Attachment_J-7_-_SEED_ORDER_-_Gap_Matrix_PSNS-HII_CVN_68_FY18.xlsx
XLSX spreadsheet 34 KB Posted
- Attached to
- CVN Nuclear Maintenance and alteration IDIQ
- Solicitation number
- N4523A18R0801
About this file
Attachment J-7 - SEED ORDER - Gap Matrix PSNS-HII CVN 68 FY18
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MASTER
| NNS Legacy codes | PSNS course number | COURSE TITLE | Training Equivalent Y/N | GAP briefing required Y/N | GAP description | Notes | Radiological Technician PSNS C/105.3 | Radiological Technician PSNS C/105.3 Supv | Shipfitter PSNS S/11 NNS X11 | Sheetmetal PSNS S/17 NNS X32 | Ship/sheet PSNS S/11-17 NNS X11-32 Supv | Welder PSNS S/26 NNS X18 | Welder PSNS S/26 NNS X18 Supv | Machinist PSNS S/38 NNS X43 | Nuc Machinist FS PSNS S/38 NNS X43 | Machinist PSNS S/38 NNS X43 Supv | Insulator PSNS S/57 NNS X33 | Nuc Insulator PSNS S/57 NNS X33 | Insulator PSNS S/57 NNS X33 Supv | Painter PSNS S/71 NNS X33 | Nuc Painter/Blaster PSNS S/71 NNS X33 | Painter/Blaster PSNS S/71 NNS X33 Supv | Electrician PSNS S/51 NNS X31 | Electrician PSNS S/51 NNS X31 Supv | Pipefitter PSNS S/56 NNS X42 | Nuc Pipefitter PSNS S/56 NNS X42 | Pipefitter PSNS S/56 NNS X42 Supv | GAP delivery | Notional hrs per student |
| N/A | N/A | N | Y | Review differences between shipyards | This is a site specific brief that Code 105.41 presents. | X | X | PSNS C/105.41 | 4-6 hrs | ||||||||||||||||||||
| HW32 | hazardous materials hazcom environmental awareness | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | NNS | 0.5 hrs | ||
| 357D | dry dock evacuation | N | Y | Course 357D | NNS personnel will get this during C/400 indoctrination briefings | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | PSNS C/400 | ||
| STD 73X100001 | 280D | hazard communication | N | Y | See HW32: HW32 GAP briefing covers the required 280D required GAP information | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | NA | NA | |
| 355D | crane safety awareness | Y | N | NNS personnel will get some additional information during C/400 indoctrination briefings | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | NA | NA | ||
| STD FLUTEPLUG, STD 750X342132, STD TRITOOLCUT, and STD 750X342102 | NNQC | non nuclear quality control | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | required for all NNS non-nuclear support personnel | X | X | X | X | X | X | X | X | X | X | NNS | 6 hrs | |||||||||||
| 4000NQCMQUAL 4000NQCNQUAL | HW19CAL | Business plan California | N | Y | HW19CAL computer based training | Only require if working in California | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | NNS | 1 hr | ||
| 4000M1019SHIP | 4314 | fire watch | N | Y | Local definitions of hot work and fire classification terminology | Note: NNS personnel will not be qualified to use 3/4 water hoses for fire watch. This GAP will not be included in the GAP briefing due to normally only being used on IRR projects | X | X | NNS | 0.5 hrs | |||||||||||||||||||
| 5360 | lead/cad/crom/arsen worker | N | Y | Local vent, barrier, and signage differences and NNS PEL in microgram vs PSNS PEL in milligram | X | X | X | X | X | X | X | X | NNS | 0.5 hrs | |||||||||||||||
| NNS currency Insulator Journeyman level | 8615 | Nuclear/Non-Nuclear interface training for non-nuc prodution workers | N | Y | NNS personnel will be briefed the full course material | required for all NNS non-nuclear support personnel | X | X | X | X | X | X | X Non Nuc Supv only | X | X Non Nuc Supv only | X | X Non Nuc Supv only | X | X | X | X | X Non Nuc Supv only | NNS | 2 hrs | |||||
| IH LEADTRNG, IH CADMTRNG, IH HEXCTRN, IH LDSTRNG, & IH LEADCADTRN | 356D | environmental awareness | N | Y | See HW32: HW32 GAP briefing covers the required 280D required GAP information | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | NA | NA | |||
| STD 750X33INSU | PS-S9041 | confined space awareness | N | N, NA See Notes | NNS will provide their own gas free services and be qualified and assigned work on confined spaces per the NNS confined space program by NNS supervisor | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | X | NA | NA | |||
| OO69 | structural fit-up | Y | N | See Memo Ser 138/083 for requirements | X | PSNS | |||||||||||||||||||||||
| B | drape | Y | N | Drape GAPs will be included in Q GAP briefing package. | X | X | X | X | X | NA | NA | ||||||||||||||||||
| P | glovebag | Y | N | Note: NNS glovebag qualified personnel are NOT drape qualified or qualified to change glovebag gloves or transfer sleeves. All other Glovebag GAPs will be included in Q GAP briefing package. | X | X | X | X | NA | NA | |||||||||||||||||||
| I | portal monitor | Y | N | X | X | NA | NA | ||||||||||||||||||||||
| STD CIHUINTRO & STD Y1076CMTC | Q | Contamination worker | N | Y | Briefing package as required by C/105.4 | Note: NNS personnel that are QP qualified are not also QB qualified | X | X | X | PSNS | 2 hrs | ||||||||||||||||||
| 4000NWS4016 4000NWS4018 | R | Radiation worker | N | Y | Briefing package as required by C/105.4 | PSNS | 1 hr | ||||||||||||||||||||||
| 4000TTN4004 | 1117 | temp lead shielding | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | Required for shielders only | PSNS S/11-17 CTD Program | 4 hrs | |||||||||||||||||||||
| NN-N3001 | Nuc Worker | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | X | X | X | X | X | NNS | 4 hrs | ||||||||||||||||||
| STD ESDTRNG1C & STD ESDTRNG4 | NN-N3002 | NQC for supervisors | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | X Nuc Supv only | X Nuc Supv only | X Nuc Supv only | X | X Nuc Supv only | NNS | 4 hrs | |||||||||||||||||
| NN-N9054 | steam plant cleanliness | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | NNS non-nuclear qualified support personnel are also required to receive the NNQC GAP briefing (6 hrs). NNS personnel with legecy code 4000M1019SHIP are not qualified to perform fushes, tank work, or high pressure water work. | X | X | X | X | X | X | NNS | 4 hrs | ||||||||||||||||
| STD MECHFITCON, STD X42TORQUE, STD BASECLEAN, & STD GSKTHZDTRG | PT-N9053 | nuclear material control | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | Nuc workers only | X | NNS | 5 hrs | ||||||||||||||||||||
| STD 74X331056, STD TUBETRANSPK, STD CIHUINTRO, STD SIGCBLSPLC, STD CVNOWW, STD LOCALWW+CI, STD CVNOCI, STD CABLRIPOUT, STD EQINSINTRO, STD CABREPRCVN, and STD Y1076CMTC | FMEA | type I cleanliness | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | NNS personnel with legecy code 4000NQCMQUAL are not qualified to perform fushes, tank work, or high pressure water work. | X | X | X | X Nuc Supv only | NNS | 4 hrs | |||||||||||||||||
| STD QX31AOV, STD QX31EC-ARC, and STD Q600VACES | PT-T9010 -PT-T9024 | intro to corporate cableways | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | NNS | 3 hrs | ||||||||||||||||||||||
| PT-T9002 | ELECTRICAL SAFETY | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | NNS | 0.5 hrs | |||||||||||||||||||||||
| PT-T9039 | electrical workmanship & non-nuclear quality control | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | NNS | 5 hrs | |||||||||||||||||||||||
| IVV/FRISK | Shop 51-52-67 CTDIVV/Frisk | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | NNS | 3 hrs | |||||||||||||||||||||||
| PRCS | Production contamination and Radiation supervisor | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | Required only for NNS supervisors assigning contamination and/or radiation work | X Nuc Supv only | X Nuc Supv only | X Nuc Supv only | X | X Nuc Supv only | PSNS | 4hrs | |||||||||||||||||
| 5326 | mechanical joint makeup | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | X | PSNS | 8 hrs | ||||||||||||||||||||||
| TSDCSWA5 | Shipwright | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | PSNS S/64 CTD Program will conduct GAP briefings apon arrival of NNS stagebuilders. | PSNS S/64 CTD Program | 8 | ||||||||||||||||||||||
| STD QX31EC-ARC, STD Q600VACES, STD QX31AOV, STD EQINSINTRO, STD TEMPLIGHT, Y-1078, and STD BATTERYBRF | PS-N9001 | primary valve mechanic | N | Y | C/1000T GAP briefing will consist of LP 6, LP 7, and LP 10 of PS-N9001 lesson plan along with local manuals and forms as needed. S/38 CTD program will be used to familiarise NNS personnel on the SCCM as needed | C/1000T poration of GAP requires use of mock ups located at PSNS. | PSNS C/1000T and S/38 CTD program | C/1000T 16 hrs CTD hrs as determined by S/38 management | |||||||||||||||||||||
| 5607 | Nuc pipe covering | N | Y | Entire CDT training package | X | X Nuc Supv only | PSNS S/57 CTD program | ||||||||||||||||||||||
| STD QX31AOV, STD Y1076CMTC, STD 751X3231057, and STD TEMPLIGHT, | 5600 | Nuc test pipefitter | N | Y | Gap will include local manuals, requirements, and paperwork associated with work at PSNS | GAP requires use of mock ups located at PSNS. NT S/56 only | PSNS | 16 hrs | |||||||||||||||||||||
| RPTS4020 | N026 | vortex freeze seal | N | Y | Gap will include local manuals, requirements, paperwork, machinery, and gages associated with work at PSNS | GAP requires use of mock ups located at PSNS. | X | X Nuc Supv only | PSNS | 32 hrs | |||||||||||||||||||
| 71OR (SSPC SP1, SP6, C-1, & C-6 equivalent) | S/71 orientation | N | Y | Local equipment and requirements. | PSNS S/71 CTD Program will conduct GAP briefings apon arrival of NNS painters/blasters. NNS personnel are not qualified to spray paint or work SHT. | X | X | PSNS | 3 hrs | ||||||||||||||||||||
| 71PCT (SSPC C-12 & C-14 equivalent) | Pump Certification Training | N | Y | Local equipment and requirements. | PSNS S/71 CTD Program will conduct GAP briefings apon arrival of NNS painters/blasters. | X | PSNS | TBD | |||||||||||||||||||||
| PH-T9003 (SSPC C-7 equivalent) | Corporate blaster | N | N | Local equipment and requirements. | PSNS S/71 CTD Program will conduct GAP briefings apon arrival of NNS painters/blasters. | X | PSNS | TBD | |||||||||||||||||||||
| ASBF | full asbestos worker | N | Y | Local requirements for vent, PPE, barriers, signage, storage, waste disposal, wetting solution. | GAP briefing must be delivered by PSNS certified instructor to certify workers for asbestos work at PSNS facilities. | X | X | X | PSNS | 4hrs | |||||||||||||||||||
| ASBGF | asbestos w/glove bag | N | Y | Local requirements for vent, PPE, barriers, signage, storage, waste disposal, wetting solution. | GAP briefing must be delivered by PSNS certified instructor to certify workers for asbestos work at PSNS facilities. | X | X | X | PSNS | 1 hrs | |||||||||||||||||||
| ASBL | limited asbestos worker | N | Y | Local requirements for vent, PPE, barriers, signage, storage, waste disposal, wetting solution. | GAP briefing must be delivered by PSNS certified instructor to certify workers for asbestos work at PSNS facilities. | X | X | X | X | X | X | X | X | X | X | PSNS | 4 hrs | ||||||||||||
| STD QTAGPLUS | Vacuum user | Nuc Vacuum user | N | Y (only if NNS personnel are required to use a nuclear vacuum system during work at PSNS) | Local Tiger vac familiarization briefing | PSNS | 2 hr | ||||||||||||||||||||||
| 4733 | electrical connection fab training | N | Y (only if NNS personnel are required to work RF or fiber connections at PSNS. See Notes column) | NNS has equivalent training for all 4733 connection methods except RF and fiber connection. | NOTE: NNS will ensure personnel being requested to have this course are proficient in the connection fabrication methods included in course 4733 (except fiber and RF connections) prior to arrival. If NNS personnel are required to work RF or fiber connections at PSNS S/51 CTD program will conduct as need familiarization briefings prior to that work. | PSNS | |||||||||||||||||||||||
| 4000NQCMQUAL 4000NQCNQUAL | ESDC | electrostatic discharge | N | Y | NNS Level 1 or level 4 personnel with GAP briefing on PSNS Terms and failure types | NNS | 0.5 hr | ||||||||||||||||||||||
| SDGAP-990B | PH-S9046 | Hazardous energy control orientation for affected employees | N | Y | NNS personnel will be briefed the full course material | NNS | .5 hrs | ||||||||||||||||||||||
| HOTWORK | Hotwork safety for welders | N | Y | NNS personnel will be briefed the full course material | X | X | PSNS Shop 26 CTD | 2 hrs | |||||||||||||||||||||
| HOTWORK2 | Hotwork awareness training for shipfitters, electricions, pipefitters, and shipwrights. | N | Y | NNS personnel will be briefed the full course material | NNS | 1 hr | |||||||||||||||||||||||
| STD EQINSINTRO, STD EQCVN78, STD EQVCS, STD CIHUINTRO, STD ETEPOVCS, STD ETGEN, STD ETMOTORCON, STD ETSHRPWRCV, STD ETSWBD, STD ETXFMR, STD CABREPRCVN, STD CABLRIPOUT, STD CVNOCI, STD LOCALWWCI, STD TUBETRANPK, STD CVNOWW, STD X31NOICTVA, STD FOMTBASH, STD FOMTCONN, STD FOCABCUTIN, STD FOCABTYPES, STD FOCLEAN, STD FOCONTIN, STD FOCPRTEST, STD FOTHEORY, STD FOFCCONN, STD FOFUSION, STD FOHYBRID, STD FOLCCONN, STD FOMQJTEST, STD FOOLLTEST, STD FOORLTEST, STD FOOTDR, STD FOSAFETY, STD FOSTSCCONN, STD 751X231057, STD X31LOCKWRE, STD X31SAFTCBL, and STD Y1076CMTC | NN-T9007 | Basic Meters | N | Y | NNS personnel will be briefed the full course material | NNS | 24 hrs | ||||||||||||||||||||||
| 4000NQCFQUAL | PT-T9008 | Corporate disconnect/reconnect | N | Y | NNS personnel will be briefed the full course material | PSNS | 2 hrs | ||||||||||||||||||||||
| OO14 | radiological poly bottle | N | Y | NNS personnel will be briefed the full course material | NT S/56 only | PSNS | 8 hrs | ||||||||||||||||||||||
| RPTS4015 | OO47 | Hydrogen monitoring | N | Y | NNS personnel will be briefed the full course material | PSNS | 1 hr | ||||||||||||||||||||||
| 4000NQCMQUAL | 3835 | Randolph pump | N | Y | NNS personnel will be briefed the full course material | PSNS | 1 hr | ||||||||||||||||||||||
| WS 001ILT | 4963 | PCB awareness training | N | Y | NNS personnel will be briefed the full course material for course 4963 and 4963W | X | X | X | X | X | PSNS | 1.5 hrs | |||||||||||||||||
| RPTS4020, STD 750X342101,STD 750X342102, and STD 750X342132 | 2989 | heat stress general | N | Y | NNS personnel will view the 2989 video | X | X | NNS | 0.5 hrs | ||||||||||||||||||||
| PMTK | precision measurement | Y | N | PSNS S/71 CTD | NOTE: PSNS S/71 CTD responsible to brief painters on instruments per PSNS&IMFINST P12410.12 | X | X | PSNS | |||||||||||||||||||||
| IN | insulating trade skill | Y | N | S/57 CTD | X | X | NA | NA | |||||||||||||||||||||
| INAS | non nuclear structural insulator attribute TSD | Y | N | S/57 CTD | X | X | NA | NA | |||||||||||||||||||||
| INP6 | non nuclear piping and vent insulator TDS | Y | N | S/57 CTD | X | X | NA | NA | |||||||||||||||||||||
| PROC8443 | Safe use of inert gases | Y | N | X | NA | NA | |||||||||||||||||||||||
| STD 73X100001 | 349C | man made vitreous fibers (non asbestos) | Y | N | X | X | X | NA | NA | ||||||||||||||||||||
| NNS currency Insulator (HULL) | RESPIRATOR | respirator | N | N, NA See Notes | NNS will provide their own respirators and be qualified and assigned work per the NNS respirator program by NNS supervisor. NNS will also be responsible for respirator cleaning and cartridges for their personnel | X | X | X | X | X | X | X | NA | NA | |||||||||||||||
| PMTA | precision measurement | Y | N | NOTE: NNS will ensure personnel being requested to have this precision measurement module are proficient in the following instruments prior to arrival 1. DIAL CALIPER/VERNIER CALIPERS |
2. DIAL INDICATOR
3. INTRA MICROMETER
4. INSIDE, OUTSIDE, DEPTH MICROMETERS
5. PRESS/TEMP/VACUUM GAGES
6. TORQUE WRENCHES
7. UNIVERSAL BEVEL VERNIER PROTRACTOR
8. FEELER/SMALL HOLE GAGES
| 9. TELESCOPE/THREAD GAGE | X | X | X | X | NA | NA | |||||
| STD 740X100081 & STD QHAZWASTE | PMTE | precision measurement | Y | N | NOTE: NNS will ensure personnel being requested to have this precision measurement module are proficient in the following instruments prior to arrival 1. TORQUE WRENCHES | ||||||
| 2. FEELER GAGES | NA | NA | |||||||||
| PMTB | precision measurement | Y | N | NOTE: NNS will ensure personnel being requested to have this precision measurement module are proficient in the following instruments prior to arrival 1. DIAL CALIPER |
2. INSIDE, OUTSIDE, DEPTH MICROMETERS
3. PRESS/TEMP/VACUUM GAGES
4. TORQUE WRENCHES
5. SIMPLE BEVEL PROTRACTOR
| 6. FEELER AND TELESCOPE GAGES | X | X | ||||||||||||||
| WRKM, WRKMPIPE, & WELDER QUALIFICATIONS | Welder workmanship and welder workmanship pipe | y | N | NNS required to provide Code 138.2 with memo with welder qualifications to be transfered, this information will be used to create a C/138.2 Memo for the transfer of qualifications. This is a requirment of NAVSEA S9074-AQ-GIB-010/248 paragraph 5.2.10, Transferal of qualification. Transfer of performance qualification from one activity to another is not permitted without specific approval by the authorized representative | X | |||||||||||
| P1P2 | Pipe fittter fit up | Y | N | See Memo Ser 138/083 for requirements | X | X | PSNS | |||||||||
| IH ASBTRNG2DW or IH ABSTRNG4DW | 4379 | CPR | y | N | NNS uses RED CROSS PSNS uses AMERICAN HEART | X | NA | NA | ||||||||
| IH ASBTRNG2DW or IH ABSTRNG4DW | PS-N9030 | Nuc production pipefitter | Y | N | X Nuc Supv only | NA | NA | |||||||||
| IH ASBTRNG2DW or IH ABSTRNG4DW | 4901 | end prep machine operator | Y | N | NA | NA | ||||||||||
| FALL | fall protection authorized | N | N, NA See Notes | NNS will provide their own fall protection equipment and be qualified and assigned work requiring fall protection per the NNS fall protection program by NNS supervisor | X | X | NA | NA | ||||||||
| PIC | Protective insulation and coating | Y | N | NNS personnel are required to have attended PIC vender training or view NNS PIC vendor training video prior to arrival. | X | NNS | 0.5 hr | |||||||||
| NBPI/NACE | Y | N | X | NA | NA |
ATTACHMENT "B"
GAP Training Matrix- NNS/ PSNS 8/24/17
Training POCs
| PSNS-HII TRAINING COMPARISON MATRIX | ||||||||||
| NNS Legacy codes | PSNS course number | COURSE TITLE | Training Equivalent Y/N | GAP briefing required Y/N | GAP description | Notes | GAP Development | GAP delivery | PSNS Training POC | NNS Training POC |
| PMTA | precision measurement | Y | N | NOTE: NNS will ensure personnel being requested to have this precision measurement module are proficient in the following instruments prior to arrival 1. DIAL CALIPER/VERNIER CALIPERS |
2. DIAL INDICATOR
3. INTRA MICROMETER
4. INSIDE, OUTSIDE, DEPTH MICROMETERS
5. PRESS/TEMP/VACUUM GAGES
6. TORQUE WRENCHES
7. UNIVERSAL BEVEL VERNIER PROTRACTOR
8. FEELER/SMALL HOLE GAGES
| 9. TELESCOPE/THREAD GAGE | NA | NA | Andy Ryan (360) 627-5590 | Pipefitters: Susan Goss (757) 688-3325 Susan.Goss@hii-nns.com Machinists: Mark Goodrich (757) 688-8186 Mark.Goodrich@hii-nns.com | |||||||
| PMTE | precision measurement | Y | N | NOTE: NNS will ensure personnel being requested to have this precision measurement module are proficient in the following instruments prior to arrival 1. TORQUE WRENCHES | |||||||
| 2. FEELER GAGES | NA | NA | Andy Ryan (360) 627-5590 | Elecctricians: Mark Goodrich (757) 688-8186 Mark.Goodrich@hii-nns.com | |||||||
| OO69 | structural fit-up | Y | N | See Memo 4855/100 Ser 138/103 dated 9 Dec 2011 for requirements | NA | NA | Gus Swenson (360) 627-5580 | Susan Goss (757) 688-3325 Susan.Goss@hii-nns.com | |||
| 4379 | CPR | y | N | NNS uses RED CROSS PSNS uses AMERICAN HEART | NA | NA | Rich Ramsey (360) 476-8321 | Susan Goss (757) 688-3325 Susan.Goss@hii-nns.com | |||
| STD 73X100001 | 355D | crane safety awareness | Y | N | NNS personnel will get some additional information during C/400 indoctrination briefings | NA | NA | C/400 (360) 204-2909 | Evens Powell (757) 688-4859 W.Powell@hii-nns.com | ||
| B | drape | Y | N | Drape GAPs will be included in Q GAP briefing package. | NA | NA | Keziah Brown (360) 627-5514 | Kevin Scherrer (757) 688-4859 Kevin.Scherrer@hii-nns.com | |||
| P | glovebag | Y | N | Note: NNS glovebag qualified personnel are NOT drape qualified or qualified to change glovebag gloves or transfer sleeves. All other Glovebag GAPs will be included in Q GAP briefing package. | NA | NA | Keziah Brown (360) 627-5514 | Kevin Scherrer (757) 688-4859 Kevin.Scherrer@hii-nns.com | |||
| I | portal monitor | Y | N | NA | NA | Keziah Brown (360) 627-5514 | Kevin Scherrer (757) 688-4859 Kevin.Scherrer@hii-nns.com | ||||
| 349C | man made vitreous fibers (non asbestos) | Y | N | NA | NA | Rich Ramsey (360) 476-8321 | Cassandra Burks (757) 380-3647 Cassandra.Burks@hii-nns.com | ||||
| STD 750X33INSU | IN | insulating trade skill | Y | N | S/57 CTD | NA | NA | S/57 CTD department (360) 340-1800 or (360) 535-2657 | Cassandra Burks (757) 380-3647 Cassandra.Burks@hii-nns.com | ||
| NNS currency Insulator (HULL) | INAS | non nuclear structural insulator attribute TSD | Y | N | S/57 CTD | NA | NA | S/57 CTD department (360) 340-1800 or (360) 535-2657 | Cassandra Burks (757) 380-3647 Cassandra.Burks@hii-nns.com | ||
| NNS currency Insulator Journeyman level | INP6 | non nuclear piping and vent insulator TDS | Y | N | S/57 CTD | NA | NA | S/57 CTD department (360) 340-1800 or (360) 535-2657 | Cassandra Burks (757) 380-3647 Cassandra.Burks@hii-nns.com | ||
| STD FLUTEPLUG, STD 750X342132, STD TRITOOLCUT, and STD 750X342102 | PS-N9030 | Nuc production pipefitter | Y | N | NA | NA | Shad Steiger (360) 476-3575 | Ed Lilley (757) 688-5185 John.Lilley@hii-nns.com | |||
| PIC | Protective insulation and coating | Y | N | NNS personnel are required to have attended PIC vender training or view NNS PIC vendor training video prior to arrival. | NNS | NNS primary PSNS alternet | S/57 CTD department (360) 340-1800 or (360) 535-2657 | Cassandra Burks (757) 380-3647 Cassandra.Burks@hii-nns.com | |||
| PS-S9041 | confined space awareness | N | N, NA See Notes | NNS will provide their own gas free services and be qualified and assigned work on confined spaces per the NNS confined space program by NNS supervisor | NA | NA | Gus Swenson (360) 627-5580 | Jeffrica Key (757) 688-7522 Jeffrica.Key@hii-nns.com | |||
| RESPIRATOR | respirator | N | N, NA See Notes | NNS will provide their own respirators and be qualified and assigned work per the NNS respirator program by NNS supervisor. NNS will also be responsible for respirator cleaning and cartridges for their personnel | NA | NA | Rich Ramsey (360) 476-8321 | Cassandra Burks (757) 380-3647 Cassandra.Burks@hii-nns.com | |||
| FALL | fall protection authorized | N | N, NA See Notes | NNS will provide their own fall protection equipment and be qualified and assigned work requiring fall protection per the NNS fall protection program by NNS supervisor | NA | NA | Gus Swenson (360) 627-5580 | Evens Powell (757) 688-4859 W.Powell@hii-nns.com | |||
| 8615 | Nuclear/Non-Nuclear interface training for non-nuc prodution workers | N | Y | NNS personnel will be briefed the full course material | required for all NNS non-nuclear support personnel | NNS | NNS | Keziah Brown (360) 627-5514 | Jack Sharkey (757) 688-1582 Jack.Sharkey@hii-nns.com | ||
| NNQC | non nuclear quality control | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | required for all NNS non-nuclear support personnel | NNS | NNS primary PSNS alternet | Rich Ramsey (360) 476-8321 | Jack Sharkey (757) 688-1582 Jack.Sharkey@hii-nns.com | ||
| STD QTAGPLUS | 990B (PH-S9046) | HEC affected employees | N | Y | NNS personnel will view the PH-S9046 Hec affected employee video | PSNS | NNS primary PSNS alternet | Rich Ramsey (360) 476-8321 | Susan Goss (757) 688-3325 Susan.Goss@hii-nns.com | ||
| 2989 | heat stress general | N | Y | NNS personnel will view the 2989 video | PSNS | NNS primary PSNS alternet | Rich Ramsey (360) 476-8321 | Amy Guerin (757) 380-2317 Amy.Guerin@hii-nns.com | |||
| STD ESDTRNG1C & STD ESDTRNG4 | ESDC | electrostatic discharge | N | Y | NNS Level 1 or level 4 personnel with GAP briefing on PSNS Terms and failure types | NNS | NNS primary PSNS alternet | Andy Ryan (360) 627-5590 | Mark Goodrich (757) 688-8186 Mark.Goodrich@hii-nns.com | ||
| STD CIHUINTRO & STD Y1076CMTC | PT-T9008 | Corporate disconnect/reconnect | N | Y | NNS personnel will be briefed the full course material | PSNS | PSNS | Andy Ryan (360) 627-5590 | Mark Goodrich (757) 688-8186 Mark.Goodrich@hii-nns.com | ||
| STD 73X100001 | 357D | dry dock evacuation | N | Y | Course 357D | NNS personnel will get this during C/400 indoctrination briefings | PSNS | PSNS | C/400 (360) 204-2909 | Evens Powell (757) 688-4859 W.Powell@hii-nns.com | |
| IH LEADTRNG, IH CADMTRNG, IH HEXCTRN, IH LDSTRNG, & IH LEADCADTRN | 5360 | lead/cad/crom/arsen worker | N | Y | Local vent, barrier, and signage differences and NNS PEL in microgram vs PSNS PEL in milligram | PSNS | NNS primary PSNS alternet | Rich Ramsey (360) 476-8321 | Cassandra Burks (757) 380-3647 Cassandra.Burks@hii-nns.com | ||
| WS 001ILT | 4314 | fire watch | N | Y | Local definitions of hot work and fire classification terminology | Note: NNS personnel will not be qualified to use 3/4 water hoses for fire watch. This GAP will not be included in the GAP briefing due to normally only being used on IRR projects | PSNS | NNS primary PSNS alternet | Rich Ramsey (360) 476-8321 | Brian Burroughs (757) 688-0707 Brian.Burroughs@hii-nns.com | |
| 5607 | Nuc pipe covering | N | Y | Entire CDT training package | PSNS | PSNS S/57 CTD program | S/57 CTD department (360) 340-1800 or (360) 535-2657 | Cassandra Burks (757) 380-3647 Cassandra.Burks@hii-nns.com | |||
| STD 740X100081 & STD QHAZWASTE | HW32 | hazardous materials hazcom environmental awareness | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | PSNS | NNS primary PSNS alternet * PSNS train the trainer | Rich Ramsey (360) 476-8321 | Susan Goss (757) 688-3325 Susan.Goss@hii-nns.com | ||
| HW19CAL | Business plan California | N | Y | HW19CAL computer based training | Only require if working in California | PSNS | NNS primary PSNS alternet | Rich Ramsey (360) 476-8321 | Amy Guerin (757) 380-2317 Amy.Guerin@hii-nns.com | ||
| IH ASBTRNG2DW or IH ABSTRNG4DW | ASBL | limited asbestos worker | N | Y | Local requirements for vent, PPE, barriers, signage, storage, waste disposal, wetting solution. | GAP briefing must be delivered by PSNS certified instructor to certify workers for asbestos work at PSNS facilities. | PSNS | PSNS | Rich Ramsey (360) 476-8321 | Cassandra Burks (757) 380-3647 Cassandra.Burks@hii-nns.com | |
| IH ASBTRNG2DW or IH ABSTRNG4DW | ASBF | full asbestos worker | N | Y | Local requirements for vent, PPE, barriers, signage, storage, waste disposal, wetting solution. | GAP briefing must be delivered by PSNS certified instructor to certify workers for asbestos work at PSNS facilities. | PSNS | PSNS | Rich Ramsey (360) 476-8321 | Cassandra Burks (757) 380-3647 Cassandra.Burks@hii-nns.com | |
| IH ASBTRNG2DW or IH ABSTRNG4DW | ASBGF | asbestos w/glove bag | N | Y | Local requirements for vent, PPE, barriers, signage, storage, waste disposal, wetting solution. | GAP briefing must be delivered by PSNS certified instructor to certify workers for asbestos work at PSNS facilities. | PSNS | PSNS | Rich Ramsey (360) 476-8321 | Cassandra Burks (757) 380-3647 Cassandra.Burks@hii-nns.com Kevin Scherrer (757) 688-4859 Kevin.Scherrer@hii-nns.com | |
| Vacuum user | Nuc Vacuum user | N | Y (only if NNS personnel are required to use a nuclear vacuum system during work at PSNS) | Local Tiger vac familiarization briefing | PSNS | PSNS | Gus Swenson (360) 627-5580 | Ed Lilley (757) 688-5185 John.Lilley@hii-nns.com | |||
| STD SP1/SP2, STD SP3/SP11, & STD BRUSH&ROLL | 71OR (SSPC C-1 equivalent) | S/71 orientation | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | GAP briefing will not cover spray painting or SHT sections of PSNS course 71OR. NNS personnel are not qualified to spray paint or work SHT. | PSNS | PSNS | Gus Swenson (360) 627-5580 | Cassandra Burks (757) 380-3647 Cassandra.Burks@hii-nns.com | |
| 4000NQCMQUAL 4000NQCNQUAL | NN-N3001 | Nuc Worker | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | NNS | NNS | Keziah Brown (360) 627-5514 | Jack Sharkey (757) 688-1582 Jack.Sharkey@hii-nns.com | ||
| 4000NQCFQUAL | NN-N3002 | NQC for supervisors | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | NNS | NNS | Keziah Brown (360) 627-5514 | Jack Sharkey (757) 688-1582 Jack.Sharkey@hii-nns.com | ||
| 4000M1019SHIP | NN-N9054 (0909) | steam plant cleanliness | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | NNS non-nuclear qualified support personnel are also required to receive the NNQC GAP briefing (6 hrs). NNS personnel with legecy code 4000M1019SHIP are not qualified to perform fushes, tank work, or high pressure water work. | NNS | NNS | Andy Ryan (360) 627-5590 | Jack Sharkey (757) 688-1582 Jack.Sharkey@hii-nns.com | |
| 4000NQCMQUAL 4000NQCNQUAL | PT-N9053 | nuclear material control | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | NNS | NNS | Shad Steiger (360) 476-3575 | Jack Sharkey (757) 688-1582 Jack.Sharkey@hii-nns.com | ||
| Q | Contamination worker | N | Y | Briefing package as required by C/105.4 | Note: NNS personnel that are QP qualified are not also QB qualified | PSNS | PSNS | Keziah Brown (360) 627-5514 | Kevin Scherrer (757) 688-4859 Kevin.Scherrer@hii-nns.com | ||
| R | Radiation worker | N | Y | Briefing package as required by C/105.4 | PSNS | PSNS | Keziah Brown (360) 627-5514 | Kevin Scherrer (757) 688-4859 Kevin.Scherrer@hii-nns.com | |||
| PRCS | Production contamination and Radiation supervisor | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | Required only for NNS supervisors assigning contamination and/or radiation work | PSNS | PSNS | Keziah Brown (360) 627-5514 | Kevin Scherrer (757) 688-4859 Kevin.Scherrer@hii-nns.com | ||
| STD MECHFITCON, STD X42TORQUE, STD BASECLEAN, & STD GSKTHZDTRG | 5326 | mechanical joint makeup | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | PSNS | PSNS | Shad Steiger (360) 476-3575 | Susan Goss (757) 688-3325 Susan.Goss@hii-nns.com | ||
| 4000NWS4016 4000NWS4018 | OO14 | radiological poly bottle | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | PSNS | PSNS | Shad Steiger (360) 476-3575 | Ed Lilley (757) 688-5185 John.Lilley@hii-nns.com | ||
| OO47 | Hydrogen monitoring | N | Y | NNS personnel will be briefed the full course material | PSNS | PSNS | Shad Steiger (360) 476-3575 | Jack Sharkey (757) 688-1582 Jack.Sharkey@hii-nns.com | |||
| 3835 | Randolph pump | N | Y | NNS personnel will be briefed the full course material | PSNS | PSNS | Shad Steiger (360) 476-3575 | Ed Lilley (757) 688-5185 John.Lilley@hii-nns.com | |||
| N026 | vortex freeze seal | N | Y | Gap will include local manuals, requirements, paperwork, machinery, and gages associated with work at PSNS | GAP requires use of mock ups located at PSNS. | PSNS | PSNS | Shad Steiger (360) 476-3575 | Susan Goss (757) 688-3325 Susan.Goss@hii-nns.com | ||
| RPTS4015 | 5600 | Nuc test pipefitter | N | Y | Gap will include local manuals, requirements, and paperwork associated with work at PSNS | GAP requires use of mock ups located at PSNS. | PSNS | PSNS | Shad Steiger (360) 476-3575 | Susan Goss (757) 688-3325 Susan.Goss@hii-nns.com Ed Lilley (757) 688-5185 John.Lilley@hii-nns.com | |
| 4000NQCMQUAL | FMEA | type I cleanliness | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | NNS personnel with legecy code 4000NQCMQUAL are not qualified to perform fushes, tank work, or high pressure water work. | NNS | NNS | Andy Ryan (360) 627-5590 | Jack Sharkey (757) 688-1582 Jack.Sharkey@hii-nns.com | |
| RPTS4020, STD 750X342101,STD 750X342102, and STD 750X342132 | 4901 | end prep machine operator | N | Y | Gap will include local manuals, requirements, paperwork, and machinery associated with work at PSNS | PSNS | PSNS | Shad Steiger (360) 476-3575 | Susan Goss (757) 688-3325 Susan.Goss@hii-nns.com | ||
| RPTS4020 | PS-N9001 | primary valve mechanic | N | Y | C/1000T GAP briefing will consist of LP 6, LP 7, and LP 10 of PS-N9001 lesson plan along with local manuals and forms as needed. S/38 CTD program will be used to familiarise NNS personnel on the SCCM as needed | C/1000T poration of GAP requires use of mock ups located at PSNS. | PSNS | PSNS C/1000T and S/38 CTD program | Shad Steiger (360) 476-3575 | Ed Lilley (757) 688-5185 John.Lilley@hii-nns.com | |
| STD QX31AOV, STD Y1076CMTC, STD 751X3231057, and STD TEMPLIGHT, | NN-T9007 | Basic Meters | N | Y | NNS personnel will be briefed the full course material | PSNS | NNS primary PSNS alternet * PSNS train the trainer | Andy Ryan (360) 627-5590 | Mark Goodrich (757) 688-8186 Mark.Goodrich@hii-nns.com | ||
| STD 74X331056, STD TUBETRANSPK, STD CIHUINTRO, STD SIGCBLSPLC, STD CVNOWW, STD LOCALWW+CI, STD CVNOCI, STD CABLRIPOUT, STD EQINSINTRO, STD CABREPRCVN, and STD Y1076CMTC | PT-T9010 -PT-T9024 | intro to corporate cableways | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | NNS | NNS | Andy Ryan (360) 627-5590 | Mark Goodrich (757) 688-8186 Mark.Goodrich@hii-nns.com | ||
| STD QX31EC-ARC, STD Q600VACES, STD QX31AOV, STD EQINSINTRO, STD TEMPLIGHT, Y-1078, and STD BATTERYBRF | PT-T9002 | ELECTRICAL SAFETY | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | NNS | NNS | Andy Ryan (360) 627-5590 | Mark Goodrich (757) 688-8186 Mark.Goodrich@hii-nns.com | ||
| STD EQINSINTRO, STD EQCVN78, STD EQVCS, STD CIHUINTRO, STD ETEPOVCS, STD ETGEN, STD ETMOTORCON, STD ETSHRPWRCV, STD ETSWBD, STD ETXFMR, STD CABREPRCVN, STD CABLRIPOUT, STD CVNOCI, STD LOCALWWCI, STD TUBETRANPK, STD CVNOWW, STD X31NOICTVA, STD FOMTBASH, STD FOMTCONN, STD FOCABCUTIN, STD FOCABTYPES, STD FOCLEAN, STD FOCONTIN, STD FOCPRTEST, STD FOTHEORY, STD FOFCCONN, STD FOFUSION, STD FOHYBRID, STD FOLCCONN, STD FOMQJTEST, STD FOOLLTEST, STD FOORLTEST, STD FOOTDR, STD FOSAFETY, STD FOSTSCCONN, STD 751X231057, STD X31LOCKWRE, STD X31SAFTCBL, and STD Y1076CMTC | PT-T9039 | electrical workmanship & non-nuclear quality control | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | NNS | NNS | Andy Ryan (360) 627-5590 | Mark Goodrich (757) 688-8186 Mark.Goodrich@hii-nns.com | ||
| STD QX31AOV, STD QX31EC-ARC, and STD Q600VACES | IVV/FRISK | Shop 51-52-67 CTDIVV/Frisk | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | NNS | NNS | S/51 CTD department (360) 627-3893 | Mark Goodrich (757) 688-8186 Mark.Goodrich@hii-nns.com | ||
| 280D | hazard communication | N | Y | See HW32: HW32 GAP briefing covers the required 280D required GAP information | NA | NA | Rich Ramsey (360) 476-8321 | Amy Guerin (757) 380-2317 Amy.Guerin@hii-nns.com | |||
| 356D | environmental awareness | N | Y | See HW32: HW32 GAP briefing covers the required 280D required GAP information | NA | NA | Rich Ramsey (360) 476-8321 | Amy Guerin (757) 380-2317 Amy.Guerin@hii-nns.com | |||
| 4963 | PCB awareness training | N | Y | NNS personnel will be briefed the full course material for course 4963 and 4963W | PSNS | PSNS | Rich Ramsey (360) 476-8321 | Amy Guerin (757) 380-2317 Amy.Guerin@hii-nns.com | |||
| 4733 | electrical connection fab training | N | Y (only if NNS personnel are required to work RF or fiber connections at PSNS. See Notes column) | NNS has equivalent training for all 4733 connection methods except RF and fiber connection. | NOTE: NNS will ensure personnel being requested to have this course are proficient in the connection fabrication methods included in course 4733 (except fiber and RF connections) prior to arrival. If NNS personnel are required to work RF or fiber connections at PSNS S/51 CTD program will conduct as need familiarization briefings prior to that work. | PSNS | PSNS | S/51 CTD department (360) 627-3893 | Mark Goodrich (757) 688-8186 Mark.Goodrich@hii-nns.com | ||
| PMT38 | precision measurement | N | Y, only if NNS personnel will be required to use PRESS/TEMP/VACUUM GAGES. NNS training for all other instruments listed in module PMT38 (see Notes column) is equivalent. | If NNS personnel are required to use PRESS/TEMP/VACUUM GAGES while at PSNS the requesting shop shall request C/1000T to provide personnel GAP briefing on the PRESS/TEMP/VACUUM GAGE section of the PMT38 training module. | NOTE: NNS will ensure personnel being requested to have this precision measurement module are proficient in the following instruments prior to arrival 1. DIAL CALIPER |
2. DIAL INDICATOR
3. INTRA MICROMETER
4. INSIDE, OUTSIDE, DEPTH MICROMETERS
5. TORQUE WRENCHES
6. FEELER/SMALL HOLE GAGES
| 7. TELESCOPE/THREAD GAGE | PSNS | PSNS | Andy Ryan (360) 627-5590 | Susan Goss (757) 688-3325 Susan.Goss@hii-nns.com | |||||||
| TSDCSWA5 | Shipwright | N | Y | Briefing package will contain information developed using NNS and PSNS lesson plan reviews | PSNS S/64 CTD Program will conduct GAP briefings apon arrival of NNS stagebuilders. | PSNS | Complete: Contact PSNS POC for full course material | PSNS S/64 CTD Program (360) 340-5334 | Evens Powell (757) 688-4859 W.Powell@hii-nns.com |
File details come from the government source that posted it. Updated .