C04.0 Attachment J-2 Price Proposal Worksheet.xls

XLS spreadsheet 215 KB Posted

Attached to
YT 803 - Large Harbor Tug Maintenance, Repair, and Preservation
Solicitation number
N4523A22R1067
Issued by

About this file

This document package includes a solicitation for maintenance, repair, and preservation services on a large harbor tug, and an associated price proposal worksheet template.

The solicitation seeks a firm-fixed price contract to drydock, clean, perform hull and system maintenance, accomplish engine and generator repairs, and return a YT-803 class tug to service. Work is to be completed between September 2022 and January 2023 at the contractor's facility capable of accommodating the vessel. The Navy intends to award the lowest priced technically acceptable proposal in August 2022. Offerors must be registered in the System for Award Management to be considered. The price proposal worksheet template provides instructions and tables for contractors to submit pricing details according to the solicitation's work specifications.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instruction Sheet

Instructions for Contractors for Filling-out J-2 Price Proposal Worksheet
All yellow fields are to be filled out by the Contractor prior to submittal to The Government.
DO NOT FILL IN ANY CELL THAT IS NOT BRIGHT YELLOW.
Labor Mix & Rates Sheet
1Enter Company Name and Date
2Fill in each rate in its applicable yellow cell
3Fill in each labor category and ensure all yellow boxes are filled in
a.Example Labor Categories
Shipfitter
Sheetmetal
Welder/Burer
Electrician
Inside Machinist
Outside Machinist
Boilermaker
Pipefitter
Insulator/Lagger
Shipwright/Carpenter
EX/Ord
Painter/Blaster
Rigger/Laborer
QA/NDT
4Next, fill in each yellow cell for Regular Labor Hours and Overtime Labor Hours
5Your Total Direct Labor Rate Per Hour will autopopulate in each sheet. All other rates entered will also auto populate.
Price Proposal Worksheet
1All company and contract information and rates will be autopopulated from previous sheet.
2Fill in each yellow cell with its applicable information
3Anything that is not in yellow is locked, these cells will auto-calculate.
4Before submitting, ensure there are no more bright yellow cells.
IF USING FCCOM
Facilities Capital Cost of Money (FCCOM) is not required. If you are not inputting FCCOM please enter N/A in all cells. However, if your company is inputting FCCOM, it needs to be calculated based on the proper CASB-CMF form. Please include the CASB-CMF form with your submission.
Labor Hour Breakdown
1Enter each labor categoy will autofill from the "labor Mix & Rates" sheet
2Fill in each Regular and Overtime hour for each labor category and line item.

Labor Mix & Rates

Contractor/Company Name:
Project/Vessel Name:YT 803Date:
Base Rates:Regular Labor$0.00FringeOverheadG&AProfitFCCOM
Labor Mix and Rates
Labor CategoryRegular HoursOvertime HoursTotal Category HoursTotal Regular $/hourTotal Overtime $/hourTotal Category Dollars
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
Column Totals000$0.00$0.00$0.00
Direct Labor Rate Per Hour0

Example Labor Categories Shipfitter Sheetmetal Welder/Burer Electrician Inside Machinist Outside Machinist Boilermaker Pipefitter Insulator/Lagger Shipwright/Carpenter EX/Ord Painter/Blaster Rigger/Laborer QA/NDT

Price Proposal Worksheet

Contractor/Company Name:0
Project/Vessel Name:YT 803Date:12/31/99
Base Rates:Labor$0.00Fringe0.00%Overhead0.00%G&A0.00%Profit0.00%FCCOM0.00
Base Work Package Proposal
PARAGRAPH No.TITLEPRIMESUBCONTRACTOROther Direct Cost (ODC)*PRIMELine Item Total
M/HLabor CostMATERIAL PRICETOTALLabor CostMaterial CostTOTALODCTravel ODCTOTALFringeOverheadG&AProfitFCCOM
1.4Arrival Conference$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.5Required Documents$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.6Progress Meetings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.7Availability Requirements$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.8Care of Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.11Condition Found Reports$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.13Safety Requirements$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.16Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.17Enviromental and Hazardous Waste Management$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.22Gas Free$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.23General Requirements for testing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.24Compartment Arrival/Closeout Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.25PCP Procedure Requirements$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.1Personnnel & Equipment$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.2Docking Procedures$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.3Blocking Plan$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.4Crib and Brace Blocking$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.5Setting and Aligning Blocks$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.6Stability Calculations$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.7Docking Conference$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.8Docking The Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.9Post Docking$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.10Shifting the Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.11Undocking The Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.13Final Docking Report$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.1Identify Distinguishing Figures and Markings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.2Rubber Fenders$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.3Zinc Anodes$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.4Hull Blasting & Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.5Hull & Freeboard Visual Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.6Hull & Freeboard UT$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.3.1Stern Rubber Fender Strap Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.3.2Bow Rubber Fender Strap Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.3.3Engine Room Escape Hatch Modification$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.3.4Lower Crew Berthing Escape Hatch Modification$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.3.5Drive Room Escape Modification$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.3.6Winch Locker Handrail Modification$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.3.7Drive Port & Stbd Vent ModificationMain Deck U/T Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.3.8Handrail Modification$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.3.9FWD Void Bilge Pump Reach Rod Bushing Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.3.10FWD Winch Locker Door Repair and Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.3.11Port/Stbd/FiFi Seachest Vent Modification$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.3.12Aft Rope Locker Access Hatch Safety Bar Modification$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.3.13AFT Rope Locker Access Modification$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.3.14Rubber Fender Retention Mod$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.1Open,Pump,Clean,Ventilate and Gas Free Tanks & Voids$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.2Tank/Void Visual Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.3Identify Color Schemes and Markings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.4Preliminary Air Test$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.5Tank/Void Touch Up Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.6Black Water Tank Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.7Tank Void Manhole Covers$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.8Clean, Flush, Disenfection of Potable Water System$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.9Certification of Potable Water Piping and Tank$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.10Final Air Test$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.11Tank/Void Closeout Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.1Main Deck Non Skid Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.2Visual Inspection for Structural Defects$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.3Main Deck Ultrasonic Test (UT) Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.1Winch System Groom and Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.2Mast Hose Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.3Brow Hose Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.4Wheelhouse Deck and Pilot House Roof Non Skid Repairs$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.5Galley Seating and Table Modifications$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.6Deck House Expansion Joint Repairs$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.7Schottel Rudder Angle Modification$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.8Wheel House Door Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.9Port/Stbd Life Raft Mount Modification$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.10Port Wheel House MOB Light Bracket Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.11Stbd Wheel House MOB Light Bracket Repair.$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.12Fire Safety Rail Monitor Railing Modification$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.13Port and STBD Line Hook Modifications$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.14Engine Room Air Intake Fan Room Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.15Port and STBD Main Engine Intake Plenums$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.16HVAC and Galley Vent Plenums Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.17Backboard Support Hooks Modification.$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.18Wheelhouse Top Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.19Aft Stub Mast Modification$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.1Schottel Z-Drive Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.2Power Transmission RepairsMain Deck U/T Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.3Hydrualic Systems Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.4Propeller Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.5Engine Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.6MCD Schottel Steering Drive Pump Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.9.1Main Engine Room Bilge Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.10.1Shore Power Panel RepairMain Deck U/T Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.10.2Tank Indicators Touch Screens Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.10.3Battery Chargers Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.10.4MVAC System Repairs$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.10.5Speed Doppler Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.10.6Depth Sounder Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.10.7Navigation Light System Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.10.8Wheelhouse Junction Box Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.10.9Wheelhouse FWD and AFT Search Light Repairs$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.10.10Schottel System Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.10.11McCann Hailer System Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.10.12CFL Deck Lights Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.10.13FWD Berthing Emergency Lighting Modification$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.10.14Engine Room Emergency Lighting$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.10.15Jacket Water Heater Port Main Engine Install$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.11.1Sea Valves$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.11.2Main Deck Commode and Flush-O-MeterMain Deck U/T Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.11.3Crew's Head Commode and Flush-O-Meter$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.11.4MCD Heat Exchanger Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.11.5Winch HPU Heat Exchanger Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.11.6Generators Heat Exchanger Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.11.7Port and STBD Main Engine Jacket Water Piping Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.11.8Port and STBD Main Engine After Cooler Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.11.9Port and STBD Main Engine Sea Water Pump Repairs$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.11.10Main Fire Pump Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.11.11Steering Cooling Heat Exchanger Repairs$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.11.12HVAC Piping Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.11.13"Z" Drive Steeriing Oil and Lube Oil Fill Valves Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.11.14FWD Head and Storeroom Vents Repair and Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.11.15FWD Void/Rope Locker Valve Repair and Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.11.16Potable Water Deck Vents Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.11.17Sea Strainer Repairs$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.13.1Operational Responsibility$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.13.2Sea Trial Baseline Testing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.13.3Dock Trial$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.13.4Final Sea Trial$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.13.5Post Sea Trial$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
LOELOE$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Base Work Package$0.00
OPTION YEAR TABLE IF NEEDED:
Level of Effort to Completion
PARAGRAPH No.TITLEM/HLabor CostMATERIAL PRICETOTALLabor CostMaterial CostTOTALODCTravel ODCTOTALFringeOverheadG&AProfitFCCOMLine Item Total
Level of Effort (LOE) to Completion - Growth2160037966$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Column Totals21600$37,966.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total LOE to Completion:$0.00
TOTAL PROPOSED PRICE:$0.00

*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

Labor Hour Breakdown

Contractor/Company Name:0
Project/Vessel Name:YT 803Date:12/31/99
Base Rates:Regular Labor Rate$0.00
NameRateTotal CostNameRateTotal Cost
Labor Hour Breakdown
PARAGRAPH No.TITLELabor CategoriesTotal Overall Labor Cost
000000000000000000Total Regular HoursTotal Overtime Hours
REGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOT
1.4Arrival Conference00$0.00
1.5Required Documents00$0.00
1.6Progress Meetings00$0.00
1.7Availability Requirements00$0.00
1.8Care of Vessel00$0.00
1.11Condition Found Reports00$0.00
1.13Safety Requirements00$0.00
1.16Preservation00$0.00
1.17Enviromental and Hazardous Waste Management00$0.00
1.22Gas Free00$0.00
1.23General Requirements for testing00$0.00
1.24Compartment Arrival/Closeout Inspection00$0.00
1.25PCP Procedure Requirements00$0.00
3.1.1Personnnel & Equipment00$0.00
3.1.2Docking Procedures00$0.00
3.1.3Blocking Plan00$0.00
3.1.4Crib and Brace Blocking00$0.00
3.1.5Setting and Aligning Blocks00$0.00
3.1.6Stability Calculations00$0.00
3.1.7Docking Conference00$0.00
3.1.8Docking The Vessel00$0.00
3.1.9Post Docking00$0.00
3.1.10Shifting the Vessel00$0.00
3.1.11Undocking The Vessel00$0.00
3.1.13Final Docking Report00$0.00
3.2.1Identify Distinguishing Figures and Markings00$0.00
3.2.2Rubber Fenders00$0.00
3.2.3Zinc Anodes00$0.00
3.2.4Hull Blasting & Preservation00$0.00
3.2.5Hull & Freeboard Visual Inspection00$0.00
3.2.6Hull & Freeboard UT00$0.00
3.3.1Stern Rubber Fender Strap Repair00$0.00
3.3.2Bow Rubber Fender Strap Repair00$0.00
3.3.3Engine Room Escape Hatch Modification00$0.00
3.3.4Lower Crew Berthing Escape Hatch Modification00$0.00
3.3.5Drive Room Escape Modification00$0.00
3.3.6Winch Locker Handrail Modification00$0.00
3.11.2Main Deck Commode and Flush-O-Meter00$0.00
3.11.3Crew's Head Commode and Flush-O-Meter00$0.00
3.11.4MCD Heat Exchanger Repair00$0.00
3.11.5Winch HPU Heat Exchanger Repair00$0.00
3.11.6Generators Heat Exchanger Repair00$0.00
3.11.7Port and STBD Main Engine Jacket Water Piping Repair00$0.00
3.11.8Port and STBD Main Engine After Cooler Repair00$0.00
3.11.9Port and STBD Main Engine Sea Water Pump Repairs00$0.00
3.11.10Main Fire Pump Repair00$0.00
3.11.11Steering Cooling Heat Exchanger Repairs00$0.00
3.11.12HVAC Piping Repair00$0.00
3.11.13"Z" Drive Steeriing Oil and Lube Oil Fill Valves Repair00$0.00
3.11.14FWD Head and Storeroom Vents Repair and Preservation00$0.00
3.11.15FWD Void/Rope Locker Valve Repair and Preservation00$0.00
3.11.16Potable Water Deck Vents Repair00$0.00
3.11.17Sea Strainer Repairs00$0.00
LOELOE00$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
Column Totals00000000000000000000000000000000000000$0.00
Base Work Package$0.00
OPTION YEAR TABLE IF NEEDED:
Labor Hour Breakdown
PARAGRAPH No.TITLELabor CategoriesTotal Overall Labor Cost
000000000000000000Total Direct HoursTotal Overtime Hours
REGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOT
0Level of Effort (LOE) to Completion - Growth00$0.00
0000$0.00
0000$0.00
0000$0.00
Column Totals00000000000000000000000000000000000000$0.00
Total Option Items (O):$0.00
TOTAL DIRECT LABOR COSTS BY WORK ITEM$0.00