This document contains government responses to requests for clarification on a solicitation for maintenance, repair, and preservation of a large harbor tug. The solicitation seeks a firm-fixed-price contract to drydock, clean, perform hull and system maintenance, undertake repairs, and undock YT-803 at the contractor's facility between September 2022 and January 2023. Responses indicate as-built drawings are unavailable, the first 5-year maintenance was completed in 2016 on propulsion components, and the statement of work errata replaces references to operational test procedures. The solicitation was amended to remove certification requirements. Offerors must register with SAM to receive awards from the Department of the Navy Naval Supply Systems Command.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Government Responses to RFC 001-004
1) Question: Are the following One Lines available?
3.10.1-Shore Power Panel Repair:
Need AC one lines
3.10.3 Battery Chargers Repairs:
Need DC one lines
3.10.11 McCann Hailer System Repair
Need copy of PA system one lines
3.10.12 CFL Deck Lights Repair
Need copy of lighting one lines
Response: Steward does not have drawings and are not available.
2) Question: 3.7.1 Schottel Z Drive Repairs Please confirm if both a 5 year and 10 year maintenance is required?
Has the 5 year maintenance not been performed?
Response: Accomplish the requirements of the Statement of Work. The first 5 year maintenance was accomplished in 2016.
3) Question: 3.10.4 MVAC System Repairs - What does MVAC stand for?
3.10.4.1 Accomplish an Operational test of the MVAC system with COR.
Can we get a copy of the existing operational test procedures?
Response: Please see the revised J-1 Attachment Statement of Work Errata 1.
4) Question: C-211-H002 Dry-Dock Certification (NAVSEA) (Oct 2018) Will you accept a haul out on a dry dock that is not in accordance with MIL-STD-1625(D)(SH)?
Response: Clause has been removed from the requirement. Please see solicitation amendment 0001.