FOUO C04.0 Attachment J-2 N4523A20R1082 YON-326 Price Proposal Worksheet.xls

XLS spreadsheet 62 KB Posted

Attached to
YON-326 Maintenance Repair & Preservation
Solicitation number
N4523A20R1082
Issued by

About this file

This document contains a price proposal worksheet and federal contract opportunity solicitation for maintenance, repair, and preservation services for a YON-326 fuel oil barge. The solicitation is seeking a firm-fixed price contract to dock, clean, conduct hull and tank inspections and repairs, engine repairs, piping and valve repairs, and sea trials for the 199-foot steel fuel barge from December 2020 to March 2021. Offerors must have facilities capable of accommodating the 199x54x3 foot, 2,848 ton barge. The solicitation is a 100% small business set-aside issued by the Department of the Navy with proposals due in September 2020 and award based on lowest price among technically acceptable offers. The price proposal worksheet is a template for offerors to provide fixed labor rates, overhead, and profit for the line items to calculate their total firm-fixed price for the services.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

YON-326

INSERT CONTRACTOR/COMPANY NAME HERE
Project =YON-326DATE: =
PRIMESUBCONTRACTORPRIMEPRIME
PARAGRAPH No.TITLEM/HMATERIAL PRICETOTALLabor CostMaterial CostTOTALOther Direct Cost (ODC)*G&APROFITLine Item Total
1.4Arrival Conference$0.00$0.00$0.00$0.00$0.00
1.5Required Documents$0.00$0.00$0.00$0.00$0.00
1.6Progress Meetings$0.00$0.00$0.00$0.00$0.00
1.7Availability Requirements$0.00$0.00$0.00$0.00$0.00
1.7.1Transport Vessel$0.00$0.00$0.00$0.00$0.00
1.7.2Office Space$0.00$0.00$0.00$0.00$0.00
1.8Care of Vessel$0.00$0.00$0.00$0.00$0.00
1.11CFR$0.00$0.00$0.00$0.00$0.00
1.13Safety Requirerments$0.00$0.00$0.00$0.00$0.00
1.16.1Maintain Preservation OQE Records$0.00$0.00$0.00$0.00$0.00
1.17Environmental/Hazwaste Managemment$0.00$0.00$0.00$0.00$0.00
1.21Gas Free$0.00$0.00$0.00$0.00$0.00
1.22.1Develop and Maintain Test Plan$0.00$0.00$0.00$0.00$0.00
3.1.2Docking & Undocking$0.00$0.00$0.00$0.00$0.00
3.1.3Blocking Plan$0.00$0.00$0.00$0.00$0.00
3.1.5Setting and Aligning of Blocks$0.00$0.00$0.00$0.00$0.00
3.1.6Docking Conference$0.00$0.00$0.00$0.00$0.00
3.1.7Dock the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.8Post Docking$0.00$0.00$0.00$0.00$0.00
3.1.11Undock the Vessel$0.00$0.00$0.00$0.00$0.00
3.2.1Distinguishing Figures & Markings$0.00$0.00$0.00$0.00$0.00
3.2.2Rubber Fenders$0.00$0.00$0.00$0.00$0.00
3.2.3Steel Half Pipe Fenders$0.00$0.00$0.00$0.00$0.00
3.2.4Zinc Anodes$0.00$0.00$0.00$0.00$0.00
3.2.5Hull Blasting and Preservation$0.00$0.00$0.00$0.00$0.00
3.2.6Hull and Freeboard Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.2.7Hull and Freeboard UT Inspection$0.00$0.00$0.00$0.00$0.00
3.2.8Skegs Repair$0.00$0.00$0.00$0.00$0.00
3.2.9Steel half Pipe Repair$0.00$0.00$0.00$0.00$0.00
3.2.10Hull Repairs (Reservation Tasking)$0.00$0.00$0.00$0.00$0.00
3.3.1Cofferdam Modifications$0.00$0.00$0.00$0.00$0.00
3.3.2Storage Locker Hasp Modification$0.00$0.00$0.00$0.00$0.00
3.3.3Storage Locker Hinge Modification$0.00$0.00$0.00$0.00$0.00
3.4.1Prepare Tanks/Voids$0.00$0.00$0.00$0.00$0.00
3.4.2Tank/Void Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.4.3Identify Color Schemes and Markings$0.00$0.00$0.00$0.00$0.00
3.4.4Preliminary Air Test$0.00$0.00$0.00$0.00$0.00
3.4.5Blast and Preserve$0.00$0.00$0.00$0.00$0.00
3.4.6Tank/Void Preservation$0.00$0.00$0.00$0.00$0.00
3.4.7Watertight Hatch Door and Scuttle Repairs$0.00$0.00$0.00$0.00$0.00
3.4.8Repair Dogging Mechanisms$0.00$0.00$0.00$0.00$0.00
3.4.9Final Air test$0.00$0.00$0.00$0.00$0.00
3.4.10On Load Fuel$0.00$0.00$0.00$0.00$0.00
3.4.11Tank Closeout Inspection$0.00$0.00$0.00$0.00$0.00
3.5.1Main Deck Non Skid Repair$0.00$0.00$0.00$0.00$0.00
3.5.2Visual Inspection for Structural defects$0.00$0.00$0.00$0.00$0.00
3.5.3Ultrasonic Test (UT) Inspection$0.00$0.00$0.00$0.00$0.00
3.6.1Superstructure Preservation$0.00$0.00$0.00$0.00$0.00
3.6.2Antenna Support Modification$0.00$0.00$0.00$0.00$0.00
3.9.1Cargo Pump Diesel Engine Repairs$0.00$0.00$0.00$0.00$0.00
3.9.2Cylinder Head and Valve Repairs$0.00$0.00$0.00$0.00$0.00
3.9.3Fuel Injector System Repairs$0.00$0.00$0.00$0.00$0.00
3.9.4Engine Oil Analysis$0.00$0.00$0.00$0.00$0.00
3.9.5Diesel Engine Coolant Analysis$0.00$0.00$0.00$0.00$0.00
3.9.6Engine Compression Pressure Test$0.00$0.00$0.00$0.00$0.00
3.9.7Starting and Charging System Test$0.00$0.00$0.00$0.00$0.00
3.9.8Power take Off (PTO) Repairs$0.00$0.00$0.00$0.00$0.00
3.9.9Engine Exhaust Inspection$0.00$0.00$0.00$0.00$0.00
3.9.10YD-5500 Exhaust Bellow Replacement$0.00$0.00$0.00$0.00$0.00
3.9.11Cargo Pump Shaft and Seal Repair$0.00$0.00$0.00$0.00$0.00
3.10.1Navigation Lighting Repairs$0.00$0.00$0.00$0.00$0.00
3.10.2Cargo deck Flood Light Repairs$0.00$0.00$0.00$0.00$0.00
3.10.3Tank Level Indicator Test$0.00$0.00$0.00$0.00$0.00
3.10.4Tapped Cable Hanger Repairs$0.00$0.00$0.00$0.00$0.00
3.11.1Cargo Piping Preservation$0.00$0.00$0.00$0.00$0.00
3.11.2Cargo Piping Pressure Gauge Repair$0.00$0.00$0.00$0.00$0.00
3.11.3Cargo Valve Repairs$0.00$0.00$0.00$0.00$0.00
3.11.4Cargo Header Isolation Valve Repairs$0.00$0.00$0.00$0.00$0.00
3.13.2Final Dock trial$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Scope (SOW/PWS)Labor Rate/MH**:G&A Rate***:Profit Rate****:
Total Bid:$0.00
*ODC = Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
**Labor Rate/Hr = Represents a composite value of all categories of direct labor to accomplish the outcomes of the requirement
***G&A = General and Administrative Overhead factor associated with
****Profit = Incentive factor associated with materials, to include subcontracting expenses, directly attributable to the contract

&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) =(MH*Labor Rate)+Material Price =Sub Cost (F) NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.