RFC__2_Response.pdf

PDF 79 KB Posted

Attached to
Maintenance, Repair and Preservation of YC-800 and 804
Solicitation number
N4523A18R0002
Issued by

About this file

Request for Clarification #2 Response

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR CLARIFICATION

N4523A18R0002

Attachment J-3

DATE OF REQUEST: 10-23-17 QUESTION NO: 2

REQUIREMENT: YC-800 and 804

REQUISITION NO.: N4523A18R0002

ITEM NO: 3.5

TITLE: Main deck repairs

PSNS&IMF CONTRACTS POC & PHONE:

See POCs listed on RFP.

PARA. NO: 3.5.1 – 3.5.4 PAGE NO: CONTRACTOR:

PLANNER’S NAME: ATTACH. NO: CONTRACTOR POC & PHONE:

CONTRACTOR QUESTION: (ONE QUESTION PER PAGE)

In reference to YC-800, can you supply a drawing that shows the main deck fittings?

DO NOT WRITE BELOW THIS LINE

SPEC CHG: No DWG/REF CHG: No RQMTS CHG: No MAT'L CHG: No

TECHNICAL REVIEW: SERIAL NO:

No additional drawings available. Ship check can provide more details. Ship check date is 01 NOV 2017 at Naval Base Kitsap (Bremerton); Pier “Delta”, 0830 to 1130.

ALL RFCs MUST BE RECEIVED NO LATER THAN 2:00 P.M. (PST), 6 November 2017.

File details come from the government source that posted it. Updated .