This is a Performance Work Statement (PWS) for Nationally Recognized Testing Laboratory (NRTL) Field Evaluation Services at Puget Sound Naval Shipyard & Intermediate Maintenance Facility (PSNS&IMF), San Diego Detachment, Naval Air Station North Island (NASNI), located in San Diego, California.
The contractor shall provide third-party NRTL field evaluation services to certify that Government-owned Industrial Plant Equipment (IPE) and portable tools comply with Occupational Safety and Health Administration (OSHA) standards under 29 CFR 1910, as well as National Electrical Code (NEC) and National Fire Protection Association (NFPA) requirements. The primary objective is to verify compliance with machine guarding and electrical safety standards for electrically powered equipment where factory certification was not obtained during procurement. The contract is non-personal services, with a period of performance of 60 days from date of award. The contractor must provide qualified personnel who are trained and authorized employees of an OSHA-recognized NRTL, capable of certifying and labeling equipment with registered certification marks. Work shall be performed at Building 73, NASNI, during standard business hours of 7:20 a.m. to 4:02 p.m., Monday through Friday, excluding federal holidays.
The contractor shall furnish all personnel, equipment, supplies, tools, diagnostic devices, and materials necessary to conduct inspections and provide NRTL registered certification marks. The Government will furnish personnel to assist with equipment access and demonstration, along with operations manuals and electrical schematics. Key deliverables include one NRTL Registered Certification Mark (adhesive label) applied immediately upon IPE approval, and one NRTL Field Evaluation Report in electronic format submitted within 10 business days of the service visit. The report must document all deficiencies, their resolutions, and confirm whether equipment has been labeled in conformance with applicable standards. Contractor personnel must comply with badging and access requirements for the naval installation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
Nationally Recognized Testing Laboratory Field Evaluation Services, NASNI
Puget Sound Naval Shipyard & Intermediate Maintenance Facility Naval Base Coronado, Naval Air Station North Island
San Diego, CA 92135
PART 1
GENERAL INFORMATION
1. GENERAL: This is a non-personal services contract to provide Nationally Recognized Testing Laboratory (NRTL) field evaluation services. The Government shall not exercise direct supervision or control over any contractor employees. Notwithstanding, contractor shall ensure employees comply with all requirements of this Performance Work Statement (PWS) and contract.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform NRTL field evaluation services as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background: Puget Sound & Intermediate Maintenance Facility (PSNS & IMF), San Diego Detachment, Naval Air Station North Island (NASNI). For nearly all electrically powered Industrial Plant Equipment (IPE) assets and portable tools, the Environmental, Safety, and Health Office, Code 106, requires NRTL field evaluation services to verify that equipment and their component parts are in compliance with Occupational Safety and Health Administration (OSHA) Standards. While many assets are factory-certified, not every procured asset is. This effort will provide a means to obtain NRTL field evaluation services for IPE or portable tool procurements where NRTL field evaluation services are not a requirement of the equipment procurement contract.
1.3 Objectives: The objective of this service contract is to obtain NRTL field evaluation services for the purpose of verifying that installed IPE and its component parts are in compliance with OSHA standards concerning machine guarding and electrical safety.
1.4 Scope: The contractor shall provide third party evaluation of Government owned IPE to certify compliance with the applicable OSHA regulations in accordance with Code of Federal Regulations (CFR) Title 29, Chapter XVII, Part 1910, and to ensure the Government owned IPE has been installed in accordance with National Electrical Code (NEC) and/or National Fire Protection Association (NFPA) requirements. The Government owned equipment that satisfies the applicable OSHA, NEC, NFPA, and/or PSNS&IMF Occupational Safety and Health (OSH) requirements shall be labeled with a NRTL registered certification mark or labeling that identifies that the Government owned equipment is in conformance with the applicable safety and technical standards. A NRTL field evaluation report shall be provided to the Government indicating all deficiencies and implemented or required resolution(s). The NRTL field evaluation report shall indicate whether the Government owned equipment has been labeled or not labeled during the inspection service visit, and if it has been labeled, the field evaluation report shall indicate that the Government owned equipment is in conformance with the applicable safety and technical standards.
1.5 Period of Performance: The period of performance shall be for 60 days after date of award.
1.6.1 Quality Assurance: The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.7 Location:
1.7.1 Place of Performance: The work to be performed under this contract will be performed at a production facility within the following site:
Building 73 Naval Base Coronado, Naval Air Station North Island
San Diego, CA 92135
1.7.2 Hours of Operation: The contractor is responsible for conducting business, between the hours of 7:20a.m. and 4:02p.m. Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.7.3 Recognized Holidays: Contractor is not required to perform services on federal holidays. The list of current federal holidays can be found here: https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/
In addition to the above listed holidays, Puget Sound Naval Shipyard is normally closed for all except necessary services during the week between Christmas Day and New Year's Day (curtailment). Necessary services/frequencies for various facilities are noted on the detail sheets and work contracted for shall be performed during this period unless otherwise directed by the Contracting Officer. Exact number of closure days may vary from year to year. Actual requirements will be determined in advance of the closure. On site work performed by the Contractor for the Contractor's convenience during this time must also be specifically requested by the Contractor in writing and approved by the Contracting Officer in advance.
1.8 Security Requirements: Contractor Employees, in order to gain access to the government facility identified in paragraph 1.7.1 to perform work under this contract, shall comply with the Badging and Access Requirements Attachment to the solicitation/contract.
1.8.1 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.9 Special Qualifications: The contract personnel performing third party evaluation of Government owned IPE to certify compliance with the applicable Occupational Safety and Health Administration (OSHA) regulations in accordance with CFR Title 29, Chapter XVII, Part 1910 and ensuring the Government owned IPE has been installed in accordance with NEC/NFPA/PSNS&IMF OSH requirements shall be a trained and qualified employee of an OSHA recognized Nationally Recognized Testing Laboratory who is authorized to certify and label the Government owned equipment with a registered certification mark or label to designate that the equipment is in conformance with the applicable safety and technical standards.
The contractor will be required to conform to all Federal NTRL requirements such as, but not limited to, OSHA, NFPA, and Federal Communications Commission (FCC).
1.10 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance.
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1 Common Definitions: Per Clause 52.212-4(e), clause 52.202-1 is incorporated by reference to this contract.
2.2 Special Definitions:
2.2.1 Industrial Plant Equipment (IPE): Plant equipment used for positioning, cutting, abrading, grinding, shaping, forming, joining, testing, measuring, heating, treating, or otherwise altering the physical, electrical, or chemical properties of materials, components, or end use items. IPE, in some cases may also include ventilation systems that are used in support of the operation of IPE.
2.2.2 Nationally Recognized Testing Laboratory (NRTL): Recognizes private sector organizations to perform certification for certain products to ensure that they meet the requirements of both the construction and general industry OSHA electrical standards. Each NRTL has a scope of test standards that they are recognized for, and each NRTL uses its own unique registered certification mark(s) to designate product conformance to the applicable product safety test standards. After certifying a product, the NRTL authorizes the manufacturer to apply a registered certification mark to the product. If the certification is done under the NRTL program, this mark signifies that the NRTL tested and certified the product, and that the product complies with the requirements of one or more appropriate product safety test standards. An organization must have the necessary capability both as a product safety testing laboratory and as a product certification body to receive OSHA recognition as an NRTL.
2.2.3 Registered Certification Mark: A mark, label, or sticker signifying that the NRTL tested and certified the product under the NRTL program, and that the product complies with the requirements of one or more appropriate product safety test standards. Users of the product can generally rely on the mark as evidence that the product complies with applicable OSHA approval requirement(s) and is safe for use in the workplace. After certifying a product under the NRTL program, the NRTL authorizes the manufacturer to apply a registered certification mark to the product.
2.3 Acronyms:
COR Contracting Officer’s Representative CFR Code of Federal Regulations FAR Federal Acquisition Regulation IPE Industrial Plant Equipment ISO International Organization for Standardization KO Contracting Officer NASNI Naval Air Station North Island NAVSEA Naval Sea Systems Command NEC National Electric Code NFPA National Fire Protection Association
NIST National Institute of Standards and Technology NRTL Nationally Recognized Testing Laboratory OSH Occupational Safety and Health (manual) OSHA Occupational Safety and Health Administration PSNS&IMF Puget Sound Naval Shipyard & Intermediate Maintenance Facility PWS Performance Work Statement QASP Quality Assurance Surveillance Plan REF Reference
PART 5
CONTRACTOR FURNISHED ITEMS AND SERVICES
5. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
5.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 4 of this PWS.
5.2 Materials: The Contractor shall furnish an NRTL registered certification mark for the IPE after it is determined to be in compliance with NRTL standards.
5.3 Equipment: The Contractor shall provide all electronics, diagnostic devices (e.g. voltage meters, multimeters), and small tools (e.g. screwdrivers, Allen wrenches) that are necessary to access IPE internals and perform all inspections and tests that are required to confirm that the inspected IPE satisfied NEC/NFPA machine guarding and electrical safety requirements.
PART 6
APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS):
6.1 The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
Code of Federal Regulations (CFR)
6.2 29 CFR 1910------------------------------------- Occupational Safety and Health Standards
National Fire Protection Association (NFPA)
6.3 NFPA 70 ----------------------------------------- National Electrical Code
6.4 NFPA 79 ----------------------------------------- Electrical Standard for Industrial Machinery
Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS&IMF), Occupational Safety and Health (OSH) Manual
6.5 OSH Volume I, Chapter 9 --------------------- Listing Requirements for Electrical Equipment
PART 7
ATTACHMENT/TECHNICAL EXHIBIT LISTING
7. ATTACHMENT/TECHNICAL EXHIBIT LIST:
7.1 Technical Exhibit 1 – Performance Requirements Summary:
7.2 Technical Exhibit 2 – Deliverables Schedule: