N4523A18R1064_Attachment_J-2a_UF-34_5-way_break_out_Updated_01JUNE2018.xls

XLS spreadsheet 75 KB Posted

Attached to
N4523A18R1064 UF-34 and UF-137
Solicitation number
N4523A18R1064
Issued by

About this file

N4523A18R1064 Updated Attachment J-2a 5-Way Breakout UF-34

View the file

Other files

File Type Posted
N4523A18R1064_Attachment_J-2b_UF-137_5-way_break_out_Updated_01JUNE2018.xls XLS spreadsheet
N4523A18R1064_Attachment_J-1a_UF-34_Updated_SOW_Errata_1_01JUNE2018.pdf PDF
N4523A18R1064_Attachment_J-3_RFC_002.pdf PDF
N4523A18R1064_Attachment_J-3_RFC_001.pdf PDF
N4523A18R1064_Attachment_J-3_RFC_004.pdf PDF
N4523A18R1064_Attachment_J-3_RFC_003.pdf PDF
N4523A18R1064_Attachment_J-3_RFC_005.pdf PDF
N4523A18R1064_Attachment_J-1b_UF-137_Updated_SOW_Errata_1_01JUNE2018.pdf PDF
N4523A18R1064_Attachment_J-7_BAVR_Instructions.pdf PDF
N4523A18R1064_UF-34_and_UF-137_Solicitation.pdf PDF
N4523A18R1064_Attachment_J-2a_UF-34_5-way_break_out.xls XLS spreadsheet
N4523A18R1064_Attachment_J-2b_UF-137_5-way_break_out.xls XLS spreadsheet
N4523A18R1064_Attachment_J-1a_UF-34_SOW.pdf PDF
N4523A18R1064_Attachment_J-1b_UF-137_SOW.pdf PDF
N4523A18R1064_Attachment_J-6b_UF-137_SOW_references_.zip ZIP file
N4523A18R1064_Attachment_J-5_Corporate_Experience_Data_Sheet.docx DOCX document
N4523A18R1064_Attachment_J-6a_UF-34_SOW_references_.zip ZIP file
N4523A18R1064_Exhibit-A_CDRLs_and_DIDs.zip ZIP file
N4523A18R1064_Attachment_J-4_Contract_Performance_Data_Sheet.docx DOCX document
N4523A18R1064_Attachment_J-3_Request_for_Clarification_(RFC)_Form.docx DOCX document
N4523A18R1064_UF-137_SOW_Draft.pdf PDF
N4523A18R1064_UF-34_SOW_Draft.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

vessel name

INSERT CONTRACTOR/COMPANY NAME HERE
Project =UF-34DATE: =
PRIMESUBCONTRACTORPRIMEPRIME
PARAGRAPH No.TITLEM/HMATERIAL PRICETOTALLabor CostMaterial CostTOTALOther Direct Cost (ODC)*G&APROFITLine Item Total
1.4Arrival Conference$0.00$0.00$0.00$0.00$0.00
1.5Required Documents$0.00$0.00$0.00$0.00$0.00
1.6Progress Meetings$0.00$0.00$0.00$0.00$0.00
1.7Availability Requirements$0.00$0.00$0.00$0.00$0.00
1.8Care Of Vessel$0.00$0.00$0.00$0.00$0.00
1.16Preservation OQE$0.00$0.00$0.00$0.00$0.00
1.17Environmental/Hazwaste Managemment$0.00$0.00$0.00$0.00$0.00
1.20Gas Free$0.00$0.00$0.00$0.00$0.00
1.21Test Plan$0.00$0.00$0.00$0.00$0.00
3.1Docking & Undocking$0.00$0.00$0.00$0.00$0.00
3.2.1Distinguishing Figures & Markings$0.00$0.00$0.00$0.00$0.00
3.2.2Rubber Fender$0.00$0.00$0.00$0.00$0.00
3.2.3Zinc Anodes$0.00$0.00$0.00$0.00$0.00
3.2.4Hull Blasting & Preservation$0.00$0.00$0.00$0.00$0.00
3.2.5Hull Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.2.6Hull UT Inspection$0.00$0.00$0.00$0.00$0.00
3.3.1Stud replacement$0.00$0.00$0.00$0.00$0.00
3.4.1Tanks: Open, Pump, Clean, Vent, Gas free$0.00$0.00$0.00$0.00$0.00
3.4.2Tanks: Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.4.3Identify Color Schemes and Markings$0.00$0.00$0.00$0.00$0.00
3.4.4Tanks: Preliminary Air Test$0.00$0.00$0.00$0.00$0.00
3.4.5Tanks:Touch-up Preservation$0.00$0.00$0.00$0.00$0.00
3.4.6Tank Access Covers, Blast & Preserve$0.00$0.00$0.00$0.00$0.00
3.4.7Tanks: Final Air Test$0.00$0.00$0.00$0.00$0.00
3.4.8Tank closeout Inspection$0.00$0.00$0.00$0.00$0.00
3.5.1Main Deck Non-skid repair$0.00$0.00$0.00$0.00$0.00
3.5.2Main Deck Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.5.3Main Deck UT inspection$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Scope (SOW/PWS)Labor Rate/MH:G&A Rate:Profit Rate:$0.00
Total Bid:

&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) =(MH*Labor Rate)+Material Price =Sub Cost (F) =Sub Cost (F) *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

File details come from the government source that posted it.