Segmented Barge 10504 Federal contract opportunity
Solicitation number
N4523A19R1064
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Amendment 0001

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1) Post answ ers to offeror questions 1-5

2) Revise the SOW w ith ERRATA one based on offeror questions # 2 and 5

3) Update section L w ith revised submission instructions.

4) Minor admin changed 5)The time for Submission has not changed. Proposals are DUE NO LATER THAN 2:00 PM PST 11 December 2018

1. CONTRACT ID CODE PAGE OF PAGES

J 1 12

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Nov-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4523A19R1064

X 9B. DATED (SEE ITEM 11)

06-Nov-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Nov-2018

CODE

PUGET SOUND NAVAL SHIPYARD CODE 400

1400 FARRAGUT

CONTRACTING CODE 440

BREMERTON WA 98314

N4523A 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4523A19R1064

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

Question #1: Paragraph 1.1 Vessel Characteristics shows vessel as 40 ft. in width. The reference drawing 10504 (4) and (5) shows the vessel as two 5 ft. wide segments joined to equal 10 ft. overall width. For estimating purposes what overall width is the vessel??

Answer #1: While assembled for transport the combined width of the 4 sections is 40 feet. Each individual section 10504(1), 10504(2),10504(3),10504(4) has an individual width of 10 feet.

Overall dimensions of each individual section is:

Length: 50 feet (DWG FISC_PUDGET_SOUND_10504(1).pdf) Width: 10 feet (DWG FISC_PUDGET_SOUND_10504(3).pdf) Height: 4 feet 0 1/2 inches (DWG FISC_PUDGET_SOUND_10504(1).pdf) This answer does not constitute a change to the solicitation

Question #2: The Specification Paragraphs 3.2 Hull Repairs, 3.3 Structural Repairs (in part), and 3.4 Tanks/Voids references drawing 10501, the reference drawings sent are 10504. Will the Government be sending these 10501 drawings, and if so when?

Answer #2: FISC_PUDGET_SOUND_10504 is the correct drawing and was provided with the solicitation.

ERRATA to follow. This answer does constitute a change to the solicitation, and is reflected in the summary of changes of this amendment.

Question #3: Page 22 of 49 lists FAR Clause 52.219.14 as being Incorporated. Contractor requests clarification of the requirements of this Clause. Is it the Governments intent to restrict Contractors from Subcontracting more than 50 percent of the cost of contract to any Subcontractor or may the Contractor utilize Small Business Subcontractors to perform more than 50 percent of the Contract cost?

Answer #3: In accordance with 13 CFR 125.6(a)(2)(i), subcontracted firms that are “similarly situated” to the prime contractor do not count against the 50% subcontract amount. Because of this, any small business that utilizes other small business subcontractors would not count toward the 50%.

Also please be aware that the direct cost of materials are excluded from this requirement, as they are not considered to be subcontracted.

This answer does not constitute a change to the solicitation

Question #4: We would like to request a shipcheck for Segmented Barge 10504 Solicitation Number: N4523A19R1064. Please let us know when the vessel is available for a visit.

Answer #4: Vessel is not available for shipcheck prior to availability. This answer does not constitute a change to the solicitation

Question #5: Paragraph 3.4.7.2 is incomplete. Contractor requests more information on the Make, Model, and any other information to be able to correctly locate parts required if available?

Answer #5: ERRATA to follow addressing paragraph 3.4.7.2. This answer does constitute a change to the solicitation, and is reflected in the summary of changes of this amendment.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

Any contract awarded as a result of this solicitation shall consist of the following sections of this solicitation, and the documents, exhibits, and attachments described below:

Part I The Schedule (Sections A through H) Part II Contract Clauses (Section I) Part III List of Documents, Exhibits and other Attachments (Section J) Part IV Representations and Instructions (Sections K through M)

Part IV of the solicitation will not be physically incorporated into the resulting contract. However, Section K, “Representations, Certifications and Other Statements of Offerors” will be retained in the contract file and acceptance of a proposal under this solicitation incorporates Section K by reference into the resultant contract (FAR 15.204-1(b)).

The following is a list of attachments to the RFP. Attachments J-1 and Exhibits A will be incorporated into the contract along with all references listed in section two (2) of the Statement of Work (SOW), digital copies of which are available upon contractor request. Attachments J-3 through J-6 are included for the purposes of the solicitation, but will not be incorporated into the resulting contract. Additionally, the contractor shall be responsible for the latest revisions of all references, specifications and standards in effect at time of proposal closing.

Number Title Number of Pages Dated Attachment J-1 Statement of Work Barge 10504 (SOW) 39 15 November 2018 Attachment J-2 Price Proposal Worksheet 1 N/A

Attachment J-3 Request for Clarification 1 N/A Attachment J-4 Contract Performance Data Sheet

2 N/A

Attachment J-5 Corporate Experience Data Sheet

6 N/A

Attachment J-6 References and Pictures (6 Zip packges)

N/A N/A

Exhibit A CDRLs and DIDs 48 Various

NOTE 1:

"Attachment” means any documentation, appended to a contract or incorporated by reference, which does not establish a requirement for deliverables.

"Exhibit” means a document, referred to in a contract, which is attached and establishes requirements for deliverables.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INSTRUCTIONS FOR OFFERORS

1. GENERAL:

a. Instructions:

1. Offerors shall submit their proposals in accordance with the following preparation instructions. The Government will consider any failure on the part of an offeror to comply with these instructions to be an indication of the quality of performance it can expect during contract performance. Therefore, the Government encourages offerors to contact the contracting officer (KO) in writing in order to request an explanation of any aspect of these instructions.

2. A proposal should not simply rephrase or restate the Government’s requirements but rather provide convincing rationale to address how the offeror meets these requirements.

Offerors shall assume that the Government has no prior knowledge of their facilities and experience and will base its evaluation on the information presented in the offeror’s proposal.

3. If an offeror believes that the requirements in these instructions contain an error, omission or are otherwise unsound, the offeror shall immediately notify the KO in writing with supporting rationale as well as the remedies the offeror is asking the KO to consider as related to the omission or error.

4. Relationship between Instructions and Evaluation: Your attention is directed to the functional relationship between Sections L and M of this solicitation. Section L provides information for the purpose of organizing the proposal and is not intended to be all inclusive.

Section M describes evaluation factors for award. Since the Government evaluation of proposals will cover areas identified in section M, proposals should address all such areas of evaluation.

5. ALL INQUIRIES shall be made via email and directed to Cindy Means, Contract Specialist, and George Rutt, Contracting Officer, at cindy.means@navy.mil and geroge.rutt@navy.mil. To ensure the Government is able to adequately address and respond to offeror requests for clarification (RFCs) via amendment if applicable, it is requested questions be submitted no later than 28 November 2018 at 2:00 pm Pacific Standard Time (PST). The government reserves the right to not answer any questions received after 28 November 2018 at 2:00 pm PST. Furthermore, offerors should note that the proposal due date will not be extended solely on the basis of questions received. RFCs shall reference the solicitation and specification page and paragraph number and be submitted on a request for clarification form (Attachment J-3) provided with this solicitation. A request for clarification form (Attachment J-3) shall be submitted for each separate question.

b. Proposal Submission Instructions:

mailto:brittany.chartier@navy.mil mailto:geroge.rutt@navy.mil

1. Time of Submission: Proposals are DUE NOT LATER THAN 2:00 P.M. PST, 11 December 2018. Late proposals will not be considered.

Important Notice: The SAFE system for submitting proposals to PSNS&IMF is no longer available. Email delivery of proposals is now the accepted method of delivery. Because large attachments may experience transmission and reception challenges, offerors are advised to submit proposals well ahead of the submission deadline.

2. Method of Delivery: Proposal submissions shall only be accepted electronically.

Offerors must submit one electronic copy of their proposal via email to the Government POCs listed in Table 1 below.

Table 1- Required Submission Methods

Transmission Method Government POC emails Email cindy.means@navy.mil and george.rutt@navy.mil

3. Electronic Delivery of Proposals: Proposals are DUE NOT LATER THAN 2:00 P.M. PST, 11 December 2018. Late proposals will not be considered. In order to be considered timely, proposals must reach the outlook email inbox of at least one of the POCs listed in Table 1 above prior to the solicitation closing deadline. Offerors shall include a listing of all email attachments in the body of their submission email, which includes the filename of each attachment. The subject line of the email submission shall reference the offeror’s company name, CAGE code, and the solicitation number.

a. If any portion of the proposal is unreadable or contains corrupted files, re-submission of such portions shall be handled IAW FAR 15.207(c). To ensure timeliness, it is highly recommended that offerors upload and transmit their electronic proposal at least twenty-four (24) hours prior to the solicitation closing deadline.

b. Electronic proposals submitted will be downloaded upon receipt but not opened until the solicitation closes.

c. One of the Government POCs listed in Table 1 above will provide confirmation email documenting receipt of proposal and confirm that all attachments listed in the body of the email match those attached for all proposals submitted at least two hours prior to solicitation closing deadline. Government POCs will attempt to provide confirmation of receipt for proposals received with less than two hours remaining until solicitation closure, but confirmation is not guaranteed.

4. Electronic File Format: Only the following extensions shall be used:

mailto:george.rutt@navy.mil

.docx for Microsoft® Word files .xlsx for Microsoft® Excel files .pdf for Adobe® Acrobat™ files

Offeror shall not embed sound or video files into submittals. Graphics, tables, photographs, and other data beyond the capability of Microsoft® Word ™, Microsoft® Excel ™, or not in currently NMCI- supported applications may be submitted in Adobe Acrobat format. Any submission document that requires a “wet signatures” or other data input by hand shall be scanned and formatted in Adobe Acrobat (PDF).

All spreadsheets shall be in Microsoft Excel format such that each mathematical equation is obvious. No fields shall be password protected.

5. Volume Layout and Page Limitations: Proposals shall be submitted in the following quantities and volume layout. At a minimum, each section as outlined below shall constitute a separate file.

Table 2- Page Layout

Volume

Section Title E-file

Page Limitations

I

I Technical Proposal, Sub-factor 1.1 Corporate Experience 1 file:

Sections I, II & III

Completed Experience Worksheet – Attachment J-5

II Technical Proposal, Sub-factor 1.2 Certifications

No Page Limitation

III Technical Proposal, Sub-factor 1.3 Facilities

No Page Limitation

II

Past Performance

1 file

Past Performance Worksheet – Attachment J-4

III

I Cover Letter 1 file 4

II Completed Solicitation and Applicable Amendments 1 file

No Page Limitation

III Price Proposal Worksheet Attachment J-2

1 file (.xlsx)

J-2 Attachment

a. Text size shall be no smaller than what is equivalent to Microsoft Word, Times New Roman, 10 point, uncompressed font.

b. Pages shall be single sided, one and one half inch spaced, with a minimum of one inch margins on all sides. Pages shall be dated and numbered sequentially by volume. A header should be present in each volume submission stating the volume number, title, solicitation identification, and the offeror's name.

c. Each volume shall contain a glossary of all abbreviations and acronyms used with an explanation for each.

d. Elaborate format and/or color representations are not desirable. Any pages that are changed (as the result of negotiations) should be of a different color (as specified by the Contracting Officer) and have changed information clearly marked by a vertical line in the right margin of the page and/or circling if changing data in a chart.

The offeror shall indicate the new date on revised pages.

e. Legible tables, charts, graphs and figures shall be used when necessary to depict organizations, systems and layout, implementation schedules, plans, etc. These displays shall be uncomplicated, legible, and shall not exceed 11 by 17 inches in size.

For tables, charts, graphs, and figures, the text shall be no smaller than 8 point, Times New Roman.

NOTE: The Government’s strong preference is for clear, concise proposals that support the evaluation criteria listed in section M of the solicitation.

c. Ship Check: There will not be a ship check for this requirement pictures are provided in Attachment J-6

References and Pictures.

d. Subcontract Information: In requesting proposals from prospective subcontractors, offerors should provide all necessary information for the contemplated purchase. The Government will not advise prospective subcontractors as to the requirements of their transactions with offerors, nor will the Government respond to direct inquiries from prospective subcontractors concerning clarifications of specification or solicitation requirements. ALL SUCH

REQUESTS FOR CLARIFICATION MUST BE SUBMITTED TO THE

GOVERNMENT THROUGH THE PRIME CONTRACTOR (OFFEROR).

e. SOW reference documentation: Offerors may request SOW reference file (Attachment J-6) access and/or password protected picture file access electronically via an email request to cindy.means@navy.mil and George.rutt@navy.mil. SOW references and picture files (Attachment J-6) are encrypted via WinZip and require WinZip or a compatible decryption program to access.

3. VOLUME I – FACTOR 1: Technical Capabilities

A. Organization: Volume I shall be organized conforming to the required proposal content. Volume I shall be clearly labeled. At a minimum, each section as outlined below shall constitute a separate file. Volume I shall not include pricing information.

The Technical volume shall be organized in the following manner:

Section I: Sub-factor 1.1 – Corporate Experience Section II: Sub-factor 1.2 – Certifications Section III: Sub-factor 1.3 – Facility

Submission Requirements:

Table 3- Technical Submission Requirements

Section M Evaluation Criteria Section L Submission Requirement Subfactor 1.1, Corporate Experience:

The prospective offeror must demonstrate specific experience providing marine preservation and structural, mechanical and electrical repairs of the complexity similar to or exceeding the scope identified in section 1.2 of the statement of work (SOW) to a like vessel as identified in section 1.1 of SOW, through a narrative of three (3) contracts within the last three (3) years.

Offerors shall provide sufficient explanation that the experience provided demonstrate that the offeror has the necessary management, technical personnel and material resources available to successfully complete marine vessel preservation services.

Offerors are required to provide Corporate Experience Data Sheets (Attachment J-5) on three (3) of the firm’s recently completed contracts or task orders (not to exceed three years older than date of solicitation) that demonstrate relevant work as outlined in subfactor 1.1 of Section M of the solicitation.

Narratives provided on the data sheet must be clear, coherent, and prepared in sufficient detail for effective evaluation of the offeror’s proposal against sub-factor 1.1. Altered or substituted data sheets may not be evaluated.

Any supporting documentation included should clearly substantiate claims and be verifiable.

Offeror’s shall include complete contract numbers, to include specific delivery/task order numbers as applicable, within the narrative provided on the data sheet to allow for the verification of claims. However, copies of contracts referenced are not required as part of the proposal.

If referencing non-government corporate experience contracts, offeror’s shall include an associated point of contact with the customer company which includes: name, company title, phone number, and email to allow for government verification.

Subfactor 1.2, Certifications:

The prospective offeror provided current

The offeror shall provide copies of current certifications for all paint inspectors that meet certificates identifying all personnel certified as paint inspectors in accordance with NAVSEA Basic Paint Inspector (NBPI), NACE International Coatings Inspector or SSPC Protective Coating Inspector programs, as required for accomplishing the requirements of the statement of work.

at least one of the requirements outlined in evaluation sub-factor 1.2.

Subfactor 1.3, Facility:

The offeror identified that the facility to be used has adequate lifting and operational capacity to safely dock the vessel per the requirements set forth in Section C of this solicitation. An on-site survey conducted by the Government Docking Observer (GDO) may be required to validate the facility’s capability.

To facilitate proper government oversight, the facility shall be located in the Puget Sound, WA region. For this procurement, the Puget Sound, WA region is defined as the West Coast of the continental US, starting from Olympia, WA and extending northward to Bellingham, WA.

The offeror shall provide a narrative illustrating that they satisfy the requirements of sub-factor 1.3. Narratives provided on the data sheet must be clear, coherent, and prepared in sufficient detail for effective evaluation of the offeror’s proposal against sub-factor 1.3. Any supporting documentation included should clearly substantiate claims and be verifiable.

4 VOLUME II- FACTOR 2: Past Performance

A. Organization: Volume II shall be organized conforming to the required proposal content. Volume II shall not include pricing information.

The Past Performance volume shall be organized in the following manner:

Contractor Performance Data Sheet (Attachment J-4)

Table 3- Past Performance Submission Requirements

Section M Evaluation Criteria Submission Requirements Evidence of past performance on one (1) contract actions within the last five (5) years that demonstrates performance relevant to preservation projects similar in scope to section 1.2 of the statement of work (SOW).

Offerors are required to provide Contractor Performance Data Sheets (Attachment J-4) on one (1) of the firm’s recently completed contracts or task orders (not to exceed five years since completion) that demonstrate relevant work as outlined in to section 1.2 of the statement of work (SOW) of the solicitation. Altered or substituted questionnaires will not be evaluated. Offerors may submit performance data regarding current contract performance as long as a minimum of one year of performance has been completed as of the closing date of this RFP.

Supporting documentation should clearly substantiate claims and be verifiable.

Offeror’s shall include complete contract numbers, to include specific delivery/task order numbers as applicable, within the narrative to allow for the verification of claims. However, copies of contracts referenced are not required as part of the proposal.

If referencing a non-government past performance, ensure that the Contractor Performance Data Sheets list a current customer point of contact with name, company title, phone number, and email included for government verification.

Past performance information obtained from established systems such as the Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases. Past performance information may also be obtained from other sources available to the Government, such as the Defense Contract Management Agency;

and interviews with Program Managers, Contracting Officers, Fee Determining Officials.

Offeror’s are not required to submit any additional documentation in support of this evaluation criterion.

2. VOLUME III – FACTOR 3: LEGAL/PRICE OFFER

A. Organization: Volume III shall be organized conforming to the required proposal content. Volume III shall be clearly labeled. At a minimum, each section as outlined below shall constitute a separate file.

The Technical volume shall be organized in the following manner:

Section I Cover Letter

Section 2

Completed solicitation and amendments

Section 3 Completed price proposal worksheet, Attachments J-2

B. Legal/Price Offer: The Legal/Price Volume consists of and must include the following:

1) A cover letter that addresses all the requirements of the “first page of the proposal” outlined in FAR 52.215-1(c)(2)(i-v). In addition to those requirements, the offeror shall include the following in the cover letter:

• Identification of all separate files included in the proposal package,

• CAGE and Data Universal Numbering System (DUNS) numbers for the prime contractor,

• Notice of any alterations to the solicitation or attachments/exhibits

(except for completing appropriate “fill-in” blocks and certifications).

• Period for acceptance of offers. The offeror agrees to hold the prices in its offer for 90 calendar days from the date specified for receipt of offers, unless another time period is specified in an amendment to the solicitation.

2) The completed SF 33 with blocks 12 through 18 completed, as well as all sections with applicable “fill-ins” filled in and shall acknowledge all amendments (block 14). Block 12 must match the 90 days specified in the provided cover letter. The representative who signs this form must be authorized to contractually bind the company providing the offer. Section B CLIN pricing must also be completed for CLIN 0001 and be equal to the total price of the price proposal worksheet. (Attachment J-2 for CLIN 0001) CLIN 0002, and CLIN 0003 are unpriced CLINs. The Offeror shall complete and provide all Representations, Certifications, and Other Statements included in section K of the solicitation.

Submission of a signed offer to the Government constitutes agreement and acceptance of the terms and conditions of the solicitation.

3) Complete the price proposal worksheet, Attachment J-2 of the Solicitation.

Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing all modifications under this contract.

C. Notification/Exceptions: The proper completion and submission to the Government of the above items will constitute an offer. Unless this solicitation expressly authorizes alternate offers with respect to specific terms and conditions of this solicitation, any exception to any of the terms and conditions shall constitute a deficiency which may make the offer unacceptable.

D. Release of Pricing Information: All pricing information submitted is for the exclusive use of Government representatives, and will be treated as business confidential and will not be publicly disclosed, provided that, where a request for disclosure of such cost information is submitted to the Government pursuant to the Freedom of Information Act (FOIA) (5 U.S.C. 552a), the Government will not disclose the offeror’s pricing information if public disclosure of such information would substantially harm the offeror in its competitive position. In order to help ensure non-disclosure, the title page of the cost proposal and other sheets of proposal data should be marked with a restrictive legend stating that the price information is proprietary.

(End of Summary of Changes)

c. Ship Check: There will not be a ship check for this requirement pictures are provided in Attachment J-6 References and Pictures.
d. Subcontract Information: In requesting proposals from prospective subcontractors, offerors should provide all necessary information for the contemplated purchase. The Government will not advise prospective subcontractors as to the requirements of...