N4523A18R1064 Attachment J-2a UF-34 Price Proposal Worksheet (5-way Breakout)
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
vessel name
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||||||||
| Project = | UF-34 | DATE: = | |||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | ||||||||
| PARAGRAPH No. | TITLE | M/H | MATERIAL PRICE | TOTAL | Labor Cost | Material Cost | TOTAL | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total |
| 1.4 | Arrival Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.5 | Required Documents | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.6 | Progress Meetings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.7 | Availability Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.8 | Care Of Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.16 | Preservation OQE | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.17 | Environmental/Hazwaste Managemment | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.20 | Gas Free | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.21 | Test Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1 | Docking & Undocking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.1 | Distinguishing Figures & Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.2 | Rubber Fender | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.3 | Zinc Anodes | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.4 | Hull Blasting & Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.5 | Hull Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.6 | Hull UT Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.1 | Stud replacement | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.1 | Tanks: Open, Pump, Clean, Vent, Gas free | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.2 | Tanks: Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.3 | Tanks: Preliminary Air Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.4 | Tanks:Touch-up Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.5 | Tank Access Covers, Blast & Preserve | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.6 | Tanks: Final Air Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.7 | Tank closeout Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.1 | Main Deck Non-skid repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.2 | Main Deck Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.3 | Main Deck UT inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| Column Totals | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Scope (SOW/PWS) | Labor Rate/MH: | G&A Rate: | Profit Rate: | $0.00 | |||||||
| Total Bid: |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) =(MH*Labor Rate)+Material Price =Sub Cost (F) =Sub Cost (F) *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.
NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.
File details come from the government source that posted it.