C09.0 N4523A21R1060 Dive Boat 65SC8801 - Attachment J-2 Price Proposal Worksheet Updated 09MAR2021.xlsx
XLSX spreadsheet 26 KB Posted
- Solicitation number
- N4523A21R1060
About this file
This document includes a price proposal worksheet and details for a federal contract solicitation to perform maintenance, repair, and preservation work on a 65-foot dive boat. Key details include:
-
The solicitation number is N4523A21R1060 and seeks to award a firm-fixed-price contract to accomplish work on one Dive Boat 65SC8801 owned by the Naval Supply Systems Command. Work will be performed at the contractor's facility between August 2021 and October 2021.
-
The requirement is set aside exclusively for HUBZone small businesses and offers must hold current HUBZone certification. Scope of work involves docking and undocking the vessel, cleaning and inspecting hull and tanks, performing various repairs, preservation and certification of systems, and sea trials upon completion. Offerors must be registered in the System for Award Management to receive award. Award is anticipated in May 2021 on a lowest-price technically acceptable basis.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dive Boat 65SC8801
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||
| Project = | Dive Boat 65SC8801 | DATE: = | |||
| PRIME | SUBCONTRACTOR | PRIME | |||
| Carney, Sean R CIV PSNS&IMF, Code 411: =MH*Labor Rate*G&A | PRIME |
Carney, Sean R CIV PSNS&IMF, Code 411: =(Prime Material Price+Subcontractor Total)*Profit Rate
| PARAGRAPH No. | TITLE | M/H | MATERIAL PRICE | TOTAL | |
| Carney, Sean R CIV PSNS&IMF, Code 411: =(MH*Labor Rate)+Material Price | Labor Cost | Material Cost | TOTAL |
Carney, Sean R CIV PSNS&IMF, Code 411: =Sub Cost (F)
Carney, Sean R CIV PSNS&IMF, Code 411: =MH*Labor Rate*G&A Carney, Sean R CIV PSNS&IMF, Code 411: =(Prime Material Price+Subcontractor Total)*Profit Rate Other Direct Cost (ODC)* G&A PROFIT Line Item Total Carney, Sean R CIV PSNS&IMF, Code 411: =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit)
| 1.4 | Arrival Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 1.5 | Required Documents | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 1.6 | Progress meetings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 1.7 | Availability requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 1.8 | Care of Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 1.13 | Safety Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 1.16 | Preservation OQE | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 1.17 | Environmental and Hazardous Waste Management | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 1.21 | Gas Free | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 1.22 | Requirements for Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.1.2 | Docking Procedure | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.1.3 | Blocking Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.1.4 | Crib and Brace Blocking: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.1.5 | Setting and Alignment of Docking Blocks | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.1.6 | Stability Calculations | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.1.7 | Docking Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.1.8 | Docking the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.1.9 | Post Docking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.1.10 | Shifting the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.1.11 | Undocking the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.1.13 | Final Docking Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.2.1 | Identify Distinguishing Figures and Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.2.2 | Rubber Fenders | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.2.3 | Zinc Anodes | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.2.4 | Hull Blasting and Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.2.5 | Hull and Freeboard Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.4.1 | Open, Pump, Clean, Ventilate, and Gas Free Tanks/Voids | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.4.2 | Tank/Void Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.4.3 | Identify Color Schemes and Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.4.4 | Preliminary Air Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.4.5 | Tank/Void Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.4.6 | Access Cover Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.4.7 | Clean, Flush & Disenfect Potable Water System | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.4.8 | Certification of Potable Water Piping and Tank | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.4.9 | Final Air Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.4.10 | Tank/Void Closeout Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.4.11 | Onload Fuel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.5.1 | Main Deck Non-skid Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.5.2 | Main Deck Visual Insp | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.5.3 | Stanchion and Stanchion Base Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.5.4 | AFT Lazzerette Hatch Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.6.1 | Pilot House Exterior Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.6.2 | Main Deck Cabin Window Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.6.3 | Pilot House Port, STBD and AFT Doors Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.6.4 | Pilot House Decking Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.7.1 | Waterborne Shaft Position | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.7.2 | Shaft Removal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.7.3 | Inspections for Wear and Defects | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.7.4 | Repairs: Propulsion shaft assembly repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.7.5 | Shaft Reassembly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.7.6 | System Operational Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.8.1 | Rudder Swing Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.8.2 | Steering Removals | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.8.3 | Steering Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.8.4 | Steering Reassembly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.8.5 | Rudder Swing Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.8.6 | System Operational Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.9.1 | Drip Pan Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.9.2 | Bulkhead Lagging Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.9.3 | Galley Decking Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.9.4 | Diver Prep Room Decking Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.9.5 | Water Closet and Shower Area Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.9.6 | Berthing Compartment Decking Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.11.1 | Fuel Piping Manifold Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.11.2 | Grey Water Overboard Valve Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.11.3 | MPDE Overboard Discharge Valve Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.11.4 | Generator Supply Valves Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.13.2 | Sea Trials Baseline | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.13.3 | Final Sea Trials | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Column Totals | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Scope (SOW/PWS) | Labor Rate/MH: | 0 | G&A Rate | 0.00% | Profit Rate: | 0.00% | $0.00 |
| Total Proposed Price |
*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.
NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.