This document contains the Government Responses to Requests for Clarification (RFC) 01-02 for solicitation N4523A24R1068 for the Maintenance, Repair, and Preservation of YT-808 ROH.
The key details are:
- The solicitation is for the maintenance, repair, and preservation of one (1) Harbor Tug, Medium (YT-808 Rainier) with specific characteristics of 90 FT length, 38 FT length, 16 FT Draft, 494 LT displacement, 438 L Tons Light Load, 4 years of age, and steel hull.
- The Government will transport the vessel to the Contractor's repair facility located in the Puget Sound, WA region. The scope includes washing and cleaning the vessel, replacing zinc anodes, blasting and preserving the underwater hull and freeboard, blasting and preserving the main deck/1st deck/2nd deck non-skid, performing hull and freeboard inspections, repairing hull and winch valves, repairing deckhouse expansion joint, testing and preserving various tanks, and replacing deck winch, mast, and brow systems hydraulic hoses.
- The Government has provided responses to two questions, including clarifying the docking plan/general arrangement drawing and stating that the hull type is steel. The Government has also added an additional ship check opportunity on August 27.
- This is a 100% Small Business set-aside under NAICS code 336611 with a size standard of 1,300 employees. The vessel availability is scheduled from December 19, 2024 to March 18, 2025.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Government Responses to RFC 01-02 N4523A24R1068 YT-808 ROH
01) Question: What is the docking plan and general arrangement?
Response: Docking plan drawing (8774050 Rev 2) is listed in the original SOW and included in the drawings package. REV 5 of the General Arrangement (8775054 Rev 5) was not included in the SOW.
Amendment 0001 addresses this change and includes and updated SOW to include Errata 1.
02) Question: What is the hull type?
Response: The hull is steel. See section 1.1 on the SOW.
03) Question: Would the Government consider expanding the area of performance to include the Vancouver region?
Response: No as the YT-808 is not able to go in the open ocean.
04) Question: Will another opportunity for a ship check be available before bids are due?
Response: Amendment 0002 is to add another ship check date. The vessel will be available for another ship check on August 27.