C04.0 N4523A21R1060 Dive Boat 65SC8801 - Attachment J-2 Price Proposal Worksheet.xlsx
XLSX spreadsheet 27 KB Posted
- Solicitation number
- N4523A21R1060
About this file
This solicitation requests proposals for the maintenance, repair, and preservation of one 65-foot dive boat. Work includes docking and undocking the vessel, cleaning and blasting exterior surfaces, conducting visual inspections and repairs of hulls, tanks, decks, doors, hatches, piping and valves. Additional work consists of removing and reinstalling shafts, rudders, and steering components, inspecting and testing propellers, opening and preserving tanks and voids, installing new zinc anodes and fresh water certification. The vessel is to receive a new nonskid deck coating. Sea trials are required upon job completion. Offerors must have HUBZone small business certification. The performance period is August 24, 2021 through October 21, 2021. Proposals are due for evaluation on a lowest price technically acceptable basis. Award is anticipated in May 2021 by the Department of the Navy for this competitively set-aside requirement.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
vessel name
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||
| Project = | Dive Boat 65SC8801 | DATE: = | |||
| PRIME | SUBCONTRACTOR | PRIME | |||
| Carney, Sean R CIV PSNS&IMF, Code 411: =MH*Labor Rate*G&A | PRIME |
Carney, Sean R CIV PSNS&IMF, Code 411: =(Prime Material Price+Subcontractor Total)*Profit Rate
| PARAGRAPH No. | TITLE | M/H | MATERIAL PRICE | TOTAL | |
| Carney, Sean R CIV PSNS&IMF, Code 411: =(MH*Labor Rate)+Material Price | Labor Cost | Material Cost | TOTAL |
Carney, Sean R CIV PSNS&IMF, Code 411: =Sub Cost (F)
Carney, Sean R CIV PSNS&IMF, Code 411: =MH*Labor Rate*G&A Carney, Sean R CIV PSNS&IMF, Code 411: =(Prime Material Price+Subcontractor Total)*Profit Rate Other Direct Cost (ODC)* G&A PROFIT Line Item Total Carney, Sean R CIV PSNS&IMF, Code 411: =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit)
| 1.4 | Arrival Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 1.5 | Required Documents | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 1.6 | Progress meetings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 1.7 | Availability requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 1.8 | Care of Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 1.13 | Safety Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 1.16 | Preservation OQE | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 1.17 | Environmental and Hazardous Waste Management | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 1.21 | Gas Free | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 1.22 | Requirements for Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.1.2 | Docking Procedure | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.1.3 | Blocking Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.1.4 | Crib and Brace Blocking: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.1.5 | Setting and Alignment of Docking Blocks | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.1.7 | Docking Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.1.8 | Docking the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.1.9 | Post Docking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.1.10 | Shifting the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.1.11 | Undocking the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.1.13 | Final Docking Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.2.1 | Identify Distinguishing Figures and Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.2.2 | Rubber Fenders | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.2.3 | Zinc Anodes | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.2.4 | Hull Blasting and Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.2.5 | Hull and Freeboard Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.4.1 | Open, Pump, Clean, Ventilate, and Gas Free Tanks/Voids | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.4.2 | Tank/Void Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.4.4 | Preliminary Air Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.4.5 | Tank/Void Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.4.6 | Access Cover Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.4.7 | Clean, Flush & Disenfect Potable Water System | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.4.8 | Certification of Potable Water Piping and Tank | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.4.9 | Final Air Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.4.10 | Tank/Void Closeout Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.4.11 | Onload Fuel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.5.1 | Main Deck Non-skid Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.5.2 | Main Deck Visual Insp | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.5.3 | Stanchion and Stanchion Base Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.5.4 | AFT Lazzerette Hatch Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.6.1 | Pilot House Exterior Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.6.2 | Main Deck Cabin Window Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.6.3 | Pilot House Port, STBD and AFT Doors Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.6.4 | Pilot House Decking Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.7.2 | Shaft Removal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.7.4 | Propeller Insp | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.7.5 | Shaft Reassembly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.8.2 | Steering Removals | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.8.3 | Steering Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.9.1 | Drip Pan Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.9.2 | Bulkhead Lagging Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.9.3 | Galley Decking Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.9.4 | Diver Prep Room Decking Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.9.5 | Water Closet and Shower Area Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.9.6 | Berthing Compartment Decking Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.11.1 | Fuel Piping Manifold Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.11.2 | Grey Water Overboard Valve Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.11.3 | MPDE Overboard Discharge Valve Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.11.4 | Generator Supply Valves Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.13.2 | Sea Trials Baseline | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.13.3 | Final Sea Trials | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Column Totals | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Scope (SOW/PWS) | Labor Rate/MH: | 0 | G&A Rate | 0.00% | Profit Rate: | 0.00% | $0.00 |
| Total Proposed Price |
********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR*********
*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.
NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.
File details come from the government source that posted it. Updated .