REQUEST FOR CLARIFICATION
N4523A18R0002
Attachment J-3
DATE OF REQUEST: 11-13-17 QUESTION NO: 9
REQUIREMENT: YC-800 and 804
REQUISITION NO.: N4523A18R0002
ITEM NO: 3.4
TITLE: Tanks and voids
PSNS&IMF CONTRACTS POC & PHONE:
See POCs listed on RFP.
PARA. NO: 3.4.5 PAGE NO: CONTRACTOR:
PLANNER’S NAME: ATTACH. NO: CONTRACTOR POC & PHONE:
CONTRACTOR QUESTION: (ONE QUESTION PER PAGE)
In the specs for the YC 800 PARA 3.4.5 it tell the contractor to remove existing and install new coating system to the interior surfaces as listed in table 2 including all structural members. The question is are we to remove the coatings on all the structural members in void 1 thru 4 plus the square feet listed in table 2 or are we to just do the square feet listed in table 2 only?
DO NOT WRITE BELOW THIS LINE
SPEC CHG: No DWG/REF CHG: No RQMTS CHG: No MAT'L CHG: No
TECHNICAL REVIEW: SERIAL NO:
Seek further clarification for voids 1 through 4 in sub-paragraph 3.4.5.1.
ALL RFCs MUST BE RECEIVED NO LATER THAN 2:00 P.M. (PST), 6 November 2017.