N4523A19R1064_Attachment_J-2_Price_Proposal_Worksheet_Barge_10504.xls

XLS spreadsheet 58 KB Posted

Attached to
Segmented Barge 10504
Solicitation number
N4523A19R1064
Issued by

About this file

Attachment J-2 Price Proposal Worksheet

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Barge 10504

INSERT CONTRACTOR/COMPANY NAME HERE
Project =Segmented Barge 10504DATE: =
PRIMESUBCONTRACTORPRIMEPRIME
PARAGRAPH No.TITLEM/HMATERIAL PRICETOTALM/HMATERIAL PRICETOTALOther Direct Cost (ODC)*G&APROFITLine Item Total
1.4Arrival Conference$0.00$0.00$0.00$0.00$0.00
1.5Required Documents$0.00$0.00$0.00$0.00$0.00
1.6Progress Meetings$0.00$0.00$0.00$0.00$0.00
1.7Availability Requirements$0.00$0.00$0.00$0.00$0.00
1.7.1Transport Vessel$0.00$0.00$0.00$0.00$0.00
1.7.2Provide Office Space$0.00$0.00$0.00$0.00$0.00
1.8Care of Vessel$0.00$0.00$0.00$0.00$0.00
1.11CFR$0.00$0.00$0.00$0.00$0.00
1.13Safety Requirements$0.00$0.00$0.00$0.00$0.00
1.16.1Maintain Preservation OQE Records$0.00$0.00$0.00$0.00$0.00
1.17Enviromental/Hazwaste management$0.00$0.00$0.00$0.00$0.00
1.22Gas Free$0.00$0.00$0.00$0.00$0.00
1.23.1Develop & Maintain Test Plan$0.00$0.00$0.00$0.00$0.00
3.1.2Docking Procedure$0.00$0.00$0.00$0.00$0.00
3.1.3Blocking Plan$0.00$0.00$0.00$0.00$0.00
3.1.4Crib and Brace Blocking$0.00$0.00$0.00$0.00$0.00
3.1.5Setting & Aligning Blocks$0.00$0.00$0.00$0.00$0.00
3.1.6Docking Conference$0.00$0.00$0.00$0.00$0.00
3.1.7Dock the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.8Post Docking$0.00$0.00$0.00$0.00$0.00
3.1.9Shifting the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.10Undock the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.12Final Docking Report$0.00$0.00$0.00$0.00$0.00
3.2.1Distinguishing Figures & Markings$0.00$0.00$0.00$0.00$0.00
3.2.2Rubber Fenders$0.00$0.00$0.00$0.00$0.00
3.2.3Zinc Anodes$0.00$0.00$0.00$0.00$0.00
3.2.4Hull Blasting & Preservation$0.00$0.00$0.00$0.00$0.00
3.2.5Hull and Freeboard Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.2.6Hull and Freeboar UT Inspection$0.00$0.00$0.00$0.00$0.00
3.3.1Barge Pin Removal$0.00$0.00$0.00$0.00$0.00
3.3.2Barge Pin Install$0.00$0.00$0.00$0.00$0.00
3.3.3Clad Weld Repair$0.00$0.00$0.00$0.00$0.00
3.3.4Fillet Weld Repair$0.00$0.00$0.00$0.00$0.00
3.4.1Open, Pump, Clean, Close, Gas Free Tanks$0.00$0.00$0.00$0.00$0.00
3.4.2Tank/Void Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.4.3Identify Color Schemes and Markings$0.00$0.00$0.00$0.00$0.00
3.4.4Preliminary Air Test$0.00$0.00$0.00$0.00$0.00
3.4.5Tank/Void Preservation$0.00$0.00$0.00$0.00$0.00
3.4.6Access Cover Preservation$0.00$0.00$0.00$0.00$0.00
3.4.7Tnk/Void Access Cover Handle$0.00$0.00$0.00$0.00$0.00
3.4.8Final Air Test$0.00$0.00$0.00$0.00$0.00
3.4.9Tank/Void C/O Inspection$0.00$0.00$0.00$0.00$0.00
3.5.1Main Deck Nonskid Preservation$0.00$0.00$0.00$0.00$0.00
3.5.2Visual Inspection Structural Defects$0.00$0.00$0.00$0.00$0.00
3.5.3Raised Vessel Identification$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.000$0.00$0.00$0.00$0.00$0.00$0.00
Scope (SOW/PWS)Labor Rate/MH:G&A Rate:Profit Rate:$0.00
Total Bid:

&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR*********

=E(XXX)*F66

=(J(XXX)+H(XXX)+I(XXX))*H65

=SUM(E(XXX)+H(XXX)+I(XXX)+J(XXX)+K(XXX))

=C(XXX)*D65+D(XXX)

=F(XXX)*D65+G(XXX)

*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.