Barge 10504
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||
| Project = | Segmented Barge 10504 | DATE: = | |||
| PRIME | SUBCONTRACTOR | PRIME | |||
| Carney, Sean R CIV PSNS&IMF, Code 411: =MH*Labor Rate*G&A | PRIME |
Carney, Sean R CIV PSNS&IMF, Code 411: =(Prime Material Price+Subcontractor Total)*Profit Rate
| PARAGRAPH No. | TITLE | M/H | MATERIAL PRICE | TOTAL | |
| Carney, Sean R CIV PSNS&IMF, Code 411: =(MH*Labor Rate)+Material Price | Labor Cost | Material Cost | TOTAL |
Carney, Sean R CIV PSNS&IMF, Code 411: =Sub Cost (F)
Carney, Sean R CIV PSNS&IMF, Code 411: =MH*Labor Rate*G&A Carney, Sean R CIV PSNS&IMF, Code 411: =(Prime Material Price+Subcontractor Total)*Profit Rate Other Direct Cost (ODC)* G&A PROFIT Line Item Total Carney, Sean R CIV PSNS&IMF, Code 411: =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit)
| 1.4 | Arrival Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.5 | Required Documents | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.6 | Progress Meetings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.7 | Availability Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.7.1 | Transport Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 11 | |||||
| 1.7.2 | Provide Office Space | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.8 | Care of Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.11 | CFR | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.13 | Safety Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.16.1 | Maintain Preservation OQE Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.17 | Enviormental/Hazwaste Management | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.22 | Gas Free | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.23.1 | Develop & Maintaine Test Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.2 | Docking Procedure | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.3 | Blocking Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.4 | Crib & Brace Blocking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.5 | Setting & Alignment Blocks | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.6 | Docking Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.7 | Docking the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.8 | Post Docking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.9 | Shifting the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.10 | Undocking the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.12 | Final Docking Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.2.1 | Identify Distinguishing Figures and Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.2.2 | Rubber Fenders | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.2.3 | Zinc Anodes | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.2.4 | Hull Blasting & Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.2.5 | Hull and Freeboard Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.2.6 | Hull and Freeboard UT Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.3.1 | Barge Pin Removal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.3.2 | Barge Pin Install | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.3.3 | Clad Weld Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.3.4 | Fillet Weld Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.4.1 | Open, Pump, Clean, Close Fas Free Tanks | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.4.2 | Tank/Void Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.4.3 | Identify Color Schemes and Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.4.4 | Preliminary air test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.4.5 | Tank/Void preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.4.6 | Access Cover Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.4.7 | Tank/Void Access Cover Handle | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.4.8 | Final Air Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.4.9 | Tank/Void C/O Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.5.1 | Main Deck Nonskid Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.5.2 | Visial Inspection Structoral defects | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.5.3 | Raised Vessel Identication | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| Column Totals | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Scope (SOW/PWS) | Labor Rate/MH: | Profit Rate: | $0.00 | |
| Total Proposed Price: |
********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR*********
*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.
NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract to include Reservation Tasking.