This solicitation requests proposals for maintenance, repair, and preservation services for a 199-foot fuel oil barge, YON-326. The Navy seeks a firm-fixed price contract to dock the vessel, complete hull repairs and preservation, engine and pump maintenance, piping and valve repairs, and sea trials. Offerors must have facilities to accommodate the barge. The period of performance is from December 2020 to March 2021. Proposals are due in September 2020, and award will be made to the responsible offeror with the lowest price and technically acceptable proposal. The estimated value of hazardous waste disposal is 500 gallons of contaminated water and 500 pounds of solids. The small business set-aside is under NAICS code 336611 with a size standard of 1,250 employees.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR SPECIFICATION CLARIFICATION
DATE OF REQUEST: 7/24/20
REQUIREMENT:
ITEM NO:2.2
TITLE: Discrepancies
PARA. NO:2.2 PAGE NO:20-21
PLANNER’S NAME: ATTACH. NO:
QUESTION NO: 01
REQUISITION NO.: N4523A20R1082
ISSUING OFFICE POC: Chris Davidson
PHONE: (360) 476-5708
EMAIL: christopher.t.davids@navy mil
1. CONTRACTOR QUESTION: Some
References are missing. Can the Navy supply the missing References as listed below?
Drawing 8274525 in paragraph 3.2.1
Drawing 7642452 in paragraph 3.6.1
Para 2.2 Publication number 8 – Manual
# 1015996 Twin Disc Power Take-Off
Para 2.2 Publication number 9 – Power
Tech 8.1 L Component Tech Manual
Para 2.2 Publication number 10 –
YANMAR Diesel Generator Operator
Manual
Para 2.2 Publication number 11 – Racor
Parker Filter/Water Separators for
Diesel Engines
Para 2.2 Publication number 12 –
Northern Lights Quick Reference Filter
Chart
Para 2.2 Publication number 13 –
FLOWSERVE Mechanical Seal Manual
Can’t open reference drawing 100 SK
10849 REV A-it is a corrupted file
DO NOT WRITE BELOW THIS LINE
SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N
TECHNICAL REVIEW: D. Besaw C/411 SERIAL NO:
Drawing 8274525 in paragraph 3.2.1 is included in the references.
Drawing 7642452 in paragraph 3.6.1 should be
“Drawing 7642542” and references the
Deckhouse structure/superstructure.
Publications #8 through #13 have been added to the reference folder.
ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING OFFICE POC NO
LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST FOR PROPOSAL.
REQUIREMENT:
ITEM NO: 3.9.1
TITLE: Cargo Pump Diesel Engine Repairs
PARA. NO: 3.9.1 & 3.9.1.2 PAGE NO: 39
PLANNER’S NAME: ATTACH. NO:
QUESTION NO: 02
REQUISITION NO.: N4523A20R1082
ISSUING OFFICE POC: Chris Davidson
1. CONTRACTOR QUESTION: Can the Navy supply the brand name, model number, serial number on the main cargo pump diesel engine?
Can the Navy supply the part numbers and quantity of all hoses, belts, filters needed on the main cargo pump diesel engine?
Can the Navy supply part numbers for the new gages and remote throttle cable required?
TECHNICAL REVIEW: D. Besaw c/411 SERIAL NO:
Cargo Pump Engine:
Manuf. - Northern Lights (John Deere) Model - 6081HF070 Serial Number - RG608-1G293655 Other - 8.1 Liter, 1676F
Refer to the technical manuals provided for questions pertaining to: part numbers and quantity of all hoses, belts, filters needed on the main cargo pump diesel engine part numbers for the new gages and remote throttle cable.
REQUIREMENT:
ITEM NO: 3.9.4
TITLE: Engine Oil Analysis
PARA. NO: 3.9.4 PAGE NO: 39
PLANNER’S NAME: ATTACH. NO:
QUESTION NO: 03
REQUISITION NO.: N4523A20R1082
ISSUING OFFICE POC: Chris Davidson supply what type of oil is used and how many gallons of oil is required for the main cargo pump diesel engine?
Refer to reference/publication #9 “YON-322
Cargo Engine Tech Manual”.
REQUIREMENT:
ITEM NO: 3.9.5
TITLE: Diesel Engine Coolant Analysis
PARA. NO: 3.9.5 & 3.9.5.2 PAGE NO: 40
PLANNER’S NAME: ATTACH. NO:
QUESTION NO: 04
REQUISITION NO.: N4523A20R1082
ISSUING OFFICE POC: Chris Davidson supply what type of Coolant is used and how many gallons of coolant is required for the main cargo pump diesel engine?
Can the Navy supply a part number for the new radiator cap?
Refer to reference/publication #9 “YON-
322 Cargo Engine Tech Manual”.
REQUIREMENT:
ITEM NO: 3.9.8
TITLE: Power Take Off (PTO) Repairs
PARA. NO: 3.9.8 PAGE NO: 40
PLANNER’S NAME: ATTACH. NO:
QUESTION NO: 05
REQUISITION NO.: N4523A20R1082
ISSUING OFFICE POC: Chris Davidson supply the model number and serial number on the twin disc power take off unit?
Can the Navy supply the part numbers and quantity of parts needed to repair the power take off unit?
Refer to reference manual #1015996 “Care
& Operation of Twin Disc Power Take-Offs.
REQUIREMENT:
ITEM NO: 3.9.9
TITLE: Engine Exhaust Inspection
PARA. NO: 3.9.9 PAGE NO: 40
PLANNER’S NAME: ATTACH. NO:
QUESTION NO: 06
REQUISITION NO.: N4523A20R1082
ISSUING OFFICE POC: Chris Davidson
1. CONTRACTOR QUESTION: Is there existing removable and reusable exhaust insulation blankets on the main cargo pump diesel engine exhaust pipe and bellow system?
SPEC CHG: N DWG/REF CHG. N RQMTS CHG: N MAT'L CHG: N
TECHNICAL REVIEW: Langham SERIAL NO: 006
There is removable reusable insulation inside the engine room. The outside is not covered.
REQUIREMENT:
ITEM NO: 3.9.10
TITLE: YD-5500 Exhaust Bellow Replacement
PARA. NO: 3.9.10 PAGE NO: 40
PLANNER’S NAME: ATTACH. NO:
QUESTION NO: 07
REQUISITION NO.: N4523A20R1082
ISSUING OFFICE POC: Chris Davidson
1. CONTRACTOR QUESTION: Is the YD-5500
Exhaust Bellow for the generator engine? Is the new replacement YD-
5500 exhaust bellow the same as the existing exhaust bellow? Is there existing removable and reusable exhaust insulation blankets on the generator engine exhaust pipe and bellow system? Can the Navy give us more information on the new exhaust bellow (part number, size of exhaust pipe, length of bellows, flanged bellows on each end, slip joint ends or to be welded to existing exhaust pipe system)? Is there a drawing showing the generator exhaust system?
Information pertaining to generator exhaust can be located on ‘Sheet 20’ – of reference
‘7642547 Outfitting Sketches’.
The exhaust bellow is for the generator engine.
The Navy is unsure if the new exhaust bellow will match the existing. Templating from existing material is typical for part(s) renewal. Refer to SOW paragraph 3.9.10.1 “Template exact sizes, locations, configurations, and materials from existing vessel conditions.”
Refer to the Tech Manual(s) provided.
The Navy is unsure if there is existing removable and reusable exhaust insulation blankets on the generator engine exhaust pipe and bellow system.
Refer to SOW paragraph 3.9.10.1 “Template exact sizes, locations, configurations, and materials from existing vessel conditions” in regards to- more information on the new exhaust bellow (part number, size of exhaust pipe, length of bellows, flanged bellows on each end, slip joint ends.
Refer to ‘Sheet 20’ – of reference ‘7642547
Outfitting Sketches’ for the generator exhaust system.
REQUIREMENT:
ITEM NO: 3.9.11
TITLE: Cargo Pump Shaft and Shaft Seal Repair
PARA. NO: 3.9.11 – 3.911.3 PAGE NO: 40
PLANNER’S NAME: ATTACH. NO:
QUESTION NO: 08
REQUISITION NO.: N4523A20R1082
ISSUING OFFICE POC: Chris Davidson supply Model number and serial numbers on the cargo pump?
Can the Navy supply the part numbers and quantity of all parts needed to replace the cargo pump shaft seal?
Can the Navy supply part numbers for the new gages and remote throttle cable required?
It states to disconnect and remove the shaft assembly. Is it the Navy’s intention to just disconnect and remove the one upper shaft and the one upper shaft coupling to check and inspect the upper shaft between centers and to replace the shaft seal? Or is it the
Navy’s intention to disconnect & remove the entire gearbox and pump assembly (couplings, shafts, impellers, main discharge head) to disassemble the pump for the inspection and put between centers of the lower shaft where the seal rides?
Refer to Tech manuals and/or drawings:
‘7642545 Cargo Piping’, ‘7642547 Outfitting
Sketches’, & ‘GPN00547 4 STG Barge Pump’ as a guide.
Refer to ‘YON-322 Cargo Engine Tech Manual’ for gage and remote throttle cable part numbers.
REQUIREMENT:
ITEM NO: 3.11.3
TITLE: Cargo Valve Repairs
PARA. NO: 3.11.3 - 3.11.3.2 PAGE NO: 43
PLANNER’S NAME: ATTACH. NO:
QUESTION NO: 09
REQUISITION NO.: N4523A20R1082
ISSUING OFFICE POC: Chris Davidson
1. CONTRACTOR QUESTION:
In paragraphs 3.11.3, 3.11.3.1 and 3.11.3.2 –
Cargo Valves Repairs; you don’t tell us a drawing number and valve piece number to reference the (5) cargo valves to reduce the turns. Can the Navy supply us this information? Can the Navy tell us what size, brand name, type of valve, material of the valve, rating of the valve, model number and serial number of the existing valves? Is the (5) cargo valves in question to be piece number V-1 on Drawing 8274481?
2. Is the Contractor to remove and replace the (5) cargo valves in paragraphs
3.11.3, 3.11.3.1 and 3.11.3.2 that would have reduced turns or just replace the operator of the valves for reduction of turns?
SPEC CHG: N DWG/REF CHG. N RQMTS CHG: N MAT'L CHG:/N
TECHNICAL REVIEW:Langham SERIAL NO: 009
Shown in Plan 11-b of drawing 500-
7642545. Replace the operation of the valves to reduce to 16 turns.
REQUIREMENT:
ITEM NO: 3.11.4
TITLE: Cargo Header Isolation Valve Repairs
PARA. NO: 3.11.4 - 3.11.4.7 PAGE NO: 43-44
PLANNER’S NAME: ATTACH. NO:
QUESTION NO: 10
REQUISITION NO.: N4523A20R1082
ISSUING OFFICE POC: Chris Davidson
In paragraphs 3.11.4 – Cargo Header
Isolation Valve Repairs; the Navy references Drawings 7642545 and
8274481. Can the Navy give us the piece number of the (6) 10” valves they would be referring to? Is the (6) 10” valves in question to be piece number
34 on Drawing 7642545?
SPEC CHG: N DWG/REF CHG./N RQMTS CHG: N MAT'L CHG: N
TECHNICAL REVIEW: Langham SERIAL NO: 010
PC #34 is correct.
REQUIREMENT:
ITEM NO: 3.13
TITLE: Dock and Sea Trials
PARA. NO: 3.13 - 3.13.4 PAGE NO: 44
PLANNER’S NAME: ATTACH. NO:
QUESTION NO: 11
REQUISITION NO.: N4523A20R1082
ISSUING OFFICE POC: Chris Davidson
On Item 3.13 through 3.13.4 - Dock and
Sea Trials; would the final dock trail of the main cargo pump diesel engine, PTO and the cargo pump be done at
Manchester Fuel Depot? Would the
Navy be responsible to fill up a cargo tank of product for the testing of the new cargo pump seal so the pump and seals won’t run dry and cause damage?
TECHNICAL REVIEW: Langham SERIAL NO: 011
Operation of the diesel engine and bump test of the pumps can be tested at contractor’s facility. The TLI’s have to be calibrated at Manchester with Fuel for a proper testing medium.
REQUIREMENT:
ITEM NO: 3.1.8
TITLE: Post Docking
PARA. NO: 3.1.8.2 - 3.1.8.3 PAGE NO: 24
PLANNER’S NAME: ATTACH. NO:
QUESTION NO: 12
REQUISITION NO.: N4523A20R1082
ISSUING OFFICE POC: Chris Davidson
In paragraph 3.1.8.2 – Post Docking; it states to wash the underwater hull and fittings
(only) with fresh water at a minimum of
3,000 PSIG nozzle pressure to remove dirt, slime, marine growth, fouling and other foreign substances. Is it the Navy’s intension for the contractor to fresh water wash at a minimum of 3,000 PSIG nozzle pressure to remove salts, dirt, slime, marine growth, fouling and other foreign substances to the Freeboard Hull, Main Deck, Deck
House Top, Cargo Deck, Storage Locker
Deck, Deck House, Masts, Storage Locker, Cargo Piping, Fittings and all appendages
(From the top of the masts to the bottom of the barge)? Is it the intension of the Navy to put each of the cost of the fresh water wash in each of the areas separate items or put the entire wash of the barge in paragraph
3.1.8.2? In paragraph 3.1.8.2 – Post
Docking; Could the Navy take and supply pictures of the Underwater and Freeboard sides and forward and aft rakes to the contractor for bidding purposes to show the condition of the coatings and marine growth on the barge?
TECHNICAL REVIEW: SERIAL NO:
The intent is to clean the underwater hull of potential contaminants, Marine growth, slime which become hazmat when the vessel is hauled out/dry docked. Pictures are not available.
DATE OF REQUEST: 7/29/20
REQUIREMENT:
ITEM NO: 3.4.8
TITLE: Repair Dogging Mechanisms
PARA. NO: 3.4.8-3.4.8.1 PAGE NO: 35
PLANNER’S NAME: ATTACH. NO:
QUESTION NO: 13
REQUISITION NO.: N4523A20R1082
ISSUING OFFICE POC: Chris Davidson
2. Para 3.4.8 Repair dogging mechanisms:
Specification says to remove existing and install new quantity (2 ea ) dogging mechanisms for No. 1 Starboard Void
Hatch and Forward Starboard Rake hatch using drawing 7642535 Rev 3 for guidance.
Drawing 7642535 REV 3 does not specify the number of dogs per hatch, or the size or material of the dogs. Can the Navy supply this information?
Is contractor to pick out the worse two dogs and replace per hatch, or are we replacing one dog per hatch? Is there a specific drawing showing details of the hatches that can be provided?
TECHNICAL REVIEW: Langham SERIAL NO: 013 Quantity is two total, One per hatch. The drawing provided is the only one available but the dogs are common industry standard.
DATE OF REQUEST: 7/29/20
REQUIREMENT:
ITEM NO: 3.10.4
TITLE: Tapped Cable Hanger Repairs
PARA. NO: 3.10.4-3.10.4.2 PAGE NO: 42
PLANNER’S NAME: ATTACH. NO:
QUESTION NO: 14
REQUISITION NO.: N4523A20R1082
ISSUING OFFICE POC: Chris Davidson
Para 3.10.4 Tapped cable hanger
Repairs Contractor to replace 250 each
Cres 316 studs and tapped cable hangers using drawing 7642544 for guidance. Drawing does not show what type of tapped hanger is to be used.
There are various types and sizes of
Tapped hangers can you please supplied type and size of hanger?
Where are these studs and tapped cable hangers located to be replaced
(in tanks & voids overheads or on top of the main deck)?
TECHNICAL REVIEW: Langham SERIAL NO: 014 Size - ½” 13 Tapped stud. Bolt with cable clip attaches to stud. Location Top of main deck various locations.
DATE OF REQUEST: 8/5/20
REQUIREMENT:
ITEM NO:3.4
TITLE: Tanks/Voids
PARA. NO:3.4.1.2 PAGE NO:31
PLANNER’S NAME: ATTACH. NO:
QUESTION NO:15
REQUISITION NO.: N4523A20R1082
ISSUING OFFICE POC: Chris Davidson
CONTRACTOR QUESTION: 1.17 Environmental and Hazardous Waste Management the table in this section calls for 500 gallons contaminated tank water and 500 pounds of tank solids. But in 3.4.1.2 it states a cumulative total of 50 gallons of tank water and a cumulative total of 50 gallons of tank solids. Please clarify what we to dispose of.
SPEC CHG:/N DWG/REF CHG. N RQMTS CHG:/N MAT'L CHG: N
TECHNICAL REVIEW:Langham SERIAL NO: 015 Paragraph 1.17 is talking about hazewaste that is estimated to be accumulated for accomplishment of production such as oily rags unused paint and solvents.