C8 N4523A25R6004 Beluga Barge Attachment J-2 Price Proposal Worksheet.xlsx

XLSX spreadsheet 94 KB Posted

Attached to
Maintenance, Repair, and Preservation of Beluga RCD Barge
Solicitation number
N4523A25R6004
Issued by

About this file

This document is a Price Proposal Worksheet (Attachment J-2) for the Maintenance, Repair, and Preservation of Beluga RCD Barge contract (Solicitation N4523A25R6004). The spreadsheet is a detailed pricing template designed for contractors to input labor rates, hours, and associated costs across multiple project paragraphs and work items. The worksheet includes instructions for completing yellow-highlighted cells, with sections for labor mix and rates, base work package pricing, level of effort calculations, and option year considerations.

The contract requires maintenance on a 240 FT steel Beluga RCD Barge, with work to be performed in the Puget Sound, WA region between 23 June 2025 and 11 August 2025. Contractors must demonstrate facility capability to accommodate the barge and complete tasks including vessel washing, steel repairs, generating ABS-approved drawings, coordinating inspections, and managing vessel delivery. The procurement is a full and open competition through the Department of the Navy Naval Supply Systems Command, with all offerors required to be registered in the System for Award Management (SAM).

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instruction Sheet

Instructions for Contractors for Filling-out J-2 Price Proposal Worksheet

All yellow fields are to be filled out by the Contractor prior to submittal to The Government.
DO NOT FILL IN ANY CELL THAT IS NOT BRIGHT YELLOW.
Labor Mix & Rates Sheet
1Enter Company Name and Date
2Fill in each rate in its applicable yellow cell
3Fill in each labor category and ensure all yellow boxes are filled in
a.Example Labor Categories
Shipfitter
Sheetmetal
Welder/Burer
Electrician
Inside Machinist
Outside Machinist
Boilermaker
Pipefitter
Insulator/Lagger
Shipwright/Carpenter
EX/Ord
Painter/Blaster
Rigger/Laborer
QA/NDT
4Next, fill in each yellow cell for Regular Labor Hours and Overtime Labor Hours
5Your Total Direct Labor Rate Per Hour will autopopulate in each sheet. All other rates entered will also auto populate.
Price Proposal Worksheet
1All company and contract information and rates will be autopopulated from previous sheet.
2Fill in each yellow cell with its applicable information
3Anything that is not in yellow is locked, these cells will auto-calculate.
4Before submitting, ensure there are no more bright yellow cells.
IF USING FCCOM
Facilities Capital Cost of Money (FCCOM) is not required. If you are not inputting FCCOM please enter N/A in all cells. However, if your company is inputting FCCOM, it needs to be calculated based on the proper CASB-CMF form. Please include the CASB-CMF form with your submission.
Labor Hour Breakdown
1Enter each labor categoy will autofill from the "labor Mix & Rates" sheet
2Fill in each Regular and Overtime hour for each labor category and line item.

Labor Mix & Rates

Contractor/Company Name:
Project/Vessel Name:Beluga RCD BargeDate:

Base Rates: Regular Labor ERROR:#DIV/0! Fringe Overhead G&A Profit FCCOM

Labor Mix and Rates

Labor Category Regular Hours Overtime Hours Total Category Hours Total Regular $/hour Total Overtime $/hour Total Category Dollars

0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
Column Totals000$0.00$0.00$0.00

Direct Labor Rate Per Hour ERROR:#DIV/0!

Example Labor Categories Shipfitter Sheetmetal Welder/Burer Electrician Inside Machinist Outside Machinist Boilermaker Pipefitter Insulator/Lagger Shipwright/Carpenter EX/Ord Painter/Blaster Rigger/Laborer QA/NDT

Beluga RCD Barge

Contractor/Company Name:0
Project/Vessel Name:Beluga RCD BargeDate:12/31/99

Base Rates: Labor ERROR:#DIV/0! Fringe 0.00% Overhead 0.00% G&A 0.00% Profit 0.00% FCCOM 0.00%

Base Work Package Proposal
PARAGRAPH No.TITLEPRIMESUBCONTRACTOROther Direct Cost (ODC)*PRIMELine Item Total
M/HLabor CostMATERIAL PRICETOTALM/HLabor CostMaterial CostTOTALODCTravel ODCTOTALFringeOverheadG&AProfitFCCOM
1.4Arrival ConferenceERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.5Required DocumentsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.6Progress MeetingsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.7Availability RequirementsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.7.1Transportation of VesselERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.8Care of VesselERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.14Hot Work/WeldingERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.16Preservation RequirementsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.17Environmental & Hazwaste MangementERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.18MaterialsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.22Gas FreeERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.23General Requirements for TestingERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.24Heavy Weather PlanERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.1.1Personnel and equipmentERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.1.2Docking ProcedureERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.1.3Blocking PlanERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.1.4Crib and Brace BlockingERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.1.5Setting and Alignment of Docking BlocksERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.1.6Docking ConferenceERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.1.7Docking the VesselERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.1.8Post DockingERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.1.9Undocking the VesselERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.1.11Final Docking ReportERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.2.1Identify Distinguishing Figures and MarkingsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.2.2Hull Blasting and PreservationERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.3.1FWD Rake Structural RepairERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.1Open, Pump, Clean, Ventilate, and Gas Free Tanks/VoidsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.2Tank/Void Visual Inspection (VT)ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.3Identify Color Schemes and MarkingsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.4Tank/Void Touch-Up PreservationERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.5Final Air TestERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.6Tank/Void Closeout InspectionERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
hERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
$10.00$10.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$10.00
$10.00$0.00$0.00$0.00$0.00$0.00
$10.00$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
Column Totals0ERROR:#DIV/0!$0.00ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!

Base Work Package ERROR:#DIV/0!

Level of Effort to Completion
PARAGRAPH No.TITLEM/HLabor CostMATERIAL PRICETOTALM/HLabor CostMaterial CostTOTALODCTravel ODCTOTALFringeOverheadG&AProfitFCCOMLine Item Total
Level of Effort (LOE) to Completion - Growth1,832ERROR:#DIV/0!$0.00ERROR:#DIV/0!$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Column Totals1,832ERROR:#DIV/0!$0.00ERROR:#DIV/0!$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Column Totals3664ERROR:#DIV/0!$0.00ERROR:#DIV/0!0$0.00ERROR:#DIV/0!$0.00$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!

Total LOE to Completion: ERROR:#DIV/0!

TOTAL PROPOSED PRICE: ERROR:#DIV/0!

ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Column Totals0ERROR:#DIV/0!$0.00ERROR:#DIV/0!$0.000ERROR:#DIV/0!$0.00$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!

Total Option Items (O): ERROR:#DIV/0!

TOTAL PROPOSED PRICE: ERROR:#DIV/0!

Total LOE to Completion: ERROR:#DIV/0!

TOTAL PROPOSED PRICE: ERROR:#DIV/0!

*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

Labor Hour Breakdown

Contractor/Company Name:0
Project/Vessel Name:Beluga RCD BargeDate:12/31/99
Base Rates:Regular Labor RateERROR:#DIV/0!
NameRateTotal CostNameRateTotal Cost
Labor Hour Breakdown
PARAGRAPH No.TITLELabor CategoriesTotal Overall Labor Cost
000000000000000000Total Regular HoursTotal Overtime Hours
REGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOT
1.4Arrival Conference00ERROR:#DIV/0!
1.5Required Documents00ERROR:#DIV/0!
1.6Progress Meetings00ERROR:#DIV/0!
1.7Availability Requirements00ERROR:#DIV/0!
1.7.1Transportation of Vessel00ERROR:#DIV/0!
1.8Care of Vessel00ERROR:#DIV/0!
1.14Hot Work/Welding00ERROR:#DIV/0!
1.16Preservation Requirements00ERROR:#DIV/0!
1.17Environmental & Hazwaste Mangement00ERROR:#DIV/0!
1.18Materials00ERROR:#DIV/0!
1.22Gas Free00ERROR:#DIV/0!
1.23General Requirements for Testing00ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
3.1.1Personnel and equipment00ERROR:#DIV/0!
ERROR:#REF!Docking Procedure00ERROR:#DIV/0!
3.1.4Crib and Brace Blocking00ERROR:#DIV/0!
3.1.5Setting and Alignment of Docking Blocks00ERROR:#DIV/0!
3.1.6Docking Conference00ERROR:#DIV/0!
3.1.7Docking the Vessel00ERROR:#DIV/0!
3.1.9Undocking the Vessel00ERROR:#DIV/0!
3.1.11Final Docking Report00ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
3.2.1Identify Distinguishing Figures and Markings00ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
3.2.2Hull Blasting and Preservation00ERROR:#DIV/0!
3.3.1FWD Rake Structural Repair00ERROR:#DIV/0!
3.4.1Open, Pump, Clean, Ventilate, and Gas Free Tanks/Voids00ERROR:#DIV/0!
3.4.2Tank/Void Visual Inspection (VT)00ERROR:#DIV/0!
3.4.3Identify Color Schemes and Markings00ERROR:#DIV/0!
3.4.4Tank/Void Touch-Up Preservation00ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
3.4.5Final Air Test00ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
3.4.6Tank/Void Closeout Inspection00ERROR:#DIV/0!
0000ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
Column Totals00000000000000000000000000000000000000ERROR:#DIV/0!

Base Work Package ERROR:#DIV/0!

OPTION YEAR TABLE IF NEEDED:

Labor Hour Breakdown
PARAGRAPH No.TITLELabor CategoriesTotal Overall Labor Cost
000000000000000000Total Direct HoursTotal Overtime Hours
REGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOT
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
Column Totals00000000000000000000000000000000000000ERROR:#DIV/0!

Total Option Items (O): ERROR:#DIV/0!

TOTAL DIRECT LABOR COSTS BY WORK ITEM ERROR:#DIV/0!

File details come from the government source that posted it. Updated .