A.17.0_Quality_Assurance_Surveillance_Plan_QASP.pdf

PDF 14 KB Posted

Attached to
EMI/EMC Testing of S-System Printer Federal contract opportunity
Solicitation number
N4523A19Q1310
Issued by
Department of the Navy Naval Sea Systems Command

About this file

QASP Attachment

View the file

Other files for this federal contract opportunity

Other files attached to EMI/EMC Testing of S-System Printer, newest first.
File Type Posted
A.04.09_GFP_Attachment.pdf PDF
A.13.0_Solicitation.pdf PDF
A.04.01_Performance_Work_Statement_DRAFT.pdf PDF
A.17.0_Quality_Assurance_Surveillance_Plan_QASP_DRAFT.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan (QASP) Project: Electromagnetic Interference and Compliance Testing on S-System Printer

Requirement PWS Performance Standard Allowable Deviation

Surveillance Method

Correction Procedures

PRS # 1.

The contractor shall provide/develop a test report after accomplishing the identified EMI/EMC testing (Deliverable 4.1) which includes the information identified in Deliverable 4.1.1 thru 4.1.11.

Page 6, Technical Exhibit 2 – Deliverables Schedule

The Contractor will provide all required documentation (Deliverable 4.1) following the delivery instructions, and include all required submittals with each delivery.

100% compliance; however, the government will determine on a case-by-case basis as to the acceptability of the non-conformance.

The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested documentation cannot be provided.

Contracting Officer Representative and Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.1.

Any part of the deliveries that reveals non-conformance with the PWS must be communicated to the COR at time of delivery.

Contractor must receive notification from the COR of acceptability of each document and provide feedback within two kweeks of receipt of each deliverable.

Government will seek an adequate consideration for acceptance of nonconforming services.

Performance Standard
PWS

File details come from the government source that posted it.