This document contains a price proposal worksheet and federal contract opportunity solicitation for maintenance, repair, and preservation services for a YON-326 fuel oil barge. The solicitation is seeking a firm-fixed price contract to dock, clean, conduct hull and tank inspections and repairs, engine repairs, piping and valve repairs, and sea trials for the 199-foot steel fuel barge from December 2020 to March 2021. Offerors must have facilities capable of accommodating the 199x54x3 foot, 2,848 ton barge. The solicitation is a 100% small business set-aside issued by the Department of the Navy with proposals due in September 2020 and award based on lowest price among technically acceptable offers. The price proposal worksheet is a template for offerors to provide fixed labor rates, overhead, and profit for the line items to calculate their total firm-fixed price for the services.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
YON-326
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||||||||
| Project = | YON-326 | DATE: = | |||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | ||||||||
| PARAGRAPH No. | TITLE | M/H | MATERIAL PRICE | TOTAL | Labor Cost | Material Cost | TOTAL | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total |
| 1.4 | Arrival Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.5 | Required Documents | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.6 | Progress Meetings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.7 | Availability Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.7.1 | Transport Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.7.2 | Office Space | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.8 | Care of Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.11 | CFR | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.13 | Safety Requirerments | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.16.1 | Maintain Preservation OQE Records | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.17 | Environmental/Hazwaste Managemment | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.21 | Gas Free | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.22.1 | Develop and Maintain Test Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.2 | Docking & Undocking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.3 | Blocking Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.5 | Setting and Aligning of Blocks | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.6 | Docking Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.7 | Dock the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.8 | Post Docking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.11 | Undock the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.1 | Distinguishing Figures & Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.2 | Rubber Fenders | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.3 | Steel Half Pipe Fenders | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.4 | Zinc Anodes | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.5 | Hull Blasting and Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.6 | Hull and Freeboard Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.7 | Hull and Freeboard UT Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.8 | Skegs Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.9 | Steel half Pipe Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.10 | Hull Repairs (Reservation Tasking) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.1 | Cofferdam Modifications | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.2 | Storage Locker Hasp Modification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.3 | Storage Locker Hinge Modification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.1 | Prepare Tanks/Voids | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.2 | Tank/Void Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.3 | Identify Color Schemes and Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.4 | Preliminary Air Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.5 | Blast and Preserve | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.6 | Tank/Void Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.7 | Watertight Hatch Door and Scuttle Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.8 | Repair Dogging Mechanisms | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.9 | Final Air test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.10 | On Load Fuel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.11 | Tank Closeout Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.1 | Main Deck Non Skid Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.2 | Visual Inspection for Structural defects | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.3 | Ultrasonic Test (UT) Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.1 | Superstructure Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.2 | Antenna Support Modification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.1 | Cargo Pump Diesel Engine Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.2 | Cylinder Head and Valve Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.3 | Fuel Injector System Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.4 | Engine Oil Analysis | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.5 | Diesel Engine Coolant Analysis | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.6 | Engine Compression Pressure Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.7 | Starting and Charging System Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.8 | Power take Off (PTO) Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.9 | Engine Exhaust Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.10 | YD-5500 Exhaust Bellow Replacement | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.11 | Cargo Pump Shaft and Seal Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.1 | Navigation Lighting Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.2 | Cargo deck Flood Light Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.3 | Tank Level Indicator Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.4 | Tapped Cable Hanger Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.11.1 | Cargo Piping Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.11.2 | Cargo Piping Pressure Gauge Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.11.3 | Cargo Valve Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.11.4 | Cargo Header Isolation Valve Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.13.2 | Final Dock trial | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Column Totals | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Scope (SOW/PWS) | Labor Rate/MH**: | G&A Rate***: | Profit Rate****: | ||||||||
| Total Bid: | $0.00 | ||||||||||
| *ODC = Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc. | |||||||||||
| **Labor Rate/Hr = Represents a composite value of all categories of direct labor to accomplish the outcomes of the requirement | |||||||||||
| ***G&A = General and Administrative Overhead factor associated with | |||||||||||
| ****Profit = Incentive factor associated with materials, to include subcontracting expenses, directly attributable to the contract |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) =(MH*Labor Rate)+Material Price =Sub Cost (F) NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.
NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.
File details come from the government source that posted it. Updated .