% of surface area, apply new MIL-PRF-24667 Type III non-skid. Apply new danger, warning, and VLA markings.1,000SF$0.00$0.00
B119Labor and material to patch Type III membrane greater than 15%1,000SF$0.00$0.00
B120Labor and material to Skim Coat Type III membrane1,000SF$0.00$0.00
B121Labor and material to apply epoxy non-skid conforming to QPL as listed Type IV (Spray). Apply new danger, warning, and VLA markings.1,000SF$0.00$0.00
B122Labor and material to apply non-high solid non-skid up to 25,000 SF with Type V MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
B123Labor and material to apply non-high solid non-skid above 25,000 SF with Type V MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
B124Labor and material to apply non-high solid non-skid up to 25,000 SF with Type V MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
B125Labor and material to apply non-high solid non-skid above 25,000 SF with Type V MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
B126Labor and material to apply up to 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition G non-skid. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
B127Labor and material to apply above 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition G non-skid. Apply new danger, warning, and VLA markings.26,000SF$0.00$0.00
128Labor and material to apply up to 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition L non-skid. Apply new danger, warning, and VLA markings.25,000$0.00$0.00
129Labor and material to apply above 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition L non-skid. Apply new danger, warning, and VLA markings.25,000$0.00$0.00
B130Labor and material to apply Type I MIL-PRF-24667, Composition L, MS-400L, High Solid. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
B131Labor and material to apply Type I MIL-PRF-24667, Composition G, UV/LSA non-skid. Apply new danger, warning, and VLA markings.10,000SF$0.00$0.00
B132Labor and material to apply Type II MIL-PRF-24667, Composition G, UV/LSA non-skid. Apply new danger, warning, and VLA markings.1,000SF$0.00$0.00
B133Labor and material to accomplish Stripe Coating on Edging and Weld Seams in accordance with NSTM 634.1,000LF$0.00$0.00
B134Labor and material to accomplish Barrier Coat on Previously Primed Decking.21,000SF$0.00$0.00
B135Labor and material for Surface Protection for Areas Without Non-Skid. Provide deck gray (top coat) in areas without non-skid. Apply new danger, warning, and VLA markings.42,000SF$0.00$0.00
B136Labor and Material for Abrasive Blast - Remove existing deck covering (non-high non-skid or paint). Prime to cleaned deck with a proprietary paint system. Primer shall be MIL-PRF-23236 Type VII, Class 17 applied at 6-8 mils followed by a coat of MIL-PRF-32171 Type I Class 1 or 2 applied at 10-12 mils in preparation for installation of Peel and Stick.15,000SF$0.00$0.00
B137Labor and Material for Ultra High Pressure Water Jetting - Remove existing deck covering (non-high non-skid or paint). Prime to cleaned deck with a proprietary paint system. Primer shall be MIL-PRF-24667 Type I, V, and VI COMP G applied at 4-6 mils followed by ONE coat of DECK GRAY NO. 26008 (FED STD 595) MIL-PREF-24635 TYPE III, 2-3 mils or TYPE V 5-8 mils in preparation for installation of Peel and Stick.21,000SF$0.00$0.00
B138Labor and Material for Removal of Worn/Torn Product (Peel and Stick) - Product removal shall be accomplished in accordance with the manufacturer's instructions.10,000SF$0.00$0.00
B139Labor and Material for Topcoat - MIL-PRF-32171 Type I Class 1 or 2 applied at 10-12 mils.38,000SF$0.00$0.00
B140Labor and material for self-adhesive installation of Peel and Stick non-skid sections - Installation of Peel and Stick non-skid shall conform to MIL-PRF-24667 Type XI or other material as approved by NAVSEA. Spaces between adjacent pieces may be up to 1-1/2 inches. This spacing should align with weld seams to the maximum extent practicable to avoid the material from bridging these seams. Seal all free edges of Peel and Stick non-skid with the manufacturer's approved sealer.10,000SF$0.00$0.00
B141Labor and material to accomplish one additional cleaning and surface prep to achieve in-tolerance conductivity readings in accordance with NSI 009-32.10,000SF$0.00$0.00
B142Labor and Material for Containment Enclosure - Enclosure setup/removal, transportation and maintained operating with electrical lights and climate control equipment to support flight deck non-skid replacement.120DAY$0.00$0.00
B143Labor and Material for Containment Enclosure - Enclosure setup/removal, transportation and maintained operating with electrical lights and climate control equipment to support flight deck non-skid replacement.120DAY$0.00$0.00
B144Labor and material for surface preparation of wheel stops/gutters3,000LF$0.00$0.00
B145Labor and Material for Gas Free Certification5EA$0.00$0.00
B146Undisclosed Work - Straight Time2,000HR$0.00$0.00
The Undisclosed Work ELINS are intended to be used to accomplish tasks that are required, but which are not covered by ELINS B101 through B138. Undisclosed Work will not be used to reimburse overtime used in accomplishing tasks under ELINS B101 through B138. Undisclosed work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in Clause RMC C-2-0050, entitled "Ordering Work."
B147Undisclosed Work - Overtime700HR$0.00$0.00
B148Undisclosed Work - Material (Covers only material required for Undisclosed Work)44,000U.S. DOLLARS$0.00$0.00
B149Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.)44,000X0.00%$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.
B150Travel/Per Diem (for bidding purposes only)36,900U.S. DOLLARS$0.00$0.00
B151Travel/Per Diem G&A (Contractor to submit a percentage.) Actual travel will be reimbursed in accordance with RMC H-2-0052.36,900X0.00%$0.00
B152Adjustment/Percentage for ELINS A101 through A135 to accomplish tasks on submarines versus surface vessels. ELIN A145 represents the amount of adjustment to be received for doing work on submarines. (Contractor to submit a percentage.)3,000X0.00%$0.00
B153Contract Data Requirements (DD Form 1423)NSP
Total Estimate for Base Year$0.00
NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, labor, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.
NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.
NOTE 3: Overtime is not authorized under the terms and conditions of this contract (with the exception of Undisclosed Work - Overtime) and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense.
NOTE 4: ELINS are to be fully burdened to include any required rental equipment.

&C&"Arial,Bold"SOLICITATION N50054-15-R-0004 EXHIBIT B &"Arial,Regular" &"Arial,Bold"

SUPPLIES OR SERVICES AND PRICES

SECOND YEAR EFFORT (OPTION I)

Third Yr (Option 2)

Contractor Name
Supplies/ServicesEst QtyUnitUnit
PriceAmount
C101Labor and Material to Abrasive Blast - Remove up to 25,000 SF of existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.25,000SF$0.00$0.00
C102Labor and Material to Abrasive Blast - Remove existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.26,000SF$0.00$0.00
C103Labor and Material to accomplish Ultra High Pressure Water Jetting - Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas up to 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.75,000SF$0.00$0.00
C104Labor and Material to accomplish Ultra High Pressure Water Jetting - Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.38,000SF$0.00$0.00
C105Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing abrasive blast method. Prime the prepared deck with a proprietary paint system and stripe coat.1,000SF$0.00$0.00
C106Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing ultra high pressure water jetting method. Prime the prepared deck with a proprietary paint system and stripe coat.1,000SF$0.00$0.00
C107Labor and material to remove any high solid non-skid system utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.15,000SF$0.00$0.00
C108Labor and material to remove any high solid non-skid system utilizing ultra high pressure water jetting method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.1,000SF$0.00$0.00
C109Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.70,000SF$0.00$0.00
C110Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.26,000SF$0.00$0.00
C111Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.43,000SF$0.00$0.00
C112Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.26,000SF$0.00$0.00
C113Labor and material to apply non-high solid non-skid up to 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
C114Labor and material to apply non-high solid non-skid above 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.26,000SF$0.00$0.00
C115Labor and material to apply non-high solid non-skid up to 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
C116Labor and material to apply non-high solid non-skid above 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.26,000SF$0.00$0.00
C117Labor and material to apply epoxy non-skid with rubber membrane conforming to QPL as listed Type III (Flex). Apply new danger, warning, and VLA markings.1,000SF$0.00$0.00
C118Labor and material to remove Type III non-skid, resurface membrane, patch a total of 15% of surface area, apply new MIL-PRF-24667 Type III non-skid. Apply new danger, warning, and VLA markings.1,000SF$0.00$0.00
C119Labor and material to patch Type III membrane greater than 15%1,000SF$0.00$0.00
C120Labor and material to Skim Coat Type III membrane1,000SF$0.00$0.00
C121Labor and material to apply epoxy non-skid conforming to QPL as listed Type IV (Spray). Apply new danger, warning, and VLA markings.1,000SF$0.00$0.00
C122Labor and material to apply non-high solid non-skid up to 25,000 SF with Type V MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
C123Labor and material to apply non-high solid non-skid above 25,000 SF with Type V MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
C124Labor and material to apply non-high solid non-skid up to 25,000 SF with Type V MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
C125Labor and material to apply non-high solid non-skid above 25,000 SF with Type V MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
C126Labor and material to apply up to 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition G non-skid. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
C127Labor and material to apply above 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition G non-skid. Apply new danger, warning, and VLA markings.26,000SF$0.00$0.00
C128Labor and material to apply up to 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition L non-skid. Apply new danger, warning, and VLA markings.25,000$0.00$0.00
C129Labor and material to apply above 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition L non-skid. Apply new danger, warning, and VLA markings.25,000$0.00$0.00
C130Labor and material to apply Type I MIL-PRF-24667, Composition L, MS-400L, High Solid. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
C131Labor and material to apply Type I MIL-PRF-24667, Composition G, UV/LSA non-skid. Apply new danger, warning, and VLA markings.10,000SF$0.00$0.00
C132Labor and material to apply Type II MIL-PRF-24667, Composition G, UV/LSA non-skid. Apply new danger, warning, and VLA markings.1,000SF$0.00$0.00
C133Labor and material to accomplish Stripe Coating on Edging and Weld Seams in accordance with NSTM 634.1,000LF$0.00$0.00
C134Labor and material to accomplish Barrier Coat on Previously Primed Decking.21,000SF$0.00$0.00
C135Labor and material for Surface Protection for Areas Without Non-Skid. Provide deck gray (top coat) in areas without non-skid. Apply new danger, warning, and VLA markings.42,000SF$0.00$0.00
C136Labor and Material for Abrasive Blast - Remove existing deck covering (non-high non-skid or paint). Prime to cleaned deck with a proprietary paint system. Primer shall be MIL-PRF-23236 Type VII, Class 17 applied at 6-8 mils followed by a coat of MIL-PRF-32171 Type I Class 1 or 2 applied at 10-12 mils in preparation for installation of Peel and Stick.15,000SF$0.00$0.00
C137Labor and Material for Ultra High Pressure Water Jetting - Remove existing deck covering (non-high non-skid or paint). Prime to cleaned deck with a proprietary paint system. Primer shall be MIL-PRF-24667 Type I, V, and VI COMP G applied at 4-6 mils followed by ONE coat of DECK GRAY NO. 26008 (FED STD 595) MIL-PREF-24635 TYPE III, 2-3 mils or TYPE V 5-8 mils in preparation for installation of Peel and Stick.21,000SF$0.00$0.00
C138Labor and Material for Removal of Worn/Torn Product (Peel and Stick) - Product removal shall be accomplished in accordance with the manufacturer's instructions.10,000SF$0.00$0.00
C139Labor and Material for Topcoat - MIL-PRF-32171 Type I Class 1 or 2 applied at 10-12 mils.38,000SF$0.00$0.00
C140Labor and material for self-adhesive installation of Peel and Stick non-skid sections - Installation of Peel and Stick non-skid shall conform to MIL-PRF-24667 Type XI or other material as approved by NAVSEA. Spaces between adjacent pieces may be up to 1-1/2 inches. This spacing should align with weld seams to the maximum extent practicable to avoid the material from bridging these seams. Seal all free edges of Peel and Stick non-skid with the manufacturer's approved sealer.10,000SF$0.00$0.00
C141Labor and material to accomplish one additional cleaning and surface prep to achieve in-tolerance conductivity readings in accordance with NSI 009-32.10,000SF$0.00$0.00
C142Labor and Material for Containment Enclosure - Enclosure setup/removal, transportation and maintained operating with electrical lights and climate control equipment to support flight deck non-skid replacement.120DAY$0.00$0.00
C143Labor and Material for Containment Enclosure - Enclosure setup/removal, transportation and maintained operating with electrical lights and climate control equipment to support flight deck non-skid replacement.120DAY$0.00$0.00
C144Labor and material for surface preparation of wheel stops/gutters3,000LF$0.00$0.00
C145Labor and Material for Gas Free Certification5EA$0.00$0.00
C146Undisclosed Work - Straight Time2,000HR$0.00$0.00
The Undisclosed Work ELINS are intended to be used to accomplish tasks that are required, but which are not covered by ELINS B101 through B138. Undisclosed Work will not be used to reimburse overtime used in accomplishing tasks under ELINS B101 through B138. Undisclosed work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in Clause RMC C-2-0050, entitled "Ordering Work."
C147Undisclosed Work - Overtime700HR$0.00$0.00
C148Undisclosed Work - Material (Covers only material required for Undisclosed Work)44,000U.S. DOLLARS$0.00$0.00
C149Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.)44,000X0.00%$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.
C150Travel/Per Diem (for bidding purposes only)36,900U.S. DOLLARS$0.00$0.00
C151Travel/Per Diem G&A (Contractor to submit a percentage.) Actual travel will be reimbursed in accordance with RMC H-2-0052.36,900X0.00%$0.00
C152Adjustment/Percentage for ELINS A101 through A135 to accomplish tasks on submarines versus surface vessels. ELIN A145 represents the amount of adjustment to be received for doing work on submarines. (Contractor to submit a percentage.)3,000X0.00%$0.00
C153Contract Data Requirements (DD Form 1423)NSP
Total Estimate for Base Year$0.00
NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, labor, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.
NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.
NOTE 3: Overtime is not authorized under the terms and conditions of this contract (with the exception of Undisclosed Work - Overtime) and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense.
NOTE 4: ELINS are to be fully burdened to include any required rental equipment.

&C&"Arial,Bold"SOLICITATION N50054-15-R-0004 EXHIBIT C &"Arial,Regular"

&"Arial,Bold"SUPPLIES OR SERVICES AND PRICES

THIRD YEAR EFFORT (OPTION II)

Fourth Yr (Option 3)

Contractor Name
Supplies/ServicesEst QtyUnitUnit
PriceAmount
D101Labor and Material to Abrasive Blast - Remove up to 25,000 SF of existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.25,000SF$0.00$0.00
D102Labor and Material to Abrasive Blast - Remove existing deck covering (non-high solid non-skid or paint) utilizing abrasive blast method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.26,000SF$0.00$0.00
D103Labor and Material to accomplish Ultra High Pressure Water Jetting - Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas up to 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.75,000SF$0.00$0.00
D104Labor and Material to accomplish Ultra High Pressure Water Jetting - Remove existing deck covering (non-high solid non-skid or paint) utilizing ultra high pressure water jetting method for areas greater than 25,000 SF from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.38,000SF$0.00$0.00
D105Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing abrasive blast method. Prime the prepared deck with a proprietary paint system and stripe coat.1,000SF$0.00$0.00
D106Labor and material to remove 100% of Type III non-skid and rubber membrane up to 2-1/2 inches thick utilizing ultra high pressure water jetting method. Prime the prepared deck with a proprietary paint system and stripe coat.1,000SF$0.00$0.00
D107Labor and material to remove any high solid non-skid system utilizing abrasive blast method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.15,000SF$0.00$0.00
D108Labor and material to remove any high solid non-skid system utilizing ultra high pressure water jetting method from aircraft elevators, flight, hangar, and other decks. Prime the cleaned deck with a proprietary paint system and stripe coat.1,000SF$0.00$0.00
D109Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.70,000SF$0.00$0.00
D110Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.26,000SF$0.00$0.00
D111Labor and material to apply non-high solid non-skid up to 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.43,000SF$0.00$0.00
D112Labor and material to apply non-high solid non-skid above 25,000 SF with Type I MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.26,000SF$0.00$0.00
D113Labor and material to apply non-high solid non-skid up to 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
D114Labor and material to apply non-high solid non-skid above 25,000 SF with Type II MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.26,000SF$0.00$0.00
D115Labor and material to apply non-high solid non-skid up to 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
D116Labor and material to apply non-high solid non-skid above 25,000 SF with Type II MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.26,000SF$0.00$0.00
D117Labor and material to apply epoxy non-skid with rubber membrane conforming to QPL as listed Type III (Flex). Apply new danger, warning, and VLA markings.1,000SF$0.00$0.00
D118Labor and material to remove Type III non-skid, resurface membrane, patch a total of 15% of surface area, apply new MIL-PRF-24667 Type III non-skid. Apply new danger, warning, and VLA markings.1,000SF$0.00$0.00
D119Labor and material to patch Type III membrane greater than 15%1,000SF$0.00$0.00
D120Labor and material to Skim Coat Type III membrane1,000SF$0.00$0.00
D121Labor and material to apply epoxy non-skid conforming to QPL as listed Type IV (Spray). Apply new danger, warning, and VLA markings.1,000SF$0.00$0.00
D122Labor and material to apply non-high solid non-skid up to 25,000 SF with Type V MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
D123Labor and material to apply non-high solid non-skid above 25,000 SF with Type V MIL-PRF-24667, Composition G. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
D124Labor and material to apply non-high solid non-skid up to 25,000 SF with Type V MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
D125Labor and material to apply non-high solid non-skid above 25,000 SF with Type V MIL-PRF-24667, Composition L. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
D126Labor and material to apply up to 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition G non-skid. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
D127Labor and material to apply above 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition G non-skid. Apply new danger, warning, and VLA markings.26,000SF$0.00$0.00
D128Labor and material to apply up to 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition L non-skid. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
D129Labor and material to apply above 25,000 SF with Type VIII (Low Temperature Cure) MIL-PRF-24667 Composition L non-skid. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
D130Labor and material to apply Type I MIL-PRF-24667, Composition L, MS-400L, High Solid. Apply new danger, warning, and VLA markings.25,000SF$0.00$0.00
D131Labor and material to apply Type I MIL-PRF-24667, Composition G, UV/LSA non-skid. Apply new danger, warning, and VLA markings.10,000SF$0.00$0.00
D132Labor and material to apply Type II MIL-PRF-24667, Composition G, UV/LSA non-skid. Apply new danger, warning, and VLA markings.1,000SF$0.00$0.00
D133Labor and material to accomplish Stripe Coating on Edging and Weld Seams in accordance with NSTM 634.1,000LF$0.00$0.00
D134Labor and material to accomplish Barrier Coat on Previously Primed Decking.21,000SF$0.00$0.00
D135Labor and material for Surface Protection for Areas Without Non-Skid. Provide deck gray (top coat) in areas without non-skid. Apply new danger, warning, and VLA markings.42,000SF$0.00$0.00
D136Labor and Material for Abrasive Blast - Remove existing deck covering (non-high non-skid or paint). Prime to cleaned deck with a proprietary paint system. Primer shall be MIL-PRF-23236 Type VII, Class 17 applied at 6-8 mils followed by a coat of MIL-PRF-32171 Type I Class 1 or 2 applied at 10-12 mils in preparation for installation of Peel and Stick.15,000SF$0.00$0.00
D137Labor and Material for Ultra High Pressure Water Jetting - Remove existing deck covering (non-high non-skid or paint). Prime to cleaned deck with a proprietary paint system. Primer shall be MIL-PRF-24667 Type I, V, and VI COMP G applied at 4-6 mils followed by ONE coat of DECK GRAY NO. 26008 (FED STD 595) MIL-PREF-24635 TYPE III, 2-3 mils or TYPE V 5-8 mils in preparation for installation of Peel and Stick.21,000SF$0.00$0.00
D138Labor and Material for Removal of Worn/Torn Product (Peel and Stick) - Product removal shall be accomplished in accordance with the manufacturer's instructions.10,000SF$0.00$0.00
D139Labor and Material for Topcoat - MIL-PRF-32171 Type I Class 1 or 2 applied at 10-12 mils.38,000SF$0.00$0.00
D140Labor and material for self-adhesive installation of Peel and Stick non-skid sections - Installation of Peel and Stick non-skid shall conform to MIL-PRF-24667 Type XI or other material as approved by NAVSEA. Spaces between adjacent pieces may be up to 1-1/2 inches. This spacing should align with weld seams to the maximum extent practicable to avoid the material from bridging these seams. Seal all free edges of Peel and Stick non-skid with the manufacturer's approved sealer.10,000SF$0.00$0.00
D141Labor and material to accomplish one additional cleaning and surface prep to achieve in-tolerance conductivity readings in accordance with NSI 009-32.10,000SF$0.00$0.00
D142Labor and Material for Containment Enclosure - Enclosure setup/removal, transportation and maintained operating with electrical lights and climate control equipment to support flight deck non-skid replacement.120DAY$0.00$0.00
D143Labor and Material for Containment Enclosure - Enclosure setup/removal, transportation and maintained operating with electrical lights and climate control equipment to support flight deck non-skid replacement.120DAY$0.00$0.00
D144Labor and material for surface preparation of wheel stops/gutters3,000LF$0.00$0.00
D145Labor and Material for Gas Free Certification5EA$0.00$0.00
D146Undisclosed Work - Straight Time2,000HR$0.00$0.00
D147Undisclosed Work - Overtime700HR$0.00$0.00
D148Undisclosed Work - Material (Covers only material required for Undisclosed Work)44,000U.S. DOLLARS$0.00$0.00
D149Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.)44,000X0.00%$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.
D150Travel/Per Diem (for bidding purposes only)36,900U.S. DOLLARS$0.00$0.00
D151Travel/Per Diem G&A (Contractor to submit a percentage.) Actual travel will be reimbursed in accordance with RMC H-2-0052.36,900X0.00%$0.00
D152Adjustment/Percentage for ELINS A101 through A135 to accomplish tasks on submarines versus surface vessels. ELIN A145 represents the amount of adjustment to be received for doing work on submarines. (Contractor to submit a percentage.)3,000X0.00%$0.00
D153Contract Data Requirements (DD Form 1423)NSP
Total Estimate for Base Year$0.00
NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, labor, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.
NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.